    S No Question Option 1 Option 2 Option 3 Option 4 Solution

    SQAM001

    Which of the following is one of the objectives of

    business plan? m

    1, Minimize inventory

    investment m

    2, Maximize the use of

    resources m

    3, To ensure that cost of

    production is less m

    4, Measure and review actual

    performance against a specified

    benchmark m 4

    SQAM002

    John Smith has joined as a management traineepersonnel in XL technologies. His manager has

    asked him to work and analyze details of all the

    applicants for the post of software engineers and

    match the parameters of the candidates to the job

    requisit ions. 1,The Training Process m 2,The Recruitment Process m 3,The Performance Process m 4,The Appraisal Process m 2

    SQAM003

    Kinks Corporation is a small scale, manufacturing

    company in the pharmaceutical domain. The

    company was set up 5 years ago. The

    management of Kinks Corporation wants to

    improve the productivity and profitability of the

    company by using IT to integrate the

    1,Consulting outsourcing

    model and off-the-shelf ERP

    package m

    2,Hosting model and off-the-

    shelf ERP package m

    3,Consulting outsourcing

    model and custom ERP

    package m

    4,Hosting model and custom ERP

    package m 2

    SQAM004

    The management of MaxElectronics felt the need

    for implementation of an effective CRM strategy

    to ensure loyalty of customers. The

    implementation of CRM must help the customer

    service representatives in handling the customers

    at the front-end and the mana

    1, Integrates customer

    information with the product

    information m

    2, Acts as a source of

    collecting customer

    information and customer

    queries m

    3, Analyzes customer behavior

    and categorizes customers

    into current and prospective

    customers m

    4, Provides instant information

    about the customer and its

    purchasing details m 4

    SQAM005

    HK Electronics was facing problems in meeting

    the requirements of the customers. Therefore, the

    management decided to change its existing

    business strategy to a new customer-oriented

    strategy. The new strategy adopted by HK

    Electronics is CRM. Identify th

    1, Providing exclusive services

    to the customers and helping

    the sales team in achieving the

    sales target m

    2, Enhancing the product

    quality by improving production

    activities m

    3, Increasing sales by

    improving sales activities m

    4, Maintaining the contact

    information of the customers m 1

    SQAM006

    Bob is analyzing the results of a software test. He

    uses a scatter plot to understand the relationship

    between the complexity of the program and the

    number of errors in the program during

    development. On the scatter plot, the tested

    variables cluster in a

    1, Tested variables have

    negative correlation. m

    2, Tested variables have a

    strong positive correlation. m

    3, Tested variables are not

    related. m

    4, Tested variables have a positive

    correlation. m 4

    SQAM007

    Infinity Ltd. is developing a payroll system. The

    system has to be delivered to the client in three

    months. The probability that the project will

    exceed its deadline has a value 0.7 and the

    impact of the risk has the value 3 on the rating

    scale.Calculate 1, 0.7 m 2, 3 m 3, 2.1 m 4, 0 m 3

    SQAM008

    Which of the following set of components are

    essential for preparing an aggregate production

    plan? m

    1, Product information, time

    period m

    2, Product information, time

    period, and work force m

    3, Product information, time

    period, and inventory m

    4, Product information, time period,

    work force, inventory, and time

    period m 4

    SQAM009

    Red Sky Pvt. Ltd. did not follow any automated

    HR Management System. Which of the following

    is not a disadvantage that the managers might be

    suffering because of manual management of HR

    processes? m 1,Increased paper work m

    2,Complexity in maintaining

    data bases of employees m

    3,Less time for analysis,

    planning, and identifying

    important opportunities within

    the organization m

    4,More time in searching and

    selecting tasks m 3

    SQAM010

    Jawger Inc. is an established organization in the

    retail sector. It has been one of the top

    organizations in its domain due to its state-of-the-

    art infrastructure, efficient management and

    processing, and tech-savvy inclination. Jawger

    Inc. has learned th

    1,The problem is that the ERP

    system data cannot be used

    for generating trend analysis

    reports. m

    2,The problem is that the ERP

    system lacked integration with

    a business intelligence tool

    that would use the ERP

    system data to generate trend

    analysis reports. To rectify the

    problem the ERP system

    needs to be integrated with a

    BI tool. m

    3,The problem is that the ERP

    system lacks integration with

    an eBusiness tool. To rectify

    the problem the ERP system

    needs to be integrated with an

    eBusiness application. m

    4,The problem was that instead of

    an ERP system, they only needed to

    install a BI system. m 2

  • 7/22/2019 Sem_D_MT_2.xls

    2/17

    SQAM011

    The management of PeopleTrust has developed

    a CRM strategy for integrating CRM with the

    business processes in the organization. For

    developing an effective CRM strategy, themanagement first defined the objectives of CRM

    and then defined the service value

    1, Basic and special service

    value m

    2, Basic, extended, and

    custom service value m

    3, Elementary, extended, and

    custom service value m

    4, Elementary, extended, and

    special service value m 2

    SQAM012

    Your organization has recently purchased an off-

    the-shelf ERP package. However, some business

    processes need to be extended to suit the needs

    of your organization. Which of the following

    components of an ERP package will help you

    extend the features of th 1,Service engine m

    2,Custom development

    workbench m 3,Administration utility m 4,Modules m 2

    SQAM013

    Which phase of the ETVX process ensures that

    no activity ends abruptly? m 1, Verification phase m 2, Entry phase m 3, Exit phase m 4, Task phase m 4

    SQAM014

    Which of the following is one of the objective of

    Master Production Schedule? m

    1, To provide informationrelated to the requirement of

    resources and raw materials

    for production m

    2, Create a logical frameworkfor developing and pursuing

    production strategies over a

    particular time period m

    3, To ensure that materials are

    available for production at the

    right time m

    4, Schedule manpower and

    machine resources for maximum

    efficiency m 1

    SQAM015

    Which of the following HRM process helps

    employees to acquire job-related skills and

    knowledge and also helps in carrying out their

    roles and responsibilities? m 1,The Recruitment Process m 2,The Training Process m

    3,The Performance

    Management Process m 4,The Appraisal Process m 2

    SQAM016

    Techsoft is a small organization but in the last

    few years it has managed to achieve a

    competitive position in the market. To expand the

    business, the management asked its sales and

    customer care executives to collect customer

    feedbacks. By reviewing the 1, Telephonic survey m 2, Written survey m 3, The Internet survey m 4, Face-to-face interviews m 4

    SQAM017

    KJI Corporation is a large-scale manufacturer of

    copper wires. KJI has a small IT support

    department that supports inventory and accounts

    management. Due to lack of coordinated working

    between the production and other departments,

    such as purchase and acc 1,Enterprise-wide m 2,In-house m 3,Partial m 4,Modular m 3

    SQAM018

    Which of the following sub-systems of the Sales

    module can help you create delivery orders? m 1,Shipping Management m 2,Billing Management m

    3,Sales order entry and

    management m

    4,Sales master data entry and

    management m 1

    SQAM019

    Which of the following plans provides information

    related to the requirement of resources and raw

    materials for the production? m 1, Business plan m 2, Production plan m

    3, Master production schedule

    m 4, Capacity planning m 3

    SQAM020

    Green Carpets Pvt. Ltd. did not emerge as a

    successful organization. The projects were never

    completed on time as deadlines were never

    correctly estimated and even the workload was

    not properly distributed. The reason that cameinto light was that the HR 1,Individualistic approach m 2,Judge the strength m 3,Fair and just policies m

