    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    1IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    MANUFACTURING BUILDING

    ELECTRICAL NOTES

    1

    2

    3

    4

    5 Exposed conduit inside Electric & Mechanical rooms shall be galvanied !igid steel conduit"

    6 Building #ire $%W ' !i(adh) Jeddah #ire or Middle East *o"

    7 Panel board +E) Electra t(pe or Mitsubishi" Made in Japan"

    8

    9 ,isconnect s#itches #ill be Es" $(pe or +"E" or approved eual"

    10 *ables tra( and ladder 1".mm thickness mill galvanied steel #ith cover"

    11 Wiring devices shall be /egrand Pass & 0e(mour t(pe) "0"2 made or approved eual"

    12 3ire alarm s(stem #ill be conventional p(rotronics t(pe or simplex or notifier"t(pe 4! as existin

    13 $elephone cables & devices shall be orthotics products or approved eual"

    14 0mall hand hole .5 x .5 x 65cm are included for the outdoor lighting 2nd site #orks"

    15 4utdoor lighting cable shall be t(pe 7/PE ins") P"8"* sheathed single or Multi core

    *ontractor must check the uantities according to the dra#ings before Bidding and shall beresponsible for his price #ithout additional cost"

    0uppl() 9nstallation) $esting & commissioning of all electrical #orks 2s per dra#ing) schedulesand specification are included"

    Wiring) 0leeves) Manholes) *ables tra() ,uct banks) *onduits) Boxes) Main Junction Boxes)%angers'0upports) 3itting 3or a complete s(stem are included

    Exposed run conduit #ill be EM$ :Electrical metallic tube; complete #ith all accessories scre#t(pe) flexible liuid tight metal if reuired and *oncealed conduit in #all or incased onconcrete #ill be P8* EM2 $* < 4r $* 6) EP$-2 ) 02PP*4 or approved eual"

    2n( civil #ork such as excavation) drilling) back-filling) red tiles) fine sand) *oncrete) ductbanks) manhole or hand hole are included) shall be done b( Electromechanical contractor"

  • 7/26/2019 03 Elec-Bld.xlsx

    2/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

  • 7/26/2019 03 Elec-Bld.xlsx

    3/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    !IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    16 3eeder cable t(pe shall be !i(adh)Jeddah cable 7/PE ' P8* 1 =8'5"> =8 or approved eual"

  • 7/26/2019 03 Elec-Bld.xlsx

    4/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    "IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

  • 7/26/2019 03 Elec-Bld.xlsx

    5/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    #IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    MANUFACTURING BUILDING

    III ELECTRICAL WORK

    1 Electrical Installations

    1.1 ot 1

    1. ot 1

    1.! ot 1

    In&lude for the &o'lete installation as des&ribedin the s'e&ifi&ation and as sho/n on dra/ing togi0e a&o'lete sste that is a&&e'table to theengineer and lo&al authorities the uantitiesentioned in the bo are indi&ati0e for the /or)sin0ol0edThe tendered shall allo/ for all ites reuired to&o'lete the /or) to the satisfa&tion of theengineer and lo&al authorities liaise /ith saudiele&tri&al &o'an 2se&3 for su''ling in&ulding&onne&ting to e4isting ele&tri& grid,&ables,du&t

    ban)s,anholes,slee0es,&ables,all &i0il/or),e4&a0ations,drilling,ba&) filling,finishing,and installation of0 1!.567." )0,transforer,ru,and in&lude for&onne&tion of se& su''lied &ables to eter &abinet

    in&luding terination

    Transforer 1!.567." )0 ,1777 )0aIn&ulding all&ables &onne&ting to e4isting ele&tri&grid,and all &i0il /or).

    Ele&tri&al 'o/er du&t ban) in&ulding all &i0il/or) as 'er dra/ing and s'e&ifi&ations for 8-

    Ee&tri&al 'o/er anholes in&ulding all &i0il /or)as 'er dra/ing and s'e&ifi&ations

  • 7/26/2019 03 Elec-Bld.xlsx

    6/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    9IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    Page Total Ao!nt

    " LIG#TING FI$TURES AND SWITC#ES

    .1 EA 1!

