S No Question Option 1 Option 2 Option 3 Option 4 Solution
SQAM001
Which of the following is one of the objectives of
business plan? m
1, Minimize inventory
investment m
2, Maximize the use of
resources m
3, To ensure that cost of
production is less m
4, Measure and review actual
performance against a specified
benchmark m 4
SQAM002
John Smith has joined as a management traineepersonnel in XL technologies. His manager has
asked him to work and analyze details of all the
applicants for the post of software engineers and
match the parameters of the candidates to the job
requisit ions. 1,The Training Process m 2,The Recruitment Process m 3,The Performance Process m 4,The Appraisal Process m 2
SQAM003
Kinks Corporation is a small scale, manufacturing
company in the pharmaceutical domain. The
company was set up 5 years ago. The
management of Kinks Corporation wants to
improve the productivity and profitability of the
company by using IT to integrate the
1,Consulting outsourcing
model and off-the-shelf ERP
package m
2,Hosting model and off-the-
shelf ERP package m
3,Consulting outsourcing
model and custom ERP
package m
4,Hosting model and custom ERP
package m 2
SQAM004
The management of MaxElectronics felt the need
for implementation of an effective CRM strategy
to ensure loyalty of customers. The
implementation of CRM must help the customer
service representatives in handling the customers
at the front-end and the mana
1, Integrates customer
information with the product
information m
2, Acts as a source of
collecting customer
information and customer
queries m
3, Analyzes customer behavior
and categorizes customers
into current and prospective
customers m
4, Provides instant information
about the customer and its
purchasing details m 4
SQAM005
HK Electronics was facing problems in meeting
the requirements of the customers. Therefore, the
management decided to change its existing
business strategy to a new customer-oriented
strategy. The new strategy adopted by HK
Electronics is CRM. Identify th
1, Providing exclusive services
to the customers and helping
the sales team in achieving the
sales target m
2, Enhancing the product
quality by improving production
activities m
3, Increasing sales by
improving sales activities m
4, Maintaining the contact
information of the customers m 1
SQAM006
Bob is analyzing the results of a software test. He
uses a scatter plot to understand the relationship
between the complexity of the program and the
number of errors in the program during
development. On the scatter plot, the tested
variables cluster in a
1, Tested variables have
negative correlation. m
2, Tested variables have a
strong positive correlation. m
3, Tested variables are not
related. m
4, Tested variables have a positive
correlation. m 4
SQAM007
Infinity Ltd. is developing a payroll system. The
system has to be delivered to the client in three
months. The probability that the project will
exceed its deadline has a value 0.7 and the
impact of the risk has the value 3 on the rating
scale.Calculate 1, 0.7 m 2, 3 m 3, 2.1 m 4, 0 m 3
SQAM008
Which of the following set of components are
essential for preparing an aggregate production
plan? m
1, Product information, time
period m
2, Product information, time
period, and work force m
3, Product information, time
period, and inventory m
4, Product information, time period,
work force, inventory, and time
period m 4
SQAM009
Red Sky Pvt. Ltd. did not follow any automated
HR Management System. Which of the following
is not a disadvantage that the managers might be
suffering because of manual management of HR
processes? m 1,Increased paper work m
2,Complexity in maintaining
data bases of employees m
3,Less time for analysis,
planning, and identifying
important opportunities within
the organization m
4,More time in searching and
selecting tasks m 3
SQAM010
Jawger Inc. is an established organization in the
retail sector. It has been one of the top
organizations in its domain due to its state-of-the-
art infrastructure, efficient management and
processing, and tech-savvy inclination. Jawger
Inc. has learned th
1,The problem is that the ERP
system data cannot be used
for generating trend analysis
reports. m
2,The problem is that the ERP
system lacked integration with
a business intelligence tool
that would use the ERP
system data to generate trend
analysis reports. To rectify the
problem the ERP system
needs to be integrated with a
BI tool. m
3,The problem is that the ERP
system lacks integration with
an eBusiness tool. To rectify
the problem the ERP system
needs to be integrated with an
eBusiness application. m
4,The problem was that instead of
an ERP system, they only needed to
install a BI system. m 2
7/22/2019 Sem_D_MT_2.xls
2/17
SQAM011
The management of PeopleTrust has developed
a CRM strategy for integrating CRM with the
business processes in the organization. For
developing an effective CRM strategy, themanagement first defined the objectives of CRM
and then defined the service value
1, Basic and special service
value m
2, Basic, extended, and
custom service value m
3, Elementary, extended, and
custom service value m
4, Elementary, extended, and
special service value m 2
SQAM012
Your organization has recently purchased an off-
the-shelf ERP package. However, some business
processes need to be extended to suit the needs
of your organization. Which of the following
components of an ERP package will help you
extend the features of th 1,Service engine m
2,Custom development
workbench m 3,Administration utility m 4,Modules m 2
SQAM013
Which phase of the ETVX process ensures that
no activity ends abruptly? m 1, Verification phase m 2, Entry phase m 3, Exit phase m 4, Task phase m 4
SQAM014
Which of the following is one of the objective of
Master Production Schedule? m
1, To provide informationrelated to the requirement of
resources and raw materials
for production m
2, Create a logical frameworkfor developing and pursuing
production strategies over a
particular time period m
3, To ensure that materials are
available for production at the
right time m
4, Schedule manpower and
machine resources for maximum
efficiency m 1
SQAM015
Which of the following HRM process helps
employees to acquire job-related skills and
knowledge and also helps in carrying out their
roles and responsibilities? m 1,The Recruitment Process m 2,The Training Process m
3,The Performance
Management Process m 4,The Appraisal Process m 2
SQAM016
Techsoft is a small organization but in the last
few years it has managed to achieve a
competitive position in the market. To expand the
business, the management asked its sales and
customer care executives to collect customer
feedbacks. By reviewing the 1, Telephonic survey m 2, Written survey m 3, The Internet survey m 4, Face-to-face interviews m 4
SQAM017
KJI Corporation is a large-scale manufacturer of
copper wires. KJI has a small IT support
department that supports inventory and accounts
management. Due to lack of coordinated working
between the production and other departments,
such as purchase and acc 1,Enterprise-wide m 2,In-house m 3,Partial m 4,Modular m 3
SQAM018
Which of the following sub-systems of the Sales
module can help you create delivery orders? m 1,Shipping Management m 2,Billing Management m
3,Sales order entry and
management m
4,Sales master data entry and
management m 1
SQAM019
Which of the following plans provides information
related to the requirement of resources and raw
materials for the production? m 1, Business plan m 2, Production plan m
3, Master production schedule
m 4, Capacity planning m 3
SQAM020
Green Carpets Pvt. Ltd. did not emerge as a
successful organization. The projects were never
completed on time as deadlines were never
correctly estimated and even the workload was
not properly distributed. The reason that cameinto light was that the HR 1,Individualistic approach m 2,Judge the strength m 3,Fair and just policies m
4,Access to organizationalinformation m 4
SQAM021
The management of TechPoint has appointed a
technical team for the implementation of a CRM
system in the organization. The main task of the
technical team is to develop and customize the
CRM system according to the requirements of the
organization. Then t
1, Demonstrating a test run of
the CRM system m
2, Providing user manual and
online help m
3, Providing training material
and demo applications m
4, Providing a common training
class for all employees m 3
7/22/2019 Sem_D_MT_2.xls
3/17
SQAM022
Smart Accessories Inc. is a leading large-scale
manufacturer of biking accessories, having state-
of-art manufacturing machinery. They dont only
excel in the manufacturing infrastructure but also
in being tech-savvy. Every department hascustom develope 1,Modular m 2,Outsourcing consultancy m 3,In-house m 4,Hosting m 3
SQAM023
The sales representatives of GemTech found that
the purchasing habits of customers vary
depending upon their age groups and the section
of society they belong to. The customer details
along with their purchasing habits helps to derive
useful information, 1, Data refining m 2, Web tracking m 3, Data analysis m 4, Data mining m 4
SQAM024
Which of the following defines the scope of the
testing activity? m 1, Test plan m 2, Test script m 3,3 ,Test specifications m 4, Test procedure m 1
SQAM025
Which of the following plan acts as an input for
preparing MRP? m 1, MPS m 2, Capacity Planning m 3, Inventory Planning m 4, Resource Planning m 1
SQAM026
Which of the following statement is false?
