HASIL PEMBANGUNAN

PEMBANGUNAN SALURAN AIR RW 05

RW 1 Gorong-gorong (50%)

RW 1 GORONG-GORONG

RW 1 PEMBANGUNAN TPT (0%)

RW 1 TPT (50%)

RW 2-3 rehap paving (0%)

RW 2-3 Rhb damping jalan (0%)

RW 2-3 Rhp damping jalan (0%)

RW 2-3 Rhp damping jalan (50%)

RW 4 Saluran air (0%)

RW 4 saluran air (40 %)

RW 5 Pemasangan box cluivert (0%)

RW 5 saluran air (50%)

RW 7 saluran air (0%)

RW 7 SALURAN AIR (50%)

RW 7 SALURAN AIR (100%)