This presentation gives insights into the electrical generation and distribution growth in Sudan. With increasing investments for transmission lines from China and sourcing of diesel generators from Finland, Sudan has been trying to build its electrical power sector. Establishing a national grid is a step illustrating this endeavor.

Citation preview

Page 1: Sudan Electrical Ambitions

February 22, 2013Procurement Consulting – Brickwork Sourcing

Sudan Electrical AmbitionsSudan Electrical Ambitions

Brickwork India (Confidential)

www.brickworksourcing.comwww.brickworksourcing.com

Page 2: Sudan Electrical Ambitions

The total installed power capacity in Sudan amounts to 1234.6 MW

The state owned National Electricity Corporation (NEC) is responsible for electricity generation, transmission and distribution in Sudan.

Only 30% of Sudan’s population has access to electricity.

Sudan’s energy consumption mix continues to be dominated by oil with hydroelectricity playing a minor role accounting for less than 10%.

The Sudan government is planning to build a national electricity network (grid) and they are taking steps in this regard.

South Sudan now sees more investments in the power sector with more number of electrical generation projects in that region.

Electricity is still being supplied through diesel powered generators to a large extent and yet more than 90% of the South Sudanese people are without access to electricity.

2

Current Scenario

Page 3: Sudan Electrical Ambitions

The total electric power required by the South Sudan region is estimated to be 450 MW and going forward this has to be met.

The large hydropower plants being built in South Sudan along the river from Nimuli to Juba would take some time before they start actual operation.

South Sudan has been undertaking feasibility studies for various Mega hydropower projects with a combined capacity of 2 000 MW, the planned projects include Fula (890 MW), Shukoli (235 MW), Lakki (410 MW) and Bedden (570 MW).

Most of the diesel generators used for power generation in South Sudan are currently being made and brought from Finland, the aim is to reduce imports and become self sufficient.

Public sector power companies in Sudan such as The Southern Sudan Electricity Corporation and The National Electricity Corporation of Sudan (NEC) are going to play an active role going forward.

3

The Future Road

Page 4: Sudan Electrical Ambitions

Sudan has vast potential to generate electricity from sources like hydro, along the Nile, solar and geothermal.

The power grid brings with it more focus on reducing power losses and outages, this can be ensured by a smooth power distribution network and an efficient electric grid, this is an area of technology partnerships for potential investors

Installation of transmission lines in Sudan is expected to see major growth and there is an opportunity for investment. For example: Sudan has seen increasing funding by the Government of China to the extent of 85% in power lines development initiative.

The Sudanese government is also proposing several projects to expand thermal and hydropower production, but is struggling to arrange sufficient financing. This is an investment opportunity area.

It is the aim of the Sudanese government to increase the access to electricity from 30% currently up to 90%.

4

Growth Drivers and Opportunities

Page 5: Sudan Electrical Ambitions

Market Potential

The current electric power generation market in Sudan and South Sudan is not great and is secondary to the oil and gas sector. With numerous proposed hydro power projects and the need to establish a national grid, Sudan and South Sudan are looking for foreign direct investments, and herein lays an opportunity for electric power generation companies to enter the market

Brickwork Sourcing works with global electric companies and component manufacturers and has the capabilities of providing end-to-end sourcing as well as vendor and supply chain management solutions.

5

Page 6: Sudan Electrical Ambitions

“The information contained in this document that includes text, graphics and links, are provided on an “as-is”, "with all faults" and "as available" basis and are without warranty of any kind. While Brickwork relies on sources that are believed to be reliable, it cannot rule out errors in judgment or application. The document is intended for “information” and “general guidance” purposes only.” Investment decisions and/or other decisions based on the conclusions and potential strategies mentioned in the document are not necessarily endorsed by the Brickwork management.”

6

About Brickwork Sourcing

Brickwork is the pioneer of the Virtual Office business. We provide virtual support for businesses across the globe. Our well informed Remote Sourcing Analysts (RSAs) can provide support at any or all stages of your sourcing lifecycle. Your Virtual Sourcing Office can be a large team of analysts supporting large companies with established procurement processes or a one-man-show to function as your entire procurement office.

Disclaimer

Page 7: Sudan Electrical Ambitions

THANK YOUTHANK YOUContact:[email protected] Sanjeeth HegdeIndia: +91 (80) - 4040 – 9999 (218 Ext)

13 April 2023

www.brickworksourcing.comwww.brickworksourcing.com