13
25. ICCI Enerji ve Çevre Fuarı ve Konferansı Türkiye Kojenerasyon Derneği Özel Oturumu Endüstride Yüksek Verimli, Kaliteli ve Güvenilir Enerji Üretimi - Kojenerasyon 29.05.2019

25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

25. ICCI

Enerji ve Çevre Fuarı ve Konferansı

Türkiye Kojenerasyon Derneği Özel Oturumu

Endüstride Yüksek Verimli, Kaliteli ve Güvenilir Enerji Üretimi - Kojenerasyon

29.05.2019

Page 2: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

PETROKİMYA TESİS VE PROSES

VERİMLİLİĞİ İÇİN KOJENERASYON

UYGULAMASI

Sedat Leblebicioğlu

Enerji Yönetimi Müdürü

PETKİM Petrokimya Holding A.Ş.

Page 3: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical
Page 4: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

GENERAL INFORMATION

18% 21meets Turkey’s Production facilities

petrochemical needs (15 main and 6 utility)

3,6 >800.000million tons TEP

annual gross energy consumption.

production capacity

Page 5: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

GENERAL INFORMATION

9.3 640billion TL million USD

Net sales in 2018 Exports in 2018

Biggest Exporterin the Aegean Region of Turkey

Page 6: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

MAJOR PROJECTS IN SOCAR TURKEY’S ALIAGA SITE

Refinery - Petrochemical - Energy - Logistics - Distribution Integration

SOCAR Terminal, 3rd largest port in Turkey

STAR Refinery, 10 million ton capacity

PETKİM Wind Power Plant, 51 MW capacity with 17 turbines

Page 7: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

STEAM ; 1200 tons/hour XHS total capacity

• 4 pcs boilers

POWER ; 222 MW total capacity

• 2 pcs Double Extraction Back Pressure ST

• 2 pcs Condensing ST

• 1 pc Gas Turbine

COGEN PLANT

>70 %total Cogen efficiency

Page 8: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

BENEFITS OF COGENERATION

EFFICIENCY

• Total efficiency higher then 80%

• Less fuel for needed energy (heat and power) demand

• Heat and Power cost reduction

• Less payback time

Page 9: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

Power Plant (traditional)

STACK

GT

~

Process Heat

BPST

Process Power

~

Post Firing

~

~

Process Heat

ProcessPower

BPST

CST

Boiler

Process Heat Demand Process Power Demand

Power Plant Input Efiiciency

Energy Loss

70 MW30 MW114 MW88 %14 MW

Power Plant (cogeneration)

70 MW30 MW

169 MW59 %

69 MW

COGENERATION - EFFICIENCY

Page 10: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

BENEFITS OF COGENERATION

RELIABILITY

• Reliable and high quality energy for process plants by;

✓ Protecting from grid failures (voltage dips..)

✓ Island mode operation when necessary

• Prevent the production losses of the process plants

• Protection of the corporate image

Page 11: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

COGENERATION - RELIABILITY

VOLTAGE DIP

• Contactors may drop out if the voltage dips below 80% of Un for more than 50-100ms.

• Induction motors slow down during the voltage dip, and try to accelerate to the operating speed after voltage recovered.

Voltage dips according to IEEE Std. 1159-1995

Page 12: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

Power Plant (cogeneration) on Load Bus

ProcessLoads

GT

~

Process Heat

BPST

~

GRID, HV

LOAD BUS, MV

POWER TR.

Page 13: 25. ICCI - kojenturk.orgkojenturk.org/uploads/dokumanlar/ICCI 2019 Sunum... · PETKİM Petrokimya Holding A.Ş. GENERAL INFORMATION 18% 21 meets Turkey’s Production facilities petrochemical

BENEFITS OF COGENERATION

HSE

• Reduced gas emissions

• Prevent unplanned shut-down related risks