ZAPATA Z1-A
METRADO DEL PRIMER NIVEL:
L1 H
LOSA ALIGERADA AREA:
VIGA PRINCIPAL 0.2 0.4VIGA SECUNDARIA 0.2 0.35
COLUMNA 0.3 4.2
MURO 1.86 2.8
PV1 AREA:
METRADO DEL SEGUNDO NIVEL:L1 H
LOSA ALIGERADA AREA:
VIGA PRINCIPAL 0.2 0.4
VIGA SECUNDARIA 0.2 0.35
COLUMNA 0.25 2.8
MURO 1.86 2.8
PV2 AREA:
METRADO TERCER NIVEL:
L1 H
LOSA ALIGERADA AREA:
VIGA PRINCIPAL 0.2 0.4
VIGA SECUNDARIA 0.2 0.35
COLUMNA 0.25 2.8
PV2 AREA:
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
2/72
8500 250 2100
6150
PS*% PS1PS2PS3 10367.4
A% PS*$!
A% 10367.43 6150
A% 1.6
L % 1.30
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
3/72
L2 FACTOR-CARGA CARGAS
1.642 300 42.6
1.82 2400 34.440.76 2400 127.68
0.3 2400 07.2
0.15 1800 1406.16
PM1 3283.08
PV1 38.25
PS1 4221.33
3.753 250 38.25
L2 ACTOR-CARGA CARGAS
1.642 300 42.6
1.82 2400 34.44
0.76 2400 127.68
0.3 2400 504
0.15 1800 1406.16
PM1 287.88
PV1 38.25
PS2 3818.13
3.753 250 38.25
L2 ACTOR-CARGA CARGAS
1.642 300 42.6
1.82 2400 34.44
0.76 2400 127.68
0.25 2400 420
PM1 138.72
PV1 38.25
PS3 2327.7
3.753 250 38.25
SC % 2502$*%0.852
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
4/72
D % 1
1
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
5/72
ZAPATA Z1-
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.588
VIGA PRINCIPAL 0.2 0.4 1.82VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.3 4.2 0.3
MURO 4.016 2.8 0.15
PV1 AREA: 6.8
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 6.588
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.25 2.8 0.25
MURO 4.016 2.8 0.15
PV2 AREA: 6.8
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.588
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.25 2.8 0.25
PV2 AREA: 6.8
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
6/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2PS3% 21715.272
A% PS*$!
A% 21715.272 6150
A% 3.53
L % 1.88
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
7/72
FACTOR-CARGA CARGAS
300 176.4
2400 34.442400 561.12
2400 07.2
1800 3036.06
PM1 6830.256
PV1 1745
PS1 8575.256
250 1745
ACTOR-CARGA CARGAS
300 176.4
2400 34.44
2400 561.12
2400 420
1800 3036.06
PM1 6343.056
PV1 1745
PS2 8088.056
250 1745
ACTOR-CARGA CARGAS
300 176.4
2400 34.44
2400 561.12
2400 420
PM1 3306.6
PV1 1745
PS3 5051.6
250 1745
SC % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
8/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
9/72
ZAPATA Z1-C
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 8.05
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 4.62COLUMNA 0.3 4.2 0.3
MURO 6.84 2.8 0.15
PV1 AREA: 10.333
METRADO DEL SEGUNDO NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 8.05
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.25
MURO 6.84 2.8 0.15
PV2 AREA: 10.333
METRADO TERCER NIVEL
L1 H L2
LOSA ALIGERADA AREA: 8.05
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.25
PV2 AREA: 10.333
D!"#:
D % 1
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.852
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
10/72
8500 250 2100 1
6150
PS*% PS1PS2PS3% 30460.83
A% PS*$!