Statement A: Employment function focuses on
paying fair, consistent, and equitable
remuneration to the workforce.
Statement B: Maintenance function identifies the
selected candidate's potential and also helps in 1,Only A m 2,Only B m 3,Both A and B m 4,None of these m 3
SQAM027
The management of Magnum Tours was hopeful
that after the implementation of the CRM system
the organization will be able to improve its service
quality. But, to their dismay, even after
implementing the CRM system the organization
was not able to solve al
1, CRM strategy not inline with
the corporate strategy and lack
of data integration m
2, Unwillingness of the
employees in using the CRM
system m
3, Required production targets
are not achieved on time m
4, Effective training programs are
not provided to the employees m 1
SQAM028
NTB Inc. is a small scale manufacturer of nuts
and bolts. The management has observed that
the working of the organization is not as efficient
as that of i ts competitors. The management
decided to consult some experts in their domain
and get tips on impro 1,Enterprise-wide m 2,In-house m 3,Partial m 4,Modular m 4
SQAM029
The technical team of MaxElectronics has
implemented a CRM system and integrated the
CRM system with all the existing enterprise
applications, such as Enterprise Resource
Planning (ERP), Web server, and data
warehouse. They have also integrated the CRM
sy
1, Upgradation will result to
loss of previous data m
2, Complex design and high
upgradation cost m 3, No scope for upgradation m
4, Upgradation will require alteast 2
years m 2
SQAM030 What is unit testing used for? m
1, To test each individual unit
of software to detect errors in
its code. m
2, To ensure that each unit
functions correctly across
different versions of browsers.
m
3, To ensure that the
developed system can handle
additional load. m
4, To ensure the validity of the
software application. m 1
SQAM031
Which of the following is not an activity performed
in test effort estimation? m
1, Identifying the risks relatedto the testing phase of SDLC
m
2, Developing a test plan
strategy m
3, Identifying the tasks to be
performed m
4, Computing the size of the
application m 1
SQAM032
Which of the following is the first activity
performed as part of the Test Execution process?
m
1, Assigning test scripts to
testers for execution. m 2, Establishing the test bed. m
3, Assigning test cases to test
cycles. m
4, Setting up the system test
environment. m 4
SQAM033
In which of the following phases of acceptance
testing, a customer must understand the
consequences of adding new functions to
enhance the software? m
1, Defining the acceptance test
criteria m
2, Developing an acceptance
test plan m
3, Executing the acceptance
test plan m
4, Developing an acceptance
decision m 1
7/22/2019 Sem_D_MT_2.xls
4/17
SQAM034
Which of the following is not an objective of
defect recording phase of the defect
management process? m
1, Further improving the
software development process
m
2, Reporting the status of the
application m
3, Gathering statistics to
develop defect resolutions for
future applications m
4, To identify the critical mistakes
made as part of the development
process. m 4
SQAM035 What is Defect Density? m
1, It is the measure of all thefound defects per size of
software entity being
measured. m
2, It is the measure of defects
before the delivery of software.
m
3, It is the average time from
one defect to the next defectoccurrence during a test
operation on a software
project. m
4, It is the measure of defects after
the delivery of software. m 1
SQAM036 What is the use of a test reporting tool? m
1, To plan a test environment
m 2, To identify risks m
3, To track the defects found
during testing. m 4,To fix the defects m 3
SQAM037
Which of the following is a responsibility of a test
lead? m 1, Creating a test plan m
2, Providing technical
leadership for the test process
m 3, Creating test data m 4, Preparing test documentation m 2
SQAM038
Which of the following is not specified as part of
test specification? m 1, Test objectives m 2, Test assumptions m 3, Test entrance/exit criteria m 4, Test effort m 4
SQAM039
In which of the following software testingmethods, checking the availability of physical
data elements is an entry criteria? m 1, Unit testing m 2, Integration testing m 3, System testing m 4, Acceptance testing m 1
SQAM040
Which of the following is not a responsibility of
customer in a software development process? m
1, Development of software
requirements and acceptance
criteria. m
2, Identification of interim and
final products for acceptance,
along with their acceptance
criteria. m
3, Estimating the time and
effort that should be spent on
the software. m
4, Scheduling adequate time to
examine the product before the final
acceptance review. m 3
SQAM041
In which of the following integration testing
approaches, all the modules that have been unit
tested for a system are put together and tested?
