Upload
alexandru-poenaru
View
222
Download
4
Embed Size (px)
DESCRIPTION
DESCRIAREA ACCIDENTULUI NUCLEAR DE LA NAGASACHI
Citation preview
Flood risk from dike failure
Dr. László Nagy BUTE Geotechnical Department
Budapest, Hungary
Where we are ?
Topography of Carpathian-Basin
Inundations before the river regulation and dike constructions
Inundation map in the middle ages
Mean discharge of rivers entering and leaving Hungary
Hungarian answer:Large scale dike construction from 1846
4200 km dikes in Hungary11000 km dikes in the Carpathian basin
arable land 40% railways 32 %main roads 15 %communities 646population affected 2,3 millionstotal value at risk 2,5×GDP
Facts about the Hungarian flood control
Carpathian Basin
Duna-valley 547 dike failures
Tisza-valley 1269 dike failures
More than 2200 dike failures in the last 200 years
Dike failures in the Carpathian basin in the last 200 years
0
20
40
60
80
100
120
140
160
180
200
befor
e 180
0
1806
1813
1820
1827
1834
1841
1848
1855
1862
1869
1876
1883
1890
1897
1904
1911
1918
1925
1932
1939
1946
1953
1960
1967
1974
1981
1988
1995
piec
es
1846< 1000 km dike
1900
1888
1876
Carpathian basin dike breaches by ten days period
0
50
100
150
200
Jan. Febr. Mar. Apr. Maj. Jun. Jul. Aug. Sept. Okt. Nov. Dec.
Tisza valleyDuna valleyCarpathian basin
Tisza-valley dike failures distribution by ten days period
0
10
20
30
40
50
60
70
80
90
100
jan. feb. m arc. apr. m aj jun. jul. aug szept. okt. nov. dec.
ice jam 88 piecessnow melt 393 piecesrain 304 pieces
Duna-valley dike breaches distribution by ten days period
0
10
20
30
40
50
60
70
80
90
Jan. Febr. Marc. Apr. Maj. Jun. Jul. Aug. Sept. Okt. Nov. Dec.
ice jam 54 %snow melt 13 %rain 33 %
not well identified13%
rainfall and snowmelt
14%
snowmelt26%
rainfall27%
ice jam flood20%
Origin of the flood causing failure
After 1816 data
Distribution of dike failure mechanism
overtopping 68,2%
subsoil failure 7,8%
wave scour 0,6%
structure 4,6%
dike stability 6,3%
other known 3,4%
deliberate cut 7,6%
From 1168 data
After 19 dry years in the Tisza-valley large floods were in 1998–2001:
1998. November - Upper-Tisza1999. March-April - Bodrog and Middle-Tisza1999. June - Tarna, Zagyva, Ipoly and Tarnoca2000. April-May - Bodrog and Middle-Tisza2001. March - Upper-Tisza
Flood defencework
Inundations due to the dike breaches in the Upper-Tisza basin in the vicinity of the Ukr-Hun border
TúrSzamos
Tisza
Borzsa
Very old dike, very loose dike
Failed cross section
Slope slides along Tisza right bank, Tarpa-Tivadar section in 2001
16 Slope slidesoccured in a 2,700 m section
in 3,5 hrs!
Flood defence work
Dike breach, River Tisza right bank,Tarpa - Tivadar section, 54+650 and 55+350 tkm
Dike breach on river Tisza at Tarpa 2001
Dike breach on river Túr 2001
Tákos (Hungary) 2001
Bagolyszállás (Ukraine)
Damages at 2001 year flood in Hungary
Inundated territory 209 km2
Endangered villages 20 Inundated villages 8No. of evacuated people 11 000 personDamaged properties 3071Reconstruction cost 490 million €
Safety strategy
Need dike construction
Safety strategy
Need dike constructionSame elevation dike
Safety strategy
Need dike constructionSame elevation dikeSame cross section dike
Safety strategy
Need dike constructionSame elevation dikeSame cross section dikeSame safety factor
Safety strategy
Need dike constructionSame elevation dikeSame cross section dikeSame safety factorSame failure probability
Safety strategy
Need dike construction Same elevation dike Same cross section dike Same safety factor Same failure probability Same risk
Thank you for your kind attention!
Dangers in Hungary according to water