METRADO DE ALBAÑILERIA

TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA

LADO ALTURA AREA PARC AREA TOT OBSERVACION

PRIMER PISO Tarrajeo rayado para ss-hh y cocinas

1.86 2.10 3.91 151.04 ss-hh-5

0.80 2.10 1.68 ss-hh-5

0.80 2.10 1.68 ss-hh-5

1.86 2.10 3.91 ss-hh-5

1.60 0.85 1.36 ss-hh-5

0.80 2.10 1.68 ss-hh-5

1.25 2.10 2.63 ss-hh-4

0.70 2.10 1.47 ss-hh-4

0.15 2.10 0.32 ss-hh-4

0.45 2.10 0.95 ss-hh-4

1.86 2.10 3.91 ss-hh-4

1.95 2.10 4.10 ss-hh-4

1.65 1.20 1.98 ss-hh-3

1.10 1.20 1.32 ss-hh-3

0.95 1.20 1.14 ss-hh-3

0.80 2.10 1.68 ss-hh-3

1.10 2.10 2.31 ss-hh-3

0.80 2.10 1.68 ss-hh-3

0.65 0.10 0.07 ss-hh-2

1.00 0.10 0.10 ss-hh-2

1.45 0.10 0.15 ss-hh-2

1.05 0.10 0.11 ss-hh-2

1.20 0.10 0.12 ss-hh-2

1.05 0.10 0.11 ss-hh-2

1.10 2.15 2.37 ss-hh-1

1.90 2.15 4.09 ss-hh-1

0.30 2.15 0.65 ss-hh-1

1.10 1.10 1.21 ss-hh-1

0.80 2.15 1.72 ss-hh-1

1.00 0.10 0.10 ss-hh-6

1.55 0.10 0.16 ss-hh-6

0.30 0.10 0.03 ss-hh-6

1.55 0.10 0.16 ss-hh-6

0.80 2.15 1.72 ss-hh-7

0.30 1.20 0.36 ss-hh-7

1.00 1.20 1.20 ss-hh-7

1.00 1.20 1.20 ss-hh-7

0.80 2.15 1.72 ss-hh-7

1.00 2.15 2.15 ss-hh-7

1.45 2.15 3.12 ss-hh-8

0.80 2.15 1.72 ss-hh-8

1.00 2.15 2.15 ss-hh-8

0.70 2.15 1.51 ss-hh-8

0.57 2.15 1.23 ss-hh-8

1.00 0.75 0.75 ss-hh-8

0.55 0.75 0.41 ss-hh-8

0.80 2.15 1.72 ss-hh-8

2.10 2.15 4.52 ss-hh-9

1.25 2.15 2.69 ss-hh-9

1.32 2.15 2.84 ss-hh-9

0.76 0.90 0.68 ss-hh-9

OBRA: Edificio residencial del GOLF - SAN ISIDRO

CLIENTE : J.E C.GCONTRATISTA : TYHV

HECHO POR: Ing.Sifuentes Tapia W

REBISADO POR: ing.Ervin De Olarte Fernandez

OBRA: Edificio residencial del GOLF - SAN ISIDRO

CLIENTE : J.E C.GCONTRATISTA : TYHV

HECHO POR: Ing.Sifuentes Tapia WREBISADO POR: ing.Ervin De Olarte Fernandez

0.45 2.15 0.97 ss-hh-9

1.25 1.20 1.50 cocina 1

2.50 2.15 5.38 cocina 1

0.95 0.00 0.00 cocina 1

0.60 0.00 0.00 cocina 1

2.35 0.60 1.41 cocina 1

0.40 0.10 0.04 cocina 1

1.80 0.10 0.18 cocina 1-vent

1.55 0.10 0.16 cocina 1

0.30 0.10 0.03 cocina 1

0.55 0.10 0.06 cocina 1

3.15 0.10 0.32 cocina 2

1.05 1.00 1.05 cocina 2-patio

1.10 0.00 0.00 cocina 2

4.00 2.15 8.60 cocina 2

0.60 1.00 0.60 cocina 2

2DO AL 7MO NIVEL

Tarrajeo rayado para ss-hh y cocinas

LADO ALTURA AREA PARC AREA TOT OBSERVACION

1.45 2.15 3.12 130.54 ss-hh-8'

0.80 2.15 1.72 ss-hh-8'

1.00 2.15 2.15 ss-hh-8'

0.70 2.15 1.51 ss-hh-8'

0.57 2.15 1.23 ss-hh-8'

1.00 0.75 0.75 ss-hh-8'

0.55 0.75 0.41 ss-hh-8'

0.80 2.15 1.72 ss-hh-8'

2.10 2.15 4.52 ss-hh-9

1.25 2.15 2.69 ss-hh-9

1.32 2.15 2.84 ss-hh-9

0.76 0.90 0.68 ss-hh-9

0.45 2.15 0.97 ss-hh-9

1.45 2.15 3.12 ss-hh-8

0.80 2.15 1.72 ss-hh-8

1.00 2.15 2.15 ss-hh-8

0.70 2.15 1.51 ss-hh-8

0.57 2.15 1.23 ss-hh-8

1.00 0.75 0.75 ss-hh-8

0.55 0.75 0.41 ss-hh-8

0.80 2.15 1.72 ss-hh-8

2.10 2.15 4.52 ss-hh-9

1.25 2.15 2.69 ss-hh-9

1.32 2.15 2.84 ss-hh-9

0.76 0.90 0.68 ss-hh-9

0.45 2.15 0.97 ss-hh-9

0.80 2.15 1.72 ss-hh-7

0.30 1.20 0.36 ss-hh-7

1.00 1.20 1.20 ss-hh-7

1.00 1.20 1.20 ss-hh-7

0.80 2.15 1.72 ss-hh-7

1.00 2.15 2.15 ss-hh-7

1.00 0.10 0.10 ss-hh-16

1.80 0.10 0.18 ss-hh-16

1.00 0.10 0.10 ss-hh-16

1.00 0.10 0.10 ss-hh-16

1.65 2.15 3.55 ss-hh-10

0.75 2.15 1.61 ss-hh-10

1.00 2.15 2.15 ss-hh-10

0.70 2.15 1.51 ss-hh-10

0.60 2.15 1.29 ss-hh-10

1.00 0.95 0.95 ss-hh-10

0.45 2.15 0.97 ss-hh-10

0.75 2.15 1.61 ss-hh-10

1.25 2.15 2.69 ss-hh-11

0.70 2.15 1.51 ss-hh-11

1.50 2.15 3.23 ss-hh-11

1.25 2.15 2.69 ss-hh-11

0.70 2.15 1.51 ss-hh-11

0.70 2.15 1.51 ss-hh-11

1.00 2.15 2.15 ss-hh-12

0.80 2.15 1.72 ss-hh-12

1.45 1.20 1.74 ss-hh-12

0.90 1.20 1.08 ss-hh-12

0.75 1.20 0.90 ss-hh-12

0.80 2.15 1.72 ss-hh-12

1.90 0.10 0.19 ss-hh-13

1.10 0.10 0.11 ss-hh-13

1.90 0.10 0.19 ss-hh-13

0.30 0.10 0.03 ss-hh-13

1.90 0.10 0.19 ss-hh-14

0.30 0.10 0.03 ss-hh-14

1.90 0.10 0.19 ss-hh-14

1.10 0.10 0.11 ss-hh-14

0.95 1.20 1.14 ss-hh-15

1.30 0.10 0.13 ss-hh-15

0.70 0.10 0.07 ss-hh-15

1.10 2.15 2.37 ss-hh-15

0.70 2.15 1.51 ss-hh-15

0.60 1.20 0.72 ss-hh-15

3.15 0.10 0.32 Cocina 2

1.05 1.00 1.05 cocina 2-patio

1.10 0.00 0.00 Cocina 2

4.00 2.15 8.60 Cocina 2

0.60 1.00 0.60 Cocina 2

2.45 0.10 0.25 Cocina 3

1.35 0.10 0.14 Cocina 3

0.70 0.10 0.07 Cocina 3

1.55 1.20 1.86 Cocina 3

0.60 0.10 0.06 Cocina 3

0.72 0.10 0.07 Cocina 3

1.90 2.15 4.09 Cocina 3

0.50 0.10 0.05 Cocina 3

0.55 0.10 0.06 Cocina 3

1.05 0.10 0.11 Cocina 3

1.23 0.10 0.12 Cocina 3

1.50 1.20 1.80 patio

1.15 0.10 0.12 Cocina 4

0.35 2.15 0.75 Cocina 4

0.55 2.15 1.18 Cocina 4

2.80 2.15 6.02 Cocina 4

0.63 0.00 0.00 Cocina 4

2.80 0.10 0.28 Cocina 4

0.70 0.10 0.07 Cocina 4

1.60 0.10 0.16 Cocina 4

0.60 0.10 0.06 Cocina 4

0.80 0.10 0.08 Cocina 4

2.15 1.00 2.15 patio

RESUMEN DE TARRAJEO RAYADO EN SHH Y COCINAS

AREA M2 TOTAL

Zotano 0.00 934.28

1er Nivel 151.04

2doAL 7MO Nivel 783.24

Cto Maquinas 0.00

METRADO DE MURO KK DE CABEZA

1ER NIVEL

LONGITUD ALTURA AREA PARC TOTAL OBSERV

1.15 2.15 2.47 49.83 dorm-2

0.67 2.15 1.44 dorm-2

0.88 1.85 1.63 recibp

0.75 1.85 1.39 comedor

1.45 2.25 3.26 sh-2

0.55 2.25 1.24 cocina-1

1.80 1.00 1.80 cocina-1

0.25 2.00 0.50 lobby

0.40 2.00 0.80 lobby

1.08 2.25 2.43 dorm-serv

1.20 2.25 2.70 dorm-serv

1.25 2.00 2.50 esc-2

1.35 2.00 2.70 esc-2

2.41 2.00 4.82 estar

1.20 2.00 2.40 estar

0.50 2.00 1.00 estar

0.58 2.00 1.16 estar

0.90 2.00 1.80 estar

1.70 2.00 3.40 estar

0.55 2.35 1.29 dormit-1

3.87 2.35 9.09 dormit-1

2DO AL 7MO NIVEL MURO KK DE CABEZA

LONGITUD ALTURA AREA PARC SUB-TOTAL OBSERV TOTAL

1.03 2.20 2.27 32.50 sh-13 194.98

0.35 2.20 0.77 escritorio

1.01 2.20 2.22 dormit-2

1.00 2.20 2.20 estar

1.06 2.20 2.33 dorm-serv

1.20 2.20 2.64 dorm-serv

1.20 2.20 2.64 dormit-2

1.05 2.20 2.31 patio

1.36 2.20 2.99 cocina-3

1.40 2.20 3.08 cocina-3

1.36 2.20 2.99 esc-2

0.50 2.20 1.10 esc-2

1.15 2.20 2.53 patio

0.75 2.20 1.65 cocina-4

0.35 2.20 0.77 patio

RESUMEN DE METRADO DE MURO DE CABEZA

AREA M2 TOTAL

Zotano 0.00 244.80

1er Nivel 49.83

2do-7mo Nivel 194.98

Cto Maquinas 0.00

METRADO DE MURO KK DE SOGA

LADO ALTURA AREA PARC AREA TOT OBSERVACION

ZOTANO

3.25 3.00 9.75 206.86 dep1 3.25 dep1 1.23

3.35 3.00 10.05 sub est 3.35 sub est 0.80

1.85 3.00 5.55 dep2 1.85 dep2 1.73

0.77 3.00 2.31 dep4 0.77 dep4 1.60

1.23 3.00 3.69 dep4 1.23 dep4 2.15

1.23 2.45 3.01 cto basu 1.15

0.80 2.45 1.96 cto basu 3.85 dep4-5 3.05

1.73 2.45 4.24 dep 10 1.70 dep4 2.63

1.60 2.45 3.92 dep 11 1.40 dep5 2.93

2.15 2.45 5.27 dep 12 3.85 dep2-3 1.35

1.15 2.45 2.82 dep 6 3.15 dep2

3.05 2.45 7.47 dep 12 0.95 dep3 2.44

2.63 2.45 6.44 dep 10 4.00 sub est 0.84

2.93 2.45 7.18 tableros 3.30 sub est 1.64

1.35 2.20 2.97 tableros 0.45 dep1 0.69

1.33 2.20 2.93 dep-7 1.70

1.85 2.20 4.07 dep-8 3.79

1.70 2.20 3.74 dep-9 0.84

1.20

3.85 3.00 11.55 dep4-5 1.20

1.70 3.00 5.10 dep4 0.85

1.40 3.00 4.20 dep5

3.85 3.00 11.55 dep2-3

3.15 3.00 9.45 dep2

0.95 3.00 2.85 dep3

4.00 3.00 12.00 sub est

3.30 3.00 9.90 sub est

0.45 3.00 1.35 dep1

2.44 2.45 5.98 tableros

0.84 2.45 2.06 cto basu

1.64 2.45 4.02 cto basu

0.69 2.45 1.69 s-h

1.70 2.45 4.17 dep-10

3.79 2.45 9.29 dep-11

0.84 2.45 2.06 dep 6

1.20 2.45 2.94 dep 12

1.20 2.45 2.94 dep 6

0.85 2.45 2.08 cto basu

1.61 2.20 3.54 dep-7

1.35 2.20 2.97 dep-8

3.55 2.20 7.81 dep-9

0.00

1ER NIVEL

LONGITUD ALTURA AREA PARC TOTAL OBSERV

0.82 2.55 2.09 673.60 dorm-1

1.08 0.60 0.65 v12

1.30 0.60 0.78 v13

1.60 2.55 4.08 escritorio

2.07 2.55 5.28 dorm-2 2.20

1.15 2.55 2.93 kitch

2.10 2.55 5.36 escritorio

0.60 2.55 1.53 wcl-2 2.15

1.50 2.55 3.83 sh5 2.80

1.65 2.55 4.21 sh5 2.15

0.60 2.55 1.53 sh-4

2.10 2.55 5.36 wcl-2

2.25 2.55 5.74 sh5

1.24 2.55 3.16 sh-4

0.30 2.55 0.77 v-7'

