1
A. Yamamoto, Y. Makida, Y. Doi, T. Haruyama, M. Kawai, Y. K ondo, H. Yamaoka, T. Kondo (KEK) S. Mizumaki, S. Mine (Tos hiba) R. Ruber, F. Haug, H. ten Kate (CERN) アアアアアアアアアアアアアアアアアアアアアアアアアアアアアアATLAS Superconducting Central ATLAS Superconducting Central Solenoid Solenoid Design parameters Size inner diameter 2.46 m outer diameter 2.63 m axial length 5.30 m Mass cold mass 5.4 ton total weight 5.7 ton Coil turns/coil 1173 nominal current 7.6 kA inductance 1.35 H stored energy 39 MJ central field 2.0 T peak field 2.6 T ramp up time 0.5 h Conductor size 30 x 4.25 mm 2 total length 10 km Al:Cu:NbTi 15.6 : 0.9 : 1 numbe r of strands 12 strand diameter 1.22 mm RRR a luminum > 500 working point at 4.5K 20 % temperature margin 2.7 K Cooling at 4.5K 130 W at 60-80K 500W helium mass flow 6-20 g/s cool down time 8 days Main features to minimize the coil rad iation thickness: 1.Common cryostat with the LAr EM calo rimeter. 2.High strength aluminum stabilizer. 3.Fast quench axial propagation using pure Al strips. 4.Triangle supports from the Inner war m vessel. 1998: test of Al- stabiliz ed Conductor 2005.11.4: Barrel calorimeter in place. 2000.12.26 : Excitation curve 2001.7.24 : Shipping from Yokohama Bay 2001.9.27: at CERN B180 with CERN DG 1999.4-6: Coil winding at Toshiba 1999.12.: Coil mounted on the Inner Warm Vessel by 24 triangle supports at Toshiba Keihin Factory. 2003.12: in front of Control Dewar in B180 2004.2.26: Coin insertion into LAr calorimeter with a few mm clearance. Final cooling and excitation in May and June 2006 2004.2.27: celebrating the success of Solenoid -LAr docking 2004.3: piping and cabling works 2000.12.26 : Celebrating the success of full excitation 8400A at Toshiba 2004.7.5: Excitation test to 8136A at B180 CERN 2004.10.27: Transportation from B180 to Point 1 2004.10.28: Descent from SX1 to US15 2005.12: connection works on Control Dewar Solenoid-v2, http://atlas.kek.jp/sub/post er/index.html Solenoid-v2, http://atlas.kek.jp/sub/post er/index.html

アトラス測定器超伝導ソレノイド: ATLAS Superconducting Central Solenoid

  • Upload
    kapono

  • View
    42

  • Download
    3

Embed Size (px)

DESCRIPTION

Solenoid-v2, http://atlas.kek.jp/sub/poster/index.html. Design parameters Sizeinner diameter 2.46 mouter diameter 2.63 m axial length 5.30 m Masscold mass 5.4 tontotal weight 5.7 ton Coilturns/coil 1173nominal current 7.6 kA inductance 1.35 Hstored energy 39 MJ - PowerPoint PPT Presentation

Citation preview

Page 1: アトラス測定器超伝導ソレノイド: ATLAS Superconducting Central Solenoid

A. Yamamoto, Y. Makida, Y. Doi, T. Haruyama, M. Kawai, Y. Kondo, H. Yamaoka, T. Kondo (KEK) S. Mizumaki, S. Mine (Toshiba) R. Ruber, F. Haug, H. ten Kate (CERN)

アトラス測定器超伝導ソレノイド:アトラス測定器超伝導ソレノイド: ATLAS Superconducting ATLAS Superconducting

Central SolenoidCentral Solenoid Design parameters

Size inner diameter 2.46 m outer diameter 2.63 m

axial length 5.30 mMass cold mass 5.4 ton total weight 5.7 tonCoil turns/coil 1173 nominal current 7.6 kA

inductance 1.35 H stored energy 39 MJcentral field 2.0 T peak field 2.6 Tramp up time 0.5 h

Conductor size 30 x 4.25 mm2 total length 10 km

Al:Cu:NbTi 15.6 : 0.9 : 1 number of strands 12

strand diameter 1.22 mm RRR aluminum > 500 working point at 4.5K 20 % temperature margin 2.7 KCooling at 4.5K 130 W at 60-80K 500W

helium mass flow 6-20 g/s cool down time 8 days

Main features to minimize the coil radiation thickness:

1. Common cryostat with the LAr EM calorimeter.2. High strength aluminum stabilizer.3. Fast quench axial propagation using pure Al strip

s.4. Triangle supports from the Inner warm vessel.

1998: test ofAl-stabilizedConductor

2005.11.4: Barrel calorimeter in place.

2000.12.26 : Excitation curve

2001.7.24 : Shipping from Yokohama Bay

2001.9.27: at CERN B180 with CERN DG

1999.4-6: Coil winding at Toshiba 1999.12.: Coil mounted on the Inner Warm Vessel

by 24 triangle supports at Toshiba Keihin Factory.

2003.12: in front of Control Dewar in B180

2004.2.26: Coin insertion into LAr calorimeter with a few mm clearanc

e.

Final cooling and excitation in May and June 2006

2004.2.27: celebrating the success of Solenoid-LAr docking

2004.3: piping and cabling works

2000.12.26 : Celebrating the success of full excitation 8400A at Toshiba

2004.7.5: Excitation test to 8136A at B180

CERN

2004.10.27: Transportation from

B180 to Point 1

2004.10.28: Descent from

SX1 to US15

2005.12: connection works on Control Dewar

Solenoid-v2, http://atlas.kek.jp/sub/poster/index.html

Solenoid-v2, http://atlas.kek.jp/sub/poster/index.html