Assemblaggio DTProduzione MinicratesInstallazioneElementi critici e azioniConclusioni
fgasparini
STATO DT E BARREL MU
Costruzione e installazione fgaspariniSW,commissining e analisi ugaspariniElettronica e Cosmic challenge mdallavalle
fgasparini Roma 30/3/2006
2
31/03/2005DT: La produzione di camere a TO raggiunge il rate di 22 camere l’anno al 31/12/05 SL 68/80 Ch 28/40 27 Ch at CERN
STATUS OF DT CHAMBER ASSEMBLY SITES ~JUNE 15
Slayers chambers ch. at ISR end prod.
TORINOJune 9 34/80/86 12/40/43 11 may4 26*/80/83 9/40 7 march/apr. 06 March 11 18 6 3 Torino rate is now 6 SL/month ( on schedule)
Stato 14/3/2006
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
24 installate
3
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
4
we have made yesterday, at CIEMAT, our last gluing operation at the superlayer level. This was the last plate of the last superlayer which corresponded to the spare MB4/10. (Marcos Cerrada 25/10/05)
below a picture of the gluing table for the last DT Superlayer in Legnaro (Paolo Checchia 21/10/05)
In Aachen214SL/214 assembled 9/6/0568/75 chambers assembled Chambers for install. 70(Kerstin Hoepfner 2/12/05)
Legnaro 21/10/05
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
5
(13/3/2006)
JPP 14/13/06
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
6
30/04/2005DT: La produzione ed il test dei minicrates raggiunge il ritmo di 16 MC al mese.152 da Giu a Feb = 17/ mese ( 6 in Agosto) 18/mese escludendo Agosto 18,5/mese da ottobre a fine anno31/12/2005 DT: 165 Minicrates disponibili al CERN177 consegnati al 31/12/05 ( 203 al feb 6/06)
/ 135 install.
68 waiting for installation
Dal Corso14/3/06
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
7
CONCLUSIONS
TRB Prod.Is finished BUT
Piano iniziale:Totale ordinato 1585Necessarie 1505 (80= 5% spare)Componenti per +60 (~ 10% tot. spare)
Dal Corso14/3/06
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
8
30/06/2005DT: Sostituzione di tutte le vecchie HV board31/7/2005DT: Completata l’installazione delle camere MB3 (36) nelle ruote +2, +1, 0 e di 6 MB4/Torino nella ruota centrale31/7/2005 DT: Installati 51 Minicrates nelle parti top delle ruote +2 ,+1,0 (17 in +2 e +1 e 21 in 0)
Wheel YB+2 completata con MC, commissioning completato, 6 MB4 da Torino installate.
Wheel YB+1 completata il 16 settembre,salvo camere nei piedi,6 MB4 da Torino installate ,commissioning iniziato in Ottobre e terminato.
YB0: possibile solo un test di installazione in Agosto, installazione rimandata a novembre e poi a Gennaio 2006 per operazioni di saldatura sul criostato.(A inizio marzo completata l’installazione di 31 camere in YB0, 20 in YB0+(completa) 11 in YB0- ,e di 20 complessivamente in YB-1 e YB-2 ).
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
9
YB+1 is complete 42 chambers installedYB+2 has 40 chambers installed ,feet chambers missing(A.Benvenuti,M,Benettoni and crew)
All commissioned before Xmas (with MCrates) (E.Conti.M.Zanetti,K.Hoepfner +…)
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
10
51 chambers (+ 2 feet ch. in YB+1) have to be installed before Mag.Test
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
YB0 chambers commissioning before Mag. Test.