0.30 2.55 0.77 v-7'

0.60 2.55 1.53 estar

3.10 2.15 6.67 escalera

1.20 0.20 0.24 pasadizo,v23

1.25 2.15 2.69 salon

1.62 0.20 0.32 salon,v2

1.05 2.15 2.26 salon

5.00 2.55 12.75 esc-3

1.85 2.30 4.26 dorm-2

1.50 0.80 1.20 dorm-2,v-3

0.77 2.30 1.77 dorm-2

1.87 2.55 4.77 salon

2.20 0.20 0.44 salon,v-2

0.35 2.55 0.89 esc-3

0.75 2.55 1.91 dorm-ser

0.80 2.55 2.04 sh-7

0.30 2.55 0.77 sh-7

1.80 2.55 4.59 sh-7

1.60 2.15 3.44 sh-7 2.80

1.10 2.15 2.37 cocina-2 2.15

0.75 2.55 1.91 ducto,hall

0.60 2.55 1.53 ducto,hall

0.75 2.55 1.91 ducto,hall

2.09 2.55 5.33 sh-9

2.08 2.55 5.30 sh-9

2.08 2.15 4.47 ducto

0.50 2.55 1.28 sh-/8 2.25

0.57 2.55 1.45 sh-8

0.70 2.55 1.79 wcl-1

0.57 2.55 1.45 wcl-1

0.70 2.55 1.79 wcl-1

2.10 2.55 5.36 escritorio

0.45 2.55 1.15 sh-6

1.50 2.55 3.83 lobby

0.45 2.55 1.15 ducto

0.65 2.55 1.66 ducto

3.65 2.55 9.31 estar

0.80 2.55 2.04 recibp

0.80 2.55 2.04 sh-3

0.95 2.55 2.42 sh-3

1.05 2.55 2.68 sh-2

0.75 2.55 1.91 cocina-1

0.65 2.55 1.66 dorm-serv

0.70 2.55 1.79 dorm-serv

0.30 2.55 0.77 dorm-serv

0.55 2.55 1.40 cocina-1

0.85 2.00 1.70 sala

0.85 2.55 2.17 escritorio

0.88 2.55 2.24 dormit-1

1.60 0.55 0.88 dormit-1 v-14

1.60 0.55 0.88 escritorio

5.21 2.60 13.55 cerco 3.20

1.14 2.60 2.96 cerco

5.78 2.60 15.03 cerco

4.57 2.60 11.88 cerco

2.60 2.60 6.76 cerco

4.68 2.60 12.17 cerco

4.55 2.60 11.83 cerco

2.80 2.60 7.28 cerco

3.17 2.60 8.24 cerco

4.67 2.60 12.14 cerco

3.51 2.60 9.13 cerco

4.95 2.60 12.87 cerco

0.75 2.55 1.91 dormit-2

0.62 2.55 1.58 sh-9

0.75 2.55 1.91 ducto

0.65 2.55 1.66 cl-3

2.70 2.55 6.89 sh-8

2.90 2.55 7.40 escritorio

0.60 2.55 1.53 escritorio

2.90 2.55 7.40 escritorio

0.15 2.55 0.38 estar

1.80 2.25 4.05 comedor-v28

0.25 2.25 0.56 estar

8.61 2.60 22.39 jardin 0.40

2.05 2.15 4.41 patio 2.50

1.01 2.15 2.17 cocina-2 2.15

1.00 2.15 2.15 cocina-2

4.35 2.55 11.09 patio-cocina-2

0.30 2.25 0.68 esc-3

1.65 2.15 3.55 sh-7

1.70 2.55 4.34 sh-6

1.70 2.55 4.34 sh-6

3.30 2.15 7.10 sala

2.25 2.55 5.74 hall-ducto

1.06 2.15 2.28 dep-14

1.20 2.15 2.58 dep-14

3.15 2.55 8.03 dep-14

6.00 2.15 12.90 lobby

4.40 2.55 11.22 sh-1

2.20 2.55 5.61 sh-1

0.65 2.55 1.66 salon

2.35 2.55 5.99 recibo

2.45 2.55 6.25 recibo

2.50 2.55 6.38 sala

3.75 2.55 9.56 dorm-serv

2.26 2.55 5.76 estar

6.00 2.15 12.90 rampa

1.86 2.55 4.74 sh-4

1.86 2.55 4.74 sh-5

2.99 2.15 6.43 escritorio

4.29 2.55 10.94 escritorio

4.04 2.55 10.30 dornit-2

3.72 2.35 8.74 kitch

0.69 2.35 1.62 kitch

1.24 2.35 2.91 kitch

0.66 2.35 1.55 kitch

1.00 3.10 3.10 cerco

9.10 3.10 28.21 cerco

4.95 3.10 15.35 cerco

3.30 3.10 10.23 ing-veh

1.85 3.10 5.74 estacionam

2.90 3.10 8.99 estacionam

1.02 3.10 3.16 estacionam

1.02 3.15 3.21 estacionam

1.73 3.15 5.45 jardin

1.03 3.15 3.24 jardin

2.05 3.15 6.46 jardin

0.75 3.10 2.33 estacionam

1.54 3.10 4.77 estacionam

1.03 3.10 3.19 estacionam

1.03 3.15 3.24 estacionam

1.11 3.15 3.50 jardin

2.63 3.15 8.28 jardin

0.91 3.15 2.87 jardin

0.60 2.25 1.35 ducto

0.50 2.25 1.13 ducto

0.60 2.50 1.50 ducto

2DO NIVEL

LONGITUD ALTURA AREA PARC TOTAL OBSERV

0.84 2.55 2.14 485.59 dorm-2

1.50 0.80 1.20 dorm-2 v3

1.00 2.55 2.55 dorm-2

2.35 2.55 5.99 patio v16

0.40 2.55 1.02 cocina-1

1.10 1.00 1.10 cocina-1-v18

0.40 2.55 1.02 cocina-1

2.60 2.55 6.63 esc-2

1.60 2.55 4.08 esc-2

2.87 1.00 2.87 patio-v15

1.30 2.55 3.32 patio

1.50 0.80 1.20 dorm-2 v3

1.80 2.55 4.59 dorm-2

2.60 2.55 6.63 esc-3

0.53 2.55 1.35 patio

1.10 1.00 1.10 patio -v18

0.52 2.55 1.33 patio

1.55 1.00 1.55 patio -v4

1.85 2.55 4.72 dorm-2

1.50 0.80 1.20 dorm-2 v-3

0.68 2.55 1.73 dorm-2

2.19 2.55 5.58 dorm-2

0.40 2.55 1.02 dorm-serv

0.60 1.00 0.60 pv-01

1.10 2.55 2.81 sh

0.60 2.55 1.53 ducto-basura

0.95 2.55 2.42 esc-2

1.20 2.55 3.06 ducto

1.20 2.55 3.06 ducto

0.50 2.55 1.28 dorm-serv

1.05 2.55 2.68 dorm-serv

0.83 2.55 2.12 dorm-serv

1.55 2.55 3.95 dorm-2

0.60 2.55 1.53 dorm-2

1.70 2.55 4.34 ascensor

0.75 2.55 1.91 dorm-serv

0.80 2.55 2.04 dorm-serv

0.30 2.55 0.77 dorm-serv

2.21 2.55 5.64 dorm-2

1.08 1.00 1.08 pasadizo

2.18 2.55 5.56 sh-9 *-//

2.18 2.55 5.56 ducto

0.55 2.55 1.40 sh-8

0.50 2.55 1.28 wcl-1'

0.72 2.55 1.84 wcl-1'

0.55 2.55 1.40 wcl-1'

0.71 2.55 1.81 wcl-1'

0.95 2.55 2.42 sh-15

3.92 2.55 10.00 dorm-serv

2.25 2.55 5.74 escritorio

1.90 2.55 4.85 sh-14

1.02 2.55 2.60 sh-13

0.60 2.55 1.53 comedor

2.15 2.55 5.48 escritorio

0.60 2.55 1.53 ducto sh-11

1.55 2.55 3.95 sh-10

0.60 2.55 1.53 v-29'

0.45 2.55 1.15 sh-10

0.60 2.55 1.53 sh-10

0.70 2.55 1.79 sh-10

0.75 2.55 1.91 wcl-3

0.70 2.55 1.79 wcl-3

1.80 2.55 4.59 sh-7 º

1.60 2.55 4.08 comedor

1.30 2.55 3.32 estar

1.10 2.55 2.81 sala

2.10 2.55 5.36 escritorio

0.65 2.55 1.66 sh-9

0.60 1.75 1.05 sh-9,v6

0.84 2.55 2.14 sh-9

2.23 2.55 5.69 sh-8

0.65 2.55 1.66 sh-8

0.55 2.55 1.40 wcl-1

0.72 2.55 1.84 wcl-1

0.70 2.55 1.79 wcl-1

0.70 2.55 1.79 wcl-1

0.90 2.55 2.30 dormit-1

1.60 0.55 0.88 dormit-1

1.20 2.55 3.06 dormit-1

1.60 0.55 0.88 escritorio

0.95 2.55 2.42 escritorio

0.85 2.55 2.17 escritorio

1.60 0.55 0.88 escritorio

0.35 2.55 0.89 escritorio

0.60 2.55 1.53 escritorio

1.60 0.55 0.88 escritorio

0.85 2.55 2.17 escritorio

1.60 0.55 0.88 escritorio

1.60 0.55 0.88 dormit-1

0.88 2.55 2.24 dormit-1

0.64 0.90 0.58 terraza-jardin

3.30 0.90 2.97 terraza-jardin

3.26 0.90 2.93 terraza-jardin

4.40 0.90 3.96 terraza-jardin

10.38 0.90 9.34 terraza-jardin

8.83 0.90 7.95 terraza-jardin

2.05 2.55 5.23 dormit-2

0.60 2.55 1.53 dormit-2

0.60 2.55 1.53 sh-9

0.60 2.55 1.53 ducto-v8

0.65 2.55 1.66 cl-3

2.40 2.55 6.12 sh-8-wcl-1

2.90 2.55 7.40 dormit-1

2.90 2.55 7.40 escritorio

0.75 2.55 1.91 escritorio

4.35 2.55 11.09 cocina-2

0.30 2.55 0.77 dorm-serv

1.64 2.55 4.18 sh-7

1.95 2.55 4.97 sh-16

1.00 2.55 2.55 sh-16

2.26 2.55 5.76 dormit-2

6.00 2.55 15.30 sala

0.60 2.55 1.53 dormit-2

1.40 2.55 3.57 sh-10

0.65 2.55 1.66 sh-10

2.55 2.55 6.50 sh-10

2.90 2.55 7.40 dormit-1

2.20 2.55 5.61 sh-11

0.60 2.55 1.53 jardinera

0.66 2.55 1.68 dormit-2

0.80 2.55 2.04 patio

0.60 1.75 1.05 patio-v6

1.05 2.55 2.68 patio

2.45 2.55 6.25 dorm-serv

0.40 2.55 1.02 cocina-3

2.75 2.55 7.01 sala

0.60 2.55 1.53 escritorio

1.13 2.55 2.88 jardinera

1.10 1.00 1.10 v-18

0.80 2.55 2.04 cocina-3

3.05 2.55 7.78 cocina-3

1.55 2.55 3.95 sh-14

1.70 2.55 4.34 sh-13

3.40 2.55 8.67 sala

4.45 2.55 11.35 cocina-4

0.65 2.55 1.66 cocina-4

1.20 2.55 3.06 cocina-4

0.35 2.55 0.89 patio

0.95 2.55 2.42 dorm-serv

2.90 2.55 7.40 sala

5.85 2.55 14.92 dormitorio-2

0.60 2.55 1.53 dormitorio-2

0.45 2.55 1.15 sh-9'

0.65 2.55 1.66 sh-8'