m 1, Top-Down testing m 2, Bottom-Up testing m 3, Big Bang testing m 4, Hybrid testing m 3
SQAM042Which of the following is not a test reporting tool?m 1, Analysis tools m 2, Code coverage tools m 3, Database tools m 4, Test report formats m 2
SQAM043
Which test reporting tool is used to represent the
results of a software test statistically? m 1, Defect tracking tool m 2, Graphic tool m 3, Drawing tool m 4, Analysis tool m 4
SQAM044
Trivia Ltd. is developing a software application
whose production cost might exceed the planned
budget. Also, the application will be competing
with similar applications already available in the
market. The application is likely to face which of
the follo 1, Software risk m 2, Testing risk m 3, Premature release risk m 4, Business risk m 4
SQAM045
Who among the following is responsible for
establishing test objectives and goals that define
the scope of the testing effort? m 1, Project manager m 2, Test manager m 3, Development team m 4, Customer m 2
SQAM046
Identify the phase in the life cycle of a test
process in which test cases are stored for any
future regression testing requirements. m 1, Design test cases phase. m 2, Wind-up phase. m 3, Execution phase. m 4, System study phase. m 2
SQAM047Which SQA activity do you need to perform in thesoftware construction phase? m
1, Assuring that the approved
design is placed underconfiguration management m
2, Reviewing the requirements
document to ensure that the
software requirements are
complete and expressed as
functional, performance, andinterface requirements m
3, Conducting FormalTechnical Review of code m
4, Assuring that the allocated
modules are included in the detaileddesign m 3
SQAM048
Which type of testing uses the black box method
for testing the software? m 1, System testing m 2, Unit testing m 3, Stress testing m 4, Recovery testing m 1
SQAM049
In which of the following integration testing
approaches, the terminal modules are tested first
followed by all the lower level modules? m 1,Top-Down testing m 2, Bottom-Up testing m 3, Hybrid testing m 4, Big Bang testing m 2
SQAM050 Identify the purpose of compliance testing? m
1, It verifies the integrity of
data during testing. m
2, It verifies whether the
authorization rules have been
properly implemented in the
application. m
3, It verifies whether the
system is able to recover from
varying degrees of failure. m
4, It verifies whether a system can
manage high volume of test plan
execution. m 2
7/22/2019 Sem_D_MT_2.xls
5/17
SQAM051
Which of the following requirements given by the
customer are related to the business procedures
and standards that the software must execute? m 1, Interface requirements m
2, Performance requirements
m
3, Non-functional requirements
m 4, Functional requirements m 4
SQAM052
Which of the following processes helps in the
defect acknowledgment process? m
1, Analyze one report for one
type of defect. m
2, Implement codes in the
software project to find known
and common defects. m
3, Develop code to count the
number of defects in a
software m
4, Implement codes to slow down
the software implementation m 2
SQAM053 What does DRE stands for? m
1, Deficiency Removal
Efficiency m 2, Defect Removal Effort m 3, Defect Regression Effort m 4, Defect Removal Efficiency m 4
SQAM054
Which test reporting tool helps a software tester
to determine the source of errors in the process
being tested? m 1, Source tool m 2, Defect tracking tool m 3, Error tracking tool m 4, Analysis tool m 2
SQAM055
The impact of a security risk on a project is
calculated to be 4. The risk factor of the same is
calculated to be 2.4. What is the probability ofoccurrence of the risk in the project? m 1, 6 m 2, 0.6 m 3, 0.06 m 4, 6.6 m 2
SQAM056
Which of the following testing techniques tests
whether the application is developed in
accordance with information technology
standards, procedures, and guidelines? m 1, Compliance testing m 2, Security testing m 3, Operations testing m 4, Recovery testing m 1
SQAM057
Which review checklist helps you to check
whether the data types and data declarations are
correct? m 1, Coding review checklist m
2, High level design review
checklist m 3, Testing review checklist m
4, Detailed design review checklist
m 1
SQAM058
According to the V model, which of the following
types of testing can be planned by using the
documents created during the requirementsphase. m 1, Integration testing m 2, Unit testing m 3, Acceptance testing m 4, System testing m 3
SQAM059
Consider the following statements:
Statement A: Test effort estimation is the
responsibility of a test manager.
Statement B: The test effort estimate helps in
determining the number of testers and time
required for software testing.
Which of the follo
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
SQAM060
Which of the following Code Coverage measure
reports the true or false outcome of each Boolean
sub-expression, separated by || and &&
operators? m 1,Condition Coverage m 2, Decision Coverage m 3, Statement Coverage m 4, Condition/Decision Coverage m 1
SQAM061
According to the V model, which of the following
types of testing should be planned in the
requirements stage of an SDLC? m 1, Unit testing m 2, Acceptance testing m 3, Integration testing m 4, System testing m 2
SQAM062 What is the purpose of stress testing? m
1, To check that the system
works efficiently when
subjected to above-normal
transaction volumes. m
2, To check if adequate
backups have been made. m
3,To check if the system
achieves the desired level of
performance. m
4, To check if a system performs
correctly over a continuous period of
time. m 1SQAM063 Which of the following is a size metric? m 1, Lines of code m 2, Number of defects m 3, Mean time to failure m 4, Project development effort m 1
SQAM064
Which test reporting tool is used to identify the
quantifiable problems to prioritize work based on
their severity? m 1, Scatter plot m 2, Pareto chart m 3, Control chart m 4, Histogram m 2
SQAM065
Newways Solutions is developing an online
reservation system. A sister concern of the
company is currently testing a similar application.
The testing team of Infinity Solutions wants to
consult the experienced testers of the sister
concern for identifyin 1, Checklist m 2, Observation m 3, Brainstorming m 4, Questionnaire m 2
7/22/2019 Sem_D_MT_2.xls
6/17
SQAM066
Which of the following types of errors become
visible when two or more modules are
integrated? m 1, Leakage errors m 2, Integration errors m 3, Compatibility errors m 4, Syntax errors m 3
SQAM067
Which of the following phases of the testing life
cycle involves documentation of testspecifications? m 1, Test execution m 2, Planning process m 3, Test design m 4, Risk analysis m 2
SQAM068
Which of the following is not a test case design
technique? m 1, Equivalence partitioning m 2, Boundary value analysis m 3, Regression analysis m 4, Extreme input testing m 3
SQAM069
Which of the following integration test
approaches allows you to test the basic skeleton
of the system early in the test process? m 1, Big Bang testing m 2, Hybrid testing m 3, Bottom-Up testing m 4, Top-Down testing m 4
SQAM070
In which phase of acceptance testing, a customer
should be comfortable with the functionality of the
software? m
1, Defining the acceptance
criteria m
2, Developing acceptance plan
m
3, Executing acceptance plan
m
4, Developing acceptance decision
m 1
SQAM071 Why are test metrics gathered? m
1,Test metrics are gathered to
evaluate the effort of the
testing team. m
2, Test metrics are gathered to
measure the effectiveness of
software testing. m
3, Test metrics are gathered to
motivate the team members of
a software project m
4, Test metrics are gathered toresolve arguments between the
development team and the design
team in a software project. m 2
SQAM072
Which statistical analysis tool is used to
maximize insight into a data set? m 1, Exploratory analysis m 2, Pareto chart m 3, Regression analysis m 4, Run chart m 1
SQAM073
Trinity Ltd. is testing a position tracking system.
