13
1996 2008 Free-Ticket granting control Not controlled (above 65 elders only) 100% controlled Fare Collection Magnetic System Eletronic System Traffic Control Analogic Digital Modernizations

19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Embed Size (px)

Citation preview

Page 1: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

1996 2008

Free-Ticket granting control Not controlled (above 65 elders only)

100% controlled

Fare Collection Magnetic System Eletronic System

Traffic Control Analogic Digital

Modernizations

Page 2: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Modernization of OCC

Page 3: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Events in Rio de Janeiro

2011 – V Jogos Mundiais Militares

2013 – Copa das Confederações

2014 – Copa do Mundo

2016 – Jogos Olímpicos

Page 4: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Maracanã Station

Metrô Rio

Maracanã Station

Page 5: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

1968 – METRO’s ORIGINAL CONCEPT

Page 6: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Metro lines 1 & 2

3 BRT systems (Link C, T5 Corridor and Barra – South

zone)

High Performance High Performance Transport RingTransport Ring

Atlantic Ocean

Suburban railways

lines

Suburban railways

lines

Metro lines

1 and 2

0 1 2 3 km

Page 7: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

High Performance Transport Ring High Performance Transport Ring

• Railway

• Metrô

• BRT

Page 8: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

Metro Barra

ExtensionLine 1

Page 9: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

New Project

Page 10: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

The new project extends Line 1, connecting Ipanema to Barra, and passes through high urban density areas. This layout will ensure best cost/benefit relation to the population since it considers infrastructure for intermodal integration in the nearby areas, and will also improve the transit as long as it creates opportunities of transport rationalization.

Extension: 13.5 km

Passengers in a weekday: 230,000

Distance between stations: 2.25 km

Number of new stations: 6

Fare: R$ 3,10

Journey time: Between Jardim Oceânico and General Osório stations: 15min30sec. Between Jardim Oceânico and Carioca (Downtown) stations: 33min40sec.

New Project

Page 11: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

New Project

Page 12: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

New Project

Summary New Project

Extension 13,5 km

Stations 6

Distance In Stations 2,25 km

Passengers in a Weekday 230.000

Amount transference until Downtown

_

Capacity expansion offer 2,7 X

Tax US$ 1,50

Investment US$ 2.500 BI

Page 13: 19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital

THANK YOU!JOUBERT FORTES FLORES FILHOInstitutional Relations and Human

Resources DirectorMETRÔ-RIO

E-mail: [email protected]: 55 21 32116301/ Fax 55 21 32116308