HUAWEI TECHNOLOGIES CO., LTD. All rights reserved www.huawei.com Internal / 内内内内 NodeB Commissioning Proced ure Helen Zheng From ARO TSD

05 NodeB Integration Operation Procedure

Embed Size (px)

Citation preview

Page 1: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

www.huawei.com

Internal / 内部公开

NodeB Commissioning Procedure

Helen Zheng From ARO TSD

Page 2: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 2All rights reserved

Upon Completion of this course, we will be able to:

Describe the procedure of NodeB commissioning

Perform the NodeB commissioning

Page 3: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 3All rights reserved

NodeB_Commissioning_Guide(V200_04)

NodeB_Remote_Commissioning

NodeB_Provisioning_Workflow V1.0

Page 4: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 4All rights reserved

1. Preparation for NodeB commissioning1. Preparation for NodeB commissioning

2. Procedure for NodeB commissioning2. Procedure for NodeB commissioning

Page 5: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 5All rights reserved

Overview of NodeB Software

Data Configuration Toolkit

MSDE2000 SP4 (Microsoft SQL server 2000 Desktop Engine)

CME software (extensible configuration tool)

LMT software (local maintenance terminal)

Operating and Maintaining NodeB

NodeB software

  3800 series NodeB 3900 series NodeB

NodeB software NodeB.pck Software.csp

NodeB BootRom NBRom.pck Firmware.csp

NodeB data configuration file NodeBCfg.xml NodeBCfg.xml

Page 6: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 6All rights reserved

Prerequisite for NodeB Commissioning

Checking NodeB:

The hardware of the NodeB is installed and passes the installation check.

The NodeB passes a power-on status check and is powered on.

The data configuration file is ready

Checking RNC:

RNC connected to the NodeB works well.

The data of the NodeB to be commissioned has been configured in RNC

Checking M2000 (ignore if local NodeB commissioning is applied)

The adaptation layer which is corresponding to the NodeB to be commissioned is installed on

the M2000 server.

The version of the M2000 is compatible with the NodeB to be commissioned.

The transmission and remote OM channel of NodeB is operational. The NodeB to be

commissioned can be automatically detected on the M2000

Page 7: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 7All rights reserved

Preparation for NodeB commissioning

Selecting commissioning modes

Local Commissioning

− The transmission is unavailable

− Perform NodeB commissioning on site with LMT

Remote Commissioning

− The transmission is available

− The O&M channel between RNC and NodeB works properly

− Perform NodeB commissioning remotely through M2000

Page 8: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 8All rights reserved

1. Preparation of NodeB commissioning1. Preparation of NodeB commissioning

2. Procedure of NodeB commissioning2. Procedure of NodeB commissioning

2.1 Procedure of NodeB local commissioning2.1 Procedure of NodeB local commissioning

2.2 Procedure of NodeB remote commissioning2.2 Procedure of NodeB remote commissioning

Page 9: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 9All rights reserved

Procedure of NodeB Local Commissioning

Step 1: Upgrade the NodeB software by LMT

Querying the active version of the NodeB software version

and BootROM version (LST SOFTWARE)

Downloading the BootROM software package of the NodeB

Activating the BootROM software

Downloading the software

Activating the software

Page 10: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 10All rights reserved

Procedure of NodeB Local Commissioning

Step 2: Downloading the NodeB data configuration file via LMT

The file name of the NodeB data configuration file must be

NodeBCfg.xml

After the download is finished, the NodeB will be reset auto

matically to make the configuration active.

Page 11: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 11All rights reserved

Procedure of NodeB Local Commissioning

Step 3: Checking the running state of the NodeB

Checking SNTP (simple Network Time Protocol)

Checking the status of a cell

Measuring RTWP

Monitoring the output power of the NodeB

Handling alarms during NodeB commissioning

Dial test (voice call, video call, web browsing..)

Step 4: Recording NodeB information in data sheet

Page 12: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 12All rights reserved

Procedure of NodeB Local Commissioning

Exception:

Automatic NodeB software upgrade and data configuration

file download from the USB disk are supported since

NodeB software version V200R010

So step 1 and step 2 above can be replaced by the simple

action of USB disk plugging in and plugging out

Page 13: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 13All rights reserved

Procedure of NodeB Local Commissioning

Due to the transmission being unavailable at this stage, the

OM channel is disconnected between M2000 and NodeB. So

NodeB license cannot be allocated and activated via M2000

NodeB integration hasn’t been finished.

What is required to do when the transmission is OK

Integrate NodeB into M2000

Allocate and activate NodeB license via M2000

Page 14: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 14All rights reserved

1. Preparation of NodeB commissioning1. Preparation of NodeB commissioning

2. Procedure of NodeB commissioning2. Procedure of NodeB commissioning

2.1 Procedure of NodeB local commissioning2.1 Procedure of NodeB local commissioning

2.2 Procedure of NodeB remote commissioning2.2 Procedure of NodeB remote commissioning

Page 15: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 15All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 1. Automatically Searching for NodeBs

Page 16: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 16All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 2. Checking Software Version information on the server

Page 17: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 17All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 3. Uploading the NodeB Software and BootROM Software

Step 4. Creating a NodeB Commissioning Project, the NodeB commissionin

g project performs automatically on the M2000

Page 18: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 18All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 5. Viewing the NodeB commissioning progress.

Step 6. When the commissioning progress shows “Finished”, obtain the

NodeB commissioning Report

Page 19: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 19All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 7. Checking the running state of NodeB

Checking SNTP (simple Network Time Protocol)

− LST SNTPCLTPARA

− LST SNTPCLTLATESTSUCCDATE

Checking the status of a cell

− DSP LOCELL

Page 20: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 20All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 7. Checking the running state of NodeB

Measuring RTWP

− If the NodeB is not connected to the antenna and feeder system or a matched load, RTWP: ~ –108 dBm.

− If the NodeB is connected to the antenna and feeder system (with TMA switched on) or a matched load, RTWP: ~ –105 dBm.

− If the services are setup, RTWP will increase several dBm (Typical: 75% Uplink Load => 6dBm increase)

Monitoring the output power of the NodeB

Page 21: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 21All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 7. Checking the running state of NodeB

Handling alarms during NodeB commissioning

Dial test (voice call, video call, web browsing..)

Page 22: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 22All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Uploading the NodeB license to the M2000 server

Allocating the NodeB license

Activating the NodeB license

Checking the loading of NodeB license

Querying the license distributed to a NodeB

Page 23: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 23All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Uploading the NodeB license to the M2000 server

Page 24: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 24All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Uploading the NodeB license to the M2000 server

Page 25: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 25All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Uploading the NodeB license to the M2000 server

Page 26: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 26All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Allocating the NodeB license

Page 27: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 27All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Allocating the NodeB license

Page 28: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 28All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Activating the NodeB license: Choose: «Distribute All» After that licens

e will be uploaded in NodeBs

Page 29: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 29All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Checking the Loading of Licenses

License Activated status should change from False to True.

Query on the NodeB LMT the following alarms:

ALM-4020 License Configuration Error

ALM-4021 System Exceed Capacity Limit of License.

If no above alarms are reported, it is an indication that the

licenses are successfully loaded.

Page 30: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 30All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 8: Initially activating the NodeB license

Querying the license distributed to a NodeB

− Execute DSP LICENSE to query the license information.

Page 31: 05 NodeB Integration Operation Procedure

HUAWEI TECHNOLOGIES CO., LTD. Page 31All rights reserved

Procedure of NodeB Remote CommissioningProcedure of NodeB Remote Commissioning

Step 9. Recording the NodeB commissioning data sheet