CV-Carlo Muniz-T_AR

Preview:

Citation preview

CVCarlo Magno R. Muñiz T +971 50 4573704 E crmdxb1@gmail.com

With over 26 years of professional and diversified

experience in the design of Mixed-Use, High-Rise, Hotel,

Office, Commercial, Residential and Recreational projects

both Design and Construction in the Middle East and Asia

I have gained a breadth of International experience and

understanding that allowed me to relate to client

perspectives and goals while still providing innovative

solutions.

In addition to my Architectural responsibilities, I am

a member of the RMJM CAD Committee as Group

Lead CAD coordinator involved in coordination, research

and implementing CAD standards in RMJM across all

disciplines.

Position in RMJMPosition in RMJMPosition in RMJMPosition in RMJM

Technical Technical Technical Technical AAAArchitectrchitectrchitectrchitect

Education & Education & Education & Education & Professional MembershipProfessional MembershipProfessional MembershipProfessional Membership

Far Eastern University - Manila, Philippines

Bachelor of Science in Architecture

Society of Engineers -Dubai (Member)

Countries of Work ExperienceCountries of Work ExperienceCountries of Work ExperienceCountries of Work Experience

UAE, Philippines

Employment RecordEmployment RecordEmployment RecordEmployment Record

RMJM RMJM RMJM RMJM INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL

Technical Architect (13 years) - Middle East

September 2002 – Present -Dubai, UAE

ATKINSATKINSATKINSATKINS (W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)

Architect (9 years) - Middle East

September 1993 – September 2002, Dubai, UAE

PRSP PRSP PRSP PRSP ARCHITECTSARCHITECTSARCHITECTSARCHITECTS

Architect / Lead CAD (4 years) - Asia

November 1991 – September 1993

Assistant Architect / CAD Coordinator

October 1989 – November 1991

Makati, Philippines

Duties and ResponsibilitiesDuties and ResponsibilitiesDuties and ResponsibilitiesDuties and Responsibilities

• Prepare Concept / Schematic design and drawing

design development in schematic code conformance

ensuring the Quality System Procedures (QSP) and

operational standards are maintained.

• In-charge of coordination and liaison with MEP,

Structural, Statutory Authority, Sub-consultants,

Contractors, Sub-Contractors, Suppliers and

Manufacturers ensuring construction drawings are fully

reviewed and coordinated prior to submission.

• Prepare the local authority submissions in accordance

with the relevant authority requirements and complied

with international building code standards to ensure all

submissions are monitored to obtain approvals and

every issuance of drawings or submissions are correct

and collated in order.

• Assist in site inspection, if required. Response on a

daily bases regarding site issues, closing the RFI,

coordinate with the site team, Consultant and Client to

close the site issues, coordinate with other Design and

Engineering team related to Structural, Electrical &

MEP. Review and approve Sub-contractors’ shop

drawings. Manage the team to update the drawings as

per the site condition.

• Take responsibility, where required by the project

leader, for specific areas of the design and project

development.

• Design Studio Team member involved in concept to

scheme to produce design, analysis, and presentations

using free hand sketching and other 2D/3D platform

design media.

• CAD Group Lead Coordinator- CAD management,

training and monitoring of staffs in terms of standards

and procedures

Relevant Project ExperienceRelevant Project ExperienceRelevant Project ExperienceRelevant Project Experience ---- Asia & Asia & Asia & Asia & MiddleMiddleMiddleMiddle----EastEastEastEast

High Rise / High Rise / High Rise / High Rise / MixedMixedMixedMixed----UUUUsesesese Development & Commercial Development & Commercial Development & Commercial Development & Commercial

• THE SPINE GARDENS (2B+G+2L Retail/Podium),

1 km. Project: Dubai, UAE

• METROPOL (500,000 sqm Project w/ 3 Towers -Hotel /

Office / Luxury Apartment & Retail 30,000 sqm).