    4,Access to organizationalinformation m 4

    SQAM021

    The management of TechPoint has appointed a

    technical team for the implementation of a CRM

    system in the organization. The main task of the

    technical team is to develop and customize the

    CRM system according to the requirements of the

    organization. Then t

    1, Demonstrating a test run of

    the CRM system m

    2, Providing user manual and

    online help m

    3, Providing training material

    and demo applications m

    4, Providing a common training

    class for all employees m 3

  • 7/22/2019 Sem_D_MT_2.xls

    3/17

    SQAM022

    Smart Accessories Inc. is a leading large-scale

    manufacturer of biking accessories, having state-

    of-art manufacturing machinery. They dont only

    excel in the manufacturing infrastructure but also

    in being tech-savvy. Every department hascustom develope 1,Modular m 2,Outsourcing consultancy m 3,In-house m 4,Hosting m 3

    SQAM023

    The sales representatives of GemTech found that

    the purchasing habits of customers vary

    depending upon their age groups and the section

    of society they belong to. The customer details

    along with their purchasing habits helps to derive

    useful information, 1, Data refining m 2, Web tracking m 3, Data analysis m 4, Data mining m 4

    SQAM024

    Which of the following defines the scope of the

    testing activity? m 1, Test plan m 2, Test script m 3,3 ,Test specifications m 4, Test procedure m 1

    SQAM025

    Which of the following plan acts as an input for

    preparing MRP? m 1, MPS m 2, Capacity Planning m 3, Inventory Planning m 4, Resource Planning m 1

    SQAM026

    Which of the following statement is false?

    Statement A: Employment function focuses on

    paying fair, consistent, and equitable

    remuneration to the workforce.

    Statement B: Maintenance function identifies the

    selected candidate's potential and also helps in 1,Only A m 2,Only B m 3,Both A and B m 4,None of these m 3

    SQAM027

    The management of Magnum Tours was hopeful

    that after the implementation of the CRM system

    the organization will be able to improve its service

    quality. But, to their dismay, even after

    implementing the CRM system the organization

    was not able to solve al

    1, CRM strategy not inline with

    the corporate strategy and lack

    of data integration m

    2, Unwillingness of the

    employees in using the CRM

    system m

    3, Required production targets

    are not achieved on time m

    4, Effective training programs are

    not provided to the employees m 1

    SQAM028

    NTB Inc. is a small scale manufacturer of nuts

    and bolts. The management has observed that

    the working of the organization is not as efficient

    as that of i ts competitors. The management

    decided to consult some experts in their domain

    and get tips on impro 1,Enterprise-wide m 2,In-house m 3,Partial m 4,Modular m 4

    SQAM029

    The technical team of MaxElectronics has

    implemented a CRM system and integrated the

    CRM system with all the existing enterprise

    applications, such as Enterprise Resource

    Planning (ERP), Web server, and data

    warehouse. They have also integrated the CRM

    sy

    1, Upgradation will result to

    loss of previous data m

    2, Complex design and high

    upgradation cost m 3, No scope for upgradation m

    4, Upgradation will require alteast 2

    years m 2

    SQAM030 What is unit testing used for? m

    1, To test each individual unit

    of software to detect errors in

    its code. m

    2, To ensure that each unit

    functions correctly across

    different versions of browsers.

    m

    3, To ensure that the

    developed system can handle

    additional load. m

    4, To ensure the validity of the

    software application. m 1

    SQAM031

    Which of the following is not an activity performed

    in test effort estimation? m

    1, Identifying the risks relatedto the testing phase of SDLC

    m

    2, Developing a test plan

    strategy m

    3, Identifying the tasks to be

    performed m

    4, Computing the size of the

    application m 1

    SQAM032

    Which of the following is the first activity

    performed as part of the Test Execution process?

    m

    1, Assigning test scripts to

    testers for execution. m 2, Establishing the test bed. m

    3, Assigning test cases to test

    cycles. m

    4, Setting up the system test

    environment. m 4

    SQAM033

    In which of the following phases of acceptance

    testing, a customer must understand the

    consequences of adding new functions to

    enhance the software? m

    1, Defining the acceptance test

    criteria m

    2, Developing an acceptance

    test plan m

    3, Executing the acceptance

    test plan m

    4, Developing an acceptance

    decision m 1

  • 7/22/2019 Sem_D_MT_2.xls

    4/17

    SQAM034

    Which of the following is not an objective of

    defect recording phase of the defect

    management process? m

    1, Further improving the

    software development process

    m

    2, Reporting the status of the

    application m

    3, Gathering statistics to

    develop defect resolutions for

    future applications m

    4, To identify the critical mistakes

    made as part of the development

    process. m 4

    SQAM035 What is Defect Density? m

    1, It is the measure of all thefound defects per size of

    software entity being

    measured. m

    2, It is the measure of defects

    before the delivery of software.

    m

    3, It is the average time from

    one defect to the next defectoccurrence during a test

    operation on a software

    project. m

    4, It is the measure of defects after

    the delivery of software. m 1

    SQAM036 What is the use of a test reporting tool? m

    1, To plan a test environment

    m 2, To identify risks m

    3, To track the defects found

    during testing. m 4,To fix the defects m 3

    SQAM037

    Which of the following is a responsibility of a test

    lead? m 1, Creating a test plan m

    2, Providing technical

    leadership for the test process

    m 3, Creating test data m 4, Preparing test documentation m 2

    SQAM038

    Which of the following is not specified as part of

    test specification? m 1, Test objectives m 2, Test assumptions m 3, Test entrance/exit criteria m 4, Test effort m 4

    SQAM039

    In which of the following software testingmethods, checking the availability of physical

    data elements is an entry criteria? m 1, Unit testing m 2, Integration testing m 3, System testing m 4, Acceptance testing m 1

    SQAM040

    Which of the following is not a responsibility of

    customer in a software development process? m

    1, Development of software

    requirements and acceptance

    criteria. m

    2, Identification of interim and

    final products for acceptance,

    along with their acceptance

    criteria. m

    3, Estimating the time and

    effort that should be spent on

    the software. m

    4, Scheduling adequate time to

    examine the product before the final

    acceptance review. m 3

    SQAM041

    In which of the following integration testing

    approaches, all the modules that have been unit

    tested for a system are put together and tested?

    m 1, Top-Down testing m 2, Bottom-Up testing m 3, Big Bang testing m 4, Hybrid testing m 3

    SQAM042Which of the following is not a test reporting tool?m 1, Analysis tools m 2, Code coverage tools m 3, Database tools m 4, Test report formats m 2

    SQAM043

    Which test reporting tool is used to represent the

    results of a software test statistically? m 1, Defect tracking tool m 2, Graphic tool m 3, Drawing tool m 4, Analysis tool m 4

    SQAM044

    Trivia Ltd. is developing a software application

    whose production cost might exceed the planned

    budget. Also, the application will be competing

    with similar applications already available in the

    market. The application is likely to face which of

    the follo 1, Software risk m 2, Testing risk m 3, Premature release risk m 4, Business risk m 4

