移动式模块化选煤厂
Mobile Modular Coal Preparation Plant
HOT Mining provide integrated engineering solutions to coal and minerals.
In coal washing preparation industry, our main service including:Coal preparation technology consultation,Equipment research and development,coal washing plant design(3D design),Intelligent coal preparation plant,modular coal washing plant,movable coal preparation plant.
All our engineers come from famous internationalprocess engineering companies, Engineering TeamExperienced in design, construction, project delivery in CHPP and mineral processing field.
About HOT
基本原理-Fundamental
Movable modular coal preparation system actually is a small dense medium coal washing plant with very compact structure.
dense medium system is as same as traditional coal washing plant. It is
equiped vibrating screens, dense medium cyclone,magnetic recovery system and other accessory equipments.
It is easy and fast to install the dense medium system on a smooth and
firm place. Timescale: 3 to 5 months for building to produce.
The requirement of quality on coal ore is not very high. The preparation effect can be as good as traditional coal washing plant.
It can reduce power,water and medium consumption.
With HOT intelligent coal washing plant system,it makes production management more easier and higher efficient.
Cyclone with Ceramic lining
Sieve-bend screen
Double spiral separators
Charge pump and slurry tank
Fine coal pump and fine coal tank
Tailings pump and tailings tank
All connecting pipes and line
Coarse Slime Separation Modular
Modular Coal Washing Plant Traditional Coal Washing Plant<1.2Mt/a
Capacity(Mt/a) 1.2Mt/a 1.2Mt/aConstruction Period 2~5 Months 12~18 Months
Process System 1. Raw coal(50~1.0mm): large diameter
cyclone2. Coarse slime1.0~0.2mm):slurry separator
3.Fine coal (0.2~0mm):filter press4.Flotation, depends on the coal class
1. Jigging process, mixed process(most)
2. Dense medium process(few) 3. Slurry(0.5~0mm): filter press
4.Flotation, depends on the coal classEfficiency >95% <90~95%
Productivity(Ton/H) 125 20~25 Power
consumption(kw.h) <4.7 >8
Medium consumption(kg/ton feeding coal)
<1.00 1.5~1.8
Water(m3/t feeding coal) <0.08 0.1~0.3
Process cost(¥/ton) 4.50~9.00 10~18 Contral system AB RSLOGIX5000 AB RSLOGIX5000
Plant and equipment Easy to remove and transport Permanent fixation
Modular Coal Washing Plant Vs Traditional plant