11
Installation in YB0Test for Inst. In UX
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
12fgasparini INFN roma 30/3/2006
13
SX 5 Thursday March 2 nd
fgasparini INFN roma 30/3/2006
14
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
AB 14/3/06
AB14/3/06
15
fga
spa
rini
IN
FN
ro
ma
30
/3/2
00
6
AB14/3/06
15
16
Una serie di azioni e’ stata intrapresa ad inizio anno per far fronte a questo piano di installazione
per ridurre I rischi in caso di problemiper velocizzare alcune operazioni cruciali
Tutta l’attivita’ e’ stata divisa in 12 settori ,con uno o piu’ responsabili/settore
PMs FG , Iaselli , Rodrigo
Local TBAB, ,
Reithler Benettoni,Puerta,Montecass.,Hoepfner,Checchia,Gonella,Giacomelli,Dattola,Piccolo,Colaleo(RPC),Bencze(Alignment)
All task responsibles are physicists or engineersin bold RED are new engineers, (P means permanent since beg. of March) . I n red are new technicians :Francia perm. Torino is 1 FTE out of 3 people, 1 + 1 part time from Aachen
I nstallation I SR I SR I SR CABLI NG I ntegration DT prep. Commiss Rack Connex MC connex MC Testing Bat904
certification ch.dressing MC inst/ test & bulk cabl YB0,cables for commiss cabl./ ppanels during cabl. after cabling HV/LV testhandling etc.. services SX 5 SX 5 SX5/ UX/ SC SX 5 SX 5
Benettoni Puerta Benvenuti Gonella Montecassiano Dattola Benvenuti Hoepfner Checchia Gonella GiacomelliConti
Settori critici sono stati rinforzati,con immissione di personale e/o nuovi strumenti
17
What is required to keep the test up-dateMATERIAL for reparations ….MANPOWER: more expert persons working at ISR are required to help on several tasks:
AND LUCK……….
Jesus Puerta Pelayo CMS Week Dec. 05
CERTIFICAZIONE DT AGLI ISRfg
aspa
rini
INF
N r
oma
30/3
/200
6
CMS Week March 06
18
AZIONI INTRAPRESE:Cordero da Torino a ISR, rinforzo del team di tecnici a rotazione (da inizio Marzo)
Jesus Puerta Pelayo CMS Week Dec. 05
fgas
parin
i IN
FN
rom
a 30
/3/2
006
19
Amedeo
7800
3600
Other forks achen
CERN
CERN
= done
AZIONI INTRAPRESE:Motorizzazione di culle di inst.Extra telai di trasportoExtra elementi di fissaggio culle.Piu’ persone per installazione
fgasparini INFN roma 30/3/2006
TORINO
CERN ?
STRUMENTI PER RIDURRE I TEMPI DI INSTALLAZIONE
20
Status of MB and RB cables installation
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12MB.LV.mc P P P P P P √ √ √ √ √ √
MB.LV.fe w w w w w w √ √ √ √ √ √MB.HV √ √ √ √ √ √
MB.OF.ttc-mc da da da da da da √ √ √ √ √ √ da da da da da da P P P P Fibres Installed by INFN PD
MB.OF.sc da da da da da da √ √ √ √ √ √ da da da da da da P P P P Fibres Installed by INFN PD
MB.CA.sc (daisy) P P √ √ √ √ √ P P
MB.CA.sc (to rack) √ √ √ √ √ √ w w w w w w
MB.MCA.veto √ √ √ √ √ √ w w w w w w
MB.CA.tr √ √ √ √ √ √ P P P P P P
MB.CA.ro √ √ √ √ √ √ P P P P P P
RB.LV.fe-8 d d d d d d P P P P
RB.LV.fe-12 d d d d d d P P P P
RB.HV d d d d d d P P P P
RB.CA.sgn da da da da da da P P P P d d d d d d d d d d d d
RB.CA.dcs-6 d d d d d d P P P P
RB.CA.dcs-9 d d d d d d P P P P
RB.MCA.t-sens d d d d d d P P P P
LEGENDAFull blank means CABLES NOT AVAILABLE AT CERNCables AVAILABLE at CERNCables installed - ready to be commissioned or commissioned
w Installation DWG and application tables UNDER WORKING nowd Installation DWG DELIVEREDda Installation DWG and application tables DELIVEREDP Sector Partially INSTALLED (DWG all released)
√ DT Cables & minicrates work well together → RPC can be installed
Note:* Racks in levels X3 and X4 of near tower on YB+1 will be finalized ufter MTCC, due to the big YB0 pipe* Spares cables will be installed after the main installation* Not shoewd here, there will be a check on the installated cables
YB+2 (IHEP team) YB+1 (Russian team)
YB+1:almost 90% MB dwg delivered!