    SQAM045

    Who among the following is responsible for

    establishing test objectives and goals that define

    the scope of the testing effort? m 1, Project manager m 2, Test manager m 3, Development team m 4, Customer m 2

    SQAM046

    Identify the phase in the life cycle of a test

    process in which test cases are stored for any

    future regression testing requirements. m 1, Design test cases phase. m 2, Wind-up phase. m 3, Execution phase. m 4, System study phase. m 2

    SQAM047Which SQA activity do you need to perform in thesoftware construction phase? m

    1, Assuring that the approved

    design is placed underconfiguration management m

    2, Reviewing the requirements

    document to ensure that the

    software requirements are

    complete and expressed as

    functional, performance, andinterface requirements m

    3, Conducting FormalTechnical Review of code m

    4, Assuring that the allocated

    modules are included in the detaileddesign m 3

    SQAM048

    Which type of testing uses the black box method

    for testing the software? m 1, System testing m 2, Unit testing m 3, Stress testing m 4, Recovery testing m 1

    SQAM049

    In which of the following integration testing

    approaches, the terminal modules are tested first

    followed by all the lower level modules? m 1,Top-Down testing m 2, Bottom-Up testing m 3, Hybrid testing m 4, Big Bang testing m 2

    SQAM050 Identify the purpose of compliance testing? m

    1, It verifies the integrity of

    data during testing. m

    2, It verifies whether the

    authorization rules have been

    properly implemented in the

    application. m

    3, It verifies whether the

    system is able to recover from

    varying degrees of failure. m

    4, It verifies whether a system can

    manage high volume of test plan

    execution. m 2

  • 7/22/2019 Sem_D_MT_2.xls

    5/17

    SQAM051

    Which of the following requirements given by the

    customer are related to the business procedures

    and standards that the software must execute? m 1, Interface requirements m

    2, Performance requirements

    m

    3, Non-functional requirements

    m 4, Functional requirements m 4

    SQAM052

    Which of the following processes helps in the

    defect acknowledgment process? m

    1, Analyze one report for one

    type of defect. m

    2, Implement codes in the

    software project to find known

    and common defects. m

    3, Develop code to count the

    number of defects in a

    software m

    4, Implement codes to slow down

    the software implementation m 2

    SQAM053 What does DRE stands for? m

    1, Deficiency Removal

    Efficiency m 2, Defect Removal Effort m 3, Defect Regression Effort m 4, Defect Removal Efficiency m 4

    SQAM054

    Which test reporting tool helps a software tester

    to determine the source of errors in the process

    being tested? m 1, Source tool m 2, Defect tracking tool m 3, Error tracking tool m 4, Analysis tool m 2

    SQAM055

    The impact of a security risk on a project is

    calculated to be 4. The risk factor of the same is

    calculated to be 2.4. What is the probability ofoccurrence of the risk in the project? m 1, 6 m 2, 0.6 m 3, 0.06 m 4, 6.6 m 2

    SQAM056

    Which of the following testing techniques tests

    whether the application is developed in

    accordance with information technology

    standards, procedures, and guidelines? m 1, Compliance testing m 2, Security testing m 3, Operations testing m 4, Recovery testing m 1

    SQAM057

    Which review checklist helps you to check

    whether the data types and data declarations are

    correct? m 1, Coding review checklist m

    2, High level design review

    checklist m 3, Testing review checklist m

    4, Detailed design review checklist

    m 1

    SQAM058

    According to the V model, which of the following

    types of testing can be planned by using the

    documents created during the requirementsphase. m 1, Integration testing m 2, Unit testing m 3, Acceptance testing m 4, System testing m 3

    SQAM059

    Consider the following statements:

    Statement A: Test effort estimation is the

    responsibility of a test manager.

    Statement B: The test effort estimate helps in

    determining the number of testers and time

    required for software testing.

    Which of the follo

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

    SQAM060

    Which of the following Code Coverage measure

    reports the true or false outcome of each Boolean

    sub-expression, separated by || and &&

    operators? m 1,Condition Coverage m 2, Decision Coverage m 3, Statement Coverage m 4, Condition/Decision Coverage m 1

    SQAM061

    According to the V model, which of the following

    types of testing should be planned in the

    requirements stage of an SDLC? m 1, Unit testing m 2, Acceptance testing m 3, Integration testing m 4, System testing m 2

    SQAM062 What is the purpose of stress testing? m

    1, To check that the system

    works efficiently when

    subjected to above-normal

    transaction volumes. m

    2, To check if adequate

    backups have been made. m

    3,To check if the system

    achieves the desired level of

    performance. m

    4, To check if a system performs

    correctly over a continuous period of

    time. m 1SQAM063 Which of the following is a size metric? m 1, Lines of code m 2, Number of defects m 3, Mean time to failure m 4, Project development effort m 1

    SQAM064

    Which test reporting tool is used to identify the

    quantifiable problems to prioritize work based on

    their severity? m 1, Scatter plot m 2, Pareto chart m 3, Control chart m 4, Histogram m 2

    SQAM065

    Newways Solutions is developing an online

    reservation system. A sister concern of the

    company is currently testing a similar application.

    The testing team of Infinity Solutions wants to

    consult the experienced testers of the sister

    concern for identifyin 1, Checklist m 2, Observation m 3, Brainstorming m 4, Questionnaire m 2

  • 7/22/2019 Sem_D_MT_2.xls

    6/17

    SQAM066

    Which of the following types of errors become

    visible when two or more modules are

    integrated? m 1, Leakage errors m 2, Integration errors m 3, Compatibility errors m 4, Syntax errors m 3

    SQAM067

    Which of the following phases of the testing life

    cycle involves documentation of testspecifications? m 1, Test execution m 2, Planning process m 3, Test design m 4, Risk analysis m 2

    SQAM068

    Which of the following is not a test case design

    technique? m 1, Equivalence partitioning m 2, Boundary value analysis m 3, Regression analysis m 4, Extreme input testing m 3

    SQAM069

    Which of the following integration test

    approaches allows you to test the basic skeleton

    of the system early in the test process? m 1, Big Bang testing m 2, Hybrid testing m 3, Bottom-Up testing m 4, Top-Down testing m 4

    SQAM070

    In which phase of acceptance testing, a customer

    should be comfortable with the functionality of the

    software? m

    1, Defining the acceptance

    criteria m

    2, Developing acceptance plan

    m

    3, Executing acceptance plan

    m

    4, Developing acceptance decision

    m 1

    SQAM071 Why are test metrics gathered? m

    1,Test metrics are gathered to

    evaluate the effort of the

    testing team. m

    2, Test metrics are gathered to

    measure the effectiveness of

    software testing. m

    3, Test metrics are gathered to

    motivate the team members of

    a software project m

    4, Test metrics are gathered toresolve arguments between the

    development team and the design

    team in a software project. m 2

    SQAM072

    Which statistical analysis tool is used to

    maximize insight into a data set? m 1, Exploratory analysis m 2, Pareto chart m 3, Regression analysis m 4, Run chart m 1

    SQAM073

    Trinity Ltd. is testing a position tracking system.

    The company is testing this kind of a system for

    the first time. In order to identify the risks

    associated with the Position Tracking system, the

    participation of the entire testing team is desired.