Istanbul, Turkey

• STELLA MARIS TOWER (59 Storey), Dubai, UAE

• ADNEC Capital Gate, Abu Dhabi, UAE

• Dubai Tower, Doha, Qatar

• Lamar Towers, Jeddah, KSA

• DWTC Convention & Exhibition Center, Dubai, UAE*

• Dubaï Stable & Seeh Al Salam Endurance, Dubai, UAE

• Burj Al Arab Hotel, Dubai, UAE*

• Jumeirah Beach Hotel, Dubai, UAE*

• Dubai Internet City- Phase 1 & 2, Dubai, UAE*

• Citibank Headquarter Tower, Makati, Philippines*

• Renaissance Mixed-use Development,

(3 Towers+Retail) Ortigas, Philippines*

TransportationTransportationTransportationTransportation

• Abu Dhabi Metro Rail System, Abu Dhabi, UAE*

Recreational / Leisure & AmusementRecreational / Leisure & AmusementRecreational / Leisure & AmusementRecreational / Leisure & Amusement

• Wonderland Water & Amusement Theme Park,

Dubai, UAE*

• Wild Wadi Water Theme Park, Dubai, UAE*

• Zabeel Park,(Area=510,000 sqm) Dubai, UAE*

ResidentialResidentialResidentialResidential

• Emaar Plot 26 to 27 - The Greens, Dubai, UAE

• Al Rayyan Hills Development, Sana’a, Yemen

EducationEducationEducationEducation

• American School of Dubai, Dubai, UAE

• King’s Dubai Primary School, Dubai, UAE

**** Experience prior to joining RMJM

Design competitions:Design competitions:Design competitions:Design competitions:

An architect in the Concept Team participating in

various responsibilities with high profile project

competitions ranging from conceptualization, design

and presentation.

• Emirates Towers 3 (Expansion Phase feasibility) • Jumeirah Palm Island • Dubai Autodrome • Radisson Hotel Jumeirah Palm • Dubai Chamber of Commerce and Industry • Akoya Development - Masterplan • Global Village Dubai • Dubai Civil Aviation Executive Hangar

With RMJMWith RMJMWith RMJMWith RMJM ---- Middle EastMiddle EastMiddle EastMiddle East----AsiaAsiaAsiaAsia

SeptemberSeptemberSeptemberSeptember 2222002 002 002 002 ---- PresentPresentPresentPresent

High Rise/ High Rise/ High Rise/ High Rise/ MixedMixedMixedMixed----UseUseUseUse CommercialCommercialCommercialCommercial & & & & HotelHotelHotelHotel

ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE

The Capital Gate feature tower flanks Abu Dhabi’s

historical Grandstand, one of the city’s cultural landmarks.

The feature tower acts as a dramatic termination to the

organic free-form stainless steel mesh canopy that forms

the Grandstand roof and provides a visual anchor for the

ADNEC Capital Centre Development as a whole within the

Abu Dhabi City Skyline. Phase 3- the Capital Gate feature

tower is now in construction. At 35 storeys high, it will offer

over 20,000 m2 of high quality offices and retail units as

well as Abu Dhabi’s first Hyatt hotel, ‘The Hyatt@Capital

Centre’. Standing at over 160m tall, the building has been

designed to be the landmark statement for the whole of the

ADNEC exhibition development.

Site Area: 53,000m2

Client: ADNEC

Status: Constructed

Role: Design & Production team / Architect

(Concept to Detail Design stage)

Dubai Tower, Doha, QatarDubai Tower, Doha, QatarDubai Tower, Doha, QatarDubai Tower, Doha, Qatar

The client’s aspiration for the project was for it to be a

beacon for Dubai in Doha, Qatar. The project brief was for

an extremely high end building. The tower is a combination

of hotel, serviced apartments, offices, residential

apartments and retail space.

Site Area: 90 storeys

Client: Sama Dubai

Status: Under construction

Role: Design & Production Team/ Architect

(Review & coordination all MEP package)

Capital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAE

The Capital Centre Hotel provides an iconic and intelligent

architectural solution for a 725 key, 5-star business hotel

located along the waterfront at the heart of the Capital

Centre District, Abu Dhabi. The project is a G+22 storey

development comprised of 702 hotel rooms and suites and

23 serviced apartments with private terraces. Its main

features include a 20 storey central atrium and podium

level containing a health club, pool and restaurants.

Site Area:100,000m2

Client: National Corporation for Tourism and Hotels

Status: Detail Design

Role: Design & Production Team / Architect

(Concept to Schematic design package)

LLLLAMAR AMAR AMAR AMAR ToToToTowers, mixedwers, mixedwers, mixedwers, mixed----use development, Jeddah, KSA use development, Jeddah, KSA use development, Jeddah, KSA use development, Jeddah, KSA

A Twin tower development located on the shores of the

Red Sea. This mixed-use development consists of two

residential towers of 61 and 69 storeys and a ten storey

office building all located above a retail mall. The V shaped

towers afford views to all apartments over the sea towards

the setting sun.

