Who is ibert ?

Otto HagerEnergy Economist

Horst UnterlechnerBiomass energy specialist

Pilot site M2MAbattoir, Jan Kempdorp1st waste to energy project 2012

In South Africa

6 Biogas plants•3 x abattoir•2 piggery•1 energy crops

Biogas Express Reactor Technology

Page 3: ibert presentation piggery

Waste to energy process

Biogas (wet waste)Biomass (Dry waste)

Page 4: ibert presentation piggery

What is bio-gas ?

“Product” of natural process of decomposing of organic material in the

absence of O2

Biological process that convers carbohydrates, fats, proteins into

methane CH4 and CO2 via Anaerobic Digestion (AD)

Page 5: ibert presentation piggery

Waste streams (Biogas liter/kg ODM)

Manure

Grasses Fruit & veg Waste

Page 6: ibert presentation piggery

Methane “production” steps

Page 7: ibert presentation piggery

Biogas process/ cycle from source to use

Page 8: ibert presentation piggery

Typical Biogas Plant

Standard foot print

ibert foot print

Page 9: ibert presentation piggery

Anaerobic Digestion- biogas with TGL

Page 10: ibert presentation piggery

Ibert USP • Process organic & non-organic waste• Small waste quantities from 5tons/day, on-site • Plant has small footprint (25 / 30 m)

• Production of biogas• Modular integrated system• Output from >12 kW(el) >20 kW(therm) • Imbedded self-usage less then 8% of total power

production• Utilization of “waste product”

Page 11: ibert presentation piggery

Reference sites South AfricaPlant #1 Meat to Market Jan Kempdorp

600m3 AD, 135 kW CHP, 15 – 20 t/day slaughter waste

Page 12: ibert presentation piggery

Plant #2 Hessequa Abattoir - Riverdale

400m3 AD, 50 kW CHP, 10 t/day slaughter waste

Page 13: ibert presentation piggery

Plant #3 No2 Piggeries – Peninsula - Queenstown

600m3 AD, 190 kW CHP, 35 t/day pig manure

Page 14: ibert presentation piggery

Plant #4 &5 Cavalier Abattoir - Cullinan

2 x 500m3 AD, 135 kW + 360 kW CHP, 15 – 40 t/day slaughter waste

Page 15: ibert presentation piggery

Standard CHP size: 135 kW

Page 16: ibert presentation piggery

Plant #6 Zandam Cheese & Piggery (W/Cape)

1 x 500m3 AD, 75 kW CHP, 30 t/day pig manureMin. load 78 kW

Page 17: ibert presentation piggery

Plant #7 Sucro Power (KZN/Durban)

1 x 200m3 AD, 16kW CHP, 30 t/day Napier Gras

Page 18: ibert presentation piggery

Project realisation - Next steps• Conduct a on-site ‘waste to energy audit”• Qualify & Quantify ‘WTE” potential and best

technology to be used• Develop a pre-feasibility report of current energy

usage cost and risks• Present go / no-go and preferred business model• Conclude contracts • Start process• Design, build, commission• Operate via M&OM agreement