    Whic 1, Checklist m 2, Questionnaire m 3, Brainstorming m 4, Interview m 3

    SQAM074

    Clark Lewis has recently been appointed as the

    Test Manager at ICIS Ltd. ICIS has developed a

    share trading application that enables customers

    to buy and sell shares online, and Clark is

    responsible for testing the application. He has

    formed a testing tea

    1, Clark should specify the

    expectations from Tim in a

    clear manner, in the next team

    meeting. m

    2, Clark should provide

    constructive criticism to Tim in

    the next team meeting and

    suggest some solutions to the

    problem. m

    3, Clark should listen to Tim in

    the next team meeting and

    analyze the key points

    conveyed by him regarding his

    performance. m

    4, Clark should provide constructive

    criticism to Tim on a one-to-one

    basis and think of some possible

    solutions to the problem. m 4

    SQAM075

    Which of the following tools is used to determine

    the breakdown point in application software? m 1, Regression testing tool m 2, Code coverage tool m 3, Load testing tool m 4, Traceability tool m 3

    SQAM076 Which of the following is a QA activity? m 1, Inspection m 2, Testing m 3, Quality audit m 4, Checkpoint review m 3

    SQAM077

    Technology Solutions Inc. is developing a library

    management system. The acceptance criteria

    was defined early in the development life cycle

    using the requirements document. During the

    analysis phase, the analysis document was used

    to prepare the system t

    1,The documents created

    during requirements, analysis,

    and design phases should

    have been tested using white-

    box testing techniques. m

    2,The documents created

    during requirements, analysis,

    and design phases should

    have been tested using black-

    box testing techniques. m

    3,The documents created

    during requirement, analysis,

    and design phases should

    have been tested using static

    testing techniques. m

    4,The documents created during

    requirement, analysis, and design

    phases should have been tested

    using structural testing techniques.

    m 3

    SQAM078

    Paraways Solutions is developing an order

    processing application using ASP.NET. The

    developers of Paraways have not worked on this

    technology before. Due to budgetary constraints,

    Paraways is not conducting any training on thenew technology being used. I 1, Market risk m 2, Testing risk m 3, Management risk m 4, Software risk m 4

    SQAM079

    Consider the following statements:

    Statement A: For each phase of testing, the

    planned tests are executed and the actual test

    results are compared with the documented

    expected results.

    Statement B: A tester while creating test cases

    estimates the expecte

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

  • 7/22/2019 Sem_D_MT_2.xls

    7/17

    SQAM080

    Which of the following acceptance requirements

    relate to the quality attributes of software? m 1, Functional Requirements m

    2, Non-Functional

    Requirements m

    3, Performance Requirements

    m 4, Interface Requirements m 2

    SQAM081

    Which of the following displays a sequence of a

    defect life cycle? m

    1, Raise a defect, report a

    defect, get the defectacknowledged by developer,

    get the defects fixed by the

    developer, verify and close the

    defect. m

    2, Raise a defect, get the

    defects fixed by the developer,

    verify and close the defect. m

    3, Report a defect, get thedefect acknowledged by

    developer, get the defects

    fixed by the developer, close

    the defect. m

    4, Raise a defect, report a defect,get the defects fixed by the

    developer, get the defect

    acknowledged by developer, verify

    and close the defect. m 1

    SQAM082

    The project manager of a software project needs

    to know the average time before the first defect

    occurs in the software. Which metric can provide

    this information to the project manager? m 1, DRE m 2, MTTF m 3, DD m 4, Cyclomatic complexity m 2

    SQAM083

    Consider the following statements:

    Statement A: Scatter plot is a statistical analysis

    tool.

    Statement B: Exploratory analysis is used to

    analyze data represented by a scatter plot.

    Which of the following is correct in context of the

    preceding statement

    1, Statement A is True and

    Statement B is False. m

    2, Statement A is False and

    Statement B is True. m

    3, Both, Statement A and

    Statement B, are True. m

    4, Both, Statement A and Statement

    B, are False. m 1

    SQAM084

    Adam Martin is the test manager of a team

    responsible for testing an application that

    provides information on daily login time of the

    employees. At one of the project meetings, Adamrealized that the team was not performing upto

    the standards set at the b

    1, Listen to the team members

    in the next team meeting and

    analyze key points conveyedby the team members

    regarding their performance. m

    2, Provide constructivecriticism to the team

    individually and in private. m

    3, Ask the team members in

    the next team meeting toprovide justification of their

    non performance. m

    4, Provide constructive criticism tothe team in the next team meeting.

    m 2

    SQAM085

    Consider the following statements:

    Statement A: The selection of an appropriate tool

    is a secondary aspect of the testing process.

    Statement B: The selection of an appropriate tool

    leads to an ease in the burden of test production

    and test execution.

    Wh

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 4

    SQAM086

    Consider the following statements:

    Statement A: Quality Assurance is oriented to

    prevention of defects.

    Statement B: Quality Control is oriented to

    detection of defects.

    Which of the following is correct in context of the

    preceding statements? m

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

    SQAM087

    Global Infosystems Inc., has developed a job site

    for Manpower Consultants, a placement

    company. To increase the business generated by

    the site, Anne Forsythe, a manager with the

    placement company has decided to launch an

    advertisement campaign promoting 1, Operation testing m 2, Stress testing m 3, Regression testing m 4, Recovery testing m 2

  • 7/22/2019 Sem_D_MT_2.xls

    8/17

    SQAM088

    Technowave Solutions is working on a gaming

    application. Jim Lewis, a tester for this project,

    has written a code to calculate the perimeter of a

    rectangle. The code needs to be tested for

    different types of inputs. Which type of testing willJim use to t 1, Integration testing m 2, System testing m 3, Acceptance testing m 4, Unit testing m 4

    SQAM089

    For a test problem, identify which of the following

    attributes gives information on why the difference

    between the problem and the ideal criteria is

    significant? m 1, Statement of Condition m 2, Criteria m 3, Cause m 4, Effect m 4

    SQAM090

    Why is i t necessary to identify critical success

    factors of the software during acceptance

    criteria? m

    1, To indicate whether the

    software has been identified of

    defects. m

    2, To indicate whether the

    software has been accepted or

    rejected, based on customer

    requirements. m

    3, To indicate whether the

    software has been able to

    meet the critical acceptance

    requirements. m

    4,4 ,To indicate whether the

    software has been corrected of

    defects. m 3

    SQAM091

    Consider the following statements:

    Statement A: Regression testing comprises

    checking consistency, completeness, and

    correctness of the software at each stage and

    between each stage of the SDLC.

    Statement B: Verification is an activity that

    provides obje

    1, Both, Statement A and

    Statement B are False. m

    2, Both, Statement A and

    Statement B are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 4

    SQAM092

    A testing team member needs to calculate the

    total number of tests that need to be conducted

    for a module. Which metric can give this

    information? m 1, DRE m 2, MTTF m 3, Cyclomatic Complexity m 4, DD m 3

    SQAM093

    Paraways Solutions is developing an onlinegaming application for school-going children. The

    organization has recruited highly experienced

    developers for this project. The developers are

    coming up with innovative ideas and developing

    excellent features in 1, Market risk m 2, Project risk m 3, Technical risk m 4, Management risk m 1

    SQAM094

    Consider the following statements:

    Statement A: A test bed is prepared to conduct a

    test based on the requirements stated for a test

    environment and the strategy devised to

    implement it.