Site Area: 415,000m2

Client: Cayan Investments

Status: Under Construction

Role: Design & Production team / Architect

(Concept to Detail Design stage)

Dubai Towers, Jeddah, KSADubai Towers, Jeddah, KSADubai Towers, Jeddah, KSADubai Towers, Jeddah, KSA

The design for Dubai Towers – Jeddah is an iconic multi-

storey elegantly proportioned skyscraper, providing over

450,000m2 of gross built-up area consisting of offices, 5-

star hotel, serviced apartments, residential apartments,

spa, ballroom, marina and a retail podium with three

underground parking levels.

Site Area: 450,000m2

Client: Sama Dubai

Status: Detail Design

Role: Design & Production team / Architect

(Concept to Schematic design package)

Hyatt RegencyHyatt RegencyHyatt RegencyHyatt Regency Creek Creek Creek Creek Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Dubai, UAEDubai, UAEDubai, UAEDubai, UAE

Situated near the Dubai creek, these 166.5m high towers

are intended to provide amazing views of Dubai Creek and

Sheikh Zayed Road skyline. The development will contain

world-class retail, offices, hotel, and serviced apartment

units. Three service floors are introduced at both towers to

satisfy servicing requirements.

Site Area: 201,018m2

Client: Dubai Healthcare City

Status: Constructed

Role: Design & Production team/ Architect

(Concept to Detail Design stage)

RRRResidential esidential esidential esidential

EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 –––– The GREENThe GREENThe GREENThe GREENSSSS

RMJM were commissioned to design two residential

buildings in The Greens. And the design provides mid-rise

apartment blocks defined by delicate detail, ornamentation

and symmetrical expressions inherent in Mediterranean

architecture. The accommodation is complemented by

leisure facilities such as swimming pool, children’s wading

pool, gymnasium, resort-style pool deck, barbeque areas

and a multi-purpose entertainment room.

Client: Emaar properties, PSJC

Status: Constructed

Role: Design & Production team / Architect

(Concept to Schematic design package)

Rayyan Hills Rayyan Hills Rayyan Hills Rayyan Hills DevelopmentDevelopmentDevelopmentDevelopment----Phase 1Phase 1Phase 1Phase 1---- Sana’a, YemenSana’a, YemenSana’a, YemenSana’a, Yemen

RMJM were commissioned in 2009 to provide

Architectural, Structural and MEP Design Services for the

Al Rayyan Hills project. The Al Rayyan Hills Project is

located on the Faj Attan Hill and Phase 1 consists of 172

residential villas and one residential apartment block. The

site is located on an exclusive steep-sided plateau of

about 440000sqm located within Sana’a city limits. It is

approximately 200m higher than the surrounding areas

giving it an impressive panoramic view from all sides to

various sections of the Capital, Sana’a.

Site Area: 440,000m2

Client: Consolidated Contractors Group Sal

(Offshore) (CCC)

Status: Constructed

Role: Production team / Architect

(Concept to Schematic design package)

Education Education Education Education

American School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAE

Designed to be a model of best practices for sustainable

design in the Middle East, the new campus for the

American School of Dubai is set on a 27-acre site in the Al

Barsha district of Dubai within a kilometer of Arabian Gulf

beaches and the famous Burj Al Arab Hotel. The school

accommodates 1,600 students in a Pre-K through 12th

grade curriculum.

Site area: 50,000m2

Client: American School of Dubai

Status: Constructed

Role: Production team / Architect

(Schematic design stage)

SkillsSkillsSkillsSkills and Abilitiesand Abilitiesand Abilitiesand Abilities::::

• Adapting technical design planning according to

Local / International Building Code standards and

regulation authority requirements in resolving any

problems/ circumstances that may arise during

construction.

• Creating building designs and highly detailed

drawing both by sketch freehand and by using

2D/3D specialist computer-aided design (CAD)

applications

• Working closely with a team of other professionals

such as building service engineer, construction

managers, quantity surveyors and arch’l technician.

