1
• 12 установочных центров OEM функционируют при азавтозаводах
6 в Италии ,6 в Европе• Производственная мощность: 1600
автомобилей в день
Установочные центры (2-й этап типового проекта OEM )
2
• 12 Installations centers nearby OEM facilities 6 Italy – 6 Europe
• Conversion capacity: 1.600 cars/day
Installation centres (Stage 2 OEM project type)
3
Conversion: General Process Flow (Stage 2 OEM project type)
Dedicated ext. incoming area (cars
ready to enter in the working area)
INComing area
Ready to be filled (lpg)
Parking/ stock area
Standardized process – JES/ SOS/ Activity
certifications/ Quality checks/ SPC in line/ click
torque wrenches verification per shift
Phase A areas
Phase B areas (hoist)
Phase C areas
Phase D areas (VLO)Ready to be tested (lpg dynamic
test, S&R and leakage test)
Ready to be checked (GCA)
Ready to be shipped (B&H)
Ext. storage areas – dedicated and identified
areas to manage the delivery steps and B&H
Preassembly area
Wharehouse areaFIFO and traceability m
anagment
4
PRODUCTKIT / COMPONENTS CONVERSION
AFTER SALESSERVICES
Tech LineFlying Doctors
Spare partsTrain the trainer
.........
OEM PROJECT
OEM Projects Types: Stage 1-2 or “0KM”
OEM customer proposal
CO-DESIGN