2.40 2.55 6.12 estar

3.75 2.55 9.56 dormitorio-1

0.76 1.75 1.33 v-6

0.60 2.55 1.53 escritorio

3ER AL 7MO NIVEL

LONGITUD ALTURA PARC SUB-TOTAL OBSERV TOTAL

0.84 2.55 2.14 454.22 dorm-2 2,271.10

1.50 0.80 1.20 dorm-2 v3

1.00 2.55 2.55 dorm-2

2.35 1.00 2.35 patio v16

0.40 2.55 1.02 cocina-1

1.10 1.00 1.10 cocina-1-v18

0.40 2.55 1.02 cocina-1

2.60 2.55 6.63 esc-2

1.60 2.55 4.08 esc-2

2.87 1.00 2.87 patio-v15

1.30 2.55 3.32 patio

1.50 0.80 1.20 dorm-2 v3

1.80 2.55 4.59 dorm-2

2.60 2.55 6.63 esc-3

0.53 2.55 1.35 patio

1.10 1.00 1.10 patio -v18

0.52 2.55 1.33 patio

1.55 1.00 1.55 patio -v4

1.85 2.55 4.72 dorm-2

1.50 0.80 1.20 dorm-2 v-3

0.68 2.55 1.73 dorm-2

2.19 2.55 5.58 dorm-2

0.40 2.55 1.02 dorm-serv

0.60 1.00 0.60 pv-01

1.10 2.55 2.81 sh

0.60 2.55 1.53 ducto-basura

0.95 2.55 2.42 esc-2

1.20 2.55 3.06 ducto

1.20 2.55 3.06 ducto

0.50 2.55 1.28 dorm-serv

1.05 2.55 2.68 dorm-serv

0.83 2.55 2.12 dorm-serv

1.55 2.55 3.95 dorm-2

0.60 2.55 1.53 dorm-2

1.70 2.55 4.34 ascensor

0.75 2.55 1.91 dorm-serv

0.80 2.55 2.04 dorm-serv

0.30 2.55 0.77 dorm-serv

2.21 2.55 5.64 dorm-2

1.08 1.00 1.08 pasadizo

2.18 2.55 5.56 sh-9

2.18 2.55 5.56 ducto

0.55 2.55 1.40 sh-8

0.50 2.55 1.28 wcl-1'

0.72 2.55 1.84 wcl-1'

0.55 2.55 1.40 wcl-1'

0.71 2.55 1.81 wcl-1'

0.95 2.55 2.42 sh-15

3.92 2.55 10.00 dorm-serv

2.25 2.55 5.74 escritorio

1.90 2.55 4.85 sh-14

1.02 2.55 2.60 sh-13

0.60 2.55 1.53 comedor

2.15 2.55 5.48 escritorio

0.60 2.55 1.53 ducto sh-11

1.55 2.55 3.95 sh-10

0.60 2.55 1.53 v-29'

0.45 2.55 1.15 sh-10

0.60 2.55 1.53 sh-10

0.70 2.55 1.79 sh-10

0.75 2.55 1.91 wcl-3

0.70 2.55 1.79 wcl-3

1.80 2.55 4.59 sh-7

1.60 2.55 4.08 comedor

1.30 2.55 3.32 estar

1.10 2.55 2.81 sala

2.10 2.55 5.36 escritorio

0.65 2.55 1.66 sh-9

0.60 1.75 1.05 sh-9,v6

0.84 2.55 2.14 sh-9

2.23 2.55 5.69 sh-8

0.65 2.55 1.66 sh-8

0.55 2.55 1.40 wcl-1

0.72 2.55 1.84 wcl-1

0.70 2.55 1.79 wcl-1

0.70 2.55 1.79 wcl-1

0.90 2.55 2.30 dormit-1

1.60 0.55 0.88 dormit-1

1.20 2.55 3.06 dormit-1

1.60 0.55 0.88 escritorio

0.95 2.55 2.42 escritorio

0.85 2.55 2.17 escritorio

1.60 0.55 0.88 escritorio

0.35 2.55 0.89 escritorio

0.60 2.55 1.53 escritorio

1.60 0.55 0.88 escritorio

0.85 2.55 2.17 escritorio

1.60 0.55 0.88 escritorio

1.60 0.55 0.88 dormit-1

0.88 2.55 2.24 dormit-1

2.05 2.55 5.23 dormit-2

0.60 2.55 1.53 dormit-2

0.60 2.55 1.53 sh-9

0.60 2.55 1.53 ducto-v8

0.65 2.55 1.66 cl-3

2.40 2.55 6.12 sh-8-wcl-1

2.90 2.55 7.40 dormit-1

2.90 2.55 7.40 escritorio

0.75 2.55 1.91 escritorio

4.35 2.55 11.09 cocina-2

0.30 2.55 0.77 dorm-serv

1.64 2.55 4.18 sh-7

1.95 2.55 4.97 sh-16

1.00 2.55 2.55 sh-16

2.26 2.55 5.76 dormit-2

6.00 2.55 15.30 sala

0.60 2.55 1.53 dormit-2

1.40 2.55 3.57 sh-10

0.65 2.55 1.66 sh-10

2.55 2.55 6.50 sh-10

2.90 2.55 7.40 dormit-1

2.20 2.55 5.61 sh-11

0.60 2.55 1.53 jardinera

0.66 2.55 1.68 dormit-2

0.80 2.55 2.04 patio

0.60 1.75 1.05 patio-v6

1.05 2.55 2.68 patio

2.45 2.55 6.25 dorm-serv

0.40 2.55 1.02 cocina-3

2.75 2.55 7.01 sala

0.60 2.55 1.53 escritorio

1.13 2.55 2.88 jardinera

1.10 1.00 1.10 v-18

0.80 2.55 2.04 cocina-3

3.05 2.55 7.78 cocina-3

1.55 2.55 3.95 sh-14

1.70 2.55 4.34 sh-13

3.40 2.55 8.67 sala

4.45 2.55 11.35 cocina-4

0.65 2.55 1.66 cocina-4

1.20 2.55 3.06 cocina-4

0.35 2.55 0.89 patio

0.95 2.55 2.42 dorm-serv

2.90 2.55 7.40 sala

5.85 2.55 14.92 dormitorio-2

0.60 2.55 1.53 dormitorio-2

0.45 2.55 1.15 sh-9'

0.65 2.55 1.66 sh-8'

