Green Infrastructure

Preview:

Citation preview

James HouleProgram Manager

UNH Stormwater Center

Context

• Climate Mitigation is all about carbon (reducing emissions)

• Climate Adaptation is all about water

General Outline

• Problem:  There are changing patterns and there need to be new innovations for municipal infrastructure built with more useful and relevant data.

• Solutions:  Widespread application of GI incorporating storage and flexible conveyance in the landscape

• Benefits:  improve local community resilience, or the ability of a community to bounce back quickly from climate impacts 

Climate Solutions New England (CSNE), 2014

Extreme Events Increasing

% increase from 1958‐2012 in the amount of precipitation from extreme rain events (heaviest 1% of all daily events from 1958‐2012

Source: Kenneth Kunkel, Cooperative Institute for Climate and Satelites, Noreth Carolina Sate and NOAA NCDC

• NOAA Rainfall data last updated  in 1963

• Research examining impacts including the last 50 yrs show that 28‐60% increase rainfall depths (Guo 2006)

• infrastructure design today relies on outdated data

Infrastructure will be increasingly compromised by climate‐related hazards, including sea level rise, coastal flooding, and intense precipitation events.

Source: Antioch University of New England, 2009

Not if…. When…

Source:Shaleen Jain, UMaine Civil & Environmental Engineering & Climate Change Institute (2012)

Three things you can do now

1.)  Use up‐to‐date design standards2.)  Include multiple no‐risk improvements to all designs3.)  Identify hotspots and implement preventative GI pilot projects

Improved Data

TP‐40 (1961)Northeast Regional Climate Center (NRCC, 2010)

Percent Difference

Event in yrs2 3.1 3.3 5%10 4.5 4.9 8%25 5.5 6.2 11%50 6.0 7.4 19%100 6.8 8.8 23%

Inches per 24 hrs

http://precip.eas.cornell.edu/

up‐to‐date code

http://www.southeastwatershedalliance.org/Final_SWA_SWStandards_Dec_2012.pdf

2013 Model Regulations$0 Cost Controls

http://www.southeastwatershedalliance.org/Final_SWA_SWStandards_Dec_2012.pdf

TSS (lbs) TP (lbs) TN (lbs)10‐years 1,471,440 4,470 122,40025‐years 3,678,600 11,175 122,400

Municipalities are facing decisions about the construction or reconstruction of water resource infrastructure today that will have a profound impact on the size, scope, cost of drainage, and relative risk years into the future.

15

Highest priority culvert was replaced with a bridge

16

17

Questions?