A% 30460.83 6150
A% 4.5
L % 2.23
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
11/72
FACTOR-CARGA CARGAS
300 2415
2400 34.44
2400 776.162400 07.2
1800 5171.04
PM1 618.84
PV1 2583.25
PS1 12202.0
250 2583.25
FACTOR-CARGA CARGAS
300 2415
2400 34.44
2400 776.16
2400 420
1800 5171.04
PM1 131.64
PV1 2583.25
PS2 11714.8
250 2583.25
FACTOR-CARGA CARGAS
300 2415
2400 34.44
2400 776.16
2400 420
PM1 360.6
PV1 2583.25
PS3 6543.85
250 2583.25
SC % 2502
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
12/72
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
13/72
ZAPATA Z1-D
METRADO DEL PRIMER NIVEL:
L1 H L2 FACTOR-CARGA
LOSA ALIGERADA AREA: 5.587 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 0.76 2400COLUMNA 0.3 4.2 0.3 2400
MURO 5.18 2.8 0.15 1800
PV1 AREA: 7.67 250
METRADO DEL SEGUNDO NIVEL:
L1 H L2 ACTOR-CARGALOSA ALIGERADA AREA: 5.587 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 0.76 2400
COLUMNA 0.25 2.8 0.3 2400
MURO 5.18 2.8 0.15 1800
PV2 AREA: 7.67 250
METRADO TERCER NIVEL:
L1 H L2 ACTOR-CARGA
LOSA ALIGERADA AREA: 5.587 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 0.76 2400
COLUMNA 0.25 2.8 0.25 2400
PV2 AREA: 7.67 250
D!"#: SC % 2502
D % 1
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
14/72
8500 250 2100 1
6150
PS*% PS1P 21875.52
A% PS*$!
A% 21875.5 6150
A% PS*$!
A% 9RE 3600
A% 9RE
L% 9RE
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
15/72
CARGAS
1676.1
34.44
127.6807.2
316.08
PM1 676.5
PV1 117.5
PS1 884
117.5
CARGAS1676.1
34.44
127.68
504
316.08
PM1 6573.3
PV1 117.5
PS2 840.8
117.5
CARGAS
1676.1
34.44
127.68
420
PM1 2573.22
PV1 117.5
PS3 440.72
117.5
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
16/72
A% 3.56
L % 1.8
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
17/72
ZAPATA Z1-E
METRADO DEL PRIMER NIVEL:
L1 H L2 TOR-CAR
LOSA ALIGERADA AREA: 5.08 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 2.55 2400COLUMNA 0.3 4.2 0.3 2400
MURO 6.53 2.8 0.15 1800
PV1 AREA: 5.51 250
METRADO DEL SEGUNDO NIVEL:
L1 H L2 CTOR-CARLOSA ALIGERADA AREA: 5.08 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 2.55 2400
COLUMNA 0.25 2.8 0.3 2400
MURO 6.53 2.8 0.15 1800
PV2 AREA: 5.51 250
METRADO TERCER NIVEL:
L1 H L2 CTOR-CAR
LOSA ALIGERADA AREA: 5.08 300
VIGA PRINCIPAL 0.2 0.4 1.82 2400
VIGA SECUNDARIA 0.2 0.35 2.55 2400
COLUMNA 0.25 2.8 0.25 2400
PV2 AREA: 5.51 250
D!"#: % 250
D % 1
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85( % 210
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
18/72
8500 250 2100 1
6150
PS*% PS1PS2 23073.33
A% PS*$!
A% 23073.33 6150
A% 3.75
L % 1.4
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
19/72
GA CARGAS
1524
34.44
428.407.2
436.68
PM1 8145.72
PV1 1487.75
PS1 633.47
1487.75
A CARGAS1524
34.44
428.4
504
436.68
PM1 7742.52
PV1 1487.75
PS2 230.27
1487.75
A CARGAS
1524
34.44
428.4
420
PM1 2721.84
PV1 1487.75
PS3 420.5
1487.75
2
3
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
20/72
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
21/72
ZAPATA Z1-
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 2.545
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 1.23COLUMNA 0.3 4.2 0.3
MURO 3.25 2.8 0.15
PV1 AREA: 3.154
METRADO DEL SEGUNDO NIVEL:
L1 H L2LOSA ALIGERADA AREA: 2.545
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 1.23
COLUMNA 0.25 2.8 0.3
MURO 3.25 2.8 0.15
PV2 AREA: 3.154
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 2.545
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 1.23
COLUMNA 0.25 2.8 0.25
PV2 AREA: 3.154
D!"#:
D % 1
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
22/72
8500 250 2100 1
6150
PS*% PS1PS2PS3% 1306.44
A% PS*$!
