發展事務委員會 - 2014年12月3日特別會議 (有關2014年10月28日會議的跟進事宜) Panel on Development – Special Meeting on 3.12.2014 (Follow-up to Meeting on 28.10.2014) 1 CB(1)321/14-15(02)

20141203 Dev Panel Meeting final [相容模式] - legco.gov.hk · Note: Upon completion of TCNTC, the estimated V/C ra tios (Tung Chung to Tsing Yi Section) are 40% (6ppsm) ... 10,630

  • Upload
    hoangtu

  • View
    237

  • Download
    0

Embed Size (px)

Citation preview

  • - 2014123(20141028)Panel on Development Special Meeting on 3.12.2014(Follow-up to Meeting on 28.10.2014)

    11

    CB(1)321/14-15(02)

  • Draft Recommended Outline Development Plan

    Draft Recommended Outline Development Planp

    22

  • Tung Chung East Draft Recommended Outline Development Plan

    33

  • Tung Chung West Draft Recommended Outline Development Plan

    44

  • Aircraft Noise

    Aircraft NoiseAircraft Noise

    55

  • 20141121Development Bureau has submitted list of follow-up action on 21.11.2014 in response to Members concerns on environmental, job opportunities and transport aspects:

    (2023)25

    25NEF 25 Contour (Operation of 3 Runway System)25

    The proposed Tung Chung New Town(TCNT) Extension would fall outside thepredicted NEF25 contour following thecommencement of operation of the 3RSin 2023

    1st Runway

    3rd Runway 2nd Runway

    25R id ti l d l t d l ti

    y

    Residential developments and population intake in TCNT Extension located within the current NEF25 would tie in with the commissioning of the 3RS

    Reference from 3RS EIA

    66

  • 25NEF 25 Contour (Operation of 3 Runway System)NEF 25 Contour (Operation of 3 Runway System)

    3rd Runway

    1st Runway

    2nd Runway

    77

    Reference from 3RS EIA

  • Chinese White Dolphin

    Chinese White Dolphin

    88

  • :

    ()Ecology (Chinese White Dolphin)

    :Information reviewed:

    AFCD CWD monitoring data

    (2012-2013)Monitoring of Marine Mammals in Hong Kong Waters (2012-2013) Final Report

    3RS EIA3RS EIA

    HZMB HKBCF and HKLR EM&A monitoring datag

    2013

    R lt f b th ti d th d lit t ki i 2013 d TMCLKL EM&AResults of both acoustic surveys and theodolite tracking in 2013 under TMCLKL EM&A

    U f l ff h T Ch N T b Chi Whi D l hi i

    99

    Usage of coastal waters offshore Tung Chung New Town by Chinese White Dolphin is very low

  • Railway

    Railway

    1010

  • TCL Peak Hour Link Flow Patronage

    ()

    201311(0815-0915)According to Nov 2013 Tung Chung Line Morning Peak Hour Link Flow Data

    Section

    Tung Chung Line Link Flow (No. of people per hour)

    Up Link Flow (Tung Chung Direction)

    Down Link Flow (Central Direction)

    HOK KOW 6,700 22,200

    KOW OLY 6,500 22,400KOW OLY 6,500 22,400

    OLY NAC 6,700 21,900

    NAC LAK 9,000 21,500LAK TSY 5,900 16,200TSY SUN 4,400 5,800SUN TUC 3 000 5 000

    1111

    SUN TUC 3,000 5,000

    source of reference: MTR

    Note: Figure are rounded to nearest 100.: 100.

  • ,Capacity of Tung Chung Line

    Tung Chung Line

    ()Carrying Capacity(passengers)(6

    ()()Passenger th h t

    ()()Passenger th h t

    Peak section V/CRatio(6

    Morning Peak per hour per direction

    (6)(using 6 ppsm)

    throughput throughput (6)(using 6 ppsm)

    Current 37,500 5,800 22,400 60%

    2031 ()

    66,000 16,000 33,000 50%

    Upon Completion of TCNTE in 2031 (estimate)

    : 203140% (6)

    1212

    : 203140% (6)Note: Upon completion of TCNTC, the estimated V/C ratios (Tung Chung to Tsing Yi Section) are 40% (6ppsm)

  • Job Opportunities

    Job Opportunitiespp

    1313

  • Commercial Development and Job Opportunities

    Estimated Extra Job Opportunities

    +

    254,950 12,748 36,374 1,819 291,324 14,567

    104,950 7,500 36,374 1,819 141,324 9,319 150,000 5,248 - - 150,000 5,248

    500,000 25,000 - - 500,000 25,000

    50 000 2 500 - - 50 000 2 50050,000 2,500 50,000 2,500

    804,950 40,248 36,374 1,819 841,324 42,067

    1414

  • Commercial Development and Job Opportunities

    Job Opportunities brought by Existing and Planned Developments in North Lantau

    Existing Tung Chung New Town

    10,630 Retail, Office and Hotel related

    Existing HK International Airport

    62,000 Labour-intensive/ Low-skilled

    Technical, Professional and Managerial

    12%

    88%

    HK International Airport Third Runway

    Estimated 79,000

    Labour-intensive/ Low-skilled

    Technical, Professional and Managerial

    88%

    50%

    North Commercial District (1st Phase) ()

    Estimated 7,000 9,000

    Planned for Hotel and Retail Services

    50%

    HKBCF Artificial Island

    To be confirmed

    Initially Planned for Retail Services

    Sunny Bay Reclamation Area

    To be confirmed

    Recreation and Commercial Uses

    1515

    Total

    At Least 158,630