K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

Preview:

DESCRIPTION

Development of vibration isolation systems for LCGT VII. K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. Akutsu A , H. Ishizaki A , D. Chen A , A. Takamori B , T. Suzuki C , N. Kimura C , S. Koike C , - PowerPoint PPT Presentation

Citation preview

1

K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA,

H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ,

N.A. LockerbieK, LCGT collaboration

ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK

Development of vibration isolation systems

for LCGT VII

2012 March 24The meeting of Physical Society of Japan

@Kwansei Gakuin University, Nishinomiya, Hyogo

22

K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA,

H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ,

N.A. LockerbieK, LCGT collaboration

ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK

Development of vibration isolation systems

for KAGRA VII

2012 March 24The meeting of Physical Society of Japan

@Kwansei Gakuin University, Nishinomiya, Hyogo

3

0. Abstract

Progress of development of vibration isolation system, which includes cryogenic payload, for KAGRA in the last half year

4

Contents

1.Introduction2.Vibration isolation3.Cryogenic payload4.Summary

5

1. Introduction KAGRA (previously known as: LCGT)

2nd generation interferometric             gravitational wave detector in Japan

Key features of KAGRA projectSilent underground site (Kamioka) :     Small seismic motion reduced requirements for vibration isolation system. Cryogenic system : Reduction of thermal noise                                and so on

6

Type-AIP + GASF (5 stage) + Payload (23kg, cryogenic)

Type-BIP + GASF (3 stage) + Payload (10kg/20kg)

Type-CStack + Single/Double-pendulum ( ~1kg)

1. Introduction

7

Type-C Type-C

MirrorStack

1. Introduction

8

Top filter[Filter0]

Inverted Pendulum (IP)

Standard GASFFilter1 (Filter1~3 in Type-A)

Bottom Filter (BF)

Intermediate Mass (IM)Intermediate Recoil Mass (IRM)

Test Mass (TM)Recoil Mass (RM)Optical Bench[Breadboard]

Pre-isolator

Payload

Filter chain

Type-Type-B B

9

1. Introduction

9

Cryogenic mirror

Cryostat

Vibration Isolation(Type A)

14m in height

Type A and

Cryo payload

10

1. Introduction

Sapphire mirror(20K)

Sapphire fiber

Shield(8K)

Cryo payload

Y. Sakakibara’s talk (in this session)

11

1. Introduction

Schedule for vibration isolation system of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 -

Prototype test (ICRR and NAOJ) : - 2014.3 Pre-isolator : 2011.7 – 2012.9 Type B payload : 2012.7 - 2013.6 Type B : 2013.1 - 2014.3 Assembling (Akeno and Kamioka) : 2012.4 - 2014.9 Standard GASF : 2012.4 – 2012.9 Installation (Kamioka) : 2014.4 - 2016.5 Type B (for iKAGRA) : 2014.4 - 2015.6 Type A and Type B (for bKAGRA) : 2015.5 - 2016.5

12

Schedule for cryogenic payload of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 -

1/4 cryostat to test payload and R&D : - 2014.9 Design for cryostat and payload : Now 1/4 cryostat installation in ICRR (Kashiwa) : 2013.3 Experiment of 1/4 cryostat : 2013.4 - 2014.9 Procurement : 2014.10 - 2015.6

Installation : 2015.8 - 2016.12

1. Introduction

13

2. Vibration isolation

Complete system

Prototype test (Pre-isolator) in Kashiwa (ICRR)

Details of experimental test will be reported by T. Sekiguchi (next talk !).

14

2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR)

14

Pre-isolator

Pre-isolator load

15

2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR)

15

Standard GASF (prototype) (production)

16

2. Vibration isolation

Digital system has already been installed(O. Miyakawa’s talk in this session).

Prototype test (Pre-isolator) in Kashiwa (ICRR)

17

Storage & Assembling

Delivered apparatus will be assembled in clean booths and stored in Akeno observatory (ICRR), Yamanashi.

2. Vibration isolation

18

2. Vibration isolation 19 standard GASF’sfrom Italy and clean booths arrived.We will start assembling soon.

Akeno

Lucca (Italy)

19

3. Cryogenic payload

19

Preparation for 1/4 cryostat Design of 1/4 cryostat is in progress.