A% 1306.44 6150
A% 2.13
L % 1.46
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
23/72
FACTOR-CARGA CARGAS
300 763.5
2400 34.44
2400 206.642400 07.2
1800 2457
PM1 4683.78
PV1 788.5
PS1 5472.28
250 788.5
ACTOR-CARGA CARGAS300 763.5
2400 34.44
2400 206.64
2400 504
1800 2457
PM1 4280.58
PV1 788.5
PS2 506.08
250 788.5
ACTOR-CARGA CARGAS
300 763.5
2400 34.44
2400 206.64
2400 420
PM1 173.58
PV1 788.5
PS3 2528.08
250 788.5
SC % 2502
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
24/72
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
25/72
ZAPATA Z1-A
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 3.1
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 0.76COLUMNA 0.3 4.2 0.3
MURO 1.82 2.8 0.15
PV1 AREA: 5.256
METRADO DEL SEGUNDO NIVEL:
L1 H L2LOSA ALIGERADA AREA: 3.1
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 0.76
COLUMNA 0.25 2.8 0.3
MURO 1.82 2.8 0.15
PV2 AREA: 5.256
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 3.1
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 0.76
COLUMNA 0.25 2.8 0.25
PV2 AREA: 5.256
D!"#:
D % 1
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
26/72
8500 250 2100 1
6150
PS*% PS1PS2PS3% 12835.5
A% PS*$!
A% 12835.5 6150
A% 2.0
L % 1.44
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
27/72
FACTOR-CARGA CARGAS
300 5.7
2400 34.44
2400 127.682400 07.2
1800 1375.2
PM1 371.4
PV1 1314
PS1 5033.4
250 1314
ACTOR-CARGA CARGAS300 5.7
2400 34.44
2400 127.68
2400 504
1800 1375.2
PM1 3316.74
PV1 1314
PS2 4630.74
250 1314
ACTOR-CARGA CARGAS
300 5.7
2400 34.44
2400 127.68
2400 420
PM1 1856.82
PV1 1314
PS3 3170.82
250 1314
SC % 2502
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
28/72
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
29/72
ZAPATA Z2-
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 12.26
VIGA PRINCIPAL 0.2 0.4 3.64VIGA SECUNDARIA 0.2 0.35 3.68
COLUMNA 0.3 4.2 0.3
MURO 3.11 2.8 0.15
PV1 AREA: 14.22
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 12.26
VIGA PRINCIPAL 0.2 0.4 3.64
VIGA SECUNDARIA 0.2 0.35 3.68
COLUMNA 0.25 2.8 0.3
MURO 3.11 2.8 0.15
PV2 AREA: 14.22
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 12.26
VIGA PRINCIPAL 0.2 0.4 3.64
VIGA SECUNDARIA 0.2 0.35 3.68
COLUMNA 0.25 2.8 0.25
PV2 AREA: 14.22
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
30/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2PS3% 32270.28
A% PS*$!
A% 32270.28 6150
A% 5.25
L % 2.2
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
31/72
CTOR-CARGA CARGAS
300 3688.8
2400 68.882400 618.24
2400 07.2
1800 2351.16
PM1 8264.28
PV1 3573
PS1 11837.28
250 3573
CTOR-CARGA CARGAS
300 3688.8
2400 68.88
2400 618.24
2400 504
1800 2351.16
PM1 7861.08
PV1 3573
PS2 11434.08
250 3573
CTOR-CARGA CARGAS
300 3688.8
2400 68.88
2400 618.24
2400 420
PM1 5425.2
PV1 3573
PS3 88.2
250 3573
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
32/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
33/72
ZAPATA Z2-C
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 16.677
VIGA PRINCIPAL 0.2 0.4 3.05VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.3 4.2 0.3
MURO 4.0 2.8 0.15
PV1 AREA: 1.327
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 16.677
VIGA PRINCIPAL 0.2 0.4 3.05
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.3
MURO 4.0 2.8 0.15
PV2 AREA: 1.327
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 16.677
VIGA PRINCIPAL 0.2 0.4 3.05
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.25
PV2 AREA: 1.327
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
34/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 41605.11
A% PS*$!
A% 41605.11 6150
A% 6.77
L % 2.60
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
35/72
CTOR-CARGA CARGAS
300 5003.1
2400 585.62400 776.16
2400 07.2
1800 302.04
PM1 10364.1
PV1 4831.75
PS1 1515.85
250 4831.75
CTOR-CARGA CARGAS
300 5003.1
2400 585.6
2400 776.16
2400 504
1800 302.04
PM1 60.
