PRODUK PT BETON ELEMENINDO PERKASA -...

Preview:

Citation preview

PRODUK PT BETON ELEMENINDO PERKASA

Half SlabHalf Slab Tiang PancangTiang PancangHollow Core Slab (HCS)Hollow Core Slab (HCS) Half SlabHalf Slab Tiang PancangTiang Pancang

Pagar BetonPagar Beton KansteinKanstein UU--DitchDitch

Hollow Core Slab (HCS)Hollow Core Slab (HCS)

Bantalan Kereta Api Bantalan Kereta Api Sun Screen UGM Sun Screen UGM Panel Fasade MolisPanel Fasade Molis

Tempat Duduk Tempat Duduk

PRODUK PRECAST PESANAN KHUSUS

Bantalan Kereta Api Bantalan Kereta Api (Sleeper)(Sleeper)

Sun Screen UGM Sun Screen UGM YogyakartaYogyakarta

Panel Fasade MolisPanel Fasade Molis

Tangga PrecastTangga Precast Glassfibre Glassfibre Reinforced CementReinforced Cement

Cooling Tower Cooling Tower Kawah DarajatKawah Darajat

Tempat Duduk Tempat Duduk PrecastPrecast

Panel Fasade Panel Fasade Mediteranian GdnMediteranian Gdn

SPESIFIKASI HOLLOW CORE SLAB

�� TebalTebal : 120, 150, 200 mm: 120, 150, 200 mm

�� LebarLebar : 1200 mm: 1200 mm

�� BeratBerat : 196, 223, 304 kg/m2 : 196, 223, 304 kg/m2

�� PanjangPanjang : Sesuai pesanan: Sesuai pesanan

�� Mutu BetonMutu Beton : K: K--450450�� Mutu BetonMutu Beton : K: K--450450

�� Diameter Tul.Diameter Tul. : PC: PC--Wire Ø5 & Ø7 mmWire Ø5 & Ø7 mm

�� Permukaan AtasPermukaan Atas : Siap pasang keramik: Siap pasang keramik

�� Permukaan Bawah : Beton ExposePermukaan Bawah : Beton Expose

Keuntungan Penggunaan HCS

� Proses produksi secara komputerisasi untuk menjamin mutu beton.

� Proses Penegangan dilakukan secara akurat, untuk menjamin Gaya Prategang yang disyaratkan.

� Beban sendiri lebih ringan 29-42% dibanding beton konvensional, sehingga dimensi balok, kolom dan pondasi mengecil.

Waktu pemasangan cepat dan bebas dari struktur penyangga.� Waktu pemasangan cepat dan bebas dari struktur penyangga.

� Permukaan pelat bagian bawah dapat berfungsi sebagai beton expose.

� Lendutan pelat akibat pembebanan sangat kecil disebabkan lawan lendut dari gaya prategang.

� “Precompression Effect” beton prategang memberikan ketahanan terhadap suhu tinggi.

� Lingkungan proyek lebih bersih dan rapi.

� Rongga berfungsi sebagai isolasi suara dan meringankan beban struktur.

PROSES PRODUKSI HCS

1. Pemberian Releasing Agent pada cetakan2. Penarikan PC-Wire3. Pemasangan angker4. Pemberian Gaya Prategang (160 bar ~ 2,7 ton)5. Pengambilan adukan dari Batching Plan6. Pengisian adukan pada Mesin Pencetak (Slide Former)6. Pengisian adukan pada Mesin Pencetak (Slide Former)7. Proses pencetakan (3jam sepanjang 150m)8. Sizing9. Pembuatan lubang joint shear connector & coakan kolom10. Curing (36 jam)11. Pemberian kode plat12. Pemotongan dengan Mesin Potong Jalur13. Pengangkatan ke ujung jalur

Pemberian Releasing Agent

Penarikan PC Wire

Pemasangan Angker

Pemberian Gaya Prategang

Pengambilan Adukan dari Batching Plan

Komputerisasi Batching Plan

Pengisian Adukan pada Slide Former

Proses Pencetakkan

Sizing

Pembuatan Lubang Joint Shear Connector

Pembuatan Coakan Kolom

Curing

Pemberian Kode Plat

Pemotongan

Pengangkatan

Penyimpanan ke Gudang Jadi

Muat Barang

Material Siap Kirim

Test Beban di Puslitbang

� Alat Bantu Pasang : Tower Crane, Mobile Crane atau Hoist

� Balok tumpuan : balok baja, balok beton dan bekisting balok beton

� Tumpuan pada balok : 5 – 10 cm

� Sistem Peletakan : Dua tumpuan

Pemasangan HCS

Pemasangan dengan Tower Crane

Menggunakan Mobile Crane

Pemasangan dengan Hoist

Peletakkan pada Balok Baja

Peletakkan pada Balok Beton

Peletakkan pada Bekisting Balok

Proses Pemasangan

Setting

Coakan pada Kolom Baja

Coakan pada Kolom Beton

Terpasang

Permukaan Bawah Expose

Gantungan Ducting AC

Gantungan Plafon

Mall Lingkar Selatan BDG Pasar Baru Bandung

Istana Plaza Bandung Dago Plaza Bandung

Bandung Electronic Center Planet Dago Bandung

Gedung Gudang Garam Bandung Gedung Arsip Bandung

ARS International School BDG Dealer Mazda Turangga BDG

Ruko Setrasari BandungKantor Pajak S. Hatta BDG

R.S Mitra Keluarga Jakarta Ruko ITC Cempaka Mas

Harco Plaza Jakarta ITC Cempaka Mas Jakarta

Panel Fasade/Sun ScreenPanel Fasade penahan sinar matahari Panel Fasade penahan sinar matahari

