60
Feasibility Study and Feasibility Study and Feasibility Study and Feasibility Study and M aster Plan for M aster Plan for M aster Plan for M aster Plan for Pleasure Beach Park Pleasure Beach Park Pleasure Beach Park Pleasure Beach Park C ity of Bridgeport, C onnecticut C ity of Bridgeport, C onnecticut C ity of Bridgeport, C onnecticut C ity of Bridgeport, C onnecticut C om m unity Forum C om m unity Forum C om m unity Forum C om m unity Forum Ralphola Taylor C om m unity C enter M ay 9 , 2 0 1 1 M ay 9 , 2 0 1 1 M ay 9 , 2 0 1 1 M ay 9 , 2 0 1 1

Pleasure Beach Community Meeting 05.09.2011

Embed Size (px)

Citation preview

Page 1: Pleasure Beach Community Meeting 05.09.2011

Feasibility Study and Feasibility Study and Feasibility Study and Feasibility Study and M aster Plan for M aster Plan for M aster Plan for M aster Plan for Pleasure Beach ParkPleasure Beach ParkPleasure Beach ParkPleasure Beach ParkC ity of Bridgeport, C onnecticutC ity of Bridgeport, C onnecticutC ity of Bridgeport, C onnecticutC ity of Bridgeport, C onnecticut

C om m unity ForumC om m unity ForumC om m unity ForumC om m unity ForumRalphola Taylor C om m unity C enter

M ay 9 , 2 0 11M ay 9 , 2 0 11M ay 9 , 2 0 11M ay 9 , 2 0 11

Page 2: Pleasure Beach Community Meeting 05.09.2011

W elcom e… ..

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 3: Pleasure Beach Community Meeting 05.09.2011

AG EN D A

Part 1: Introductions and Opening Remarks (10 minutes)

• Honorable Bill Finch, Mayor, City of Bridgeport• State Representative Don Clemens• Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities

Part 2: Stantec Presentation (40 minutes)

• Pleasure Beach Park: Existing Conditions

Master Plan for Pleasure Beach Park, Bridgeport, CT

• Pleasure Beach Park: Existing Conditions• Environmental Overview• Study Goals and Objectives• Public Safety• Scope of Work• Project Schedule

Part 3: Attendee Participation (60 minutes)

• Preliminary Facilities Program, Needs, Challenges and Opportunities• Next Steps

Page 4: Pleasure Beach Community Meeting 05.09.2011

AG EN D A

Part 1: Introductions and Opening Remarks (10 minutes)

• Honorable Bill Finch, Mayor, City of Bridgeport• State Representative Don Clemens• Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities

Part 2: Stantec Presentation (40 minutes)

• Pleasure Beach Park: Existing Conditions

Master Plan for Pleasure Beach Park, Bridgeport, CT

• Pleasure Beach Park: Existing Conditions• Environmental Overview• Study Goals and Objectives• Public Safety• Scope of Work• Project Schedule

Part 3: Attendee Participation (60 minutes)

• Preliminary Facilities Program, Needs, Challenges and Opportunities• Next Steps

Page 5: Pleasure Beach Community Meeting 05.09.2011

EXISTIN G C O N D ITIO N S

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 6: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 7: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 8: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 9: Pleasure Beach Community Meeting 05.09.2011

FLO O D ZO N ES

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 10: Pleasure Beach Community Meeting 05.09.2011

Photo Tour of Pleasure Beach

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 11: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 12: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 13: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 14: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 15: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 16: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 17: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 18: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 19: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 20: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 21: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 22: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 23: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 24: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 25: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 26: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 27: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 28: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 29: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 30: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 31: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 32: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 33: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 34: Pleasure Beach Community Meeting 05.09.2011

Building C onditions

• C ondition Study for Building Refurbishm ent at Pleasure Beach

- U tilities and pavem ent- Existing boardw alk- H arbor H ut- Pavilion

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 35: Pleasure Beach Community Meeting 05.09.2011

Environm ental O verview

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 36: Pleasure Beach Community Meeting 05.09.2011

Environm ental O verviewState Listed Plant Species

Significant H abitat: C oastal sand dunes habitatD EP N atural D iversity D ata Base

• Sickle-leaf golden aster – State Endangered

• Beach needle grass/Bitter panic grass – State Endangered• Beach needle grass/Bitter panic grass – State Endangered

• Blazing star – State Species of Special Concern

• Eastern prickly-pear – State Special Concern

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 37: Pleasure Beach Community Meeting 05.09.2011

STATE EN D AN G ERED PLAN TS

Beach Needle Grass/Bitter Panic Grass Sickle-leaf Golden Aster

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 38: Pleasure Beach Community Meeting 05.09.2011

STATE SPEC IES O F C O N C ERN

Blazing Star Eastern Prickly-Pear

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 39: Pleasure Beach Community Meeting 05.09.2011

Environm ental O verviewDEP N atural D iversity D ata BaseState and Federally Listed Anim al Species

• Piping Plover – State and Federally threatened species

• Least Tern – State threatened

• Barn O w l – State endangered• Barn O w l – State endangered

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 40: Pleasure Beach Community Meeting 05.09.2011

State & Federal Threatened Species

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 41: Pleasure Beach Community Meeting 05.09.2011

PIPIN G PLO VERState & Federal Threatened Species

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 42: Pleasure Beach Community Meeting 05.09.2011

LEAST TERNState Threatened Species

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 43: Pleasure Beach Community Meeting 05.09.2011

BARN O W LState Endangered Species

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 44: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 45: Pleasure Beach Community Meeting 05.09.2011

O ur G oal:D evelop a Feasible Program of Park Im provem ents and D evelop a Feasible Program of Park Im provem ents and D evelop a Feasible Program of Park Im provem ents and D evelop a Feasible Program of Park Im provem ents and

Prepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entation....Prepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entationPrepare C oncept D esign Plans for Future Im plem entation....