PV1 4831.75
PS2 1472.65
250 4831.75
CTOR-CARGA CARGAS
300 5003.1
2400 585.6
2400 776.16
2400 420
PM1 6784.86
PV1 4831.75
PS3 11616.61
250 4831.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
36/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
37/72
ZAPATA Z2-D
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 12.376
VIGA PRINCIPAL 0.2 0.4 3.74VIGA SECUNDARIA 0.2 0.35 3.43
COLUMNA 0.3 4.2 0.3
MURO 1.82 2.8 0.15
PV1 AREA: 14.38
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 12.376
VIGA PRINCIPAL 0.2 0.4 3.74
VIGA SECUNDARIA 0.2 0.35 3.43
COLUMNA 0.25 2.8 0.3
MURO 1.82 2.8 0.15
PV2 AREA: 14.38
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 12.376
VIGA PRINCIPAL 0.2 0.4 3.74
VIGA SECUNDARIA 0.2 0.35 3.43
COLUMNA 0.25 2.8 0.25
PV2 AREA: 14.38
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
38/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 3036.15
A% PS*$!
A% 3036.15 6150
A% 4.4
L % 2.22
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
39/72
CTOR-CARGA CARGAS
300 3712.8
2400 718.082400 576.24
2400 07.2
1800 1375.2
PM1 720.24
PV1 357.25
PS1 10887.4
250 357.25
CTOR-CARGA CARGAS
300 3712.8
2400 718.08
2400 576.24
2400 504
1800 1375.2
PM1 6887.04
PV1 357.25
PS2 10484.2
250 357.25
CTOR-CARGA CARGAS
300 3712.8
2400 718.08
2400 576.24
2400 420
PM1 5427.12
PV1 357.25
PS3 024.37
250 357.25
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
40/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
41/72
ZAPATA Z2-E
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: .878
VIGA PRINCIPAL 0.2 0.4 3.74VIGA SECUNDARIA 0.2 0.35 2.66
COLUMNA 0.3 4.2 0.3
MURO 3.51 2.8 0.15
PV1 AREA: 11.203
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: .878
VIGA PRINCIPAL 0.2 0.4 3.74
VIGA SECUNDARIA 0.2 0.35 2.66
COLUMNA 0.25 2.8 0.3
MURO 3.51 2.8 0.15
PV2 AREA: 11.203
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: .878
VIGA PRINCIPAL 0.2 0.4 3.74
VIGA SECUNDARIA 0.2 0.35 2.66
COLUMNA 0.25 2.8 0.25
PV2 AREA: 11.203
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
42/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 2725.65
A% PS*$!
A% 2725.65 6150
A% 4.54
L % 2.13
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
43/72
CTOR-CARGA CARGAS
300 263.4
2400 718.082400 446.88
2400 07.2
1800 2653.56
PM1 768.12
PV1 2800.75
PS1 1048.87
250 2800.75
CTOR-CARGA CARGAS
300 263.4
2400 718.08
2400 446.88
2400 504
1800 2653.56
PM1 7285.2
PV1 2800.75
PS2 10086.67
250 2800.75
CTOR-CARGA CARGAS
300 263.4
2400 718.08
2400 446.88
2400 420
PM1 4548.36
PV1 2800.75
PS3 734.11
250 2800.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
44/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
45/72
ZAPATA Z2-
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 4.54
VIGA PRINCIPAL 0.2 0.4 3.64VIGA SECUNDARIA 0.2 0.35 1.33
COLUMNA 0.3 4.2 0.3
MURO 3.64 2.8 0.15
PV1 AREA: 6.015
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 4.54
VIGA PRINCIPAL 0.2 0.4 3.64
VIGA SECUNDARIA 0.2 0.35 1.33
COLUMNA 0.25 2.8 0.3
MURO 3.64 2.8 0.15
PV2 AREA: 6.015
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 4.54
VIGA PRINCIPAL 0.2 0.4 3.64
VIGA SECUNDARIA 0.2 0.35 1.33
COLUMNA 0.25 2.8 0.25
PV2 AREA: 6.015
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
46/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 1071.6
A% PS*$!
A% 1071.6 6150
A% 3.10
L % 1.76
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
47/72
CTOR-CARGA CARGAS
300 1486.2
2400 68.882400 223.44
2400 07.2
1800 2751.84
PM1 6067.56
PV1 1503.75
PS1 7571.31
250 1503.75
CTOR-CARGA CARGAS
300 1486.2
2400 68.88
2400 223.44
2400 504
1800 2751.84
PM1 5664.36
PV1 1503.75
PS2 7168.11
250 1503.75
CTOR-CARGA CARGAS
300 1486.2
2400 68.88
2400 223.44
2400 420
PM1 2828.52
PV1 1503.75
PS3 4332.27
250 1503.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
48/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
49/72
ZAPATA Z1-AA
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 1.637
VIGA PRINCIPAL 0.2 0.4 1.82VIGA SECUNDARIA 0.2 0.35 0.76
COLUMNA 0.3 4.2 0.3
MURO 4.2 2.8 0.15
PV1 AREA: 3.483
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 1.637
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 0.76
COLUMNA 0.25 2.8 0.3
MURO 4.2 2.8 0.15
PV2 AREA: 3.483
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 1.637
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 0.76
COLUMNA 0.25 2.8 0.25
PV2 AREA: 3.483
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
50/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 14787.15
A% PS*$!