UGM JogjakartaUGM Jogjakarta

�� Mutu Beton Mutu Beton : K: K--350350�� UkuranUkuran : 2625 x 4180 x 150mm: 2625 x 4180 x 150mm�� BeratBerat : 1800 kg: 1800 kg�� Diam. tulDiam. tul : Wiremesh M8: Wiremesh M8�� Diam. tulDiam. tul : Wiremesh M8: Wiremesh M8�� Diam. tul dowel Diam. tul dowel : Ø 6 dan Ø 10 mm: Ø 6 dan Ø 10 mm�� Sistem sambSistem samb : Embaded plate (6mm): Embaded plate (6mm)

Besi siku 100x10x100Besi siku 100x10x100�� Additive Additive : Sika type F: Sika type F�� SambunganSambungan : Sealant type : Sealant type

Sikaflex ConstrnSikaflex Constrn�� Pemasangan Pemasangan : Tower Crane, Mobil : Tower Crane, Mobil

Crane 20 ton & TakelCrane 20 ton & Takel

Pembuatan Cetakan

Pemasangan Core

Vibrating Table

Pengecoran

Uji Slump

Hasil Cetakan

Penyimpanan ke Gudang Jadi

Pengangkatan dengan Sling Kain

Muat Barang

Persiapan Pra Pemasangan

1. Proses pengukuran (marking)1. Proses pengukuran (marking)

2. Pembuatan dudukan untuk besi siku dengan2. Pembuatan dudukan untuk besi siku dengan

sistem Dyna Boltsistem Dyna Bolt

3. Leveling balok3. Leveling balok3. Leveling balok3. Leveling balok

4. Pemasangan Takel4. Pemasangan Takel

Pembuatan Dudukan Besi Siku

Dudukan Besi Siku

Leveling Balok

Pemasangan Takel

Pemasangan

�� Menggunakan :Menggunakan :

--Tower CraneTower Crane

--Mobil Crane 20 tonMobil Crane 20 ton

�� Menggunakan sling kain (ring belt) untuk Menggunakan sling kain (ring belt) untuk �� Menggunakan sling kain (ring belt) untuk Menggunakan sling kain (ring belt) untuk menghindari gompalmenghindari gompal

Penyimpanan di Lokasi Pemasangan

Pemasangan dengan Tower Crane

Pemasangan dengan Mobil Crane

Setting

Pemasangan Besi Siku

Pengelasan Embaded Plate

Terpasang

Panel FasadePanel Fasade Mall Lingkar SelatanPanel Fasade Mall Lingkar Selatan

�� Mutu Beton Mutu Beton : K: K--350350�� UkuranUkuran : 200x5600x100mm: 200x5600x100mm�� Berat Berat : 2700 kg: 2700 kg�� Diam. tulDiam. tul : Wiremesh M8: Wiremesh M8Diam. tul dowel Diam. tul dowel : Ø 12 mm : Ø 12 mm –– 200 mm200 mm�� Diam. tul dowel Diam. tul dowel : Ø 12 mm : Ø 12 mm –– 200 mm200 mm

�� Sistem sambSistem samb : Dowel & Embaded : Dowel & Embaded plateplate

�� Additive Additive : Sika type F: Sika type F�� SambunganSambungan : Sealant type : Sealant type

Sikaflex ConstrnSikaflex Constrn�� Pemasangan Pemasangan : Mobil Crane 20 ton: Mobil Crane 20 ton

TakelTakel

Pembuatan Cetakan

Hasil Cetakan

Muat Barang

Pemasangan dengan Mobil Crane

Pengelasan Dowel

Embaded Plate

Ikatan Dowel dengan Shear Connector Balok

Tampak Belakang

Terpasang

Pengecatan

Tangga PrecastTangga Precast Pasar Baru Bandung Tangga Precast Pasar Baru Bandung untuk tangga daruratuntuk tangga darurat

�� Mutu betonMutu beton : K: K--350350�� UkuranUkuran : l:1200,sisi miring : l:1200,sisi miring

3000,bordes 15003000,bordes 15003000,bordes 15003000,bordes 1500�� Berat Berat : 3800 kg: 3800 kg�� Diam.TulDiam.Tul : 16 dan 10 mm: 16 dan 10 mm�� Diam.Tul DowelDiam.Tul Dowel : 22 mm: 22 mm�� Sistem SambgSistem Sambg : Stek/dowel: Stek/dowel�� AdditiveAdditive : Sika type F: Sika type F�� Pemasangan Pemasangan : Tower Crane dan : Tower Crane dan

TakelTakel

Cetakan

Pemasangan Tulangan

Pengecoran

Vibrating

Hasil Cetakan

Pemasangan dengan Tower Crane

Tulangan Dowel pada Balok

Terpasang