The company is testing this kind of a system for
the first time. In order to identify the risks
associated with the Position Tracking system, the
participation of the entire testing team is desired.
Whic 1, Checklist m 2, Questionnaire m 3, Brainstorming m 4, Interview m 3
SQAM074
Clark Lewis has recently been appointed as the
Test Manager at ICIS Ltd. ICIS has developed a
share trading application that enables customers
to buy and sell shares online, and Clark is
responsible for testing the application. He has
formed a testing tea
1, Clark should specify the
expectations from Tim in a
clear manner, in the next team
meeting. m
2, Clark should provide
constructive criticism to Tim in
the next team meeting and
suggest some solutions to the
problem. m
3, Clark should listen to Tim in
the next team meeting and
analyze the key points
conveyed by him regarding his
performance. m
4, Clark should provide constructive
criticism to Tim on a one-to-one
basis and think of some possible
solutions to the problem. m 4
SQAM075
Which of the following tools is used to determine
the breakdown point in application software? m 1, Regression testing tool m 2, Code coverage tool m 3, Load testing tool m 4, Traceability tool m 3
SQAM076 Which of the following is a QA activity? m 1, Inspection m 2, Testing m 3, Quality audit m 4, Checkpoint review m 3
SQAM077
Technology Solutions Inc. is developing a library
management system. The acceptance criteria
was defined early in the development life cycle
using the requirements document. During the
analysis phase, the analysis document was used
to prepare the system t
1,The documents created
during requirements, analysis,
and design phases should
have been tested using white-
box testing techniques. m
2,The documents created
during requirements, analysis,
and design phases should
have been tested using black-
box testing techniques. m
3,The documents created
during requirement, analysis,
and design phases should
have been tested using static
testing techniques. m
4,The documents created during
requirement, analysis, and design
phases should have been tested
using structural testing techniques.
m 3
SQAM078
Paraways Solutions is developing an order
processing application using ASP.NET. The
developers of Paraways have not worked on this
technology before. Due to budgetary constraints,
Paraways is not conducting any training on thenew technology being used. I 1, Market risk m 2, Testing risk m 3, Management risk m 4, Software risk m 4
SQAM079
Consider the following statements:
Statement A: For each phase of testing, the
planned tests are executed and the actual test
results are compared with the documented
expected results.
Statement B: A tester while creating test cases
estimates the expecte
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
7/22/2019 Sem_D_MT_2.xls
7/17
SQAM080
Which of the following acceptance requirements
relate to the quality attributes of software? m 1, Functional Requirements m
2, Non-Functional
Requirements m
3, Performance Requirements
m 4, Interface Requirements m 2
SQAM081
Which of the following displays a sequence of a
defect life cycle? m
1, Raise a defect, report a
defect, get the defectacknowledged by developer,
get the defects fixed by the
developer, verify and close the
defect. m
2, Raise a defect, get the
defects fixed by the developer,
verify and close the defect. m
3, Report a defect, get thedefect acknowledged by
developer, get the defects
fixed by the developer, close
the defect. m
4, Raise a defect, report a defect,get the defects fixed by the
developer, get the defect
acknowledged by developer, verify
and close the defect. m 1
SQAM082
The project manager of a software project needs
to know the average time before the first defect
occurs in the software. Which metric can provide
this information to the project manager? m 1, DRE m 2, MTTF m 3, DD m 4, Cyclomatic complexity m 2
SQAM083
Consider the following statements:
Statement A: Scatter plot is a statistical analysis
tool.
Statement B: Exploratory analysis is used to
analyze data represented by a scatter plot.
Which of the following is correct in context of the
preceding statement
1, Statement A is True and
Statement B is False. m
2, Statement A is False and
Statement B is True. m
3, Both, Statement A and
Statement B, are True. m
4, Both, Statement A and Statement
B, are False. m 1
SQAM084
Adam Martin is the test manager of a team
responsible for testing an application that
provides information on daily login time of the
employees. At one of the project meetings, Adamrealized that the team was not performing upto
the standards set at the b
1, Listen to the team members
in the next team meeting and
analyze key points conveyedby the team members
regarding their performance. m
2, Provide constructivecriticism to the team
individually and in private. m
3, Ask the team members in
the next team meeting toprovide justification of their
non performance. m
4, Provide constructive criticism tothe team in the next team meeting.
m 2
SQAM085
Consider the following statements:
Statement A: The selection of an appropriate tool
is a secondary aspect of the testing process.
Statement B: The selection of an appropriate tool
leads to an ease in the burden of test production
and test execution.
Wh
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 4
SQAM086
Consider the following statements:
Statement A: Quality Assurance is oriented to
prevention of defects.
Statement B: Quality Control is oriented to
detection of defects.
Which of the following is correct in context of the
preceding statements? m
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
SQAM087
Global Infosystems Inc., has developed a job site
for Manpower Consultants, a placement
company. To increase the business generated by
the site, Anne Forsythe, a manager with the
placement company has decided to launch an
advertisement campaign promoting 1, Operation testing m 2, Stress testing m 3, Regression testing m 4, Recovery testing m 2
7/22/2019 Sem_D_MT_2.xls
8/17
SQAM088
Technowave Solutions is working on a gaming
application. Jim Lewis, a tester for this project,
has written a code to calculate the perimeter of a
rectangle. The code needs to be tested for
different types of inputs. Which type of testing willJim use to t 1, Integration testing m 2, System testing m 3, Acceptance testing m 4, Unit testing m 4
SQAM089
For a test problem, identify which of the following
attributes gives information on why the difference
between the problem and the ideal criteria is
significant? m 1, Statement of Condition m 2, Criteria m 3, Cause m 4, Effect m 4
SQAM090
Why is i t necessary to identify critical success
factors of the software during acceptance
criteria? m
1, To indicate whether the
software has been identified of
defects. m
2, To indicate whether the
software has been accepted or
rejected, based on customer
requirements. m
3, To indicate whether the
software has been able to
meet the critical acceptance
requirements. m
4,4 ,To indicate whether the
software has been corrected of
defects. m 3
SQAM091
Consider the following statements:
Statement A: Regression testing comprises
checking consistency, completeness, and
correctness of the software at each stage and
between each stage of the SDLC.
Statement B: Verification is an activity that
provides obje
1, Both, Statement A and
Statement B are False. m
2, Both, Statement A and
Statement B are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 4
SQAM092
A testing team member needs to calculate the
total number of tests that need to be conducted
for a module. Which metric can give this
information? m 1, DRE m 2, MTTF m 3, Cyclomatic Complexity m 4, DD m 3
SQAM093
Paraways Solutions is developing an onlinegaming application for school-going children. The
organization has recruited highly experienced
developers for this project. The developers are
coming up with innovative ideas and developing
excellent features in 1, Market risk m 2, Project risk m 3, Technical risk m 4, Management risk m 1
SQAM094
Consider the following statements:
Statement A: A test bed is prepared to conduct a
test based on the requirements stated for a test
environment and the strategy devised to
implement it.
