深圳创至博发实业有限公司shenzhen opcsun industry co.,ltd
Patch cord’s Production Flow
First step : fiber strip and kits assembling (Thread some of the connector
components)2
Second step : Thread the ferrule and inject 353nd adhesive)
3
Third step : curing and Solidify4
Forth step : end-face cleaning5
Fifth step : Polishing6
Sixth step : ultrasonic cleaning7
Seventh step : end-face checking8
Eighth step : Circle crimping and finished assembling
8
Ninth step : Test IL and RL10
Tenth step : Finished end-face checking 8
Last step : Package12