2.40 2.55 6.12 estar

3.75 2.55 9.56 dormitorio-1

0.76 1.75 1.33 v-6

0.60 2.55 1.53 escritorio

CUARTO DE MAQUINAS y AZOTEA

LONGITUD ALTURA AREA PARC TOTAL OBSERV

7.51 0.75 5.63 271.27 parapeto

4.20 0.75 3.15 parapeto

2.42 0.75 1.82 parapeto

0.75 0.75 0.56 parapeto

2.12 0.75 1.59 parapeto

7.25 0.75 5.44 parapeto

6.30 0.75 4.73 parapeto

2.00 0.75 1.50 parapeto

7.70 0.75 5.78 parapeto

1.85 0.75 1.39 parapeto

6.30 0.75 4.73 parapeto

2.00 0.75 1.50 parapeto

3.90 0.75 2.93 parapeto

1.85 0.75 1.39 parapeto

6.43 0.75 4.82 parapeto

7.10 0.75 5.33 parapeto

2.28 0.75 1.71 parapeto

0.60 0.75 0.45 parapeto

2.29 0.75 1.72 parapeto

4.50 0.75 3.38 parapeto

5.51 0.75 4.13 parapeto

5.68 0.75 4.26 parapeto

0.95 0.75 0.71 parapeto

0.90 0.75 0.68 parapeto

0.95 0.75 0.71 parapeto

0.90 0.75 0.68 parapeto

0.85 0.75 0.64 parapeto

0.80 0.75 0.60 parapeto

0.85 0.75 0.64 parapeto

1.90 3.40 6.46 esc-2

1.45 3.40 4.93 esc-2

2.60 2.55 6.63 esc-2 v-17

1.60 3.40 5.44 esc-2

3.55 3.40 12.07 esc-2

3.70 3.40 12.58 cto maq

1.80 3.40 6.12 esc-3

2.60 3.40 8.84 esc-3

2.15 3.40 7.31 esc-3

3.10 3.40 10.54 esc-3

3.40 3.40 11.56 cto maq

3.55 3.40 12.07 esc-2

0.80 2.55 2.04 cto maq-v21

1.10 3.40 3.74 cto maq

3.25 3.40 11.05 esc-3

0.80 2.55 2.04 cto maq-v21

2.00 3.40 6.80 cto maq

1.90 3.40 6.46 esc-3

5.40 3.40 18.36 esc-3

0.80 2.55 2.04 cto maq-v21

3.25 3.40 11.05 esc-3

1.75 3.40 5.95 azotea

0.80 2.55 2.04 cto maq-v21

1.15 3.40 3.91 cto maq

1.90 3.40 6.46 azotea

3.25 1.88 6.11 baranda

3.25 1.88 6.11 baranda

RESUMEN DE METRADO DE MURO DE SOGA

AREA M2 TOTAL

Zotano 206.86 3,908.40

1er Nivel 673.60

2do Nivel 485.59

3er-7mo Nivel 2,271.10

Cto Maquinas 271.27

TARRAJEO EN INTERIORES ACABADO CON C:ASOTANO

LONGITUD ALTURA NªLADOS AREA PARC TOTAL OBSERV

3.10 3.30 2.00 20.46 332.70

0.35 3.30 2.00 2.31

3.10 3.30 2.00 20.46

3.50 3.30 2.00 23.10

3.90 3.30 2.00 25.74

3.05 3.30 2.00 20.13

1.85 3.30 2.00 12.21

3.85 3.30 2.00 25.41

0.95 3.30 2.00 6.27

3.85 2.50 2.00 19.25

1.70 2.50 2.00 8.50

1.40 2.50 2.00 7.00

1.20 2.50 2.00 6.00

0.75 2.50 2.00 3.75

1.33 2.15 2.00 5.72

1.85 2.15 2.00 7.96

1.45 2.15 2.00 6.24

1.35 2.15 2.00 5.81

2.60 2.15 2.00 11.18

2.25 2.15 2.00 9.68

0.84 2.40 2.00 4.03

1.64 2.40 2.00 7.87

0.84 2.40 2.00 4.03

0.36 2.40 2.00 1.73

3.54 2.40 2.00 16.99

0.84 2.40 2.00 4.03

1.20 2.40 2.00 5.76

1.33 2.40 2.00 6.38

2.93 2.40 2.00 14.06

0.45 2.40 2.00 2.16

2.15 2.40 2.00 10.32

1.15 2.40 2.00 5.52

0.55 2.40 2.00 2.64

1ER NIVEL

LONGITUD ALTURA NªLADOS AREA PARC TOTAL OBSERV

0.82 2.15 2.00 3.53 1,176.40 dorm-1

1.08 0.60 2.00 1.30 parapeto

1.30 0.60 2.00 1.56 escritorio

1.60 2.15 2.00 6.88 escritorio

1.15 2.40 2.00 5.52 kitch

2.25 2.50 2.00 11.25 kitch

2.10 2.50 2.00 10.50 escritorio

0.60 2.50 2.00 3.00 wcl-2

1.50 2.50 1.00 3.75 sh5

1.65 2.50 1.00 4.13 sh5

0.60 2.50 1.00 1.50 sh-4

0.60 2.50 2.00 3.00 estar

3.10 1.85 2.00 11.47 escalera

1.20 1.85 2.00 4.44 pasadizo

1.25 1.85 2.00 4.63 salon

1.62 2.00 2.00 6.48 salon

1.05 2.00 2.00 4.20 salon

5.00 2.00 2.00 20.00 lobby

1.85 2.00 2.00 7.40 esc-3

1.50 0.80 2.00 2.40 patio

0.77 2.00 2.00 3.08 dorm-2

1.87 2.25 2.00 8.42 salon

2.20 2.25 2.00 9.90 salon

0.35 2.25 2.00 1.58 esc-3

0.75 2.25 2.00 3.38 dorm-ser

0.80 2.25 1.00 1.80 sh-7

0.30 2.25 1.00 0.68 sh-7

1.80 2.25 1.00 4.05 sh-7

1.60 1.85 1.00 2.96 sh-7

1.10 1.85 2.00 4.07 cocina-2

0.75 2.25 2.00 3.38 ducto

0.60 2.25 2.00 2.70 ducto

0.75 1.85 2.00 2.78 ducto

2.09 2.25 2.00 9.41 dorm-2

2.08 2.25 2.00 9.36 dorm-2

2.08 1.85 2.00 7.70 ducto

0.50 2.25 1.00 1.13 sh-/8

0.57 2.25 1.00 1.28 sh-8

0.70 2.25 2.00 3.15 wcl-1

0.57 2.25 2.00 2.57 wcl-1

0.70 2.25 2.00 3.15 wcl-1

2.10 2.25 2.00 9.45 escritprio

0.45 2.25 1.00 1.01 sh-6

1.50 2.25 2.00 6.75 lobby

0.45 2.25 2.00 2.03 ducto

0.65 2.25 2.00 2.93 ducto

3.65 2.25 2.00 16.43 estar

0.80 2.25 2.00 3.60 recibp

0.80 2.25 1.00 1.80 sh-3

0.95 2.25 1.00 2.14 sh-3

1.05 2.25 1.00 2.36 sh-2

0.75 2.25 2.00 3.38 cocina-1

0.65 2.25 2.00 2.93 dorm-serv

0.70 2.25 2.00 3.15 dorm-serv

0.30 2.25 2.00 1.35 dorm-serv

0.55 2.25 2.00 2.48 cocina-1

0.85 2.00 2.00 3.40 sala

0.85 2.25 2.00 3.83 escritorio

0.88 2.25 2.00 3.96 dormit-1

1.60 0.55 2.00 1.76 dormit-1

1.60 0.55 2.00 1.76 escritorio

5.21 2.60 2.00 27.09 cerco

1.14 2.60 2.00 5.93 cerco

5.78 2.60 2.00 30.06 cerco

4.57 2.60 2.00 23.76 cerco

2.60 2.60 2.00 13.52 cerco

4.68 2.60 2.00 24.34 cerco

4.55 2.60 2.00 23.66 cerco

2.80 2.60 2.00 14.56 cerco

3.17 2.60 2.00 16.48 cerco

4.67 2.60 2.00 24.28 cerco

3.51 2.60 2.00 18.25 cerco

4.95 2.60 2.00 25.74 cerco

0.75 2.25 2.00 3.38 dormit-2

0.82 2.25 1.00 1.85 sh-9

0.75 2.25 2.00 3.38 ducto

0.65 2.25 2.00 2.93 cl-3

2.70 2.25 1.00 6.08 sh-8

2.90 2.25 2.00 13.05 escritorio

0.60 2.25 2.00 2.70 escritorio

2.90 2.25 2.00 13.05 escritorio

0.15 2.25 2.00 0.68 estar

1.80 2.25 2.00 8.10 comedor-v28

0.25 2.25 2.00 1.13 estar

8.61 2.60 2.00 44.77 jardin

2.05 1.85 2.00 7.59 patio

1.01 1.85 2.00 3.74 cocina-2

1.00 1.85 2.00 3.70 cocina-2

4.35 2.25 2.00 19.58 patio-cocina-2

0.30 2.25 2.00 1.35 esc

1.65 2.00 1.00 3.30 sh-7

1.70 2.00 1.00 3.40 sh-6

1.70 2.00 1.00 3.40 sh-6

3.30 2.00 2.00 13.20 hall

2.25 2.00 2.00 9.00 sala

1.05 2.00 2.00 4.20 dep-14

1.20 2.00 2.00 4.80 dep-14

3.15 2.00 2.00 12.60 dep-14

6.00 2.00 2.00 24.00 lobby

4.40 2.00 1.00 8.80 sh-1

2.20 2.00 1.00 4.40 sh-1

0.65 2.00 1.00 1.30 sh-1

2.35 2.00 2.00 9.40 recibo

2.45 2.00 2.00 9.80 recibo

2.50 2.00 2.00 10.00 sala

3.75 2.00 2.00 15.00 dorm-serv

2.26 2.00 2.00 9.04 estar

6.00 2.00 2.00 24.00 rampa

1.86 2.35 1.00 4.37 sh-4

1.86 2.35 1.00 4.37 sh-5

2.99 2.35 2.00 14.05 escritorio

4.29 2.35 2.00 20.16 escritorio

4.04 2.35 2.00 18.99 dornit-2

3.72 2.35 2.00 17.48 kitch

0.69 2.35 2.00 3.24 kitch

1.24 2.35 2.00 5.83 kitch

0.66 2.35 2.00 3.10 kitch

1.00 3.10 2.00 6.20 cerco

9.10 3.10 2.00 56.42 cerco

4.95 3.10 2.00 30.69 cerco

3.30 3.10 2.00 20.46 ing-veh

1.85 3.10 2.00 11.47 estacionam

2.90 3.10 2.00 17.98 estacionam

1.02 3.10 2.00 6.32 estacionam

1.02 3.15 2.00 6.43 estacionam

1.73 3.15 2.00 10.90 jardin

1.03 3.15 2.00 6.49 jardin

2.05 3.15 2.00 12.92 jardin

0.75 3.10 2.00 4.65 estacionam

1.54 3.10 2.00 9.55 estacionam

1.03 3.10 2.00 6.39 estacionam

1.03 3.15 2.00 6.49 estacionam

1.11 3.15 2.00 6.99 jardin

2.63 3.15 2.00 16.57 jardin

0.91 3.15 2.00 5.73 jardin

0.60 2.25 2.00 2.70 ducto

0.50 2.25 2.00 2.25 ducto

0.60 2.50 2.00 3.00 ducto

2DO NIVEL

LONGITUD ALTURA NªLADOS AREA PARC TOTAL OBSERV

0.84 2.55 2.00 4.28 872.44 dorm-2

1.50 0.80 2.00 2.40 dorm-2 v3

1.00 2.55 2.00 5.10 dorm-2

2.35 2.55 2.00 11.99 patio v16

0.40 2.55 2.00 2.04 cocina-1

1.10 1.00 2.00 2.20 cocina-1-v18

0.40 2.55 2.00 2.04 cocina-1

2.60 2.55 2.00 13.26 esc-2

1.60 2.55 2.00 8.16 esc-2

2.87 1.00 2.00 5.74 patio-v15

1.30 2.55 2.00 6.63 patio

1.50 0.80 2.00 2.40 dorm-2 v3

1.80 2.55 2.00 9.18 dorm-2

2.60 2.55 2.00 13.26 esc-3

0.53 2.55 2.00 2.70 patio

1.10 1.00 2.00 2.20 patio -v18

0.52 2.55 2.00 2.65 patio

1.55 1.00 2.00 3.10 patio -v4

1.85 2.55 2.00 9.44 dorm-2

1.50 0.80 2.00 2.40 dorm-2 v-3

0.68 2.55 2.00 3.47 dorm-2

2.19 2.55 2.00 11.17 dorm-2

0.40 2.55 2.00 2.04 dorm-serv

0.60 1.00 2.00 1.20 pv-01

1.10 2.55 1.00 2.81 sh

0.60 2.55 2.00 3.06 ducto-basura

0.95 2.55 2.00 4.85 esc-2

1.20 2.55 2.00 6.12 ducto

1.20 2.55 2.00 6.12 ducto

0.50 2.55 2.00 2.55 dorm-serv

1.05 2.55 2.00 5.36 dorm-serv

0.83 2.55 2.00 4.23 dorm-serv

1.55 2.55 2.00 7.91 dorm-2

0.60 2.55 2.00 3.06 dorm-2

1.70 2.55 2.00 8.67 ascensor

0.75 2.55 2.00 3.83 dorm-serv

0.80 2.55 2.00 4.08 dorm-serv

0.30 2.55 2.00 1.53 dorm-serv

2.21 2.55 2.00 11.27 dorm-2

1.08 1.00 2.00 2.16 pasadizo

2.18 2.55 1.00 5.56 sh-9

2.18 2.55 2.00 11.12 ducto

0.55 2.55 1.00 1.40 sh-8

0.50 2.55 2.00 2.55 wcl-1'

0.72 2.55 2.00 3.67 wcl-1'

0.55 2.55 2.00 2.81 wcl-1'

0.71 2.55 2.00 3.62 wcl-1'

0.95 2.55 1.00 2.42 sh-15

3.92 2.55 2.00 19.99 dorm-serv

2.25 2.55 2.00 11.48 escritorio

1.90 2.55 1.00 4.85 sh-14

1.02 2.55 1.00 2.60 sh-13

0.60 2.55 2.00 3.06 comedor

2.15 2.55 2.00 10.97 escritorio

0.60 2.55 1.00 1.53 ducto sh-11

1.55 2.55 1.00 3.95 sh-10

0.60 2.55 2.00 3.06 v-29'

0.45 2.55 1.00 1.15 sh-10

0.60 2.55 1.00 1.53 sh-10

0.70 2.55 1.00 1.79 sh-10

0.75 2.55 2.00 3.83 wcl-3

0.70 2.55 2.00 3.57 wcl-3

1.80 2.55 0.00 0.00 sh-7

1.60 2.55 2.00 8.16 comedor

1.30 2.55 2.00 6.63 estar

1.10 2.55 2.00 5.61 sala

2.10 2.55 2.00 10.71 escritorio

0.65 2.55 1.00 1.66 sh-9

0.60 1.75 1.00 1.05 sh-9,v6

0.84 2.55 1.00 2.14 sh-9

2.23 2.55 1.00 5.69 sh-8

0.65 2.55 1.00 1.66 sh-8

0.55 2.55 2.00 2.81 wcl-1

0.72 2.55 2.00 3.67 wcl-1

0.70 2.55 2.00 3.57 wcl-1

0.70 2.55 2.00 3.57 wcl-1

0.90 2.55 2.00 4.59 dormit-1

1.60 0.55 2.00 1.76 dormit-1

1.20 2.55 2.00 6.12 dormit-1

1.60 0.55 2.00 1.76 escritorio

0.95 2.55 2.00 4.85 escritorio

0.85 2.55 2.00 4.34 escritorio

1.60 0.55 2.00 1.76 escritorio

0.35 2.55 2.00 1.79 escritorio

0.60 2.55 2.00 3.06 escritorio

1.60 0.55 2.00 1.76 escritorio

0.85 2.55 2.00 4.34 escritorio

1.60 0.55 2.00 1.76 escritorio

1.60 0.55 2.00 1.76 dormit-1

0.88 2.55 2.00 4.49 dormit-1

0.64 0.90 2.00 1.15 terraza-jardin

3.30 0.90 2.00 5.94 terraza-jardin

3.26 0.90 2.00 5.87 terraza-jardin

4.40 0.90 2.00 7.92 terraza-jardin

10.38 0.90 2.00 18.68 terraza-jardin

8.83 0.90 2.00 15.89 terraza-jardin

2.05 2.55 2.00 10.46 dormit-2

0.60 2.55 2.00 3.06 dormit-2

0.60 2.55 1.00 1.53 sh-9

0.60 2.55 2.00 3.06 ducto-v8

0.65 2.55 2.00 3.32 cl-3

2.40 2.55 1.00 6.12 sh-8-wcl-1

2.90 2.55 2.00 14.79 dormit-1

2.90 2.55 2.00 14.79 escritorio

0.75 2.55 2.00 3.83 escritorio

4.35 2.55 2.00 22.19 cocina-2

0.30 2.55 2.00 1.53 dorm-serv

1.64 2.55 1.00 4.18 sh-7

1.95 2.55 1.00 4.97 sh-16

1.00 2.55 1.00 2.55 sh-16

2.26 2.55 2.00 11.53 dormit-2

6.00 2.55 2.00 30.60 sala

0.60 2.55 2.00 3.06 dormit-2

1.40 2.55 1.00 3.57 sh-10

0.65 2.55 1.00 1.66 sh-10

2.55 2.55 1.00 6.50 sh-10

2.90 2.55 2.00 14.79 dormit-1

2.20 2.55 1.00 5.61 sh-11

0.60 2.55 2.00 3.06 jardinera

0.66 2.55 2.00 3.37 dormit-2

0.80 2.55 2.00 4.08 patio

0.60 1.75 2.00 2.10 patio-v6

1.05 2.55 2.00 5.36 patio

2.45 2.55 2.00 12.50 dorm-serv

0.40 2.55 2.00 2.04 cocina-3

2.75 2.55 2.00 14.03 sala

0.60 2.55 2.00 3.06 escritorio

1.13 2.55 2.00 5.76 jardinera

1.10 1.00 2.00 2.20 v-18

0.80 2.55 2.00 4.08 cocina-3

3.05 2.55 2.00 15.56 cocina-3

1.55 2.55 1.00 3.95 sh-14

1.70 2.55 1.00 4.34 sh-13

3.40 2.55 2.00 17.34 sala

4.45 2.55 2.00 22.70 cocina-4

0.65 2.55 2.00 3.32 cocina-4

1.20 2.55 2.00 6.12 cocina-4

0.35 2.55 2.00 1.79 patio

0.95 2.55 2.00 4.85 dorm-serv

2.90 2.55 2.00 14.79 sala

5.85 2.55 2.00 29.84 dormitorio-2

0.60 2.55 2.00 3.06 dormitorio-2

0.45 2.55 1.00 1.15 sh-9'

0.65 2.55 1.00 1.66 sh-8'

