Upload
rajesh920
View
213
Download
0
Embed Size (px)
Citation preview
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 1/17
SAP Manufacturing Execution
EMEA SAP ME Consulting
June 3rd, 2009
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 2/17
© SAP 2008 / Page 2
1. MES Overview1.1. What is MES?1.2 Why do I need an MES?1.3 SAP Manufacturing Execution Solution Suite
1.4. What Markets does SAP ME serve?2. Structure of SAP ME
2.1. Production Line and Product Modeling2.2. The User Experience – User Interface
2.3 The User Experience – Sample WIP Reports3. SAP ME within the Enterprise
3.1 Manufacturing Execution and ERP Integration3.2 Sample MII Dashboard Report Divider headline
Agenda
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 3/17
© SAP 2008 / Page 3
MES Overview
What is MES?Stands for Manufacturing Execution SystemShop Floor Control System
– Production Line Modeling – Product Modeling for Assembly purposes – WIP Tracking of Assemblies – Test and Repair Functions and Non Conformance Handling
The SAP Solution for MES is SAP Manufacturing Execution or SAP ME
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 4/17
© SAP 2008 / Page 4
Why do I need an MES?
If you have a requirement for:
Full WIP assembly tracking throughout manufacturing processesProvides continuity for full enterprise Supply Chain Solution
Metrics on resource utilization and production efficienciesRouter Management to insure that product flows through correct process
Real Time Inventory ReconciliationConfirmations and Backflushes of material consumption to ERP system at the time ofconsumptionKnow what current inventory counts are
Product GenealogyFull visibility and traceability of all components consumed into an assemblyFull visibility and traceability of multi level assemblies
Critical for cases where recalls are done – can “Find Where Used” on componentsPacking traceabilityNon Conformance Logging and Tracking
Logging of Non Conformances on assemblies – failures, defects, and repairsDocumentation of repair or scrap processes
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 5/17© SAP 2008 / Page 5
Why do I need an MES?
If you have a requirement for:
Forced control of validated assemblyInsure that proper components, with revision control, are added into assembliesUser and Time stamping of all production activities (assembly, test, and repair)Certification management for users
Managing and Reporting of Labor data to time and attendance or payroll system
THE BOTTOM LINEIn addition to meeting strict Component Traceability requirements MES canprovide you full visibility into Shop Floor Operations in order to moreefficiently find and implement operational excellence init iatives.
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 6/17© SAP 2008 / Page 6
SAP Manufacturing Execution Solution Suite
SAP Manufacturing Execution• Manages and controls manufacturing
and shop floor operations
• Integrates business systems to the shop floor
• Complete component and item ‐level visibility for single and global operations
Real ‐time SPC and Historical SQC
Production Metrics
Machine Integration Layer
ERP Shop Floor Integration
Return and Repair
Production Transfer
Labor Tracking
Engineering Change Management
Test and Repair
Non ‐conformance Management
Traceability
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 7/17© SAP 2008 / Page 7
What Markets does SAP ME serve?
Complex, Discrete Manufacturing
Aerospace &
Defense
High Tech Automotive
& Auto Electronics
Medical
Device
Industrial
Machinery & Components
high volume/low mix
make ‐to ‐stock repetitive manufacturing
low volume/high mix
build ‐to ‐order assembly manufacturing
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 8/17© SAP 2008 / Page 8
Structure of SAP ME
Production Line Modeling – Router Control – Manage Assembly Operations, Resources (Assembly Stations) and Work Centers – Provide WIP Tracking of Assembled Units throughout entire production process
– Non Conformance logging, tracking and resolution
Main ProductionRouter
Failure
andRepairLoop
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 9/17© SAP 2008 / Page 9
Structure of SAP ME
Product ModelingMaterial DataBills of Material Management
Assembly Data collection (genealogy data)Parametric Data CollectionBuyoff ManagementNon Conformance Code ManagementWork Instructions for Shop Floor Operators
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 10/17© SAP 2008 / Page 10
Structure of SAP ME
Sample BOM for a Printed Circuit Assembly
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 11/17© SAP 2008 / Page 11
The User Experience- User Interfacehigh volume/low, mix make-to-stock, repetitive manufacturing
Serialized Unit Tracking
Material Consumption
Data Collection
Visual Instructions
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 12/17© SAP 2008 / Page 12
The User Experience – Sample WIP Reports
Sample Genealogy As-Built Report
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 13/17© SAP 2008 / Page 13
The User Experience – Sample WIP Reports
Sample Activity Log for an Assembly
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 14/17© SAP 2008 / Page 14
Manufacturing Execution and ERP Integration
Examples of SAP ME integrationprocesses managed by SAP MII
TraceabilityOrder Processing
Production Order Planned (Repetitive)
Order Service Order
Order ManagementOrder Split/MergeEngineering Change
Component ConfirmationProduction ScrapBackflushOperator CertificationsQuality Notification
Reports Generated throughBusiness Objects
End to End integration processes
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 15/17
© SAP 2008 / Page 15
8/9/2019 2009 06 Worldtour IND25 SAP Fr
http://slidepdf.com/reader/full/2009-06-worldtour-ind25-sap-fr 16/17
© SAP 2008 / Page 16
Thank you!