ROTEC Soil Stabilizer can be applied to various road construction needs :
ROTEC Made in Indonesia
Residential PedestrianJogging TracksGolf cart Path
Air StripService RoadParking AreaInspection Road
MiningPlantation Factory Accessand many More
AirStrip
Residential Factory Access Pipeline Inspection Road
Mining Jogging Track
Plantation
Parking AreaGolf Carth path
Dusty Road Poor Road Condition
Common Pavement Problems
Crack Pumping Road
Soil Cement Pavement
Additives to stabilize and solidifies soil (stabilization & solidification) by means of Physics-Chemistry.
Form : Powder composed of inorganic minerals.
ROTEC is developed and tested for tropical climates.
Water coated soil particles -Soil can not bond with Cement
Normal Soil Condition
ROTEC fill the cavities of soil particles, Soil blends to cement perfectly.
Role of ROTEC
ROTECdecomposes water in the soil
Soil blends perfectly with cement
Soil particles are coated with ROTEC
soil
soil
Soil
Soil particlescoated with water
Soil particles
soil
Pavement Layer (Rigid & Flexible Pavement)
Hotmix 5cm
Base 20cm
SubBase30cm
• LPB CBR 20%, LPA CBR 50%• Longer time to construct• High cost
ROTEC proven superior in terms of quality, cost and time.
* Optional
Hotmix 3cm
ROTEC 20cm
• Faster to Construct• Cost-efficient• CBR up to 100% (Strong)• Water Resistant
Road Construction Comparison
Conventional Road Construction ROTEC Construction
PAVEMENT COMPARISSON
Load Distribution on Pavement
Analisa perhitungan Stabilisasi dengan metode Plaxis
PAVEMENT SURFACE OPTION
ROTEC CONCRETE ASPALT PAVING BLOCK
ROTEC PAVEMENT LAYERS
Soil Cement Water
COMPOSITION
ROTEC
Comparisson Sand-Gravel & ROTECSand – gravel Bond ROTEC
Sand – Gravel Bond
ROTEC ApplicationWater Resistant After Flood
Implementation Method
Initial Striping
Cut and Fill
Form & Improve
Mixing Cement & Soil
Rotec Sprinkling & Compacting
Finished Road
Finished Road
PROJECTS REFERENCE
PT GSM - Riau
Cut & Field + Forming
Compacting
Rotec Aplication process
Finished Road
Transportation
PT GPTR
CBR Testing
PKS PAJ - Jambi
Main entrance
PT PAJ
Work Progress
After Rotec application
Engine Room Access
Pilot Project at Papah, Sabah - Malaysia
Papah, sabah – Malaysia (3bln)
Papah, sabah – Malaysia (15bln)
www.ROTEC.co.id www.ROTEC.co.id
Kondisi Awal Akses Jalan masuk PT Poseidon Aquakultura - Lampung
Akses Jalan masuk yang meyulitkan pengiriman barang barang
www.ROTEC.co.id
www.ROTEC.co.id
Akses Jalan masuk, tidak dapat di lalui dengan berjalan Kaki, sehingga harus rental hardTop (4x4)
Foto Progress Pekerjaan, Pementukan badan jalan Menggunakan Grader
www.ROTEC.co.id www.ROTEC.co.id
Foto Progress Pekerjaan, Pementukan dan Pemadatan badan jalan
www.ROTEC.co.id www.ROTEC.co.id
www.ROTEC.co.id www.ROTEC.co.id
Foto Setelah Aplikasi ROTEC Selesai, Jalan Tahan Air dan beban kendaraan
Year of Construction 2011
PT MNS – 15 September 2016
Construction year 2011
Construction year 2011
Pavement Surface (15 September 2016)