Statement B: A test bed only contains the
hardware necessary to co
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 3
SQAM095
Consider the following statements:
Statement A: Quality assurance is product
oriented.
Statement B: Testing is a quality assurance
activity.
Which of the following is correct in context of thepreceding statements? m
1, Both, Statement A andStatement B, are False. m
2, Both, Statement A andStatement B, are True. m
3, Statement A is True andStatement B is False. m
4, Statement A is False andStatement B is True. m 1
SQAM096
Global Solutions Inc. has developed a library
management system. After development, the
software was thoroughly tested using various
testing techniques and finally, the software was
implemented at the library site. Earlier, the library
had been using a ma 1, Performance testing m 2,2 ,Parallel testing m 3, Operations testing m 4, Security testing m 2
7/22/2019 Sem_D_MT_2.xls
9/17
SQAM097
Susan Ward is a software developer in
Supersoft2000 Inc. She has developed an
application that offers e-commerce services for
transacting business through the Internet. Which
technique should Susan use to test i f the financialtransactions are safe? m 1, Security testing m 2, Reliability testing m 3, Regression testing m 4, Operations testing m 1
SQAM098
Consider the following statements:
Statement A: Statement Coverage measure can
distinguish between two consecutive switch
statements.
Statement B: Statement Coverage measure is
sensitive to logical operators, such as || and &&.
Which of the following is
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 1
SQAM099
Consider the following statements:
Statement A: It is the responsibility of a customer
to perform acceptance testing.
Statement B: It is the responsibility of a customer
to define the accept and reject criteria for the
software.
Which of the following i
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
SQAM100
Consider the following statements:
Statement A: Inspections are very effective at
finding defects.
Statement B: Inspection is an example of
dynamic technique for detecting defects.
Which of the following is correct in context of the
preceding statements
1, Both, Statement A and
Statement B are False. m
2, Both, Statement A and
Statement B are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 3
SQAM101
Consider the following statements:
Statement A: Word processing packages can be
used to prepare test report formats.
Statement B: All organizations use a standard
test report format.
Which of the following is correct in context of the
preceding statemen
1,Statement A is True and
Statement B is False. m
2,Statement A is False and
Statement B is True. m
3,Both, Statement A and
Statement B, are True. m
4,Both, Statement A and Statement
B, are False. m 1
SQAM102
Consider the following statements:
Statement A: Software testing is successful if the
test data tests all aspects of the softwareeffectively.
Statement B: Test coverage is a measure of the
coverage goal of a program based on test data.
Which of the fo
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 1
SQAM103
Software Technologies Inc., had developed a
library information system. The application had
been running successfully for the last nine
months. However, due to a hard disk failure, all
library records in the database server have been
lost. No backup of th 1, Recovery testing m 2, Operations testing m 3, Regression testing m 4, Integration testing m 1
7/22/2019 Sem_D_MT_2.xls
10/17
SQAM104
Which of the following activities cannot performed
by using Code Coverage tools? m
1, Measure the coverage of a
set of test cases m
2, Analyze test case coverage
against system requirements
m 3, Evaluate the test results m
4, Develop new test cases to test
previously untested parts of a
system m 3
SQAM105
Which of the following activities are included
under Responsibilities of Customer, a componentof a software acceptance plan? m
1, Identifying the end-users ofthe final product m
2, Scheduling resource andfacility requirements m
3, Preparing change controlreport m 4, Creating a project plan m 2
SQAM106
Consider the following statements:
Statement A: Validation is the process of
evaluating software at the end of the SDLC to
ensure that the software product complies with
software requirements.
Statement B: Validation testing is the
determination of how w
1, Both, Statement A and
Statement B are False. m
2, Both, Statement A and
Statement B are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
SQAM107
Consider the following statements:
Statement A: SQA activities in the software
design phase involve use of the High-level design
review checklist.
Statement B: SQA activities in the software
design phase involve use of the detailed design
review checklis
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 2
SQAM108
Software Solutions Inc. is developing a payroll
application for SSTP Corporation. SSTP
Corporation is already using a leave accounting
system that facilitates the management ofemployees' leaves. The application has been
running successfully for the last 1, Integration Testing m 2, Regression Testing m 3, Compliance Testing m 4, Intersystem Testing m 4
SQAM109
Consider the following statements:
Statement A: A tester, while creating test cases,
estimates the expected test results, whereas, the
actual test results occur during execution of these
test cases.
Statement B: A tester, while executing a test
script, n
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 3
SQAM110
Consider the following statements:
Statement A: During execution of acceptance
plan, the objectives of the acceptance activities
are defined along with procedures for meeting
these objectives.
Statement B: Execution of acceptance plan
determines whether
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 4
SQAM111
Which of the following is an objective of defect
reports? m
1, Identify defects in all phases
of SDLC. m
2, Identify whether the
software developed meetscustomer requirements or not.
m
3, Provide information about
the defects to the developmentteam and enable the team to
reproduce the defect. m
4, Provide information of the defects
to the customer. m 3
SQAM112
The development team knows the number of
operators and number of operands used in a
software project. How can they use this
information to calculate the size of the program?
m
1, Software Size= log2 (Total
number of operator tokens
used) + log2 (Total number of
operand tokens used) m
2, Software Size= Total
number of operator tokens
used + Total number of
operand tokens used m
3, Software Size= Total
number of unique operator
tokens used + Total number of
unique operand tokens used m
4, Software Size= Total number of
operator tokens used * Total
number of operand tokens used m 2
7/22/2019 Sem_D_MT_2.xls
11/17
SQAM113
Consider the following statements:
Statement A: Structural test case design
techniques are used when test data is developed
from documents that specify the intendedbehavior of application software.
Statement B: Equivalence partitioning, a
structural tes
1,Both, Statement A and
Statement B, are False. m
2,Both, Statement A and
Statement B, are True. m
3,Statement A is True and
Statement B is False. m
4,Statement A is False and
Statement B is True. m 1
SQAM114
Consider the following statements:
Statement A: Preparing test documentation is not
a responsibility of a software tester.
Statement B: Reporting test results is not a
responsibility of a software tester.