2.40 2.55 2.00 12.24 estar

3.75 2.55 2.00 19.13 dormitorio-1

0.76 1.75 2.00 2.66 v-6

0.60 2.55 2.00 3.06 escritorio

3ER AL 7MO NIVEL

LONGITUD ALTURA NªLADOS AREA PARC TOTAL OBSERV

0.84 2.55 2.00 4.28 806.64 dorm-2 4033.19251.50 0.80 2.00 2.40 dorm-2 v3

1.00 2.55 2.00 5.10 dorm-2

2.35 1.00 2.00 4.70 patio v16

0.40 2.55 2.00 2.04 cocina-1

1.10 1.00 2.00 2.20 cocina-1-v18

0.40 2.55 2.00 2.04 cocina-1

2.60 2.55 2.00 13.26 esc-2

1.60 2.55 2.00 8.16 esc-2

2.87 1.00 2.00 5.74 patio-v15

1.30 2.55 2.00 6.63 patio

1.50 0.80 2.00 2.40 dorm-2 v3

1.80 2.55 2.00 9.18 dorm-2

2.60 2.55 2.00 13.26 esc-3

0.53 2.55 2.00 2.70 patio

1.10 1.00 2.00 2.20 patio -v18

0.52 2.55 2.00 2.65 patio

1.55 1.00 2.00 3.10 patio -v4

1.85 2.55 2.00 9.44 dorm-2

1.50 0.80 2.00 2.40 dorm-2 v-3

0.68 2.55 2.00 3.47 dorm-2

2.19 2.55 2.00 11.17 dorm-2

0.40 2.55 2.00 2.04 dorm-serv

0.60 1.00 2.00 1.20 pv-01

1.10 2.55 1.00 2.81 sh

0.60 2.55 2.00 3.06 ducto-basura

0.95 2.55 2.00 4.85 esc-2

1.20 2.55 2.00 6.12 ducto

1.20 2.55 2.00 6.12 ducto

0.50 2.55 2.00 2.55 dorm-serv

1.05 2.55 2.00 5.36 dorm-serv

0.83 2.55 2.00 4.23 dorm-serv

1.55 2.55 2.00 7.91 dorm-2

0.60 2.55 2.00 3.06 dorm-2

1.70 2.55 2.00 8.67 ascensor

0.75 2.55 2.00 3.83 dorm-serv

0.80 2.55 2.00 4.08 dorm-serv

0.30 2.55 2.00 1.53 dorm-serv

2.21 2.55 2.00 11.27 dorm-2

1.08 1.00 2.00 2.16 pasadizo

2.18 2.55 1.00 5.56 sh-9

2.18 2.55 2.00 11.12 ducto

0.55 2.55 1.00 1.40 sh-8

0.50 2.55 2.00 2.55 wcl-1'

0.72 2.55 2.00 3.67 wcl-1'

0.55 2.55 2.00 2.81 wcl-1'

0.71 2.55 2.00 3.62 wcl-1'

0.95 2.55 1.00 2.42 sh-15

3.92 2.55 2.00 19.99 dorm-serv

2.25 2.55 2.00 11.48 escritorio

1.90 2.55 1.00 4.85 sh-14

1.02 2.55 1.00 2.60 sh-13

0.60 2.55 2.00 3.06 comedor

2.15 2.55 2.00 10.97 escritorio

0.60 2.55 2.00 3.06 ducto sh-11

1.55 2.55 1.00 3.95 sh-10

0.60 2.55 2.00 3.06 v-29'

0.45 2.55 1.00 1.15 sh-10

0.60 2.55 1.00 1.53 sh-10

0.70 2.55 1.00 1.79 sh-10

0.75 2.55 2.00 3.83 wcl-3

0.70 2.55 2.00 3.57 wcl-3

1.80 2.55 1.00 4.59 sh-7

1.60 2.55 2.00 8.16 comedor

1.30 2.55 2.00 6.63 estar

1.10 2.55 2.00 5.61 sala

2.10 2.55 2.00 10.71 escritorio

0.65 2.55 1.00 1.66 sh-9

0.60 1.75 1.00 1.05 sh-9,v6

0.84 2.55 1.00 2.14 sh-9

2.23 2.55 1.00 5.69 sh-8

0.65 2.55 1.00 1.66 sh-8

0.55 2.55 2.00 2.81 wcl-1

0.72 2.55 2.00 3.67 wcl-1

0.70 2.55 2.00 3.57 wcl-1

0.70 2.55 2.00 3.57 wcl-1

0.90 2.55 2.00 4.59 dormit-1

1.60 0.55 2.00 1.76 dormit-1

1.20 2.55 2.00 6.12 dormit-1

1.60 0.55 2.00 1.76 escritorio

0.95 2.55 2.00 4.85 escritorio

0.85 2.55 2.00 4.34 escritorio

1.60 0.55 2.00 1.76 escritorio

0.35 2.55 2.00 1.79 escritorio

0.60 2.55 2.00 3.06 escritorio

1.60 0.55 2.00 1.76 escritorio

0.85 2.55 2.00 4.34 escritorio

1.60 0.55 2.00 1.76 escritorio

1.60 0.55 2.00 1.76 dormit-1

0.88 2.55 2.00 4.49 dormit-1

2.05 2.55 2.00 10.46 dormit-2

0.60 2.55 2.00 3.06 dormit-2

0.60 2.55 1.00 1.53 sh-9

0.60 2.55 2.00 3.06 ducto-v8

0.65 2.55 2.00 3.32 cl-3

2.40 2.55 1.00 6.12 sh-8-wcl-1

2.90 2.55 2.00 14.79 dormit-1

2.90 2.55 2.00 14.79 escritorio

0.75 2.55 2.00 3.83 escritorio

4.35 2.55 2.00 22.19 cocina-2

0.30 2.55 2.00 1.53 dorm-serv

1.64 2.55 1.00 4.18 sh-7

1.95 2.55 1.00 4.97 sh-16

1.00 2.55 1.00 2.55 sh-16

2.26 2.55 2.00 11.53 dormit-2

6.00 2.55 2.00 30.60 sala

0.60 2.55 2.00 3.06 dormit-2

2.55 2.55 1.00 6.50 sh-10

2.90 2.55 2.00 14.79 dormit-1

2.20 2.55 1.00 5.61 sh-11

0.60 2.55 2.00 3.06 jardinera

0.66 2.55 2.00 3.37 dormit-2

0.80 2.55 2.00 4.08 patio

0.60 1.75 2.00 2.10 patio-v6

1.05 2.55 2.00 5.36 patio

2.45 2.55 2.00 12.50 dorm-serv

0.40 2.55 2.00 2.04 cocina-3

2.75 2.55 2.00 14.03 sala

0.60 2.55 2.00 3.06 escritorio

1.13 2.55 2.00 5.76 jardinera

1.10 1.00 2.00 2.20 v-18

0.80 2.55 2.00 4.08 cocina-3

3.05 2.55 2.00 15.56 cocina-3

1.70 2.55 1.00 4.34 sh-13

3.40 2.55 2.00 17.34 sala

4.45 2.55 2.00 22.70 cocina-4

0.65 2.55 2.00 3.32 cocina-4

1.20 2.55 2.00 6.12 cocina-4

0.35 2.55 2.00 1.79 patio

0.95 2.55 2.00 4.85 dorm-serv

2.90 2.55 2.00 14.79 sala

5.85 2.55 2.00 29.84 dormitorio-2

0.60 2.55 2.00 3.06 dormitorio-2

0.45 2.55 1.00 1.15 sh-9'

0.65 2.55 1.00 1.66 sh-8'

