present sg group

Preview:

Citation preview

Singapore

Marina Barrage

Smart Manager 4MBA

Ramkhamhaeng University

SG

-

SG

Singhapura) • 4

SG•

SG•

Stamford Raffles) Bencoolen)

Bengkulu) •

SG

• William Farquhar)

• Philip Jackson)

SG

Republic of Singapore)

SG

• 3•

• 1 Doing Business (

-

Ranking 2013 2012 2011 2010

1 New York New York New York New York

2 London London London London

3 Hong Kong Hong Kong Hong Kong Hong Kong

4 Tokyo Tokyo Tokyo Tokyo

5 Singapore Singapore Singapore Paris

6 Shanghai Shanghai Shanghai Singapore

7 Paris Frankfurt Paris Frankfurt

8 Frankfurt Paris Frankfurt Shanghai

9 Chicago Zurich Sydney Washington

10 Sydney Chicago Amsterdam Sydney

Xinhua-Dow Jones International Financial Center Development Index 2013

A leading global city in the heart of Asia)•

- Economic growth that sustainable- Having a strong social security framework- A world-class environment and infrastructure- A Singapore that is secure and influential- Having strong families, cohesive society

2011 2012 2013(e)Avg

2013-2015

(259.8 267.9(e) 277.86 289.5

(49,270.9

049,936.3

(e)50,899.1

852,099.

00

GDP, % 4.9 1.3 2.9 3.4

(56,989

56,142(e)

57,537 56,839

21.9 21.0(e) 20.7 19.7

AEC•

70%25%

/

1 (Doing Business 2013)•

5 •

(re-export)

100%

1

• 1

fDi Asia-Pacific Cities of the Future 2011/12)

• 1

7 8 (fDi Asia-Pacific Cities of the Future 2011/2012) 1 Doing Business 2012 Report, World Bank)

• 2

7 1

IMD World Competitiveness Yearbook 2011)

24th 11th 21st

1st

1st 17th

:

Gross National

Income(M.S

$)

Per Capi

ta GNI(S$)

Gross

Domestic Product

(M.S$)

GDPGrowth % % %

006

213,183.1

48,435

214,233.5 4.

007

234,246.2

51,050

230,871.4 4. 2

008

250,387.9

51,739

233,524.5

009(E) na na na

-- na

:

2007 2008

Total Manufacturing 253,380.6 259,339.2

Food, Beverage & Tobacco 5,707.7 6,598.7

Printing & Reproduction of Recorded Media 2,985.9 2,942.5

Refined Petroleum Products 48,040.0 60,372.7

Chemicals & Chemical Products 35,247.1 36,980.9

Pharmaceutical Products 21,206.9 16,686.4

Pharmaceutical Products 21,206.9 16,686.4

Rubber & Plastic Products 2,650.9 2,464.8

Non-metallic Mineral Products 1,905.8 1,953.9

Fabricated Metal Products except Machinery & Apparatus 8,892.5 9,128.9

Machinery & Equipment 18,965.1 18,758.4

Electrical Machinery & Apparatus 4,089.2 4,111.1

Electronic Products & Components 77,411.0 71,630.5

Medical, Precision & Optical Instruments, Watches & Clocks 5,915.9 5,752.1

Transport Equipment 15,275.6 16,469.3

:

891

2872

International Enterprise Singapore

(%)

2007 2008 2008 . .- . . 2009 . .- . . 2008 2009 . .- . .

561,746.02 669,883.56 340,066.88 230,125.42 19.25 -32.33

299,003.20 344,282.33 175,447.36 119,884.42 15.14 -31.67

262,742.82 325,601.23 164,619.51 110,241.00 23.92 -33.03

36,260.38 18,681.10 10,827.85 9,643.42 -48.48 -10.94

: International Enterprise, Singapore

Re-export)

SMEs

SMEs)

SMEs

SMEs

IMD

Growth

-

-

-

Growth

Clean Energy-

--

- Biomedical

ERI@N (Energy Research Institute @ Nanyang Technological University (NTU)

Growth

• >>>

- The Concept Plan

- The Master Plan

block street code

Growth

Growth

1. The Concept Plan

---

-

-

Growth

2. The Master Plan

“Singapore Way”