Which of the following is correct in context of
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 1
SQAM115
Jack Thomas was assigned the task of testing an
online share trading application. Jack has to
create relevant test cases and on the basis of
these test cases, test plans will be executed
during each phase of the testing life cycle. While
creating the test
1, Jack should confirm that the
application runs successfully
on all supported hardware and
software environments. m
2, Jack should check for the
standard back up and recovery
procedures and special
security requirements. m
3, Jack should confirm that the
different modules of the
application can be successfully
integrated to perform one or
more application functions. m
4, Jack should conduct performance
and load tests on individual
application components. m 4
SQAM116
Global Solutions Inc., has developed HRMS
software for its customer to provide automation
solutions for the management of the Human
Resource Department of CompuServe. However,
during acceptance testing, it was found that thesoftware was not functioning p
1, Detecting software defectsearly during development m
2, Preparing appropriate testfacilities m
3, Identifying the business
standards and procedures forsoftware development m
4, Considering customers
requirements early during softwaredevelopment m 4
SQAM117
John Allen, a project manager at Blue IT
Systems, has just delivered a software
application on inventory control for Green Alley
Stores Ltd. Now, the senior management decides
to analyze the defect removal processes adopted
by Johns team. The number of 1, 6 m 2, 0.06 m 3, 0.6 m 4, 0.7 m 3
SQAM118
Michelle, a software tester, uses a run chart to
represent the performance level of a software
application on different hardware configurations.
There are around nine data points on the run
chart, which are above the average of the plotted
data. What does 1, A trend m 2, Two or more processes m 3, Unusual events m 4, Low performance m 3
SQAM119
Assertion: Operations testing is designed to verify
that prior to production, the operating procedures
and staff can properly execute the application
software.
Reason: Operations testing confirms the
successful execution of the application software
during
1, BOTH the assertion and the
reason are TRUE, and the
reason is a correct explanation
of the assertion. m
2, BOTH the assertion and the
reason are TRUE, but the
reason IS NOT a correct
explanation of the assertion. m
3, The assertion is TRUE and
the reason is FALSE. m
4, The assertion is FALSE and
hence the reason DOES NOT apply.
m 1
SQAM120
Which of the following activity is not performed as
part of the risk analysis phase? m
1, Determining the probability
of occurrence of risks. m
2, Identifying the impact of
risks. m 3, Monitoring risks. m 4, Prioritizing risks. m 3
SQAM121
James Cooper, a certified software tester, has
been asked by CompCord Inc. to test an
application that provides information about the
login and logout time of the employees. For this
task, James has to create a record showing the
number of users who log o 1, Recovery testing m 2, Security testing m 3, Audit trail m 4, Data integrity m 3
7/22/2019 Sem_D_MT_2.xls
12/17
SQAM122
Web Solutions Corp. has developed an online
reservation application for a travel agency. One of
the requirements given by the client is that the
information provided by the website should be
highly secure. Identify under which of thefollowing categories 1, Functional requirement m
2, Non-functional requirementm 3, Performance requirement m 4, Interface requirement m 2
SQAM123
During the acceptance testing of a software
project, the customers found 12 defects. Earlier,
the testing team had found 67 defects while
reviewing the design phase, and 75 defects while
performing the system testing. How efficient were
the defect removal 1, 0.87 m 2, 0.922 m 3, 0.75 m 4, 0.94 m 2
SQAM124
The software testing team of Ebiz Solutions is
analyzing the results of a software test on an e-
commerce application. The team uses a scatter
plot to represent the relationship between thenumbers of errors identified during the
development phase and the
1, Negative correlationbetween the tested variables
m
2, No correlation between the
tested variables m
3, Positive correlation between
the tested variables m
4, Error during development anderrors during testing are
independent of one another m 3
SQAM125
Newwave Ltd. is developing an inventory
management system. The project is in its testing
phase. One of the testers has been asked to
document the different combinations of
conditions and associated results in order to
derive unique test cases for validati 1, Code coverage tools m 2, Test scripts m 3, Checklists m 4, Decision tables m 4
SQAM126 Which of the following is a software risk? m 1, Market risk m 2, Budget risk m 3, Management risk m 4, Technical risk m 4
SQAM127
Consider the following statements:
Statement A: A tester need not have knowledge
of the tools that aid in software development.
Statement B: A tester must have knowledge of
the software development, operation, and
maintenance process.
Which of the follo
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 4
SQAM128
Web Solutions Corp. has developed an online
reservation application for a travel agency. One of
the requirements given by the client is that the
users should not spend much time on getting
used to the website and finding the relevant
information. Identify 1, Functional requirement m
2, Non-functional requirement
m 3, Interface requirement m 4, Performance requirement m 3
SQAM129
A software program has 32 edges and 29 nodes
in its flowchart. The testing team needs the
estimated maximum number of test cases that
need to applied to the software program to
ensure that all the statements have been
executed at least once. Calculate the 1, 2 m 2, 3 m 3, 4 m 4, 5 m 4
SQAM130
Betty, a software tester, uses a control chart tomonitor the frequency of occurrence of defects in
a software project over a period of time. She
analyzes the chart and concludes that the
frequency of occurrence of defects is stable.
What observation on t
1, Data points have multiple
entries above and below the
central line of the control chart.
m
2, Majority of data points lie
below the lower limit of the
control chart. m
3, Majority of data points lie
above the upper limit of the
control chart. m
4, Data points lie within the upper
and lower limit of the control chart.
m 4
7/22/2019 Sem_D_MT_2.xls
13/17
SQAM131
Consider the following statements:
Statement A: The load testing tool should be
evaluated to determine if the tool supports the
application technology not only at the GraphicalUser Interface (GUI) level but also at the middle
tier and database level.
St
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 3
SQAM132
Which of the following risk identification
techniques is used when a broad range of
options or ideas are required in a short span of
time? m 1, Observation m 2, Interviews m 3, Brainstorming m 4, Checklist m 3
SQAM133
Smart Solutions Corp. has been assigned a
project to develop an application that provides
information about the total number of hours for
which an employee logs on to the system. Whichof the following requirements should the
customer specify, at the begi
1, Non-Functional
requirements m
2, Performance requirements
m 3, Functional requirements m 4, Interface requirements m 2
SQAM134
The development team at Technology Systems is
developing an application for a car dealer. The
application will be used to extract the names and
addresses of the car owners whose cars need
servicing by the 20th of the month, from a
database of cars sold b 1, 0.875 defects m 2, 32 defects m
3, 0.18 defects per function
point m 4, 1 defect per function point m 3
SQAM135
Robert, a software tester, is prioritizing the
causes of poor quality of a software application
using a Pareto chart. He ranks developer errorsas the most significant cause to the poor quality
of the software and poorly defined objectives as
the least si
1, The number of erros related
to poorly defined objectives
developer errors is theminimum and number of
developer errors is the
maximum. m
2, The number of errors
related to poorly definedobjectives is the maximum and
the number of developer errors
is the minimum. m
3, The number of errors
related to poorly defined
objectives is minimum. m
4, The number of developer errors is
the maximum. m 2
SQAM136
Assertion: Static testing validates the
conformance of a software application to the
specified requirements without executing the
code.