2.40 2.55 2.00 12.24 estar

3.75 2.55 2.00 19.13 dormitorio-1

0.76 1.75 2.00 2.66 v-6

0.60 2.55 2.00 3.06 escritorio

CUARTO DE MAQUINAS y AZOTEA

LONGITUD ALTURA NªLADOS AREA PARC TOTAL OBSERV

7.51 0.75 2.00 11.27 532.19 parapeto

4.20 0.75 2.00 6.30 parapeto

2.42 0.75 2.00 3.63 parapeto

0.75 0.75 2.00 1.13 parapeto

2.12 0.75 2.00 3.18 parapeto

7.25 0.75 2.00 10.88 parapeto

6.30 0.75 2.00 9.45 parapeto

2.00 0.75 2.00 3.00 parapeto

7.70 0.75 2.00 11.55 parapeto

1.85 0.75 2.00 2.78 parapeto

6.30 0.75 2.00 9.45 parapeto

2.00 0.75 2.00 3.00 parapeto

3.90 0.75 2.00 5.85 parapeto

1.85 0.75 2.00 2.78 parapeto

6.43 0.75 2.00 9.65 parapeto

7.10 0.75 2.00 10.65 parapeto

2.28 0.75 2.00 3.42 parapeto

0.60 0.75 2.00 0.90 parapeto

2.29 0.75 2.00 3.44 parapeto

4.50 0.75 2.00 6.75 parapeto

5.51 0.75 2.00 8.27 parapeto

5.68 0.75 2.00 8.52 parapeto

0.95 0.75 2.00 1.43 parapeto

0.90 0.75 2.00 1.35 parapeto

0.95 0.75 2.00 1.43 parapeto

0.90 0.75 2.00 1.35 parapeto

0.85 0.75 2.00 1.28 parapeto

0.80 0.75 2.00 1.20 parapeto

0.85 0.75 2.00 1.28 parapeto

1.90 3.40 2.00 12.92 esc-2

1.45 3.40 2.00 9.86 esc-2

2.60 2.55 2.00 13.26 esc-2 v-17

1.60 3.40 2.00 10.88 esc-2

3.55 3.40 2.00 24.14 esc-2

3.70 3.40 2.00 25.16 cto maq

1.80 3.40 2.00 12.24 esc-3

2.60 3.40 2.00 17.68 esc-3

2.15 3.40 2.00 14.62 esc-3

3.10 3.40 2.00 21.08 esc-3

3.40 3.40 2.00 23.12 cto maq

3.55 3.40 2.00 24.14 esc-2

0.80 2.55 2.00 4.08 cto maq-v21

1.10 3.40 2.00 7.48 cto maq

3.25 3.40 2.00 22.10 esc-3

0.80 2.55 2.00 4.08 cto maq-v21

2.00 3.40 2.00 13.60 cto maq

1.90 3.40 2.00 12.92 esc-3

5.40 3.40 2.00 36.72 esc-3

0.80 2.55 2.00 4.08 cto maq-v21

3.25 3.40 2.00 22.10 esc-3

1.75 3.40 2.00 11.90 azotea

0.80 2.55 2.00 4.08 cto maq-v21

1.15 3.40 2.00 7.82 cto maq

1.90 3.40 2.00 12.92 azotea

3.25 1.88 2.00 12.22 baranda

3.25 1.88 2.00 1.88 baranda

RESUMEN DE METRADO TARRAJEO DE MUROS INTERIORES

AREA M2 TOTAL

Zotano 332.70 6,946.92

1er Nivel 1,176.40

2do Nivel 872.44

3er-7mo Nivel 4,033.19

Cto Maquinas 532.19

TARRAJEO EN EXTERIORES ACABADO CON C:A1ER NIVEL ELEVACION POSTERIOR

AREA PAÑO ALTURA NªLADOS AREA PARC TOTAL OBSERV

10.93 1.00 1.00 10.93 77.11

-1.99 1.00 1.00 -1.99

14.66 1.00 1.00 14.66

10.00 1.00 1.00 10.00

-3.16 1.00 1.00 -3.16

-0.24 1.00 1.00 -0.24

7.05 1.00 1.00 7.05

-2.34 1.00 1.00 -2.34

30.53 1.00 1.00 30.53

-1.61 1.00 1.00 -1.61

-1.95 1.00 1.00 -1.95

4.29 3.55 1.00 15.23

2DO NIVEL ELEVACION POSTERIOR

AREA PAÑO ALTURA NªLADOS AREA PARC TOTAL OBSERV

14.15 1.00 1.00 14.15 51.70

-1.99 1.00 1.00 -1.99

16.21 1.00 1.00 16.21

-1.24 1.00 1.00 -1.24

1.04 1.00 1.00 1.04

9.30 1.00 1.00 9.30

6.60 1.00 1.00 6.60

2.23 1.00 1.00 2.23

9.82 1.00 1.00 9.82

-2.70 1.00 1.00 -2.70

-1.72 1.00 1.00 -1.72

3ER NIVEL AL 7MO NIVEL ELEVACION POSTERIOR

AREA PAÑO ALTURA NªLADOS AREA PARC SUB TOTAL OBSERV TOTAL

14.12 1.00 1.00 14.12 64.93 324.65

-2.02 1.00 1.00 -2.02

18.66 1.00 1.00 18.66

-1.26 1.00 1.00 -1.26

-2.99 1.00 1.00 -2.99

51.98 1.00 1.00 51.98

-3.30 1.00 1.00 -3.30

-2.99 1.00 1.00 -2.99

-1.26 1.00 1.00 -1.26

-1.29 1.00 1.00 -1.29

-2.70 1.00 1.00 -2.70

-2.02 1.00 1.00 -2.02

AZOTEA ELEVACION POSTERIOR

AREA PAÑO ALTURA NªLADOS AREA PARC SUB TOTAL OBSERV

27.83 1.00 1.00 27.83 47.77

25.92 1.00 1.00 25.92

-2.99 1.00 1.00 -2.99

-2.99 1.00 1.00 -2.99

1-7MO NIVEL ELEVACION LATERAL

AREA PAÑO ALTURA NªLADOS AREA PARC SUB TOTAL OBSERV

13.15 21.70 1.00 285.36 700.81 LADO IZQ

13.35 21.70 1.00 289.70 LADO DER

7.39 3.20 1.00 23.65 fachada

1.03 3.20 1.00 3.30 entrada

1.03 3.20 1.00 3.30 entrada

1.02 3.20 1.00 3.26 entrada

1.02 3.20 1.00 3.26 entrada

2.90 3.20 1.00 9.28 entrada

1.73 3.20 1.00 5.54 entrada

1.03 3.20 1.00 3.30 entrada

1.90 3.20 1.00 6.08 entrada

1.11 3.20 1.00 3.55 entrada

2.63 3.20 1.00 8.42 entrada

6.61 3.20 1.00 21.15 entrada

4.95 3.20 2.00 31.68 izq-der lateral

1-7MO NIVEL ELEVACION PRINCIPAL SIN CONSIDERAR VANOS

Longitud Altura NªVeces Area Parc Sub Total OBSERV

30.95 21.70 1.00 671.62 671.62

RESUMEN DE TARRAJEO DE MUROS EXTERIORES

DESCRIPCION AREA M2 sub-TOTAL TOTAL

ELEVACION PÒSTERIOR 501.23 1,873.65

1er Nivel 77.11

2do Nivel 51.70

3er-7mo Nivel 324.65

Cto Maquinas 47.77

ELEVACION LATERAL 700.81

ELEVACION PRINCIPAL 671.62

Friontal con vanos 671.62

RESUMEN DE TARRAJEO DE MUROS EXTERIORES

AREA M2 sub-TOTAL TOTAL

ELEVACION PÒSTERIOR 689.59 2,062.03

posterior con vanos 641.82

Cto Maquinas 47.77

ELEVACION LATERAL 700.81

ELEVACION PRINCIPAL 671.63

Friontal con vanos 671.63

METRADO SIN CONSIDERAR LAS ABERTURAS POR VANOS

TARRAJEO DE VIGAS PERALTADAS1ER NIVEL

LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC TOTAL OBSERV

0.65 0.25 0.35 1.25 3.07 3.84 114.76 M6

0.00 0.10 0.35 0.45 0.82 0.37

0.65 0.25 0.35 1.25 1.08 1.35 V12

0.65 0.25 0.35 1.25 1.30 1.63 V13

0.00 0.10 0.35 0.45 1.60 0.72

0.65 0.25 0.35 1.25 1.20 1.50 V23

0.50 0.25 0.25 1.00 0.60 0.60 V6

0.50 0.25 0.25 1.00 1.62 1.62 V2

0.50 0.25 0.25 1.00 3.05 3.05 M2

0.50 0.15 0.25 0.90 1.10 0.99 PATIO

0.50 0.15 0.25 0.90 1.55 1.40 PATIO

0.50 0.15 0.25 0.90 1.50 1.35 V3

0.00 0.10 0.40 0.50 6.15 3.08 RAMPA

0.40 0.25 0.40 1.05 1.91 2.01 ESTAR

WILLY:ESTE METRADO CORRESPONDE A TODO LA CARA SIN CONSIDERAR AVERTURA POR VANOS

0.00 0.10 0.40 0.50 2.60 1.30 ESC-2

0.40 0.25 0.40 1.05 1.05 1.10 SALON

0.40 0.25 0.40 1.05 3.93 4.13 SALON

0.15 0.25 0.15 0.55 0.60 0.33 DUCTO

0.65 0.20 0.40 1.25 2.08 2.60 SH9

0.40 0.35 0.40 1.15 0.90 1.04 SH9

0.40 0.35 0.40 1.15 4.25 4.89 COMEDOR

0.00 0.15 0.40 0.55 0.98 0.54 SH6

0.40 0.50 0.40 1.30 4.50 5.85 LOBBY

0.00 0.15 0.40 0.55 3.70 2.04 COMEDOR

0.40 0.50 0.40 1.30 1.00 1.30 RECIBO

0.00 0.15 0.40 0.55 3.08 1.69 RECIBO

0.40 0.50 0.40 1.30 2.67 3.47

0.40 0.35 0.40 1.15 6.17 7.10

0.25 0.25 0.25 0.75 3.25 2.44 SALA

0.25 0.25 0.25 0.75 0.65 0.49 COCINA 1

0.25 0.25 0.25 0.75 1.80 1.35 COCINA 1

0.25 0.25 0.25 0.75 3.00 2.25 PATIO+

0.50 0.25 0.25 1.00 6.15 6.15

0.50 0.25 0.25 1.00 2.15 2.15 TERRAZA

0.10 0.10 0.25 0.45 0.65 0.29 TERRAZA

0.25 0.25 0.25 0.75 2.30 1.73 LOBBY

0.25 0.25 0.25 0.75 1.60 1.20 ESCRITORIO

0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1

0.00 0.10 0.25 0.35 0.88 0.31 DORMITORIO-1

VERT

0.00 0.15 0.40 0.55 0.88 0.48 COCINA-2

0.40 0.30 0.40 1.10 2.88 3.17 ESTAR

0.00 0.15 0.40 0.55 2.68 1.47 ESCRITORIO

0.40 0.25 0.40 1.05 0.85 0.89 ESC-3

0.00 0.10 0.40 0.50 1.65 0.83 ESC-3

0.00 0.10 0.40 0.50 3.31 1.66 LOBBY

0.40 0.25 0.40 1.05 2.55 2.68 LOBBY

0.00 0.10 0.40 0.50 1.20 0.60 DEP 14

0.40 0.25 0.40 1.05 1.20 1.26 ESC-4

0.40 0.25 0.40 1.05 1.66 1.74 SALON

0.40 0.25 0.40 1.05 1.80 1.89 HALL

0.00 0.10 0.40 0.50 5.00 2.50 COMEDOR

0.40 0.25 0.40 1.05 0.90 0.95 ESC-2

0.40 0.25 0.40 1.05 2.35 2.47 RECIBO

0.40 0.25 0.40 1.05 3.30 3.47 COCINA-1

0.00 0.10 0.40 0.50 5.05 2.53 DORR-SERV

0.40 0.25 0.40 1.05 0.95 1.00 ESTAR

0.00 0.10 0.40 0.50 0.60 0.30 ESC-3

0.40 0.25 0.40 1.05 3.89 4.08 ESCRITORIO

2DO AL 7MO NIVEL

LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC SUB- TOTAL OBSERV AREA TOT

0.50 0.15 0.25 0.90 1.51 1.36 104.24 DORMITORIO-2 625.460.40 0.15 0.40 0.95 2.23 2.12 COCINA-1

1.05 1.05 0.00 2.10 2.60 5.46 ESC-2

0.40 0.25 0.40 1.05 1.07 1.12 patio

0.40 0.25 0.40 1.05 2.50 2.63 patio

1.05 0.00 1.05 2.10 2.60 5.46 ESCALERA

0.50 0.15 0.25 0.90 1.10 0.99 PATIO

0.50 0.15 0.25 0.90 1.50 1.35 DORMITORIO-2

0.40 0.35 0.40 1.15 3.13 3.60 ESTAR

0.40 0.35 0.40 1.15 1.10 1.27 COMEDOR

0.40 0.50 0.40 1.30 0.90 1.17 COMEDOR

0.40 0.35 0.40 1.15 2.25 2.59 COMEDOR

0.40 0.15 0.40 0.95 0.97 0.92 SH

0.60 0.50 0.60 1.70 1.20 2.04 SALA

0.40 0.35 0.40 1.15 2.15 2.47 SH

0.40 0.50 0.40 1.30 0.90 1.17 ESTAR

0.40 0.15 0.40 0.95 3.05 2.90 COMEDOR

0.40 0.50 0.40 1.30 2.67 3.47 COMEDOR

0.40 0.15 0.40 0.95 2.05 1.95 COMEDOR

0.40 0.50 0.40 1.30 2.05 2.67 COMEDOR

0.40 0.35 0.40 1.15 0.63 0.72 COMEDOR

0.40 0.20 0.40 1.00 3.05 3.05 COMEDOR

0.40 0.35 0.40 1.15 0.90 1.04 ESTAR

0.40 0.20 0.40 1.00 2.22 2.22 SH

0.25 0.25 0.25 0.75 3.25 2.44 SALA

0.25 0.25 0.25 0.75 3.00 2.25 SALA

0.25 0.25 0.25 0.75 3.00 2.25 SALA

0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1

0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO

0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO

0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1

0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO

0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1

0.50 0.10 0.25 0.85 0.88 0.75 DORMITORIO-1

VERT

0.00 0.15 0.40 0.55 2.90 1.60 DORMITORIO-1

0.40 0.30 0.40 1.10 2.95 3.25 ESTAR

0.00 0.15 0.40 0.55 2.05 1.13 PATIO

0.40 0.25 0.40 1.05 1.15 1.21

0.00 0.10 0.40 0.50 1.65 0.83 DUCTO

0.00 0.10 0.40 0.50 6.00 3.00 DORM1-WCL-SH-10

0.00 0.10 0.40 0.50 2.26 1.13 DORMITORIO-2

0.00 0.10 0.40 0.50 1.66 0.83 SH-12

0.40 0.25 0.40 1.05 2.95 3.10 ESTAR

0.00 0.10 0.40 0.50 2.75 1.38 ESCRITORIO

0.40 0.25 0.40 1.05 0.90 0.95 ESC-2

0.60 0.25 0.60 1.45 1.20 1.74 ASCENSOR

0.40 0.25 0.40 1.05 0.95 1.00 SH-14

0.40 0.25 0.40 1.05 1.10 1.16 SH-13

0.40 0.10 0.40 0.90 3.40 3.06 SALA

0.40 0.25 0.40 1.05 2.75 2.89 COMEDOR

0.40 0.10 0.40 0.90 2.95 2.66 ESCRITORIO

0.40 0.25 0.40 1.05 2.25 2.36 COCINA-1

CTO DE MAQUINAS

LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC SUB- TOTAL OBSERV

0.30 0.20 0.30 0.80 1.70 1.36 20.61

0.30 0.20 0.30 0.80 1.70 1.36

0.30 0.20 0.30 0.80 0.85 0.68

0.30 0.20 0.30 0.80 0.85 0.68

0.30 0.20 0.30 0.80 1.00 0.80

0.00 0.10 0.45 0.55 1.20 0.66

0.00 0.10 0.45 0.55 1.36 0.75

0.45 0.25 0.45 1.15 0.90 1.04

0.00 0.10 0.45 0.55 1.36 0.75

0.45 0.25 0.45 1.15 0.90 1.04

0.45 0.10 0.45 1.00 1.20 1.20

0.30 0.20 0.30 0.80 1.70 1.36

0.30 0.20 0.30 0.80 1.70 1.36

0.30 0.20 0.30 0.80 0.85 0.68

0.30 0.20 0.30 0.80 0.85 0.68

0.30 0.20 0.30 0.80 1.00 0.80

0.00 0.10 0.45 0.55 1.20 0.66

0.00 0.10 0.45 0.55 1.36 0.75

0.45 0.25 0.45 1.15 0.90 1.04

0.00 0.10 0.45 0.55 1.36 0.75

0.45 0.25 0.45 1.15 0.90 1.04

0.45 0.10 0.45 1.00 1.20 1.20

RESUMEN DE METRADO TARRAJEO DE VIGAS PERALTADAS

AREA M2 TOTAL

Zotano 0.00 760.83

1er Nivel 114.76

2do al 7mo Nivel 625.46

Cto Maquinas 20.61

DERRAMES EN VANOS1ER NIVEL

LADO-1 LADO-2 LADO-3 PERIMETRO CARAS PARCIAL TOTAL OBSERV

2.15 0.00 0.00 2.15 0.00 0.00 294.10 M6

1.08 1.50 1.50 4.08 0.00 0.00 vanos de fachada V12

1.30 1.50 1.50 4.30 0.00 0.00 vanos de fachada V13

0.80 2.10 0.00 2.90 2.00 5.80 P15

0.90 2.10 0.00 3.00 2.00 6.00 P13'

0.90 2.10 2.10 5.10 2.00 10.20 P13

0.90 2.10 0.00 3.00 2.00 6.00 P13

0.90 2.10 2.10 5.10 2.00 10.20 P13

0.80 2.10 2.10 5.00 2.00 10.00 P15

0.80 2.10 2.10 5.00 2.00 10.00 P15

0.80 2.10 2.10 5.00 2.00 10.00 P15

0.30 0.30 0.30 0.90 2.00 1.80 V7

0.30 0.30 0.30 0.90 2.00 1.80 V7

0.60 0.00 0.00 0.60 2.00 1.20 V11

2.15 0.00 0.00 2.15 2.00 4.30 P2

1.95 0.00 0.00 1.95 0.00 0.00 vanos de fachada V23

0.60 0.40 0.00 1.00 0.00 0.00 vanos de fachada V6

1.62 1.95 0.00 3.57 0.00 0.00 vanos de fachada V2

2.15 0.00 0.00 2.15 2.00 4.30 M3

1.95 0.00 0.00 1.95 2.00 3.90 V1

2.15 2.15 0.00 4.30 2.00 8.60 M2

2.15 0.00 0.00 2.15 2.00 4.30 P2

2.15 0.00 0.00 2.15 2.00 4.30 P5'