    Statement B: A test bed only contains the

    hardware necessary to co

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 3

    SQAM095

    Consider the following statements:

    Statement A: Quality assurance is product

    oriented.

    Statement B: Testing is a quality assurance

    activity.

    Which of the following is correct in context of thepreceding statements? m

    1, Both, Statement A andStatement B, are False. m

    2, Both, Statement A andStatement B, are True. m

    3, Statement A is True andStatement B is False. m

    4, Statement A is False andStatement B is True. m 1

    SQAM096

    Global Solutions Inc. has developed a library

    management system. After development, the

    software was thoroughly tested using various

    testing techniques and finally, the software was

    implemented at the library site. Earlier, the library

    had been using a ma 1, Performance testing m 2,2 ,Parallel testing m 3, Operations testing m 4, Security testing m 2

  • 7/22/2019 Sem_D_MT_2.xls

    9/17

    SQAM097

    Susan Ward is a software developer in

    Supersoft2000 Inc. She has developed an

    application that offers e-commerce services for

    transacting business through the Internet. Which

    technique should Susan use to test i f the financialtransactions are safe? m 1, Security testing m 2, Reliability testing m 3, Regression testing m 4, Operations testing m 1

    SQAM098

    Consider the following statements:

    Statement A: Statement Coverage measure can

    distinguish between two consecutive switch

    statements.

    Statement B: Statement Coverage measure is

    sensitive to logical operators, such as || and &&.

    Which of the following is

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 1

    SQAM099

    Consider the following statements:

    Statement A: It is the responsibility of a customer

    to perform acceptance testing.

    Statement B: It is the responsibility of a customer

    to define the accept and reject criteria for the

    software.

    Which of the following i

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

    SQAM100

    Consider the following statements:

    Statement A: Inspections are very effective at

    finding defects.

    Statement B: Inspection is an example of

    dynamic technique for detecting defects.

    Which of the following is correct in context of the

    preceding statements

    1, Both, Statement A and

    Statement B are False. m

    2, Both, Statement A and

    Statement B are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 3

    SQAM101

    Consider the following statements:

    Statement A: Word processing packages can be

    used to prepare test report formats.

    Statement B: All organizations use a standard

    test report format.

    Which of the following is correct in context of the

    preceding statemen

    1,Statement A is True and

    Statement B is False. m

    2,Statement A is False and

    Statement B is True. m

    3,Both, Statement A and

    Statement B, are True. m

    4,Both, Statement A and Statement

    B, are False. m 1

    SQAM102

    Consider the following statements:

    Statement A: Software testing is successful if the

    test data tests all aspects of the softwareeffectively.

    Statement B: Test coverage is a measure of the

    coverage goal of a program based on test data.

    Which of the fo

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 1

    SQAM103

    Software Technologies Inc., had developed a

    library information system. The application had

    been running successfully for the last nine

    months. However, due to a hard disk failure, all

    library records in the database server have been

    lost. No backup of th 1, Recovery testing m 2, Operations testing m 3, Regression testing m 4, Integration testing m 1

  • 7/22/2019 Sem_D_MT_2.xls

    10/17

    SQAM104

    Which of the following activities cannot performed

    by using Code Coverage tools? m

    1, Measure the coverage of a

    set of test cases m

    2, Analyze test case coverage

    against system requirements

    m 3, Evaluate the test results m

    4, Develop new test cases to test

    previously untested parts of a

    system m 3

    SQAM105

    Which of the following activities are included

    under Responsibilities of Customer, a componentof a software acceptance plan? m

    1, Identifying the end-users ofthe final product m

    2, Scheduling resource andfacility requirements m

    3, Preparing change controlreport m 4, Creating a project plan m 2

    SQAM106

    Consider the following statements:

    Statement A: Validation is the process of

    evaluating software at the end of the SDLC to

    ensure that the software product complies with

    software requirements.

    Statement B: Validation testing is the

    determination of how w

    1, Both, Statement A and

    Statement B are False. m

    2, Both, Statement A and

    Statement B are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

    SQAM107

    Consider the following statements:

    Statement A: SQA activities in the software

    design phase involve use of the High-level design

    review checklist.

    Statement B: SQA activities in the software

    design phase involve use of the detailed design

    review checklis

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 2

    SQAM108

    Software Solutions Inc. is developing a payroll

    application for SSTP Corporation. SSTP

    Corporation is already using a leave accounting

    system that facilitates the management ofemployees' leaves. The application has been

    running successfully for the last 1, Integration Testing m 2, Regression Testing m 3, Compliance Testing m 4, Intersystem Testing m 4

    SQAM109

    Consider the following statements:

    Statement A: A tester, while creating test cases,

    estimates the expected test results, whereas, the

    actual test results occur during execution of these

    test cases.

    Statement B: A tester, while executing a test

    script, n

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 3

    SQAM110

    Consider the following statements:

    Statement A: During execution of acceptance

    plan, the objectives of the acceptance activities

    are defined along with procedures for meeting

    these objectives.

    Statement B: Execution of acceptance plan

    determines whether

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 4

    SQAM111

    Which of the following is an objective of defect

    reports? m

    1, Identify defects in all phases

    of SDLC. m

    2, Identify whether the

    software developed meetscustomer requirements or not.

    m

    3, Provide information about

    the defects to the developmentteam and enable the team to

    reproduce the defect. m

    4, Provide information of the defects

    to the customer. m 3

    SQAM112

    The development team knows the number of

    operators and number of operands used in a

    software project. How can they use this

    information to calculate the size of the program?

    m

    1, Software Size= log2 (Total

    number of operator tokens

    used) + log2 (Total number of

    operand tokens used) m

    2, Software Size= Total

    number of operator tokens

    used + Total number of

    operand tokens used m

    3, Software Size= Total

    number of unique operator

    tokens used + Total number of

    unique operand tokens used m

    4, Software Size= Total number of

    operator tokens used * Total

    number of operand tokens used m 2

  • 7/22/2019 Sem_D_MT_2.xls

    11/17

    SQAM113

    Consider the following statements:

    Statement A: Structural test case design

    techniques are used when test data is developed

    from documents that specify the intendedbehavior of application software.

    Statement B: Equivalence partitioning, a

    structural tes

    1,Both, Statement A and

    Statement B, are False. m

    2,Both, Statement A and

    Statement B, are True. m

    3,Statement A is True and

    Statement B is False. m

    4,Statement A is False and

    Statement B is True. m 1

    SQAM114

    Consider the following statements:

    Statement A: Preparing test documentation is not

    a responsibility of a software tester.

    Statement B: Reporting test results is not a

    responsibility of a software tester.