    . EA 15

    .! EA 1

    ." EA 177

    .# EA :

    .9 EA 177

    .; EA 1#

    .5 EA 17

    Su''l,install, &onne&t and test the follo/inglighting fi4tures, all a&&ording to dra/ing and s'e&ifi&ation theite in&luding &ondu&ting,/iring,&ables,et

    'i'es,lighting fi4tures, /irring,&ables, in&uldingan &i0il /or) and all fi4ing a&&essories thatneededto 'ro0ide 'erfe&t o'eration &ondition.

    TI$= 49 WATT >I=>C(MPACT TI$= P(E WIT> #7 WATTAMP 9-5 METER >I=>.IP9#.

    WA M(*$TE% TI$= #7/>I=> PRESS*RE S(%I*MWEAT>ERPR((PRISMATIC %ITI$= B#7 WATTS WIT>@ACK*P @ATTER !.7 >R.

    EBIT I=>TI$= WIT> SE< C($TAI$E%EMER=E$C S*PP, 147W, !>R

  • 7/26/2019 03 Elec-Bld.xlsx

    7/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    ;IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    Page Total Ao!nt

    % POWER OUTLETS& SWITC#ES

    !.1 %*PEB (*TET 7 ?(T, 7A EA ;1

    !. >A$% %RAER (*TET 7A EA 1

    !.! %ISC($$ECT SWITC> 21 P>3 EA !9

    !." %ISC($$ECT SWITC> 2! P>3 EA #

    !.#

  • 7/26/2019 03 Elec-Bld.xlsx

    8/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    5IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    !.5 ot 1

    Page Total Ao!nt

    ' DISTRIBUTION PANELS(

    ".1 CIRCUIT BREAKERS

    EA 1

    ". MDB

    EA 1

    #76 #7AMP ! P $(S

    !776 "77AMP ! P $(S!776 !77AMP ! P 1 $(S

    1976 197AMP ! P 1 $(S

    "76 9! AMP ! P 1 $(S

    9!6 177 AMP ! P 1 $(S

    776 #7AMP ! P " $(S

    Ele&tri&al &ables tra , as 'er dra/ing ands'e&ifi&ation, and e0erthing reuired for a

    &o'lete sste a&&ording to dra/ings ands'e&ifi&ations.

    Rate and 'ri&e shall be su''l and install thefollo/ing 'anel boards in&luding s&re/, /ashers,nuts, &la's,bo4es,&onne&tors,hanger6su''orts,du&t ban)s,anholes,slee0es,et

    'i'es,&ables tra,all &i0il /or), all fittings,endbell, all &i0il /or) su&h as e4&a0ation, drilling,ba&) filling, &on&rete and an a&&essories,testing,&oissioning,and e0erthing reuired foa &o'lete sste a&&ording to dra/ings ands'e&ifi&ations.

    Main &. @r. 2 1#7 3 a' inside nea 1ren&losure.i'9#./eather'roof.

    Main brea)er 1#7 a' 6 1977 af , !'h , " /ire,97 hF, flush or surfa&e ounted,@ran&hes 8-

  • 7/26/2019 03 Elec-Bld.xlsx

    9/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    :IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    Page Total Ao!nt

    ".! PB)PS*

    EA 1

    "." PB)PS"

    EA 1

    ".# PB)S

    EA 1

    ! AMP 1 P " $(S

    ".9 PB)O

    EA 1

    7AMP 1 P : $(S

    #7 AMP ! P $(S

    ! AMP 1 P 9 $(S

    ".; PB)L

    EA 1

    ! AMP 1 P # $(S

    Main brea)er !77 a' 6 "77 af , !'h , " /ire, 97hF, flush or surfa&e ounted,@ran&hes 8-

    97 AMP ! P !7 $(S!AMP 1 P : $(S!AMP ! P 1 $(S

    Main brea)er !77 a' 6 "77 af , !'h , " /ire, 97hF, flush or surfa&e ounted,@ran&hes 8-

    97 AMP ! P !" $(S!AMP 1 P 5 $(S

    Main brea)er 9! a' 6 177 af , !'h , " /ire, 97hF, flush or surfa&e ounted,@ran&hes 8-

    Main brea)er 197 a' 6 197 af , !'h , " /ire, 97hF, flush or surfa&e ounted,@ran&hes 8-

    Main brea)er #7 a' 6 #7 af , !'h , " /ire, 97hF, flush or surfa&e ounted,@ran&hes 8-