Reason: Static testing is conducted to ascertain
whether a software application meets all the
requirements specified in
1, BOTH the assertion and the
reason are TRUE, and the
reason is a correct explanation
of the assertion. m
2, BOTH the assertion and the
reason are TRUE, but the
reason IS NOT a correct
explanation of the assertion. m
3, The assertion is TRUE and
the reason is FALSE. m
4, The assertion is FALSE and
hence the reason DOES NOT apply.
m 3
SQAM137
Which of the following information is not specified
as part of the risk analysis table? m 1, Probability of occurrence m 2, Risk impact m 3, Risk factor m 4, Risk mitigation strategy m 4
SQAM138
Henry Ford was assigned to test a Java
application developed by Smart Java Co. While
testing a particular Java code, Henry suggested
to his team that if they want complete code
coverage, all the Boolean sub-expressions must
be separated by logical || and
1, Multiple Condition Coverage
m
2, Decision/Condition
Coverage m 3, Path Coverage m 4, Condition Coverage m 1
SQAM139
Global Solutions, Inc. has developed anapplication for Super Solutions Corp., which will
provide automated solutions for the management
of the HR Department of Super Solutions. The
application was developed keeping in mind the
customer requirements. Howe
1, Change the software
specifications m
2, Communicate the software
problems to the development
team m 3, Reject the software m 4, Review the software again m 3
SQAM140
Perry is analyzing the results of a software test.
She uses a scatter plot to understand the
relationship between the complexity of the
program and the number of errors in the program
during development. On the scatter plot, the data
points of the tested
1, Tested variables are
positively related. m
2, Tested variables have a
negative correlation. m
3, Tested variables are not
related. m
4, Tested variables are closely
related in a positive manner. m 2
7/22/2019 Sem_D_MT_2.xls
14/17
SQAM141
NewWave Ltd. is developing an inventory
management system. The project is in its testing
phase. One of the testers has been asked to
specify the order of actions that should be
performed during a test session. Identify which ofthe following tools should 1, Test script m 2, Checklist m 3, Decision table m 4, Traceability tool m 1
SQAM142
Consider the following statements:
Statement A: Budget risk is a type of software
risk.
Statement B: Technology change is a contender
for software risk.
Which of the following is correct about the above
statements? m
1, Statement A is True and
Statement B is False. m
2, Statement A is False and
Statement B is True. m
3, Both, Statement A and
Statement B, are True. m
4, Both, Statement A and Statement
B, are False. m 4
SQAM143
Global Software Solutions Inc. is a softwaredevelopment company that provides financial
analysis applications to large and medium-sized
financial companies. Currently, the organization
is creating an online application for one of its
clients. The managem 1, Test design m 2, Planning process m 3, Test execution m 4, Quantitative measurement m 2
SQAM144
Web Market Inc. has been asked to develop a
software that will provide automated solutions for
an electronic marketplace. The representative for
the market has specified the acceptance
requirements for the particular software in the
beginning of the proje
1, Performance requirements
m
2, Non-Functional
requirements m 3, Functional requirements m 4, Interface requirements m 2
SQAM145
John, a Java programmer has developed a code
for a shopping mall. The code generates an
applet that displays description of all the products
available in the mall along with their prices. The
Java applet has to undergo a process of code
review. In which p 1, Task phase m 2, Exit phase m 3, Entry phase m 4, Verification phase m 4
SQAM146
Consider the following statements:
Statement A: Premature release risks arise when
deadline of completion of the project has
exceeded.
Statement B: Premature release risks arise when
an equally competitive product is about to be
released in the market by
1, Statement A is True and
Statement B is False. m
2, Statement A is False and
Statement B is True. m
3, Both, Statement A and
Statement B, are True. m
4, Both, Statement A and Statement
B, are False. m 3
SQAM147
SmartLabs Inc., is a software development
company that develops customized software
solutions. Currently, the organization is
developing a shopping application that would
require shoppers to register themselves with the
shopping site before placing an ord
1, Defect tracking and
management m 2, Planning process m 3, Test design m 4, Test execution m 3
SQAM148
Rob, a test manager in Global SoftwareSolutions, needs to create a test evaluation report
for stress testing that was carried out on the
network of the organization. Suggest the phase of
the test process life cycle during which Rob
should create this rep 1, System study phase m 2, Execution phase m 3, Design test cases phase m 4, Wind-up phase m 2
7/22/2019 Sem_D_MT_2.xls
15/17
SQAM149
Consider the following statements:
Statement A: A questionnaire contains a list of
questions related to a particular risk.
Statement B: The list of questions in aquestionnaire is standard and fixed.
Which of the following is correct in context of the
p
1, Both, Statement A and
Statement B, are False. m
2, Both, Statement A and
Statement B, are True. m
3, Statement A is True and
Statement B is False. m
4, Statement A is False and
Statement B is True. m 3
SQAM150
Countryside Markets is developing a shopping
application that would require shoppers to
register themselves before placing an order. The
project is in its testing phase. During a team
meeting, there was a disagreement about the
phase of the testing life c 1, Test reporting m 2, Test execution m 3, Test design m 4, Planning process m 4
SQAM151
Web Solutions Corp. has developed an onlinereservation application for a travel agency. One of
the requirements given by the client is that the
system should support future expansion of the
business. Identify under which of the following
categories will 1, Functional requirement m 2, Interface requirement m
3, Non-functional requirement
m 4, Performance requirement m 3
SQAM152
The software development team in Software
Solutions has developed a code in C++ to
generate an inventory management software.
This software has to be tested line-by-line to
check whether it maps to the information
technology standards. Which type of testi 1, Operations testing m 2, Performance testing m 3, Recovery testing m 4, Compliance testing m 4
SQAM153
To deliver high quality softwares, Technology
Systems performs quality planning, formal
technical reviews, and software testing. It is
observed that the organization spends a
considerable amount of time in testing due to
many errors being found in the cod
1, Train software developers.
m 2, Train software testers. m
3, Conduct inspection after
each phase of SDLC. m 4, Conduct checkpoint review. m 1
SQAM154
Soft Solutions Inc., developed a software that
provides automated solutions for an electronics
shopping mall. After the software acceptance
review, the customer prepared an acceptance
plan without mentioning the precautions for
potential misuse of the sof 1, Criticality of the software m
2, Resources involved in
developing the software m 3, Size of the software m
4, Time period in which the software
was developed m 1
SQAM155
InfoTech Software Solutions has developed a
new payroll system for its employees. The old
payroll system had some performance problems.