    Which of the following is correct in context of

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 1

    SQAM115

    Jack Thomas was assigned the task of testing an

    online share trading application. Jack has to

    create relevant test cases and on the basis of

    these test cases, test plans will be executed

    during each phase of the testing life cycle. While

    creating the test

    1, Jack should confirm that the

    application runs successfully

    on all supported hardware and

    software environments. m

    2, Jack should check for the

    standard back up and recovery

    procedures and special

    security requirements. m

    3, Jack should confirm that the

    different modules of the

    application can be successfully

    integrated to perform one or

    more application functions. m

    4, Jack should conduct performance

    and load tests on individual

    application components. m 4

    SQAM116

    Global Solutions Inc., has developed HRMS

    software for its customer to provide automation

    solutions for the management of the Human

    Resource Department of CompuServe. However,

    during acceptance testing, it was found that thesoftware was not functioning p

    1, Detecting software defectsearly during development m

    2, Preparing appropriate testfacilities m

    3, Identifying the business

    standards and procedures forsoftware development m

    4, Considering customers

    requirements early during softwaredevelopment m 4

    SQAM117

    John Allen, a project manager at Blue IT

    Systems, has just delivered a software

    application on inventory control for Green Alley

    Stores Ltd. Now, the senior management decides

    to analyze the defect removal processes adopted

    by Johns team. The number of 1, 6 m 2, 0.06 m 3, 0.6 m 4, 0.7 m 3

    SQAM118

    Michelle, a software tester, uses a run chart to

    represent the performance level of a software

    application on different hardware configurations.

    There are around nine data points on the run

    chart, which are above the average of the plotted

    data. What does 1, A trend m 2, Two or more processes m 3, Unusual events m 4, Low performance m 3

    SQAM119

    Assertion: Operations testing is designed to verify

    that prior to production, the operating procedures

    and staff can properly execute the application

    software.

    Reason: Operations testing confirms the

    successful execution of the application software

    during

    1, BOTH the assertion and the

    reason are TRUE, and the

    reason is a correct explanation

    of the assertion. m

    2, BOTH the assertion and the

    reason are TRUE, but the

    reason IS NOT a correct

    explanation of the assertion. m

    3, The assertion is TRUE and

    the reason is FALSE. m

    4, The assertion is FALSE and

    hence the reason DOES NOT apply.

    m 1

    SQAM120

    Which of the following activity is not performed as

    part of the risk analysis phase? m

    1, Determining the probability

    of occurrence of risks. m

    2, Identifying the impact of

    risks. m 3, Monitoring risks. m 4, Prioritizing risks. m 3

    SQAM121

    James Cooper, a certified software tester, has

    been asked by CompCord Inc. to test an

    application that provides information about the

    login and logout time of the employees. For this

    task, James has to create a record showing the

    number of users who log o 1, Recovery testing m 2, Security testing m 3, Audit trail m 4, Data integrity m 3

  • 7/22/2019 Sem_D_MT_2.xls

    12/17

    SQAM122

    Web Solutions Corp. has developed an online

    reservation application for a travel agency. One of

    the requirements given by the client is that the

    information provided by the website should be

    highly secure. Identify under which of thefollowing categories 1, Functional requirement m

    2, Non-functional requirementm 3, Performance requirement m 4, Interface requirement m 2

    SQAM123

    During the acceptance testing of a software

    project, the customers found 12 defects. Earlier,

    the testing team had found 67 defects while

    reviewing the design phase, and 75 defects while

    performing the system testing. How efficient were

    the defect removal 1, 0.87 m 2, 0.922 m 3, 0.75 m 4, 0.94 m 2

    SQAM124

    The software testing team of Ebiz Solutions is

    analyzing the results of a software test on an e-

    commerce application. The team uses a scatter

    plot to represent the relationship between thenumbers of errors identified during the

    development phase and the

    1, Negative correlationbetween the tested variables

    m

    2, No correlation between the

    tested variables m

    3, Positive correlation between

    the tested variables m

    4, Error during development anderrors during testing are

    independent of one another m 3

    SQAM125

    Newwave Ltd. is developing an inventory

    management system. The project is in its testing

    phase. One of the testers has been asked to

    document the different combinations of

    conditions and associated results in order to

    derive unique test cases for validati 1, Code coverage tools m 2, Test scripts m 3, Checklists m 4, Decision tables m 4

    SQAM126 Which of the following is a software risk? m 1, Market risk m 2, Budget risk m 3, Management risk m 4, Technical risk m 4

    SQAM127

    Consider the following statements:

    Statement A: A tester need not have knowledge

    of the tools that aid in software development.

    Statement B: A tester must have knowledge of

    the software development, operation, and

    maintenance process.

    Which of the follo

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 4

    SQAM128

    Web Solutions Corp. has developed an online

    reservation application for a travel agency. One of

    the requirements given by the client is that the

    users should not spend much time on getting

    used to the website and finding the relevant

    information. Identify 1, Functional requirement m

    2, Non-functional requirement

    m 3, Interface requirement m 4, Performance requirement m 3

    SQAM129

    A software program has 32 edges and 29 nodes

    in its flowchart. The testing team needs the

    estimated maximum number of test cases that

    need to applied to the software program to

    ensure that all the statements have been

    executed at least once. Calculate the 1, 2 m 2, 3 m 3, 4 m 4, 5 m 4

    SQAM130

    Betty, a software tester, uses a control chart tomonitor the frequency of occurrence of defects in

    a software project over a period of time. She

    analyzes the chart and concludes that the

    frequency of occurrence of defects is stable.

    What observation on t

    1, Data points have multiple

    entries above and below the

    central line of the control chart.

    m

    2, Majority of data points lie

    below the lower limit of the

    control chart. m

    3, Majority of data points lie

    above the upper limit of the

    control chart. m

    4, Data points lie within the upper

    and lower limit of the control chart.

    m 4

  • 7/22/2019 Sem_D_MT_2.xls

    13/17

    SQAM131

    Consider the following statements:

    Statement A: The load testing tool should be

    evaluated to determine if the tool supports the

    application technology not only at the GraphicalUser Interface (GUI) level but also at the middle

    tier and database level.

    St

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 3

    SQAM132

    Which of the following risk identification

    techniques is used when a broad range of

    options or ideas are required in a short span of

    time? m 1, Observation m 2, Interviews m 3, Brainstorming m 4, Checklist m 3

    SQAM133

    Smart Solutions Corp. has been assigned a

    project to develop an application that provides

    information about the total number of hours for

    which an employee logs on to the system. Whichof the following requirements should the

    customer specify, at the begi

    1, Non-Functional

    requirements m

    2, Performance requirements

    m 3, Functional requirements m 4, Interface requirements m 2

    SQAM134

    The development team at Technology Systems is

    developing an application for a car dealer. The

    application will be used to extract the names and

    addresses of the car owners whose cars need

    servicing by the 20th of the month, from a

    database of cars sold b 1, 0.875 defects m 2, 32 defects m

    3, 0.18 defects per function

    point m 4, 1 defect per function point m 3

    SQAM135

    Robert, a software tester, is prioritizing the

    causes of poor quality of a software application

    using a Pareto chart. He ranks developer errorsas the most significant cause to the poor quality

    of the software and poorly defined objectives as

    the least si

    1, The number of erros related

    to poorly defined objectives

    developer errors is theminimum and number of

    developer errors is the

    maximum. m

    2, The number of errors

    related to poorly definedobjectives is the maximum and

    the number of developer errors

    is the minimum. m

    3, The number of errors

    related to poorly defined

    objectives is minimum. m

    4, The number of developer errors is

    the maximum. m 2

    SQAM136

    Assertion: Static testing validates the

    conformance of a software application to the

    specified requirements without executing the

    code.