  • 7/26/2019 03 Elec-Bld.xlsx

    10/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    17IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    ".5 PB)G

    EA 1

    7 AMP 1 P 5 $(S

    ! AMP 1 P " $(S

    Page Total Ao!nt

    + CABLES & ACCESSORIES

    NOTES(

    #.1 .M ##

    #. "415# G 14;7 C* B..P.E.6P?C .M 17

    #.! "417 G 14;7 C* B..P.E.6P?C .M 1!7

    #." "4;7 G 14!# C* B..P.E.6P?C .M "#

    Main brea)er "7 a' 6 9! af , !'h , " /ire, 97 hF,flush or surfa&e ounted,@ran&hes 8-

    Rate and 'ri&e shall be su''l and install thefollo/ing &ables in&luding du&t ban)s, lugs ,

    galands ,&onduits, bo4es, '0& or steel, Dun&tionbo4es, &onne&tors, all fittings,end bell, testing ,&oissioning, , all &i0il /or) su&h ase4&a0ation, drilling, ba&) filling, &on&rete and an&i0il /or), and e0erthing reuired for a&o'lete sste a&&ording to dra/ings ands'e&ifi&ations.

    The &ontra&tor ust &he&) the length in the site

    before su''l.

    ;416C 4 9!7 G17 Cu. CA@E C*B..P.E.6P?C

  • 7/26/2019 03 Elec-Bld.xlsx

    11/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    11IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    #.# "4!# G 1419 C* B..P.E.6P?C .M !7

    #.9 "419 G 149 C* B..P.E.6P?C .M !7

    Page Total Ao!nt

    , FIRE ALARM S-STEM

    9.1 EA 1

    9. So)e dete&tor. EA :1

    9.! Manual brea) glass station. EA ;

    9." Alar bell. 9H. EA ;

    9.# Weather 'roof alar bell /ith flashing light.i'9#. EA

    9.9 >eat dete&tor. EA !

    Co'lete Sste As Per %ra/ing And to beat&hing and to be &onne&ted /ith E4isting

  • 7/26/2019 03 Elec-Bld.xlsx

    12/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    1IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    Page Total Ao!nt

    . TELEP#ONE S-STEM

    ./* ot 1

    ./" TEEP>($E (*TET R.-11 EA "

    Co'lete sste a&&ording to /eatherfordreuireents, all &i0il /or), be &onne&ted to thee4isting 'ab4. As 'er dra/ing and s'e&ifi&ation.

  • 7/26/2019 03 Elec-Bld.xlsx

    13/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    1!IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    Page Total Ao!nt

    0 PUBLIC ADDRESS S-STEM

    0/* ot 1

    0/" EA "

    0/% >(R$ SPEAKER EA 1;

    Co'lete sste a&&ording to /eatherfordreuireents, all &i0il /or), as 'er dra/ing ands'e&ifi&ation.

    SPEAKER RECESSE% TPE # WATT WIT>MATC>I$= TRA$S

  • 7/26/2019 03 Elec-Bld.xlsx

    14/15

  • 7/26/2019 03 Elec-Bld.xlsx

    15/15

    Jar Workshop and Manufacturing BuildingPhase-1

    Weatherford Al-Rushaid.Al-Khobar, K.S.A.

    1#IMPACT, Consulting Engineers.Al-Khobar, K.S.A.

    S.$o %es&ri'tion (f Wor) *nit +uantit Pri&e Aount

    *2 GROUNDING S-STEM

    *2/* ot 1

    **

    **/* ot 1

    **/" EA "#

    Page Total Ao!nt

    Total Price For Electrical Wor3

    Su''l and installation of a grounding sste .In&luding ne&essar earth/or), buried gal0aniFedsteel foundations stri's surrounding the buildingto suit grounding resisti0it reuired all &ounter

    'oise and all asso&iated /or)s as sho/n ondra/ings and s'e&ifi&ation.

    CLOSED CIRCUIT TELE4ISION S-STEM5CCT46

    Su''l, install, testing, &oissioning and 'utinto o'eration CCT? sste &o'lete /ithCCT? Wor)station, Terination and allne&essar a&&essories to finish /or)s as 'erdra/ings, s'e&ifi&ation and standard