Upload
puwarinwdet02
View
230
Download
4
Embed Size (px)
Citation preview
(.)
Life Cycle
Critical Paths
C C 4 Cost, Time, Scope and Quality
() C 4
Cost, Time, Scope and Quality C (Risk)
C C (Lesson Learned) (Risk Analysis)
(Project Stakeholder)
Project Stakeholder
-
-
- ( EPC Contractor )
-
;
, (Planning & Estimating)
(Time Scheduling)
(Resource Scheduling)
C (Cost Scheduling)
; ()
(Monitoring)
C (Forecasting)
C (Control)
(Bid for Contractor)
(Detail Engineering)
(Construction)
(Commissioning)
(Finished)
;
9 ()(Engineering Consultant Service)
(Scope of Work & Budgeting)
G
(Basic Engineering Design & Invitation to Bid (ITB) Document)
SCOPE
PLANNING -
SCHEDULE & PROGRESS Schedule, Progress Curves, etc.
COST Budgets for Costs, Manpower, etc.
DOCUMENTS
CHANGES /
Work Breakdown Structure (WBS)
C
C
C Logical Relationships
Logical Relationships Finish To Start
Start To Start
Finish To Finish
Start To Finish
Logical Relationships: Finish To Start
A
B
FROM
TO
TO activity FROM activity 100%
Ex. (TO) C(FROM)
Logical Relationships: Start To Start
TO activity FROM activity
Ex. LAN (TO) (FROM)
A
B
FROM
TO
Logical Relationships: Finish To Finish
TO activity FROM activity
Ex. setup (TO) LAN (FROM) C
A
B
FROM
TO
Logical Relationships: Start To Finish
TO activity FROM activity
Ex. (TO) (FROM)
A
B
FROM
TO
Gantt Chart & Milestones WBS plot
Gantt Chart
Milestone Task
Milestone C
Milestone Gantt Chart
Gantt Chart & Milestones
1. Ethane Separation Plant
- Basic Design
- EIA
- Detailed Eng./Con.
2. GSP-6
- Basic Design
- EIA
- Detailed Eng./Con.
3. Small LNG
- Contractor Selection
- Detailed Eng./Con.
Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1
20092008Action Plan
2004 2005 2006 2007Q3 Q4 Q1
Lic. Award PMC Award EPC Award
Commissioning
EIA Approval
Lic. Award PMC Award EPC Award
EIA Approval
Commercial Run
Commissioning
Commercial Run
EPC AwardInnitial Acceptance
Critical Paths Gantt Chart
C Microsoft Project Critical Path
Critical Path Task C C C C Critical Path List
Know Your Status C
C
% * C (weighting) =
Engineering, Procurement Construction C
Project Weighting & % of Work CompletedParts Weight Disciplines Agreed % of work completed (important)
Eng 15% Process (20%)Mechanic (30%)Piping (25%)EE & Instru (15%)Civil (10%)
- AFD 50%- AFC 75%- As-built 100%
Pro 70% - Issue query to vendors 30%- Issue purchase order 60%- FAT & Shipping 80%- On site delivery 100%
Cons 15% Depends on each construction disciplines
S-Curve C Plot
S-Curve
S-Curve
S-Curve S-Curve Engineering, Procurement Construction
S-Curve C
S-Curve
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
M ONTHS
C
U
M
U
L
A
T
I
V
E
P
R
O
G
R
E
S
S
Plan Actual
Milestone
setup
C ,
C
SCOPE -
PLANNING -
SCHEDULE & PROGRESS
COST
DOCUMENTS
CHANGE SCOPE
C
/ SCOPE
V
, C
V (Final Deliverable)
Product, Service, Process Plan
C
V Project Manager Project Manager Management Skill C:
LEADING:
COMMUNICATING: ,
NEGOTIATING:
PROBLEM SOLVING:
MOTIVATING: ,
Project Manager
Scope Baseline
Project Manager ()
Milestones
EPC Contractor
Project Scope of Work
EPC Contractor Milestone Evidences Weightings
Project Coordination Procedure
?
Good Contract Management:
Good Negotiating Skill:
Good Schedule Control:
Good Cost Control:
Good Change Management System (for Scope, Schedule and Budget Changes): Scope
. EIA Report
(Live Plant)
. V
(.)
M9 (.)
M9 (.)
39
GTG Unit
WHRU
Design Actual
40
Lean Pump
Sale Gas compressor
Design Actual
41
( )
42G9
43
( /)
44
A ()
G9
45
!