A% 14787.15 6150
A% 2.40
L % 1.55
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
51/72
CTOR-CARGA CARGAS
300 41.1
2400 34.442400 127.68
2400 07.2
1800 371.52
PM1 554.4
PV1 870.75
PS1 6465.6
250 870.75
CTOR-CARGA CARGAS
300 41.1
2400 34.44
2400 127.68
2400 504
1800 371.52
PM1 511.74
PV1 870.75
PS2 6062.4
250 870.75
CTOR-CARGA CARGAS
300 41.1
2400 34.44
2400 127.68
2400 420
PM1 1388.22
PV1 870.75
PS3 2258.7
250 870.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
52/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
53/72
ZAPATA Z2-
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.571
VIGA PRINCIPAL 0.2 0.4 1.2VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.3 4.2 0.3
MURO 5.3 2.8 0.15
PV1 AREA: 7.707
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 6.571
VIGA PRINCIPAL 0.2 0.4 1.2
VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.25 2.8 0.3
MURO 5.3 2.8 0.15
PV2 AREA: 7.707
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.571
VIGA PRINCIPAL 0.2 0.4 1.2
VIGA SECUNDARIA 0.2 0.35 3.34
COLUMNA 0.25 2.8 0.25
PV2 AREA: 7.707
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
54/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 24464.31
A% PS*$!
A% 24464.31 6150
A% 3.8
L % 1.
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
55/72
CTOR-CARGA CARGAS
300 171.3
2400 368.642400 561.12
2400 07.2
1800 4074.84
PM1 7883.1
PV1 126.75
PS1 80.85
250 126.75
CTOR-CARGA CARGAS
300 171.3
2400 368.64
2400 561.12
2400 504
1800 4074.84
PM1 747.
PV1 126.75
PS2 406.65
250 126.75
CTOR-CARGA CARGAS
300 171.3
2400 368.64
2400 561.12
2400 420
PM1 3321.06
PV1 126.75
PS3 5247.81
250 126.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
56/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
57/72
ZAPATA Z2-CC
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: .004
ESCALERA - VIGA CHATA 0.2 0.2 1.1VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.3 4.2 0.3
MURO 5.74 2.8 0.15
PV1 AREA: 10.423
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: .004
ESCALERA - VIGA CHATA 0.2 0.2 1.1
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.3
MURO 5.74 2.8 0.15
PV2 AREA: 10.423
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: .004
ESCALERA - VIGA CHATA 0.2 0.2 1.1
VIGA SECUNDARIA 0.2 0.35 4.62
COLUMNA 0.25 2.8 0.25
PV2 AREA: 10.423
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
58/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 230.4
A% PS*$!
A% 230.4 6150
A% 4.77
L % 2.18
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
59/72
CTOR-CARGA CARGAS
300 2701.2
2400 183.362400 776.16
2400 07.2
1800 433.44
PM1 807.36
PV1 2605.75
PS1 11513.11
250 2605.75
CTOR-CARGA CARGAS
300 2701.2
2400 183.36
2400 776.16
2400 504
1800 433.44
PM1 8504.16
PV1 2605.75
PS2 1110.1
250 2605.75
CTOR-CARGA CARGAS
300 2701.2
2400 183.36
2400 776.16
2400 420
PM1 4080.72
PV1 2605.75
PS3 6686.47
250 2605.75
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
60/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
61/72
ZAPATA Z2-DD
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.235
VIGA PRINCIPAL 0.2 0.4 1.82VIGA SECUNDARIA 0.2 0.35 3.16
COLUMNA 0.3 4.2 0.3
MURO 3.36 2.8 0.15
PV1 AREA: 7.76
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 6.235
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 3.16
COLUMNA 0.25 2.8 0.3
MURO 3.36 2.8 0.15
PV2 AREA: 7.76
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 6.235
VIGA PRINCIPAL 0.2 0.4 1.82
VIGA SECUNDARIA 0.2 0.35 3.16
COLUMNA 0.25 2.8 0.25
PV2 AREA: 7.76
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
62/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 2083.8
A% PS*$!
