  • FINEST SOLUTIONS FINEST SOLUTIONS FINEST SOLUTIONS FINEST SOLUTIONS

    Unique technologies for kiln plant, raw meal

    and cement grinding!

    Josef KeuschniggJosef KeuschniggJosef KeuschniggJosef Keuschnigg

    PM-TECHNOLOGIES

  • RE-ENGINEERING THE KILN PLANT

    Tapping into the full kiln potentialTapping into the full kiln potentialTapping into the full kiln potentialTapping into the full kiln potential

    PM-TECHNOLOGIES

    cyclone stage calciner chloride-bypass & kiln inlet2-step meal chute system

    TAILOR-MADE OPTIMISATION CONCEPTS

    A cyclone preheaters basic equipment design is rarely a decisive factor for the functioning of the kiln

    plant, but rather the numerous details in the cyclone stages, the calciner and the lower preheater area.

    BOTTLENECK ANALYSIS

    When re-engineering the kiln plant, all effects of the complete kiln system must be considered.

  • EFFECTS AND MEASURES WHEN UPGRADING THE PLANT

    Effects and measuresEffects and measuresEffects and measuresEffects and measures

    PLANT UPGRADE

    INCREASED GAS FLOW RATES

    - Pressure drop reduction of cyclone stages to increase the level of clinker output

    - Improved cyclone efficiency and low pressure drop

    - Potential for increase in gas throughput of 30% to 40% by keeping the p level

    CLINKER QUALITY AND OUTPUT

    - Kiln burner and cooler assessment, etc.

    (in collaboration with external partners)

    OPTIMISED OPERATING CONDITIONS IN LOWER PH AREA

    - Reduction of dust re-circulation rate and build-ups

    - Efficient chloride extraction via gas bypass system

    EFFICIENT HEAT GENERATION AND HEAT TRANSFER

    - Good burnout with moderate of needed calciner residence time

    - Sufficient calcination at favourable calciner exit oxygen and temperature

  • CYCLONE STAGE OPTIMISATION

    OPTIMISATION OF KILN PLANTS

    OPTIMISATION MEASURES

    - Cyclone solutions for maximum gas throughput

    - Special key parts installed on the inside for high efficiency at low p

    - Re-designing of critical cyclone components and areas

    - Fluidic-optimized cyclone inlets and entrance bend units

    ActivitiesActivitiesActivitiesActivities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails

    PM-TECHNOLOGIES CYCLONE UPGRADE PACKAGE

    - To ensure high cyclone efficiency and low pressure drop

    - p reduction potential of up to 50% when installing HURRITEC GV guide vanes

    Individual Individual Individual Individual solutions and solutions and solutions and solutions and the attention to detail the attention to detail the attention to detail the attention to detail are are are are prerequisites prerequisites prerequisites prerequisites

    when making high quality technical when making high quality technical when making high quality technical when making high quality technical modifications with a modifications with a modifications with a modifications with a

    maximum remaximum remaximum remaximum re----use of the existing equipment!use of the existing equipment!use of the existing equipment!use of the existing equipment! pr

    e

    s

    s

    u

    r

    e

    d

    r

    o

    p

    17

    mbar

    7,6

    mbar

    -55%

    after

    p STAGE 1 before

  • MI-CFD BASED INLINE CALCINER OPTIMISATION

    CalcinerCalcinerCalcinerCalciner optimisationoptimisationoptimisationoptimisation

    OPTIMISATION OF KILN PLANTS

    - CFD-based burner positioning

    - Well chosen tertiary air inlets

    Temperature oC

    Oxygen (%)

    FOCUS ON SIMULATION

    - Position of meal inlets

    - Staged meal chute systems

  • PREHEATER MODIFICATION

    - Top stage: cyclones, guide vanes HURRITEC GV, entrance bend units

    - Calciner + 0,6 sec residence time, rearrangement of burners

    - 2step meal chute system with servo drive meal splitter

    - kiln riser duct with adjustable orifice and splash box

    RESULTS

    - pressure drop reduction at top stage: 21 9,5mbar

    - Improved calcination: 90% 98%

    - Clinker production increase: +370 t/day

    - volumetric load of kiln: up to 5,4tpd/m

    OPTIMISATION OF KILN PLANTS

    REFERENCE VENEZUELA

    c

    l

    i

    n

    k

    e

    r

    p

    r

    o

    d

    u

    c

    t

    i

    o

    n

    2880

    tpd

    3350

    tpd

    +16%

    before after

    PH, calciner and cyclone PH, calciner and cyclone PH, calciner and cyclone PH, calciner and cyclone optimisationoptimisationoptimisationoptimisation, reference , reference , reference , reference and resultsand resultsand resultsand results

    p

    r

    e

    s

    s

    u

    r

    e

    d

    r

    o

    p

    T

    o

    p

    s

    t

    a

    g

    e

    21

    mbar

    9,5

    mbar

    -55%

    after

    p STAGE 1 before

  • TAPPING INTO THE FULL POTENTIAL OF GRINDING SYSTEMS

    Tapping into the full potential of grinding systemsTapping into the full potential of grinding systemsTapping into the full potential of grinding systemsTapping into the full potential of grinding systems

    PM-TECHNOLOGIES

    TAILOR-MADE OPTIMISATION CONCEPTS

    the right ball charge in combination with a perfect separation is the most wanted target during an

    optimization phase.