Fabio MontecassianoCMS Week March 06
fgas
parin
i IN
FN
rom
a 30
/3/2
006
21
RACKSEASY LV crate and AC-DC conv.
A3050
DIGITAL
SECT 10
A3050
DIGITAL
SECT 10
A3009
DIGITAL
A3050
DIGITAL
A3009ANALOG
A3100
S. COLL
A3100
S. COLL
A3050
DIGITAL
A3050
DIGITAL
A3009
DIG/AN
A3050
DIGITAL
A3009
DIG/AN
A3050
DIGITAL
A3006
ALIGN.
A3006
ALIGN
A38
01 A30
09
SEC 12
A3009
SECT 11
A3009
SECT 10
NOT USED
A3486
A3486
PARALLEL
• DT HV racks cabling is going on well• LV racks still lto be done. There are
cables longer then needed to be finalized
by CIEMAT.• TRIGGER rack is under preparation now.
A moke-up for Sector Collector CRATE was made by INFN PD.
• P. Checchia and some CIEMAT tecnician
will begin soon this activity
fgas
parin
i IN
FN
rom
a 30
/3/2
006
20
22
YB0, YB-1 and YB-2A lot of missing items needed to finalize cutting lengths
• YB-1 and YB-2
– Peripheral paths are almost the same as in the positive wheels. No major work is required there. I can adapt what I already done for positive wheels.
– Radial layouts (ZmL and ZmR) has still to be designed and verified
• YB0
– it is not yet defined from the point of view of peripheral paths. D. Dattola is working on this subject.
– also radial layout ZmL and ZmR are needed• Also there are many other urgent work pending
– Cables in the chains :PRR, procurement, cutting lengths– cable chain patch panels– racks layout update (LV/RPC/ALIGN requested changes in the last months)– Detailed design of each single rack with cables ....
AZIONI INTRAPRESE: in collaborazione con RPC rinforzato il team Dattola/Montecassiano(Colonna, Abajiev, + disegnatori Pd e Na, P.Checchia resp. per cablaggionei racks e balconate)
fgas
parin
i IN
FN
rom
a 30
/3/2
006
23
PMs FG , Iaselli , Rodrigo
Local TBAB, ,
Reithler Benettoni,Puerta,Montecass.,Hoepfner,Checchia,Gonella,Giacomelli,Dattola,Piccolo,Colaleo(RPC),Bencze(Alignment)
All task responsibles are physicists or engineersin bold RED are new engineers, (P means permanent since beg. of March) . I n red are new technicians :Francia perm. Torino is 1 FTE out of 3 people, 1 + 1 part time from Aachen
I nstallation I SR I SR I SR CABLI NG I ntegration DT prep. Commiss Rack Connex MC connex MC Testing Bat904
certification ch.dressing MC inst/ test & bulk cabl YB0,cables for commiss cabl./ ppanels during cabl. after cabling HV/LV testhandling etc.. services SX 5 SX 5 SX5/ UX/ SC SX 5 SX 5
Benettoni Puerta Benvenuti Gonella Montecassiano Dattola Benvenuti Hoepfner Checchia Gonella GiacomelliConti
Neededphys 2 5 0 0 4 2 2 1techs 6 0 7 0 6 1 part time
availablephys 2 5 CREW CREW CREWtechs 6 0 7 0 To (0,25) Aa (2) Pd (2) CIEMAT (0,25) Total ~ 4 , 5 FTE
missing phys 0 1 0 0techs 0 0 0 2