    Reason: Static testing is conducted to ascertain

    whether a software application meets all the

    requirements specified in

    1, BOTH the assertion and the

    reason are TRUE, and the

    reason is a correct explanation

    of the assertion. m

    2, BOTH the assertion and the

    reason are TRUE, but the

    reason IS NOT a correct

    explanation of the assertion. m

    3, The assertion is TRUE and

    the reason is FALSE. m

    4, The assertion is FALSE and

    hence the reason DOES NOT apply.

    m 3

    SQAM137

    Which of the following information is not specified

    as part of the risk analysis table? m 1, Probability of occurrence m 2, Risk impact m 3, Risk factor m 4, Risk mitigation strategy m 4

    SQAM138

    Henry Ford was assigned to test a Java

    application developed by Smart Java Co. While

    testing a particular Java code, Henry suggested

    to his team that if they want complete code

    coverage, all the Boolean sub-expressions must

    be separated by logical || and

    1, Multiple Condition Coverage

    m

    2, Decision/Condition

    Coverage m 3, Path Coverage m 4, Condition Coverage m 1

    SQAM139

    Global Solutions, Inc. has developed anapplication for Super Solutions Corp., which will

    provide automated solutions for the management

    of the HR Department of Super Solutions. The

    application was developed keeping in mind the

    customer requirements. Howe

    1, Change the software

    specifications m

    2, Communicate the software

    problems to the development

    team m 3, Reject the software m 4, Review the software again m 3

    SQAM140

    Perry is analyzing the results of a software test.

    She uses a scatter plot to understand the

    relationship between the complexity of the

    program and the number of errors in the program

    during development. On the scatter plot, the data

    points of the tested

    1, Tested variables are

    positively related. m

    2, Tested variables have a

    negative correlation. m

    3, Tested variables are not

    related. m

    4, Tested variables are closely

    related in a positive manner. m 2

  • 7/22/2019 Sem_D_MT_2.xls

    14/17

    SQAM141

    NewWave Ltd. is developing an inventory

    management system. The project is in its testing

    phase. One of the testers has been asked to

    specify the order of actions that should be

    performed during a test session. Identify which ofthe following tools should 1, Test script m 2, Checklist m 3, Decision table m 4, Traceability tool m 1

    SQAM142

    Consider the following statements:

    Statement A: Budget risk is a type of software

    risk.

    Statement B: Technology change is a contender

    for software risk.

    Which of the following is correct about the above

    statements? m

    1, Statement A is True and

    Statement B is False. m

    2, Statement A is False and

    Statement B is True. m

    3, Both, Statement A and

    Statement B, are True. m

    4, Both, Statement A and Statement

    B, are False. m 4

    SQAM143

    Global Software Solutions Inc. is a softwaredevelopment company that provides financial

    analysis applications to large and medium-sized

    financial companies. Currently, the organization

    is creating an online application for one of its

    clients. The managem 1, Test design m 2, Planning process m 3, Test execution m 4, Quantitative measurement m 2

    SQAM144

    Web Market Inc. has been asked to develop a

    software that will provide automated solutions for

    an electronic marketplace. The representative for

    the market has specified the acceptance

    requirements for the particular software in the

    beginning of the proje

    1, Performance requirements

    m

    2, Non-Functional

    requirements m 3, Functional requirements m 4, Interface requirements m 2

    SQAM145

    John, a Java programmer has developed a code

    for a shopping mall. The code generates an

    applet that displays description of all the products

    available in the mall along with their prices. The

    Java applet has to undergo a process of code

    review. In which p 1, Task phase m 2, Exit phase m 3, Entry phase m 4, Verification phase m 4

    SQAM146

    Consider the following statements:

    Statement A: Premature release risks arise when

    deadline of completion of the project has

    exceeded.

    Statement B: Premature release risks arise when

    an equally competitive product is about to be

    released in the market by

    1, Statement A is True and

    Statement B is False. m

    2, Statement A is False and

    Statement B is True. m

    3, Both, Statement A and

    Statement B, are True. m

    4, Both, Statement A and Statement

    B, are False. m 3

    SQAM147

    SmartLabs Inc., is a software development

    company that develops customized software

    solutions. Currently, the organization is

    developing a shopping application that would

    require shoppers to register themselves with the

    shopping site before placing an ord

    1, Defect tracking and

    management m 2, Planning process m 3, Test design m 4, Test execution m 3

    SQAM148

    Rob, a test manager in Global SoftwareSolutions, needs to create a test evaluation report

    for stress testing that was carried out on the

    network of the organization. Suggest the phase of

    the test process life cycle during which Rob

    should create this rep 1, System study phase m 2, Execution phase m 3, Design test cases phase m 4, Wind-up phase m 2

  • 7/22/2019 Sem_D_MT_2.xls

    15/17

    SQAM149

    Consider the following statements:

    Statement A: A questionnaire contains a list of

    questions related to a particular risk.

    Statement B: The list of questions in aquestionnaire is standard and fixed.

    Which of the following is correct in context of the

    p

    1, Both, Statement A and

    Statement B, are False. m

    2, Both, Statement A and

    Statement B, are True. m

    3, Statement A is True and

    Statement B is False. m

    4, Statement A is False and

    Statement B is True. m 3

    SQAM150

    Countryside Markets is developing a shopping

    application that would require shoppers to

    register themselves before placing an order. The

    project is in its testing phase. During a team

    meeting, there was a disagreement about the

    phase of the testing life c 1, Test reporting m 2, Test execution m 3, Test design m 4, Planning process m 4

    SQAM151

    Web Solutions Corp. has developed an onlinereservation application for a travel agency. One of

    the requirements given by the client is that the

    system should support future expansion of the

    business. Identify under which of the following

    categories will 1, Functional requirement m 2, Interface requirement m

    3, Non-functional requirement

    m 4, Performance requirement m 3

    SQAM152

    The software development team in Software

    Solutions has developed a code in C++ to

    generate an inventory management software.

    This software has to be tested line-by-line to

    check whether it maps to the information

    technology standards. Which type of testi 1, Operations testing m 2, Performance testing m 3, Recovery testing m 4, Compliance testing m 4

    SQAM153

    To deliver high quality softwares, Technology

    Systems performs quality planning, formal

    technical reviews, and software testing. It is

    observed that the organization spends a

    considerable amount of time in testing due to

    many errors being found in the cod

    1, Train software developers.

    m 2, Train software testers. m

    3, Conduct inspection after

    each phase of SDLC. m 4, Conduct checkpoint review. m 1

    SQAM154

    Soft Solutions Inc., developed a software that

    provides automated solutions for an electronics

    shopping mall. After the software acceptance

    review, the customer prepared an acceptance

    plan without mentioning the precautions for

    potential misuse of the sof 1, Criticality of the software m

    2, Resources involved in

    developing the software m 3, Size of the software m

    4, Time period in which the software

    was developed m 1

    SQAM155

    InfoTech Software Solutions has developed a

    new payroll system for its employees. The old

    payroll system had some performance problems.