    BOTTLENECK ANALYSIS

    When re-engineering the separation system, all effects of the complete grinding system must be considered.

    dynamic classifier product separationimpact hammer millultrafine classifier

  • CLASSICLON - LEADING GENERATION OF CLASSIFIER

    activitiesactivitiesactivitiesactivities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails

    PM-TECHNOLOGIES

    DESIGN CHARACTERISTICS

    - various housing types for up to 5.500Blaine

    - proven drive-unit for stable operation

    - patented technology for highest separation forces

    - low-speed-rotor technology = low-wear-rotor

    ADVANTAGES

    - highest classifying-efficiency

    - proven technology at several references

    - stable plant operation

    - low cost and easy maintenance

    draft force Fd centrifugal force Fc

  • CLASSICLON - RETRO-FIT

    CLASSIFYING AND GRINDING

    HIGHEST TECHNICAL STANDARD FOR EXISTING CLASSIFIERS

    - based on existing classifier-housing

    - 1st, 2nd or 3rd generation classifier upgrades are possible

    custom made designcustom made designcustom made designcustom made design

    - re-use of existing cyclone-separators

    - existing fan and filter can be used further

    rererere----use of existing equipment is possibleuse of existing equipment is possibleuse of existing equipment is possibleuse of existing equipment is possible

    maximum economic upgrades due to maximum economic upgrades due to maximum economic upgrades due to maximum economic upgrades due to lolololowwww

    modification costs for equipment and buildingmodification costs for equipment and buildingmodification costs for equipment and buildingmodification costs for equipment and building!!!!

    activitiesactivitiesactivitiesactivities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails

  • REFERENCE GERMANY 2009: OPTIMIZATION OF CEMENT GRINDING SHOP

    - new CLASSICLON DS classifier and HURRITEC ST for product separation

    - ball mill: enlargement of 2nd grinding chamber and adapted ball-charge

    - improved roller press efficiency due to better operation conditions

    ENGINEERING FOR CLASSIFYING/GRINDING PLANTS

    C

    E

    M

    I

    4

    2

    ,

    5

    R

    (

    3

    3

    0

    0

    c

    m

    /

    g

    ) 75 t/h

    88 t/h+18%

    before after

    C

    E

    M

    I

    5

    2

    ,

    5

    N

    (

    4

    1

    4

    0

    c

    m

    /

    g

    )

    43 t/h

    68 t/h+58%

    before after

    CLASSIFYING AND GRINDING

    activities and technical detailsactivities and technical detailsactivities and technical detailsactivities and technical details

    - basic equipment: 1.700kW ball-mill (3,0m) with 2nd generation classifier and 500kW roller-press

    - scope of project: project coordination, detail engineering and delivery of new classifying system

    MODIFICATIONS

    PRODUCTION RATE AFTER SYSTEM UPGRADE

  • IMPACT HAMMER MILL

    CLASSIFYING AND GRINDING

    TECHNICAL DETAILS

    - flow-optimized housing-design

    - upper and lower deflector plates

    to reach internal material re-circulation

    for highest pre-grinding effect

    patented design for highest prepatented design for highest prepatented design for highest prepatented design for highest pre----grinding effectgrinding effectgrinding effectgrinding effect

    activitiesactivitiesactivitiesactivities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails

    gas inletmaterial

    chargematerial + gas

    outlet

    - for integration in existing ball-mill systems

    - retro-fit of existing hammer mills is possible

    - perfect for tandem drying-grinding systems

    individual solutionsindividual solutionsindividual solutionsindividual solutions

  • IMPACT HAMMER MILL NEW PROJECT VENEZUELA

    CLASSIFYING AND GRINDING

    activitiesactivitiesactivitiesactivities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails

    Clay dryClay dryClay dryClay dry----grinding systemgrinding systemgrinding systemgrinding system

    - Hot gas supply of preheater exhaust gas

    - Additional heat demand in wet season

    with a hot gas generator

    - Unique installation of impact hammer mill

    - HURRITEC double dip tube Cyclone technology

    for low pressure drop

    - Intermediate dry clay bin for easy

    handling of the system

    - Upgrade of complete raw grinding

    system +40% output of up to 320t/h

    - Planned start up: middle of 2012

  • ACTIVITIES AND PRODUCTS: OVERVIEW

    PM-TECHNOLOGIES

    TAPPING INTO THE FULL POTENTIAL OF GRINDING SYSTEMS

    GRINDING AND CLASSIFYING SYSTEMS

    Neugasse 111, 8200 Gleisdorf, Austria

    P: +43 / 3112 / 41990-00, M: [email protected], W: www.pm-technologies.at

    THANKS FOR YOUR ATTENTION!