• Knowledgeable in AutoCAD, Revit-(Basic),

Microsoft Office and Excel

• Basic to intermediate knowledge of Sketch Up

and Adobe Photoshop

Major Major Major Major Project Project Project Project Undertaken Undertaken Undertaken Undertaken ---- Visual photosVisual photosVisual photosVisual photos

RRRR MMMM JJJJ M M M M INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL ---- PPPP oooo rrrr tttt ffff oooo llll i i i i oooo

September 2002 – Present -Dubai, UAE

Website: http://www.rmjm.com/

THE SPINETHE SPINETHE SPINETHE SPINE GARDENS GARDENS GARDENS GARDENS (1km(1km(1km(1km ---- Commercial RetailCommercial RetailCommercial RetailCommercial Retail / Podium/ Podium/ Podium/ Podium))))

Dubai,UAEDubai,UAEDubai,UAEDubai,UAE

MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development

Status: Preliminary Concept to Design Development

Role: Production team / Architect / Liaison all MEP

coordination with all Discipline (Engineers)

METROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, Turkey

MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development

Status: Under Construction

Role: Production team / Architect / Lead CAD

W HOTEL & RESIDENCEW HOTEL & RESIDENCEW HOTEL & RESIDENCEW HOTEL & RESIDENCE, , , , Dubai, UAEDubai, UAEDubai, UAEDubai, UAE

Luxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced Apartments

Status: Under Construction

Role: Production team / Architect

STELLA MARIS TOWERSTELLA MARIS TOWERSTELLA MARIS TOWERSTELLA MARIS TOWER, Dubai, UAE, Dubai, UAE, Dubai, UAE, Dubai, UAE

Luxury ApartmentsLuxury ApartmentsLuxury ApartmentsLuxury Apartments & Retail / F&B& Retail / F&B& Retail / F&B& Retail / F&B

Status: For Construction

Role: Production team / Architect / Liaison all MEP

coordination with all Discipline (Engineers)

LOTUS COMPLEX LOTUS COMPLEX LOTUS COMPLEX LOTUS COMPLEX Mumbai, IndiaMumbai, IndiaMumbai, IndiaMumbai, India

MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development (Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)

Status: Constructed

DWTC DWTC DWTC DWTC CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER –––– Dubai, UAEDubai, UAEDubai, UAEDubai, UAE

MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development (Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)

Status: Constructed

AAAA TTTT KKKK IIII NNNN S S S S –––– PPPP oooo rrrr tttt ffff oooo llll i i i i oooo

September 1993 – September 2002, Dubai, UAE

Website: http://www.atkinsglobal.com/en-GB/middle-east

BURJ AL ARAB 7BURJ AL ARAB 7BURJ AL ARAB 7BURJ AL ARAB 7----STAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAE

Jumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAE

Status: Constructed

Role: Concept Design stage / Design Production Team

DUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAE

Status: Constructed (Master plan)

Role: Production team / Architect. Concept & Schematic

Design stage

ZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAE

Status: Constructed (Master plan)

Role: Production team / Architect. Concept, Schematic &

Detail Design stage

PPPP RRRR SSSS P P P P ARCHITECTS ARCHITECTS ARCHITECTS ARCHITECTS –––– PPPP oooo rrrr tttt ffff oooo llll i i i i oooo

October 1989 – September 1993, Makati, Philippines

Website: http://www.prsparchitects.com/Index.html

Renaissance Residential Renaissance Residential Renaissance Residential Renaissance Residential 3333----TowerTowerTowerTowerssss, , , , Pasig, Pasig, Pasig, Pasig, PhilippinesPhilippinesPhilippinesPhilippines

Status: Constructed

Role: Production team / Architect. Concept, Schematic &

Detail Design to Construction stage

CITIBANK TOWER CITIBANK TOWER CITIBANK TOWER CITIBANK TOWER –––– Office, Makati, PhilippinesOffice, Makati, PhilippinesOffice, Makati, PhilippinesOffice, Makati, Philippines

Status: Constructed

Role: Production team / Architect. Concept, Schematic &

Detail Design to Construction stage

CCCCEBUEBUEBUEBU HOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, Philippines

Cebu Business Park Cebu Business Park Cebu Business Park Cebu Business Park –––– Office BuildingOffice BuildingOffice BuildingOffice Building

Status: Constructed

Role: Production team Concept & Schematic stage