46
A
47
48
49
S (U)
50
!
PLEM INSTALLATION (Initial Gas System)@ PRP
HD-60
(Topside)
69
/ ; (Platform)
Jacket Installation
/G (Platform)
Jacket Installation
/G (Platform)
Jacket Installation
/G (Platform)
Jacket Installation
/G (Platform)
Modules Installation
/G (Platform)
Modules Installation
/G (Platform)
Modules Installation
/G (Platform)
Pedestrain Tripod/Bridge Installation
/G (Platform)
Pedestrain Tripod/Bridge Installation
/G (Platform)
Tripod/Flare Installation
/ ; (Platform)
Tripod/Flare Installation
/ ; (Platform)
ERP
PRP
Pedestrain Tripod/Bridge Installation
/G (Platform)
67
PTT Public
Company Limited
ESP Construction Area
68
80
20
40
60
100 PTT Public Company Limited
14.21 Trees removalU/G verificationFencing work
69
80
20
40
60
100 PTT Public Company Limited
19.13Soil strippingA/G facilities removal
70
80
20
40
60
100 PTT Public Company Limited
Soil stripping(continued)
24.17
71
PTT Public
Company Limited
80
20
40
60
100
30.61
Soil replacement &compaction
72
PTT Public
Company Limited
34.59
80
20
40
60
100
Soil replacement &compaction (continued)
73
PTT Public
Company Limited
40.94
80
20
40
60
100
Foundation workPre-casted pipe rackU/G piping work
74
PTT Public
Company Limited
80
20
40
60
100
44.50
Foundation workPre-casted pipe rackU/G piping work
(continued)
75
PTT Public
Company Limited
49.80
80
20
40
60
100
Erection of Pre-casted pipe rackESP Substation 2nd FloorU/G piping work
(continued)
76
PTT Public
Company Limited
55.41
80
20
40
60
100
Pre-casted pipe rack completedESP Substation 2nd FloorU/G piping work
(continued)
77
PTT Public
Company Limited
61.6480
20
40
60
100
Steel structure installationA/G piping workIncinerator & Benfield units
demolished
78
PTT Public
Company Limited
68.0280
20
40
60
100
Cooling fan installationErection of pre-casted pipe rack
(existing Benfield unit area)Steel structure installation (continued)A/G piping work (continued)
79
PTT Public
Company Limited
74.4680
20
40
60
100
Road crossing under existing pipe rackCooling fan installation (continued)Steel structure installation (continued)A/G piping work (continued)
80
PTT Public
Company Limited80.2380
20
40
60
100
GTG installationRoad crossing under existing pipe rackCooling fan installation (continued)Steel structure installation (continued)A/G piping work (continued)
81
PTT Public
Company Limited84.86
80
20
40
60
100
Columns erectionConstruction of WHRU main stackCooling fan installation completedSuper structure above existing rackA/G piping work (continued)
82
PTT Public
Company Limited88.30
80
20
40
60
100
Switchgear installation & Cabling workRotating Machine erection Columns erection completedWHRU main stack completedGTG & Compressor shelter erectionA/G piping work (continued)
83
PTT Public
Company Limited90.61
80
20
40
60
100
DCS panel installationInstrument cable tray installationSwitchgear installation & Cabling workRotating Machine erection (continued)WHRU main stack completedGTG & Compressor shelter erectionA/G piping work (continued)
84
85
V 4 42 ;
GSP-GDF 42 ;, 36 ;
86
UA U6
20 58 2 182
! (.)
36, .3007, 344, 331, 304, 33, 9, .2003, 3222
137 46
61. 500 kV
2. 500 kV - - 9 2
3. 230 kV - 2
86 29
61. 9 2. 9
3. 92 4.
5. 9 ROW 115 kV
77 25
300 100
33
3222
304
344
311
9 4 ( )
87
88
9 1. !2. 3. !4. 5. !6. 7. 8. 9. !
89
!
90
91
!
92
93
!!
94
95
96
97
!
98
!
99
!
100
!
101
102
103
Critical Path : mobilization of construction equipmentProblem : No HDD Equipment is available in the Rental MarketSolution : Direct Pipe
104
International Practice applied !!!
105
!
106
!
. ! 7
1. 2. ! (EIA)3. !
!4. !
5. 6. 7. !
107
!
12
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
108
109
110
111
Before
After
112
113
114
115
116
117
A
A
118
119
120