A% 2083.8 6150
A% 3.41
L % 1.85
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
63/72
CTOR-CARGA CARGAS
300 1870.5
2400 34.442400 530.88
2400 07.2
1800 2540.16
PM1 618.18
PV1 140
PS1 8138.18
250 140
CTOR-CARGA CARGAS
300 1870.5
2400 34.44
2400 530.88
2400 504
1800 2540.16
PM1 574.8
PV1 140
PS2 7734.8
250 140
CTOR-CARGA CARGAS
300 1870.5
2400 34.44
2400 530.88
2400 420
PM1 3170.82
PV1 140
PS3 5110.82
250 140
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
64/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
65/72
ZAPATA Z2-EE
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 5.067
VIGA PRINCIPAL 0.2 0.4 1.2VIGA SECUNDARIA 0.2 0.35 2.55
COLUMNA 0.3 4.2 0.3
MURO 2.55 2.8 0.15
PV1 AREA: 6.041
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 5.067
VIGA PRINCIPAL 0.2 0.4 1.2
VIGA SECUNDARIA 0.2 0.35 2.55
COLUMNA 0.25 2.8 0.3
MURO 2.55 2.8 0.15
PV2 AREA: 6.041
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 5.067
VIGA PRINCIPAL 0.2 0.4 1.2
VIGA SECUNDARIA 0.2 0.35 2.55
COLUMNA 0.25 2.8 0.25
PV2 AREA: 6.041
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
66/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 17168.7
A% PS*$!
A% 17168.7 6150
A% 2.7
L % 1.67
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
67/72
CTOR-CARGA CARGAS
300 1520.1
2400 368.642400 428.4
2400 07.2
1800 127.8
PM1 5152.14
PV1 1510.25
PS1 6662.3
250 1510.25
CTOR-CARGA CARGAS
300 1520.1
2400 368.64
2400 428.4
2400 504
1800 127.8
PM1 4748.4
PV1 1510.25
PS2 625.1
250 1510.25
CTOR-CARGA CARGAS
300 1520.1
2400 368.64
2400 428.4
2400 420
PM1 2737.14
PV1 1510.25
PS3 4247.3
250 1510.25
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
68/72
( % 21003
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
69/72
ZAPATA Z2-A
METRADO DEL PRIMER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 3.5204
VIGA PRINCIPAL 0.25 0.4 2.16VIGA SECUNDARIA 0.25 0.35 1.23
COLUMNA 0.3 4.2 0.3
MURO 3.25 2.8 0.15
PV1 AREA: 3.244
METRADO DEL SEGUNDO NIVEL:L1 H L2
LOSA ALIGERADA AREA: 3.5204
VIGA PRINCIPAL 0.25 0.4 2.16
VIGA SECUNDARIA 0.25 0.35 1.23
COLUMNA 0.25 2.8 0.3
MURO 3.25 2.8 0.15
PV2 AREA: 3.244
METRADO TERCER NIVEL:
L1 H L2
LOSA ALIGERADA AREA: 3.5204
VIGA PRINCIPAL 0.25 0.4 2.16
VIGA SECUNDARIA 0.25 0.35 1.23
COLUMNA 0.25 2.8 0.25
PV2 AREA: 3.244
D!"#:
$!% &'('&)"'" !#*' "#+ *#,,#!
$!% $* - SC -(/D $*%0.85
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
70/72
D % 1
8500 250 2100 1
6150
PS*% PS1PS2 15204.72
A% PS*$!
A% 15204.72 6150
A% 2.47
L % 1.57
$!%
$!%
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
71/72
CTOR-CARGA CARGAS
350 1232.14
2400 518.42400 258.3
2400 07.2
1800 2457
PM1 5373.04
PV1 811
PS1 6184.04
250 811
CTOR-CARGA CARGAS
350 1232.14
2400 518.4
2400 258.3
2400 504
1800 2457
PM1 46.84
PV1 811
PS2 5780.84
250 811
CTOR-CARGA CARGAS
350 1232.14
2400 518.4
2400 258.3
2400 420
PM1 2428.84
PV1 811
PS3 323.84
250 811
C % 2502
8/18/2019 PREDIMENSIONAMIENTO DE ZAPATAS.xlsx
72/72
( % 21003