-

-

--

-

Growth

-- (Expressway) --- Changi International

Airport - Maritime and Port

Authority

Growth

• R&D

R&D

- . –R&D

- R&D

-

-

Growth

-

-

Growth

Management

Management

2,400 ./

715

Management

2011

50 ( . .2061)

Management

NEWater 4

Management

(see water process to fresh)

Marina Bay RunggolSerangoon

Management

5

7

( . .2030)

Management

1927 1961 1962

Johor Johor

Management

1965Tunku Abdul

Rahman“

Johor”

Management

Johor

Management

1963

• 4 1981

1983

•SeletaLower Seletar

1988

• 1990 Johor

Management

1998 – 2002)

Management

8

2061

Management

2002

1998 NEWater Study

2011

Management

2002

NEWaterNEWater

Management

2005

“ ” Marina Bay

2008

2011Runggol Serangoon

1961 2011

Management

1962 2061

The Institute of Southeast Asian Studies

380 7602010 2060

55%

Management

1890 James MacRitchie

James MacRitchie

Water Crisis

Water Crisis

19101911 3

Alexandra Road

1912 1915–

1917

Water Crisis

1955 - 1961

1963

Water Crisis

Water Crisis

NEWater

Water Crisis

3

• Local Catchments)

• Imported Water)•

Desalinated Water)•

NEWater4

Water Crisis

NEWater

NEWater

Microfiltration, Reverse Osmosis

Water Crisis

Water Efficiency Labeling Scheme : WELS)

Water Tariff) • Water Conservation

Tax)

Water Crisis

NEWater

“Let’s Not Waste Precious Water” 1981

11 • -

- (Public-Private-People Partnership)

Active, Beautiful and Clean (ABC) Waters

Water Crisis

147 2020

155

PUB

“ Water for All: Conserve,

Value and Enjoy “

Water Crisis

Water Crisis

• The Environment and Water Resources

(NEWR)

• The Public Utilities Board (PUB)

1 1963

National

Water Crisis

Water Crisis

• The National Environmental Agency

(NEA) 1 2002

• The Environment and Water Industry

Development Council (EWI)

2006

Global

hydrohub EWI

Marina Barrage

(Marina

Barrage)

008

,

-Recharge (Water Supply)-Regulate (Flood Control)-Relax (Lifestyle Attraction)

Benefit

Recharge (Water Supply)Marina Barrage

Benefit

Regulate (Flood Control)Marina barrage

Chinatown Boat Quay Jalan BesarGeylang

9

Benefit

Relax (Lifestyle Attraction)Marina barrage

Green roofs (

dragonboating

Benefit

3

250 3 1,000

Human Resource

(National

Public Unity Board (PUB)

• 17

1/6 Marina Reservoir

(Desalination)

Marina Barrage

Human Resource

“Sustainable Singapore”

Green Roof

Human Resource

Production

Production

- 3

( )

Production

Production

Production

Production

Source Control

Production

Production

2 Mitigation Measures

Production

Water Quality Monitoring and Prediction using Modeling

Model

Monitor

Production

Public, Private, & People (3P) Participation

Production

• NEWater

Production

• NEWaterDomestic wastewater)

Production

NEWater

Production

• NEWater

Microfiltration

Reverse osmosis Ultraviolet (UV)

Production

• NEWater

Production

• NEWater

• NEWater

Production

Operation

• Marina Barrage

* 10

30 50 • NEWater

Operation

Operation

Operation

• dual-flushing)

• -

Operation

Operation

Operation

Operation

Operation

Operation

Land Reclamation

Land Reclamation)

International

Operation

Operation

Marketing

PUB Water for All : Conserve Value and Enjoy

Marketing

-

Active Beautiful and Clean Waters ABC

Durability

DurabilityPricing

-

DurabilityLCFCs

Durability

“WEB Certificate” Water

Efficiency Labeling Scheme : WELS

NEWater

Success

Success

Summarize

- Internal and External Environment scanning

- Strategy formulation - Strategy implementation - Evaluation and control

Blue Ocean

Summarize

THE END

Recommended