2.10 2.10 0.80 5.00 2.00 10.00 P15

2.15 2.15 0.00 4.30 2.00 8.60 PV2

1.15 1.15 0.00 2.30 2.00 4.60 PV3

2.15 2.15 0.80 5.10 2.00 10.20 P8

0.30 0.30 0.30 0.90 2.00 1.80 V7

2.15 0.70 2.15 5.00 2.00 10.00 P8

2.15 2.15 0.00 4.30 2.00 8.60 P4

1.35 0.00 1.35 2.70 0.00 0.00 vanos de fachada V3

2.15 0.00 0.00 2.15 2.00 4.30 P3

2.15 0.00 0.00 2.15 2.00 4.30 P7

0.60 0.40 0.60 1.60 2.00 3.20 V6

0.15 0.15 0.15 0.45 2.00 0.90 V8

0.60 0.40 0.60 1.60 2.00 3.20 V6

2.15 0.00 2.15 4.30 2.00 8.60 P7

2.15 0.00 2.15 4.30 2.00 8.60 P3

2.15 0.00 0.00 2.15 2.00 4.30 P3

2.15 0.00 2.15 4.30 2.00 8.60 WCL-1

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

2.15 0.00 0.00 2.15 2.00 4.30 M4

2.15 0.70 0.00 2.85 2.00 5.70 P8

2.50 0.00 2.50 5.00 2.00 10.00 M1

2.15 0.00 2.15 4.30 2.00 8.60 P1

2.15 0.00 0.00 2.15 2.00 4.30 M5

1.15 1.80 0.00 2.95 0.00 0.00 vanos de fachada V5

1.85 0.65 1.85 4.35 0.00 0.00 vanos de fachada V9

2.15 0.00 0.00 2.15 2.00 4.30 P3

Sole:METRADO DE DERRAMES SIN CONSIDERAR LOS DERRAMES EN VANOS DE FACHADA

2.15 0.00 2.15 4.30 2.00 8.60 P4

2.15 0.80 2.15 5.10 2.00 10.20 P7

2.15 0.80 2.15 5.10 2.00 10.20 P8

2.15 0.00 2.15 4.30 2.00 8.60 P7

2.15 1.00 2.15 5.30 2.00 10.60 P1

0.15 0.15 0.15 0.45 2.00 0.90 V8

1.15 0.35 1.15 2.65 2.00 5.30 P10

2do NIVEL

LADO-1 LADO-2 LADO-3 PERIMETRO CARAS PARCIAL TOTAL OBSERV

1.35 1.50 1.35 4.20 0.00 0.00 334.55 V3

1.15 2.35 1.15 4.65 0.00 0.00 vanos de fachada V16

0.40 0.40 0.40 1.20 2.00 2.40 V19

2.15 0.90 2.15 5.20 2.00 10.40 P3

2.15 0.00 2.15 4.30 2.00 8.60 M8

2.15 0.00 2.15 4.30 2.00 8.60 P3

2.15 0.00 2.15 4.30 2.00 8.60 P5

2.15 0.00 2.15 4.30 2.00 8.60 P5

1.10 1.15 1.10 3.35 2.00 6.70 V18

1.15 1.08 1.15 3.38 2.00 6.75 V24

1.80 1.15 1.80 4.75 2.00 9.50 V15

2.15 0.70 2.15 5.00 2.00 10.00 P8

0.32 0.62 0.32 1.26 2.00 2.52 V29

2.15 0.90 2.15 5.20 2.00 10.40 P3

2.15 0.80 2.15 5.10 2.00 10.20 PV2

2.15 0.00 0.00 2.15 2.00 4.30 P4

0.00 0.70 0.00 0.70 2.00 1.40 P10

1.31 0.60 0.00 1.91 2.00 3.82 P19

0.15 0.15 0.00 0.30 2.00 0.60 V8

2.15 0.80 0.00 2.95 2.00 5.90 P7

2.15 0.80 0.00 2.95 2.00 5.90 P7

2.15 0.70 0.00 2.85 2.00 5.70 P8

2.15 0.90 0.00 3.05 2.00 6.10 P4

2.15 1.40 0.00 3.55 2.00 7.10 PV1

2.15 0.70 0.00 2.85 2.00 5.70 P8

2.15 0.80 0.00 2.95 2.00 5.90 P7

0.62 0.32 0.62 1.56 2.00 3.12 V29

0.62 0.32 0.00 0.94 2.00 1.88 V29

0.60 0.40 0.00 1.00 2.00 2.00 V6

2.15 0.80 2.15 5.10 2.00 10.20 P7

2.15 0.90 0.00 3.05 2.00 6.10 P3

2.15 0.90 0.00 3.05 2.00 6.10 P3

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14

2.15 0.90 2.15 5.20 2.00 10.40 P3

0.00 0.90 0.00 0.90 2.00 1.80 P3

2.15 0.00 2.15 4.30 2.00 8.60 WCL-1

2.15 0.80 2.15 5.10 2.00 10.20 P7

0.60 0.40 0.00 1.00 2.00 2.00 V6

0.00 0.15 0.00 0.15 2.00 0.30 V8

0.32 0.62 0.32 1.26 2.00 2.52 V29

0.32 0.62 0.00 0.94 2.00 1.88 V29

2.15 0.90 0.00 3.05 2.00 6.10 P3

2.15 0.80 0.00 2.95 2.00 5.90 P7

2.15 0.90 0.00 3.05 2.00 6.10 P4

2.15 0.70 0.00 2.85 2.00 5.70 P8

0.30 0.30 0.00 0.60 2.00 1.20 V7

2.15 0.70 2.15 5.00 2.00 10.00 P8

2.15 0.90 2.15 5.20 2.00 10.40 P5

Sole:METRADO DE DERRAMES SIN CONSIDERAR LOS DERRAMES EN VANOS DE FACHADA

2.15 0.80 0.00 2.95 2.00 5.90 PV2

1.14 0.65 0.00 1.79 2.00 3.58 P11

0.30 0.30 0.30 0.90 2.00 1.80 V7

2.15 0.80 2.15 5.10 2.00 10.20 P7

2.15 0.80 2.15 5.10 2.00 10.20 P7

0.32 0.62 0.00 0.94 2.00 1.88 V29

0.00 0.90 0.00 0.90 2.00 1.80 P3

1.35 1.50 0.00 2.85 0.00 0.00 vanos de fachada V3

2.15 0.80 2.15 5.10 2.00 10.20 P7

2.15 0.90 2.15 5.20 2.00 10.40 P3

0.00 0.90 0.00 0.90 2.00 1.80 P3

2.15 0.00 2.15 4.30 2.00 8.60 WCL-1

1.35 2.60 0.00 3.95 0.00 0.00 vanos de fachada V17

1.15 1.10 1.15 3.40 0.00 0.00 vanos de fachada V18

1.15 1.55 1.15 3.85 0.00 0.00 vanos de fachada V4

1.35 1.50 1.35 4.20 0.00 0.00 vanos de fachada V3

RESUMEN DE METRADO DERRAMES EN VANOS

LONG ML TOTAL

Zotano 0.00 2,301.40

1er Nivel 294.10

2do al 7mo Nivel 2,007.30

Cto Maquinas 0.00

TARRAJEO DE COLUMNAS Y PLACAS1ER NIVEL

LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL OBSERV

1.00 1.00 0.10 1.00 3.10 2.55 7.91 69.56 P1

1.55 2.50 1.20 0.00 5.25 2.55 13.39 P2

1.00 1.00 0.10 0.00 2.10 2.55 5.36 P3

0.10 0.83 1.00 1.00 2.93 2.55 7.47 P1

0.85 0.50 0.25 0.75 2.35 2.55 5.99 P4

0.75 0.50 0.75 0.95 2.95 2.55 7.52 P5

0.90 0.42 1.20 0.68 3.20 2.55 8.16 P6

0.10 0.70 0.10 0.00 0.90 2.55 2.30 P7

0.25 2.00 0.25 2.00 4.50 2.55 11.48 PLACA-3

2DO NIVEL

LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL OBSERV

1.40 0.50 1.20 2.35 5.45 2.55 13.90 131.55 P2

0.10 1.00 0.25 1.00 2.35 2.55 5.99 P1

0.10 1.00 0.25 0.00 1.35 2.55 3.44 P3

0.10 0.75 0.85 0.25 1.95 2.55 4.97 P4

0.10 1.00 0.25 1.00 2.35 2.55 5.99 P1

0.60 0.75 0.75 1.25 3.35 2.55 8.54 P5

0.90 0.32 1.20 0.20 2.62 2.55 6.68 P6

0.10 0.70 0.00 0.00 0.80 2.55 2.04 P7

7.46 6.46 0.35 0.10 14.37 2.55 36.64 PLACA-3

2.20 0.35 2.20 0.35 5.10 2.55 13.01 PLACA-2

2.65 0.20 2.65 0.00 5.50 2.55 14.03 PLACA-2

2.95 0.25 2.95 0.25 6.40 2.55 16.32 PLACA-1

AZOTEA Y CUARTO DE MAQUINAS

LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL OBSERV

2.20 0.35 2.20 0.35 5.10 1.25 6.38 53.82 PLACA-2

0.05 2.20 0.05 0.00 2.30 1.25 2.88 PLACA-2

0.10 0.70 0.10 0.00 0.90 3.70 3.33

Willy:No se ha considerado en el metrado las columnas y placas empotradas en muros, ya q estas son metradas en muros

0.10 0.70 0.10 0.00 0.90 3.70 3.33

0.05 2.20 0.05 0.00 2.30 2.20 5.06 PLACA-2

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

2.20 0.35 2.20 0.35 5.10 1.25 6.38 PLACA-2

0.05 2.20 0.05 0.00 2.30 1.25 2.88 PLACA-2

0.10 0.70 0.10 0.00 0.90 3.70 3.33

0.10 0.70 0.10 0.00 0.90 3.70 3.33

0.05 2.20 0.05 0.00 2.30 2.20 5.06 PLACA-2

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

RESUMEN DE METRADO TARRAJEO DE COLUMNAS Y PLACAS

AREA TOTAL

Zotano SON SOLAQUEADAS 0.00 912.71

1er Nivel 69.56

2do al 7mo Nivel 789.33

Cto Maquinas 53.82

CIELORRASOS CON MEZCLA C:A1ER NIVEL

PAÑO AREA PARC NºVECES AREA TOTAL OBSERV

1.00 4.25 1.00 4.25 390.54

2.00 66.94 1.00 66.94

3.00 20.38 1.00 20.38

4.00 8.64 1.00 8.64

5.00 2.86 1.00 2.86

6.00 1.73 1.00 1.73

7.00 3.08 1.00 3.08

8.00 21.50 1.00 21.50

9.00 17.07 1.00 17.07

10.00 3.12 1.00 3.12

11.00 23.72 1.00 23.72

12.00 17.40 1.00 17.40

13.00 20.97 1.00 20.97

14.00 41.55 1.00 41.55

15.00 20.13 1.00 20.13

16.00 41.29 1.00 41.29

17.00 21.35 1.00 21.35

18.00 41.58 1.00 41.58

19.00 3.60 1.00 3.60

20.00 3.60 1.00 3.60

21.00 1.10 1.00 1.10

22.00 4.68 1.00 4.68

2do al 7mo NIVEL

PAÑO AREA PARC NºVECES AREA TOTAL OBSERV

1.00 31.16 6.00 186.96 2,048.46

2.00 10.85 6.00 65.10

3.00 10.08 6.00 60.48

4.00 3.12 6.00 18.72

5.00 2.26 6.00 13.56

6.00 3.10 6.00 18.60

7.00 21.43 6.00 128.58

8.00 15.38 6.00 92.28

PISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILARPISO VINILICO DE 1.6MMPISO VINILICO DE 1.6MM

PISO LAMINADO DE MADERAPISO LAMINADO DE MADERAPISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO DE GRANITO LAVADO

PISO DE GRANITO LAVADO

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO PORCELANATO.PISO PORCELANATO.PISO GRANITO LAVADO.PISO GRANITO LAVADO.PISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO LAMINADO DE MADERA

PISO LAMINADO DE MADERA

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO VINILICO DE 1.6MMPISO VINILICO DE 1.6MMPISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO DE ALFOMBRA DE 7 Ó 8 MM + GFIELTRO NACIONAL.