Preliminary.

20

3. Cryogenic payload

20

Preparation for 1/4 cryostat Design of cryogenic payload is in progress.

http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=570

Preliminary.

21

3. Cryogenic payload

21

Preparation for 1/4 cryostat Themal and mechanical simulation of payload (S. Koike, Y. Sakakibara, and T. Sekiguchi)

22

3. Cryogenic payload

22

Preparation for 1/4 cryostat (C. Tokoku)Cryocooler has already arrived at ICRR !

23

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

24

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

Test sample (T. Uchiyama)

25

3. Cryogenic payload

25

Sapphire fibers to suspend sapphire mirrors Sapphire fibers from MolTech GmbH (Germany)

Length = 350 mm diameter = 1.8 mm Almost as needed in bKAGRA. Need to check the quality.

26

3. Cryogenic payload Baffle for the (large angle) scattered light

Design from Mike Smith – Caltech (support from LIGO and U.S. National Science Foundation )

Needs suspension inside radiation shield !

27

3. Cryogenic payload

Digital system for temperature monitor Discussion is in progress.

28

4. Summary Vibration isolation Prototype test in Kashiwa : pre-isolator (Sekiguchi and Miyakawa’ talk) Assembling of Standard GASF in Akeno is started soon. Cryogenics payload Design of the 1/4 cryostat and payload are in progress. Cryocooler for 1/4 cryostat and test samples of sapphire fibers arrived. Baffle in cryostat and digital system are being discussed.

29

Thank you for your attention !

30

4. SummaryPlan for next half year Vibration isolation Prototype test : pre-isolator and payload Assembling in Akeno : Standard GASF Cryogenics payload Design of the 1/4 cryostat and payload

31

(1)How to assemble Details of construction, clean room ….

(2)Strength Tensile strength, development of clamp, …

(3)Control system Actuators (what and where), resonant mode (frequency and Q)

2. Issues

32

(4)Cooling

Temperature of mirror, initial cooling time, heat resistance …

(5)Noise

Thermal noise, vibration via heat links …

2. Issues

33

Cryogenic payload : One of key features of LCGT projectCryogenic part of seismic isolation system

Cryostat installation in ICRR (Kashiwa) ~2013.3 (Check of cryostat system)

Check of cryogenic payload in ICRR

Preparation is in progress. (1)Thermal simulation (2)Sapphire fiber-mirror connection (3)Simulation of effect of external vibration (with heat link) (4)Thermal noise

4. Summary

34

(1)How to assemble Details of construction, clean room ….

(2)Control system Actuators (what and where), resonant mode (frequency and Q)

5. Future work

35

Type-B Type-B

Inverted pendulum

Top filter

2-stage GASF

Mirror

36

iKAGRA operation

    2011 2012 2013 2014 2015 2016  Standard GASF Prototype test                                                 in NIKHEF/ICRR  Procure                                                    Assembling                                                 in AkenoPre-isolator Prototype test                                                 in ICRR  Procure                                                    Assembling                                                 in AkenoType-B payload Prototype test                                                 in NAOJ  Procure                                                    Assembling                                                 in Kamioka  Installation                                                  Type-A SAS Prototype test                                                 in the site

  Installation                                   ETM   ITM        

Type-B SAS Prototype test                                                 in TAMA  Installation                                     SRM PRM      Stack Procure                                                    Installation                                                  

Schedule along roadmap

1. Introduction

37

Type-A: IP + GASF (5 stage) + Payload (23kg, cryogenic)Type-B: IP + GASF (3 stage) + Payload (10kg/20kg, room temp.)Type-C: Stack + Single/Double-pendulum (~1kg)

ConfiguratioConfigurationn

Chamber iKAGRA bKAGRA

ITMX, ITMY, ETMX, ETMY

Type-A

IAOX, IAOY, EAOX, EAOY

Type-B Payload on Stack(for ITM/ETM)

Type-C(for AO)

BS, PR2, PR3 Type-B Payload on Stack

Type-B

PRM, SRM, SR2, SR3

Type-B

MCF, MCE, MMT Type-C Type-C

PD, BRTX, BRTY Type-C

Recommended