Flood Analysis in Geum River& Countermeasure Establishment

Flood Analysis in Geum River& Countermeasure Establishment

the 8th Hydro Asia 2014

Hydraulic and Hydrology

Session 1

Total Water Service Provider K-water

21 Climate Change in Korea

1

In 100 years : Temp. 5℃ ↑, precipitation 17% ↑

2 times more than global warming

0.74℃

[Change of Global Mean Temp.]

1.7℃

[Change of Mean Temp. of Korea]

(Source : KMA, Institute)

Climate Change in Korea

Water management under Changes & Challenges

Frequency, Intensity of Flood & Drought in-crease

- Flood damage (billion Won) : 123.6(’71)→1,990.4(’05)

Evaportranspiration & Water demand etc. in-

crease

Regional rainfall deviation & uncertainty in-

creaseTyphoon intensity & Heavy rain increase

- Typhoon intensity : 984→960hpa, 24hpa↓/36yr

- Heavy rainy days : 20→31days, 11days↑/50yr

1 Climate Change in Korea

Total Water Service Provider K-water

22Climatic & Geographical Characteristics in Korea

The 70’s : 1,225mm → Recently : 1,465mm, 19.6% ↑

Since the 1970, drought with every 5-7 years

Annual Precipitation : 1,277mm

2 Climatic Characteristics – Precipitation trends

895

19

77

19

82

19

88

19

94

20

01

20

08

1,007

1,001

953

1,061

1,016

1,383

1,409

1,7361,611

1,6691,791 1,908

Trough : 817.5㎜ (60.7%)Monsoon : 327.0㎜ (24.3%) Typhoon : 201.4㎜ (14.9%)

Trend

5yr 6yr 6yr 7yr 7yr

1465mm

1225mm

Effective Water management is absolutely required

Trough : 362.5㎜ (41.4%) Monsoon : 321.8㎜ (36.7%) Typhoon : 191.8㎜ (21.9%)

Precipitation During Summer Season (JJAS) : 876.1 ㎜ (65% of the Total)

2 Climatic Characteristics – Monthly precipitation

Annual Precipitation : Global 1.6 timesAnnual Precipitation : Global 1.6 times Water per Capita : Global 1/6 timesWater per Capita : Global 1/6 times

1,277

2,629

534 201,364

715 22,741

807 16,427

867 7,794

1,690 4,933

1,220 4,907

627 4,530

2 Climatic Characteristics – Water per capita

Mountainous withMountainous with

Steep slopeSteep slope

Korea landKorea land

Seasonal discharge variation is very severe(Flood season : much water flood,⇒ Dry season : small water drought)⇒

= Raito of Max/Min River discharge

90260

190270

13022

834

1830

3114

0 50 100 150 200 250 300

Han

NakdongKeum

Seomjin

YoungsanYangtze Thames

SeineRhein

NileMississippi

Yodo

Coefficient of regime

2

Water per capita

Geographical Characteristics

Total Water Service Provider K-water

23Geum Gang River & GRRP(River Restoration Project)

3 Geum Gang River & GRRP(River Restoration Project)

3 Geum Gang River & GRRP(River Restoration Project)

Youngju damYoungju dam

HwasunHwasun

DamyangDamyang

Han Riv.Han Riv.

Seomjin Riv.Seomjin Riv.

Nakdan Nakdan

Youngsan Riv.Youngsan Riv.

ChilgokChilgok

GangjeongGoryeong

GangjeongGoryeong

DalseongDalseong

Hapcheon ChangnyeongHapcheon Changnyeong

Changnyeong HamanChangnyeong Haman

GangcheonGangcheon

YeojuYeoju

IpoIpo

SeungchonSeungchon

JuksanJuksan

DamDam WeirWeir Flood Retention Res.Flood Retention Res.

BarrageExpansionBarrage

Expansion

Introduction of GRRP

Andong-Imhaconnection

Andong-Imhaconnection

GumiGumi

SangjuSangju

Bohyeondam

Bohyeondam

Nakdong Riv.Nakdong Riv.

BarrageExpansionBarrage

Expansion

Project

Dredging : 43 million ㎥

Multi-purpose Weir : 3

Bank Reinforcement : 117 ㎞

Embanking Agr. Res. : 30

Farmland Remodeling : 17

Small Hydro-power : 3

Eco-stream : 199 ㎞

Bike Road : 301 ㎞

Basin Area : 9,912 ㎢ , Basin Length : 397 ㎞

Geum Riv.Geum Riv.

BaekjeBaekje

SejongSejong

GongjuGongju

3 Geum Gang River & GRRP(River Restoration Project)

Riverbed and Water Level Profiles of the Geum River

Estuary barrage Daecheong dam

Sejongweir

137 ㎞

GongjuweirBaekje

weir

24.2MCM15.5MCM

5.7MCM

length

depth

3 Geum Gang River & GRRP(River Restoration Project)

Status of Weirs in the Geum River

Sejong-weir Gongju-weir Baekje-weir

Weir Length(m) 348 280 311

Capacity(106 m3) 5.7 15.5 24.2Hydropower plants

Capacity ( ㎾ ) 2,310 3,000 2,640

Fishway(ea) 1 2 1

Sejong-weir Gongju-weir Baekje-weir

Total Water Service Provider K-water

24 TEAM PROJECT

4 TEAM PROJECT

MISSION

□ Find various solutions to flood problems

at target areas

□ and Verify your solution !

4 TEAM PROJECT

Target area

4 TEAM PROJECT

Target area

AREA 1AREA 2

AREA 1

4 TEAM PROJECT

NO. 21+000

NO. 21+660

Length : L=2,860m (No. 18+550 ~ No.

22+650)Bank top level: Right(7.75m~9.16m), Left(-)

Flood Level : EL. 6.76m ~ EL. 7.47m (100year return period)

Cultivated Land Altitude: EL. 3.70m ~ EL. 3.75m

FLOW

AREA 1

4 TEAM PROJECT

NO. 21+000

NO. 21+660

Problems : Sudden river narrows, Non-bank area(left

side)- Frequent flooding at cultivated land

- River bed sedimentation at direct downstream by Bottleneck phe-

nomenon- Oppose the river improvements by local residents

Riverbed sedimenta-

tion

FLOW

Non-Bank area

AREA 2

4 TEAM PROJECT

Length : L=1,890m (No. 26+740 ~ No.

28+630)Bank top level: Right(8.55m~9.23m), Left(10.00m~10.36m)

Flood Level : EL. 8.01m ~ EL. 8.35m (100year return period)

BANK

BANK

AREA 2

4 TEAM PROJECT

BANK

BANK

Problems : Sudden river narrows

- Concerned about right-bank erosion by speedy flow veloc-

ity- River bed sedimentation at direct downstream by Bottleneck phe-

nomenon

• DEM at target areas

□ Modeling Analysis using 1-D(HEC-RAS,…) & 2-D(CCHE-2D, MIKE,..) tool

Go! Go! Go! Move! Move! Move!

□ Given data :

• A river bed measurement data (CAD-type)

• Frequency flood discharge at target point

• Other necessary data for analysis..

□ Segregation of duties

Go! Go! Go! Move! Move! Move!

TEAM Target area Remarks

1 Area1

2 Area2

3 Area1

4 Area2

5 Area1

6 Area2

- Elemental analysis => joint execution(3 teams)

- Find solution => each team

- Verify solution => each team

□ 1 target area for 3 teams

Go! Go! Go! Move! Move! Move!