7
SELAMAT DATANG ke Majlis Bandaraya Melaka Bersejarah Majlis Bandaraya Melaka Bersejarah

Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

Embed Size (px)

Citation preview

Page 1: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

SELAMAT DATANG keMajlis Bandaraya Melaka BersejarahMajlis Bandaraya Melaka Bersejarah

Page 2: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

MBMB'S MIGRATION TO O.S.S.Agenda

01 MIGRATION I (Servers)

02 MIGRATION 2 (Desktops)

03 BENEFITS

04 CHALLENGES

Page 3: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

MIGRATION 1 (Servers)

2002 (1) FIREWALL (NETWORK-BOX)

(2) MAIL, INTRANET (RH7.2)

2007 (3) LAMP, WEB, GALLERY (Ubuntu7)

(1) DNS (DSL4.2)

(1) LOGINS (CENTOS4.6)

2008 (1) RSYNC BACKUP (Ubuntu7)

Page 4: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

MIGRATION II (Desktops)

2005 (160) LINUX DESKTOP (Ubuntu/Xandros)

MyUbuntu

(320) OPENOFFICE (10) GIMP

Page 5: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

BENEFITS FROM O.S.S.

01 100% LEGAL 02 VERY STABLE

03 LOW COST 04 LOW MAINTENANCE

05 EASIER TO MANAGE

Quality & Productivity

2008 Cost Saving: OpenOffice upgrade = RM520,000 2008 Cost Saving: Database+Tools = RM???,???

Invest/training <= RM60,000

Page 6: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

CHALLENGES

01 THE CEO

02 MANAGING CHANGE AWARENESS TRAININGS

(USERS)SUPPORT CERTIFICATES

+ T-SHIRTS

Page 7: Melaka City Hall Sharing Success Story by the Regional OSS Case Study Winners

Terima Kasih!