    The proposed application is currently in its testing

    phase. Before phasing out the old system, the

    testing team must en 1, Parallel testing m 2, Intersystem testing m 3, Control testing m 4, Integration testing m 1

    SQAM156

    NewWays Softwares has recently started in-

    house testing of software applications. Being a

    new testing team, there is a lot of confusionbetween the roles and responsibilities. This

    confusion is leading to a lot of differences

    between the members of the te 1, Test lead m 2, Tester m 3, Development team m 4, Test manager m 2

    SQAM157

    Paraways Solutions is developing an airline

    reservation application. One of the requirements

    given by the client is that the website should be

    able to cater the visually-challenged users and

    should allow them to browse the website easily.

    Identify under w 1, Interface requirement m 2, Performance requirement m 3, Functional requirement m 4, Non-functional requirement m 1

  • 7/22/2019 Sem_D_MT_2.xls

    16/17

    SQAM158

    The code developing team in Paraways Solution

    has developed software to record the entry time

    and exit time of employees. The employees are

    asked to fill a feedback form. Under which

    category of manual tools will this feedback formbe listed? m 1, Decision tables m 2, Test scripts m 3, Checklists m 4, Checkpoint review m 3

    SQAM159

    Inform Solutions is developing an Internet

    banking application for one of its clients. The

    project is currently in its testing phase. Wil liams,

    one of the testers working on this project, has

    been asked to document the details of the test

    cases that have

    1, Williams should create a

    test item transmittal report. m

    2, Williams should create a

    test summary report. m

    3, Williams should create a

    test log. m

    4, Williams should create a test

    incident report. m 3

    SQAM160

    Net Solutions Ltd has developed a software to

    create HTML pages without coding. The testing

    for this application needs to be carried out. The

    test manager wants to use an automated testingtool that would avoid the defects from cropping

    up in the test exe

    1, The test manager should

    select a code coverage tool. m

    2, The test manager shouldselect a regression testing

    tool. m

    3, The test manager should

    select a traceability tool. m

    4, The test manager should select a

    traceability tool. m 4

    SQAM161

    Perfect Solutions is working on an order

    processing application. Now, the testing team has

    been asked to define the sequence of the testing

    process. Identify which of the following

    documents should the testing team create for the

    same. m

    1, The testing team should

    create a test plan. m

    2, The testing team should

    create a test case specification

    document. m

    3, The testing team should

    create a test design

    specification document. m

    4, The testing team should create a

    procedure specification document.

    m 1

    SQAM162

    Solution Shares Ltd. has developed a software to

    enable online trading of shares. Sandra, one of

    the testers working on the project, has beenasked to document the test case design.

    Presently, she has to document the input and

    output values for the tests.

    1, A test plan should be

    created. m

    2, A test design specification

    should be created. m

    3, A test case specification

    should be created. m

    4, A test procedure specification

    should be created. m 3

    SQAM163

    Blue Skies School has engaged a software

    organization to create a software for the school

    library. The software will allow the library staff to

    keep a record of all the books issued and

    returned. The software is currently in its testing

    phase. Identify wh 1, Operations testing m 2, System testing m 3, Error-handling testing m 4, Control testing m 1

    SQAM164

    Broadways Ltd. is developing an online software

    application. The development team for this

    project includes nine team members. During the

    team meetings, James, the test manager for this

    project, realized that a few members of the team

    have grudges against 1, Software risk m 2, Premature release risk m 3, Management risk m 4, Market risk m 1

    SQAM165

    Broadways Ltd. is developing a software

    application that has to be delivered next month.

    The project manager for this project is pushing

    the team to complete the application this month

    because another similar application is being

    released by a competitor 1, Business risk m 2, Premature release risk m 3, Testing risk m 4, Software risk m 1

    SQAM166

    Which of the following is NOT considered to be a

    critical success factor for acceptance testing? m

    1, Significance of the software

    for the organization. m

    2, Impact of failure of the

    software. m

    3, Complexity of the

    requirements defined in the

    project plan. m

    4, Business risks in developing the

    software. m 4

    SQAM167

    In which of the following phases of the testing life

    cycle are the actual test results compared with

    the expected results? m

    1, Defect tracking and

    management m

    2, Quantitative measurement

    m 3, Performing tests m 4, Test reporting m 3

    SQAM168

    Which of the following is not a responsibility of a

    tester? m

    1, Providing technical

    leadership for the tests. m

    2, Creating test

    documentation. m 3, Executing tests. m 4, Creating test data. m 1

  • 7/22/2019 Sem_D_MT_2.xls

    17/17

    SQAM169

    Technowave Ltd. has just completed the testing

    of an inventory management system for its client.

    The application will be delivered to the client next

    week. The client has an existing inventory system

    that needs to the be integrated with the newsystem dev 1, Requirements testing m 2, Parallel testing m 3, Intersystem testing m 4, Integration testing m 3

    SQAM170

    Technique Solutions has developed an order

    processing application. The testing team has

    identified a few defects that need to be fixed by

    the development team. Identify which of the

    following types of testing needs to be performed

    to ensure that the fixes 1, Recovery testing m 2, Regression testing m 3, Control testing m 4, Parallel testing m 2

    SQAM171

    Technique Solutions has developed an order

    processing application. The test manager wants

    to confirm that the users at the client-end are

    comfortable using the new application. Identifywhich of the following types of testing needs to be

    performed in the 1, Manual-support testing m 2, Recovery testing m 3, Regression testing m 4, Requirements testing m 1

    SQAM172

    Technique Solutions has developed an online

    auction application . The software is currently in

    its testing phase. Joseph, one of the testers, has

    been asked to test the performance of the

    application when a large number of users access

    it simultaneously, 1, Stress testing m 2, Recovery testing m 3, Regression testing m 4, Compliance testing m 1

    SQAM173

    Paraways Corp. has created an online shopping

    application for a leading chain of super stores.

    Now, the test manager for this project wants theapplication to be tested by the users at the client

    site. Identify which of the following types of testing

    need 1, Alpha testing m 2, Beta testing m 3, Requirements testing m 4, Regression testing m 2

    SQAM174

    Newwave Solutions is developing a payroll

    management system for a client. The testing

    phase of the project has just been completed.

    The defects identified are intimated to the

    development team for fixes. The development

    team fixed the defects quickly and

    1, The client should have been

    involved because then the

    development team would have

    done the fixes properly. m

    2, The testing team should

    have done the fixes

    themselves to shorten the

    process. m

    3, The development team

    should have done beta testing

    before giving the application

    for verification to the testing

    team. m

    4, The development team should

    have done regression testing before

    giving the application for verification

    to the testing team. m 4

    SQAM175

    Newwave Solutions is developing a payroll

    management system for a client. The testing

    phase of the project has just been completed.

    The testing team has identified certain defects

    that need to be fixed by the development team.

    The project manager wants th

    1, The development team

    should perform a thorough

    alpha testing because this will

    ensure that all the defects are

    addressed and closed

    effectively. m

    2, The development team

    should perform thorough

    regression testing because

    this will ensure that all the

    defects are addressed and

    closed effectively. m

    3, The development team

    should perform a thorough

    beta testing because this will

    ensure that all the defects are

    addressed and closed

    effectively. m

    4, The development team should

    perform a thorough error-handling

    testing because this will ensure that

    all the defects are addressed and

    closed effectively. m 2