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 46: Pleasure Beach Community Meeting 05.09.2011

Study O bjectives

• Integrate w ork on parallel studies (buildings, docks, access)

• Conduct a com prehensive outreach strategy

• Provide for public safety on site

• Identify and protect endangered plants and w ildlife

• O btain regulatory concurrence

Identify potential program space• Identify potential program space

• Identify a program of future recreation am enities

• D evelop alternatives and a preferred concept plan

• D evelop an im plem entation strategy (com ponents, cost, access, endangered species protection, flood m anagem ent, public safety plan)

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 47: Pleasure Beach Community Meeting 05.09.2011

Public Safety:• Com m unication

• Mobility on-site and off-site

• Lifeguards

• Park patrol (seasonal, full-tim e?)

Storm notification• Storm notification

• Storm shelter

• Site and existing building preparation

• U tility service (w ater, electric)

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 48: Pleasure Beach Community Meeting 05.09.2011

SC O PE O F W O RK

• Project K ick-O ff Meeting

• D ata Collection

• Site A ssessm ent

• Stakeholder Identification

Prelim inary Park Program• Prelim inary Park Program

• Final Program /Site A ssessm ent/Regulatory Fram ew ork

• D evelop A lternative Schem atic Plans

• Refine A lternative Schem atic Plans

• Conceptual D esign/Final Master Plan D eliverable

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 49: Pleasure Beach Community Meeting 05.09.2011

PRO JEC T SC H ED U LE

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 50: Pleasure Beach Community Meeting 05.09.2011

AG EN D A

Part 1: Introductions and Opening Remarks (10 minutes)

• Honorable Bill Finch, Mayor, City of Bridgeport• State Representative Don Clemens• Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities

Part 2: Stantec Presentation (40 minutes)

• Pleasure Beach Park: Existing Conditions

Master Plan for Pleasure Beach Park, Bridgeport, CT

• Pleasure Beach Park: Existing Conditions• Environmental Overview• Study Goals and Objectives• Public Safety• Scope of Work• Project Schedule

Part 3: Attendee Participation (60 minutes)

• Preliminary Facilities Program, Needs, Challenges and Opportunities• Next Steps

Page 51: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 52: Pleasure Beach Community Meeting 05.09.2011

Prelim inary Program of Park Im provem entsFacilities:• N ature center• Fishing pier (on m ainland and Pleasure Beach)• Concessions/refreshm ents• Restroom s• Beach (sw im m ing and surf fishing)

Master Plan for Pleasure Beach Park, Bridgeport, CT

• Beach (sw im m ing and surf fishing) • Passive open space and picnic area• W ildlife sanctuary• Paths and trails (non-m otorized)• O bservation and look-out areas

Page 53: Pleasure Beach Community Meeting 05.09.2011

N eeds:• Public aw areness of w ildlife value and conditions

• A variety of passive recreation activities

• N eighborhood/youth activities

• Parking facilities on m ainland

• D ebris rem oval on m ainland vacant lots

• Established developm ent space on m ainland• Established developm ent space on m ainland

• Establish reliable access from the East End

• Site patrols (security, ecological m onitoring, enforcem ent of rules)

• Stabilization of existing buildings to prevent further deterioration and vandalism

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 54: Pleasure Beach Community Meeting 05.09.2011

Challenges:• State and Federal regulatory requirem ents (CTD EP, U SFW S, A CO E, FEMA )

• Protecting endangered and threatened species

• Establishing reliable access (how , how often, m onitoring, cost, fee structure)

• Establishing funding partners (private, public, non-profit)• Establishing funding partners (private, public, non-profit)

• Capital funding

• Financial sustainability

• Staffing for program m ing, m aintenance, public safety, regulatory m onitoring, etc.

• Public safety and em ergency access

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 55: Pleasure Beach Community Meeting 05.09.2011

Challenges:• W aste disposal (trash, sanitary)

• U tility m aintenance (electric, w ater, other)

• Equipm ent and m aterial transport and access

• Building restoration• Building restoration

• Stratford and CTD EP role in enforcing access

restrictions at Long Beach

• Im pacts of clim ate change/sea level rise on

coastal resources

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 56: Pleasure Beach Community Meeting 05.09.2011

O pportunities:• A fter school, youth and sum m er cam p program s

• Youth training in environm ental stew ardship• A quaculture education• Local business investm ent at gatew ay (m ain-land)

• Local business investm ent at gatew ay (m ain-land)

• EcoTourism• Recreational fishing• G reen Energy pilot project w ith corporate sponsorship

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 57: Pleasure Beach Community Meeting 05.09.2011

Stakeholder Meeting Sum m ary • Keep it sim ple!

• A void lengthy regulatory review periods

• Secure existing buildings on site

• Program m ust allow people and w ildlife to co-existexist

• Identify, delineate and protect sensitive areas

• Provide public safety m easures

• Establish access as soon as possible

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 58: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 59: Pleasure Beach Community Meeting 05.09.2011

PRO JEC T SC H ED U LE

Master Plan for Pleasure Beach Park, Bridgeport, CT

Page 60: Pleasure Beach Community Meeting 05.09.2011

Master Plan for Pleasure Beach Park, Bridgeport, CT

Thank you!