The proposed application is currently in its testing
phase. Before phasing out the old system, the
testing team must en 1, Parallel testing m 2, Intersystem testing m 3, Control testing m 4, Integration testing m 1
SQAM156
NewWays Softwares has recently started in-
house testing of software applications. Being a
new testing team, there is a lot of confusionbetween the roles and responsibilities. This
confusion is leading to a lot of differences
between the members of the te 1, Test lead m 2, Tester m 3, Development team m 4, Test manager m 2
SQAM157
Paraways Solutions is developing an airline
reservation application. One of the requirements
given by the client is that the website should be
able to cater the visually-challenged users and
should allow them to browse the website easily.
Identify under w 1, Interface requirement m 2, Performance requirement m 3, Functional requirement m 4, Non-functional requirement m 1
7/22/2019 Sem_D_MT_2.xls
16/17
SQAM158
The code developing team in Paraways Solution
has developed software to record the entry time
and exit time of employees. The employees are
asked to fill a feedback form. Under which
category of manual tools will this feedback formbe listed? m 1, Decision tables m 2, Test scripts m 3, Checklists m 4, Checkpoint review m 3
SQAM159
Inform Solutions is developing an Internet
banking application for one of its clients. The
project is currently in its testing phase. Wil liams,
one of the testers working on this project, has
been asked to document the details of the test
cases that have
1, Williams should create a
test item transmittal report. m
2, Williams should create a
test summary report. m
3, Williams should create a
test log. m
4, Williams should create a test
incident report. m 3
SQAM160
Net Solutions Ltd has developed a software to
create HTML pages without coding. The testing
for this application needs to be carried out. The
test manager wants to use an automated testingtool that would avoid the defects from cropping
up in the test exe
1, The test manager should
select a code coverage tool. m
2, The test manager shouldselect a regression testing
tool. m
3, The test manager should
select a traceability tool. m
4, The test manager should select a
traceability tool. m 4
SQAM161
Perfect Solutions is working on an order
processing application. Now, the testing team has
been asked to define the sequence of the testing
process. Identify which of the following
documents should the testing team create for the
same. m
1, The testing team should
create a test plan. m
2, The testing team should
create a test case specification
document. m
3, The testing team should
create a test design
specification document. m
4, The testing team should create a
procedure specification document.
m 1
SQAM162
Solution Shares Ltd. has developed a software to
enable online trading of shares. Sandra, one of
the testers working on the project, has beenasked to document the test case design.
Presently, she has to document the input and
output values for the tests.
1, A test plan should be
created. m
2, A test design specification
should be created. m
3, A test case specification
should be created. m
4, A test procedure specification
should be created. m 3
SQAM163
Blue Skies School has engaged a software
organization to create a software for the school
library. The software will allow the library staff to
keep a record of all the books issued and
returned. The software is currently in its testing
phase. Identify wh 1, Operations testing m 2, System testing m 3, Error-handling testing m 4, Control testing m 1
SQAM164
Broadways Ltd. is developing an online software
application. The development team for this
project includes nine team members. During the
team meetings, James, the test manager for this
project, realized that a few members of the team
have grudges against 1, Software risk m 2, Premature release risk m 3, Management risk m 4, Market risk m 1
SQAM165
Broadways Ltd. is developing a software
application that has to be delivered next month.
The project manager for this project is pushing
the team to complete the application this month
because another similar application is being
released by a competitor 1, Business risk m 2, Premature release risk m 3, Testing risk m 4, Software risk m 1
SQAM166
Which of the following is NOT considered to be a
critical success factor for acceptance testing? m
1, Significance of the software
for the organization. m
2, Impact of failure of the
software. m
3, Complexity of the
requirements defined in the
project plan. m
4, Business risks in developing the
software. m 4
SQAM167
In which of the following phases of the testing life
cycle are the actual test results compared with
the expected results? m
1, Defect tracking and
management m
2, Quantitative measurement
m 3, Performing tests m 4, Test reporting m 3
SQAM168
Which of the following is not a responsibility of a
tester? m
1, Providing technical
leadership for the tests. m
2, Creating test
documentation. m 3, Executing tests. m 4, Creating test data. m 1
7/22/2019 Sem_D_MT_2.xls
17/17
SQAM169
Technowave Ltd. has just completed the testing
of an inventory management system for its client.
The application will be delivered to the client next
week. The client has an existing inventory system
that needs to the be integrated with the newsystem dev 1, Requirements testing m 2, Parallel testing m 3, Intersystem testing m 4, Integration testing m 3
SQAM170
Technique Solutions has developed an order
processing application. The testing team has
identified a few defects that need to be fixed by
the development team. Identify which of the
following types of testing needs to be performed
to ensure that the fixes 1, Recovery testing m 2, Regression testing m 3, Control testing m 4, Parallel testing m 2
SQAM171
Technique Solutions has developed an order
processing application. The test manager wants
to confirm that the users at the client-end are
comfortable using the new application. Identifywhich of the following types of testing needs to be
performed in the 1, Manual-support testing m 2, Recovery testing m 3, Regression testing m 4, Requirements testing m 1
SQAM172
Technique Solutions has developed an online
auction application . The software is currently in
its testing phase. Joseph, one of the testers, has
been asked to test the performance of the
application when a large number of users access
it simultaneously, 1, Stress testing m 2, Recovery testing m 3, Regression testing m 4, Compliance testing m 1
SQAM173
Paraways Corp. has created an online shopping
application for a leading chain of super stores.
Now, the test manager for this project wants theapplication to be tested by the users at the client
site. Identify which of the following types of testing
need 1, Alpha testing m 2, Beta testing m 3, Requirements testing m 4, Regression testing m 2
SQAM174
Newwave Solutions is developing a payroll
management system for a client. The testing
phase of the project has just been completed.
The defects identified are intimated to the
development team for fixes. The development
team fixed the defects quickly and
1, The client should have been
involved because then the
development team would have
done the fixes properly. m
2, The testing team should
have done the fixes
themselves to shorten the
process. m
3, The development team
should have done beta testing
before giving the application
for verification to the testing
team. m
4, The development team should
have done regression testing before
giving the application for verification
to the testing team. m 4
SQAM175
Newwave Solutions is developing a payroll
management system for a client. The testing
phase of the project has just been completed.
The testing team has identified certain defects
that need to be fixed by the development team.
The project manager wants th
1, The development team
should perform a thorough
alpha testing because this will
ensure that all the defects are
addressed and closed
effectively. m
2, The development team
should perform thorough
regression testing because
this will ensure that all the
defects are addressed and
closed effectively. m
3, The development team
should perform a thorough
beta testing because this will
ensure that all the defects are
addressed and closed
effectively. m
4, The development team should
perform a thorough error-handling
testing because this will ensure that
all the defects are addressed and
closed effectively. m 2