Phys/Eng. Benettoni Puerta,, CREW Piccolo(RPC) Abajiev(RPC) CREW Checchia (0,5), CREW Giacomelli 0,5Adamantonio(RPC)Chamizo Colonna(P) Giac/Giun (1) Giunta 0,5Philips M.Fernandez Calvo (Alignm.) Gonella (0,5)
Cordero(P) plus CERN Integration
technicians Padova(4)+To(2) 2 IHEP L.Roscilli (Napoli) see belowRPC (2) Divincenzo, M.Rampazzo (Padova)
Francia, plus CERN IntegrationCafaro,GiordanoAhjiadoTorino
in SX5 and on wheels and ppanels,HV,LV on towers,feet LV,R-out,trigg m.c. to rack HV, LVlater in UX chains gas,cooling Hardware install. electronics
CREW >>>>>>>>>Nervo,Mariotti,Cerminara,Mila,Sowa,Biallas,C.Fernandez,Villanueva,Conti,Zotto,Torassa,Zanetti,Masetti, Rovelli,Cavallo,Perrotta …... (all Physicists on rotation basis (permanent in blue))
per installazione/cablaggi/commissioning
fgas
parin
i IN
FN
rom
a 30
/3/2
006
24per installazione/cablaggi/commissioning
fgas
parin
i IN
FN
rom
a 30
/3/2
006
available tech CIEMAT Aachen Padova Bologna Torino IHEP CERN
Ahjiado FullT 1+ 1 mech Barcellan(ISR/SX) Cafaro 1/2 1 mech FTE 2 FTE FT Divincenzo FTFrancia Full T Schulz+ 1 electrTemporin(SX) Giordano 1/2 (out of3 part time)
for ISR part time X (SX) 1 electr o,25X (cabling) 0,25 following needs Y (SX)
Borsato (SX)Fetchenhauer Modenese(SX)(full time) Pedrotta (mech)
Colombo (mech)all part time= 0,25
total FTE Technicians + Physicists
2,25 2 2 1 1,25 11,5 crew 1 Hoepfner 0,5 Gonella 0,7 Giac o,7 Nervo 1 hoepfner
3 certification 1,5 Crew 0,5 Checchia 1 Benv 0,5 Crew 0,3 Montecass
0,09 Giunta 0,12 Giunta 0,7 Montecass. 0,3 Giunta 0,7 Mariotti 0,5 Dattola
1,5 Crew 0,8 Cordero 0,5 Colonna
0,5 benetton i 0,5 Dattola 0,5 Giunta
1 install. 0,3 install
6,84 4,6 6,7 3 4,95 3,8
people supported 11,44 14,6 by CERN
(tech. 4,25 + phys 7) (tech ~5,6+ phys.~ 8,9)
TOTALE I / G/ S = 26 FTE
25
CONCLUSIONI, SITUAZIONE FINANZIARIA E RICHIESTE:
HVB e il ritardato avvio di Torino e della produzione dei MC non hanno introdotto ritardi che si siano ripercossi su sequenza e tempi di installazione.
Tutte le finestre disponibili sono state utilizzate.
Commissioning e test di settore (vedi Ugo e Marco) senza particolari problemi.
Notevole mobilitazione di personale.
Elemento critico:Moria elevata di BTI moduli in fase di produzione delle TRB
Elementi critici per installazione dopo Mag.Test:- Certificazione camere agli ISR (dipende da DT)- Disponibilita’ dei cavi (solo parzialmente dip. da DT)- Scarsezza di personale ,soprattutto tecnico, residente al CERN- Organizzazione non semplice di fronte a fatti inaspettati
fgas
parin
i IN
FN
rom
a 30
/3/2
006
26
NO EXTRACOSTI CORE (salvo sorprese)
Maggiori spese per tools e hired manpower ( M&O B )
Missioni estere insufficienti: a settembre esaurito finanziamento (quindi sblocco SJ + …………….)
Sblocchi SJ richiesti su CA
Bologna 40 KE ( new HVB >>> hired mp) (Accordo di compensazione con la Germania)