DONDE SE COLOCARA CONTRAPISO

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILARPISO VINILICO DE 1.6MMPISO VINILICO DE 1.6MM

PISO LAMINADO DE MADERAPISO LAMINADO DE MADERAPISO CERAMICO CELIMA 30x30 O SIMILAR

PISO CERAMICO CELIMA 30x30 O SIMILAR

PISO DE GRANITO LAVADO

PISO DE GRANITO LAVADO

Sole:METRADO SIN CONSIDERAR JARDINES COMO AREA ,VERIFICAR ESPEC-TEC

Sole:METRADO CONSIDERANDO JARDINES COMO AREA ,VERIFICAR ESPEC-TEC

9.00 0.77 6.00 4.62

10.00 3.12 6.00 18.72

11.00 21.92 6.00 131.52

12.00 17.40 6.00 104.40

13.00 20.97 6.00 125.82

14.00 41.55 6.00 249.30

15.00 20.13 6.00 120.78

16.00 41.29 6.00 247.74

17.00 21.35 6.00 128.10

18.00 41.58 6.00 249.48

19.00 3.63 6.00 21.78

20.00 3.63 6.00 21.78

21.00 1.10 6.00 6.60

22.00 4.68 6.00 28.08

23.00 0.91 6.00 5.46

Cto de Maquinas

PAÑO AREA PARC NºVECES AREA TOTAL OBSERV

1.00 3.60 2.00 7.20 53.72

2.00 0.81 2.00 1.62

3.00 1.35 2.00 2.70

4.00 1.53 2.00 3.06

5.00 0.89 2.00 1.78

6.00 10.78 2.00 21.56

7.00 5.60 2.00 11.20

8.00 2.30 2.00 4.60

RESUMEN DE METRADO TARRAJEO DE CIELORRASO

AREA TOTALZotano SON SOLAQUEADAS 0.00 2,492.72

1er Nivel 390.54

2do al 7mo Nivel 2,048.46

Cto Maquinas 53.72

CONTRAPISO1ER NIVEL

PAÑO AREA N° VECES AREA PARC AREA TOT AREA TOT OBSERV

PRIMER NIVEL

1.00 51.32 0.00 0.00 0.00 423.86 JARDIN FROTACHADO

2.00 13.25 0.00 0.00 JARDIN FROTACHADO

3.00 8.33 0.00 0.00 JARDIN FROTACHADO

4.00 5.16 0.00 0.00 JARDIN FROTACHADO

5.00 46.54 0.00 0.00 JARDIN FROTACHADO

6.00 61.62 0.00 0.00 JARDIN FROTACHADO

7.00 12.27 1.00 12.27 41.08 TERRAZA

8.00 6.21 1.00 6.21 TERRAZA

9.00 3.00 1.00 3.00 TERRAZA

10.00 8.25 1.00 8.25 TERRAZA

11.00 11.35 1.00 11.35 RAMPA

12.00 21.83 1.00 21.83 85.92 DORMITORIO-2

13.00 3.74 1.00 3.74 WCL

14.00 11.74 1.00 11.74 DORMITORIO-2

15.00 11.86 1.00 11.86 ESCRITORIO

16.00 12.10 1.00 12.10 DORMITORIO-2

17.00 13.95 1.00 13.95 DORMIT-1+WCL

18.00 10.70 1.00 10.70 ESCRITORIO

19.00 54.32 1.00 54.32 88.00 ESTAR-COMEDR

20.00 33.68 1.00 33.68 ESTAR-COMEDR

21.00 5.51 1.00 5.51 10.29 DORM-SERV

22.00 4.78 1.00 4.78 DORM-SERV

23.00 2.80 1.00 2.80 38.62 SH-3

24.00 1.86 1.00 1.86 SH-7

25.00 6.10 1.00 6.10 PATIO

26.00 7.09 1.00 7.09 PATIO

27.00 9.12 1.00 9.12 COCINA-2

28.00 11.65 1.00 11.65 COCINA-1

29.00 60.02 1.00 60.02 84.99 LOBBY

30.00 11.70 1.00 11.70 SALON

31.00 2.21 1.00 2.21 SH-1

32.00 11.06 1.00 11.06 ENTRADA

33.00 3.17 1.00 3.17 15.58 SH-4

34.00 2.95 1.00 2.95 SH-5

35.00 2.83 1.00 2.83 SH-2

36.00 1.65 1.00 1.65 SH-6

37.00 2.73 1.00 2.73 SH-9

38.00 2.25 1.00 2.25 SH-8

39.00 29.44 1.00 29.44 59.38 ESTACIONAMIENTO PULIDO

40.00 29.94 1.00 29.94 ESTACIONAMIENTO PULIDO

2 NIVEL

PAÑO AREA N° VECES AREA PARC AREA TOT AREA TOT OBSERV

41 11.42 1.00 11.42 108.83 354.48 DORMITORIO-2

42 14.05 1.00 14.05 DORMITORIO-1

41 10.75 1.00 10.75 ESCRITORIO

42 10.67 1.00 10.67 ESCRITORIO

43 14.05 1.00 14.05 DORMITORIO-1

44 10.60 1.00 10.60 ESCRITORIO

45 13.93 1.00 13.93 DORMITORIO-1

46 12.00 1.00 12.00 DORMITORIO-2

47 11.36 1.00 11.36 DORMITORIO-2

48 4.95 1.00 4.95 65.10 PATIO

49 2.00 1.00 2.00 SH-15

50 10.47 1.00 10.47 COCINA-1

51 9.75 1.00 9.75 COCINA-3

52 5.21 1.00 5.21 PATIO

53 2.19 1.00 2.19 SH-12

54 6.94 1.00 6.94 PATIO

55 6.31 1.00 6.31 COCINA-2

56 1.91 1.00 1.91 SH-7

57 5.18 1.00 5.18 DORM-SERV

58 4.79 1.00 4.79 DORM-SERV

59 5.40 1.00 5.40 DORM-SERV

60 36.69 1.00 36.69 108.87 ESTAR-COMEDR

61 36.26 1.00 36.26 ESTAR-COMEDR

62 35.92 1.00 35.92 ESTAR-COMEDR

63 2.71 1.00 2.71 21.21 SH-9'

64 2.19 1.00 2.19 SH-8'

65 2.21 1.00 2.21 SH-14

66 2.21 1.00 2.21 SH-13

67 2.87 1.00 2.87 SH-11

68 2.22 1.00 2.22 SH-10

69 1.92 1.00 1.92 SH-16

70 2.19 1.00 2.19 SH-8'

71 2.69 1.00 2.69 SH-9'

72 39.16 1.00 39.16 50.47 TERRAZA

73 3.43 1.00 3.43 TERRAZA

74 3.43 1.00 3.43 TERRAZA

75 4.45 1.00 4.45 TERRAZA

3ER AL 7MO NIVEL

PAÑO AREA N° VECES AREA PARC AREA TOT AREA TOT OBSERV

76 11.42 5.00 57.10 544.15 1,576.60 DORMITORIO-2

77 14.05 5.00 70.25 DORMITORIO-1

78 10.75 5.00 53.75 ESCRITORIO

79 10.67 5.00 53.35 ESCRITORIO

80 14.05 5.00 70.25 DORMITORIO-1

81 10.60 5.00 53.00 ESCRITORIO

82 13.93 5.00 69.65 DORMITORIO-1

83 12.00 5.00 60.00 DORMITORIO-2

84 11.36 5.00 56.80 DORMITORIO-2

85 4.95 5.00 24.75 325.50 PATIO

86 2.00 5.00 10.00 SH-15

87 10.47 5.00 52.35 COCINA-1

88 9.75 5.00 48.75 COCINA-3

89 5.21 5.00 26.05 PATIO

90 2.19 5.00 10.95 SH-12

91 6.94 5.00 34.70 PATIO

92 6.31 5.00 31.55 COCINA-2

93 1.91 5.00 9.55 SH-7

94 5.18 5.00 25.90 DORM-SERV

95 4.79 5.00 23.95 DORM-SERV

96 5.40 5.00 27.00 DORM-SERV

97 36.69 5.00 183.45 544.35 ESTAR-COMEDR

98 36.26 5.00 181.30 ESTAR-COMEDR

99 35.92 5.00 179.60 ESTAR-COMEDR

100 2.71 5.00 13.55 106.05 SH-9'

101 2.19 5.00 10.95 SH-8'

102 2.21 5.00 11.05 SH-14

103 2.21 5.00 11.05 SH-13

104 2.87 5.00 14.35 SH-11

105 2.22 5.00 11.10 SH-10

106 1.92 5.00 9.60 SH-16

107 2.19 5.00 10.95 SH-8'

108 2.69 5.00 13.45 SH-9'

109 3.43 5.00 17.15 56.55 TERRAZA

110 3.43 5.00 17.15 TERRAZA

111 4.45 5.00 22.25 TERRAZA

AREA TOTAL TOTALZotano 0.00 2,354.94

1er Nivel 423.86 610.08

2do Nivel 354.48 354.48

3er al 7mo Nivel 1,576.60 1,576.60

Cto Maquinas 0.00

RESULTADO 2,541.16

TARRAJEO DE FONDO DE ESCALERA1ER NIVEL

Longitud Ancho Area Parc AREA TOT Tramos OBSERV

1 nivel

5.24 1.20 6.29 21.61 1 Tramo ESC-1

2.85 1.20 3.42 2 Tramo ESC-1

2.44 1.20 2.93 1 Tramo ESC-2

1.20 2.60 3.12 Descanso ESC-2

2.44 1.20 2.93 3 Tramo ESC-2

2.44 1.20 2.93 1 Tramo ESC-2

1.20 2.60 3.12 Descanso ESC-2

2.44 1.20 2.93 3 Tramo ESC-2

2do al 7mo NIVEL

Longitud Ancho Area Parc SubTotal Total Tramos OBSERV

RESUMEN DE METRADO CONTRAPISO

2 nivel 2 -7 nivel

2.44 1.20 2.93 15.02 90.14 1 Tramo ESC-2

1.20 2.60 3.12 Descanso ESC-2

2.44 1.20 2.93 3 Tramo ESC-2

2.44 1.20 2.93 1 Tramo ESC-2

1.20 2.60 3.12 Descanso ESC-2

2.44 1.20 2.93 3 Tramo ESC-2

Escalera de Cuarto de Maquinas

Longitud Ancho Area Parc SubTotal Tramos OBSERV

1.92 0.53 1.02 2.99 1 Tramo cto de maquinas

0.90 0.53 0.48 Descanso bloque 1

1.92 0.53 1.02 1 Tramo cto de maquinas

0.90 0.53 0.48 Descanso bloque 2

RESUMEN DE METRADO TARRAJEO DE FONDO DE ESCALERA

AREA TOTAL

Zotano 9.71 114.75

1er Nivel 11.90

2do-7mo Nivel 90.14

Cto Maquinas 2.99

TARRAJEO DE PASOS Y CONTRAPASOS CEMENTO PULIDOSotano y 1er Nivel

Longitud Ancho NºPasos Area Parc AREA TOT Tramos OBSERV

1 nivel

1.20 0.25 14.00 4.20 30.66 pasos ESC-2

1.20 0.18 17.00 3.57 contrapaso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 14.00 4.20 pasos ESC-2

1.20 0.18 17.00 3.57 contrapaso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 17.00 5.10 pasos ESC-1

1.20 0.18 18.00 3.78 contrapaso ESC-1

2do y 7mo Nivel

Longitud Ancho NºPasos Area Parc AREA TOT Tramos OBSERV

2Nivel

1.20 0.25 14.00 4.20 21.78 pasos ESC-2

1.20 0.18 17.00 3.57 contrapaso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 14.00 4.20 pasos ESC-2

1.20 0.18 17.00 3.57 contrapaso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

1.30 1.20 1.00 1.56 descanso ESC-2

Cto De Maquinas

Longitud Ancho NºPasos Area Parc AREA TOT Tramos OBSERV

Azotea

0.90 0.25 8.00 1.80 8.50 pasos cto de maquinas

0.90 0.18 9.00 1.46 contrapaso bloque 1

0.90 1.10 1.00 0.99 descanso

0.90 0.25 8.00 1.80 pasos cto de maquinas

0.90 0.18 9.00 1.46 contrapaso bloque 2

0.90 1.10 1.00 0.99 descanso

RESUMEN DE METRADO TARRAJEO DE PASOS Y CONTRAPASOS

AREA TOTAL

169.84

Sotano y 1er Nivel 30.66

2do-7mo Nivel 130.68

Cto Maquinas 8.50

TARRAJEO DE CON INPERMEABILIZANTE EN JARDINERAS1ER NIVEL

Longitud Altura Area Parc AREA TOT OBSERV

1 nivel

1.84 1.35 2.48 63.15 int-jardin

0.95 1.35 1.28 int-jardin

1.81 1.35 2.44 int-jardin

0.84 1.35 1.13 int-jardin

2 nivel

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

1.60 0.35 0.56 dorm -2

0.45 0.35 0.16 dorm -2

1.60 0.35 0.56 dorm -2

0.45 0.35 0.16 dorm -2

1.15 0.35 0.40 patio

1.15 0.35 0.40 patio

1.08 0.35 0.38 patio

1.05 0.35 0.37 patio

10.23 0.95 9.72 x terraza

8.98 0.95 8.53 x terraza

1.25 0.95 1.19 x terraza

4.10 0.95 3.90 x terraza

3.41 0.95 3.24 x terraza

3 nivel

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

4 nivel

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

5 nivel

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

6 nivel

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

3.15 0.35 1.10 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

7 nivel

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

2.65 0.35 0.93 fachada

0.35 0.35 0.12 fachada

Atencion ing Ervin de Olarte AQUÍ ESTAN los metrados de las partidas de albañileria.

Espero que puedas entenderlo, ya que puse detalles en observaciones para su entendimiento y revicion de la misma..

Atte Un amigo: WAST

Bueno comouun dia dijistes, aqui estoy preparandome para cuando nos llegue el momento de GOBERNAR ESTE PAIS...

Aqui sigo con el grupo que funde en la universidad aunque esta mejor ordenanda meda ORGULLO que mis compañeros no lo hayan abandonado el tiempo de mi estancia por Lima

cto basu 1.33 dep-7

cto basu 1.85 dep-8

dep 10 1.70 dep-9

dep 11

dep 12 1.61 dep-7

dep 6 1.35 dep-8

dep 12 3.55 dep-9

dep 10

tableros

tableros

tableros

cto basu

cto basu

s-h

dep-10

dep-11

dep 6

dep 12

dep 6

cto basu

Sole:METRADO DE DERRAMES SIN CONSIDERAR LOS DERRAMES EN VANOS DE FACHADA

Sole:METRADO DE DERRAMES SIN CONSIDERAR LOS DERRAMES EN VANOS DE FACHADA

Willy:No se ha considerado en el metrado las columnas y placas empotradas en muros, ya q estas son metradas en muros

Sole:METRADO CONSIDERANDO JARDINES COMO AREA ,VERIFICAR ESPEC-TEC

2 10 20 7 140 420