HAMMER MAZE 2003

Preview:

Citation preview

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 1/16

HAMMER MAZE

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 2/16

CEILING BOLT

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 3/16

FLOOR BOLT

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 4/16

POSTS: THESE ARE

TWO SIZES OF

SQUARE METALPOSTS ONE SLIDING

IN OTHER. THERE IS A

CLIP THROUGH THIS

THAT HOLDS THE

POST AT A CERTAIN

HEIGHT. THE BOTTOM

AND TOP ARE PLACED

OVER THE BOLTS IN

FLOOR AND CEILING.THE TWO POSTS ARE

SLID APART AND

LOCKED INTO PLACE

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 5/16

LATCHES

HOLDING

PANELS

IN PLACE

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 6/16

SLIDING

LATCH

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 7/16

PANELS

FASTENED TO

POSTS

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 8/16

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 9/16

PANEL TO SIMULATE WALL STUDS

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 10/16PROP LAID ON FLOOR TO SIMULATE RAFTERS

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 11/16

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 12/16

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 13/16

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 14/16

RAMP TO

SECOND FLOOR

SO YOU WILLHAVE TO GET

LADDER TO

CLIMB OR USE

OTHERMETHODS

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 15/16

8/14/2019 HAMMER MAZE 2003

http://slidepdf.com/reader/full/hammer-maze-2003 16/16

USE ONE METAL POST AND THREADED POST THAT SLIDES INTO. THIS

WILL BE SCREWED UP INTO A 2X4 ACROSS CEILING AND BOLTED

INTO PLACE. THE METAL POST WILL BE PLACED OVER A BOLT

ANCORED INTO THE FLOOR. WE WILL THEN MAKE PANELS AND HOLDIN PLACE LIKE HAMMER

METHOD THAT

WE WILL BE

USING IN OAK

HARBOR