PIGGING

PIGGING ADALAH AKTIFITAS DI DALAM PERPIPAAN PADA DUNIA INDUSTRI, MIGAS DAN PETROKIMIA.

SALAH SATU KEGIATAN PIGGING ADALAH TEKNIK MEMBERSIKAN BAGIAN DALAM PIPA DARI SOFT - SCALE ATAU DEPOSIT YANG MENEMPEL PADA DINDING PIPA BAGIAN DALAM

PIG BERGERAK MENGIKUTI ALIRAN DIDALAM PIPA DARI UJUNG KE UJUNG. ATAU DARI PIG LAUNCHER SAMPAI KE PIG RECEIVER

PIG LAUNCHER & RECEIVERDIGUNAKAN UNTUK MENGIRIM & MENERIMA "PIG" PIG YANG DIKIRIM DARI STATION A KE STATION B AKAN MENGIKUTI ALIRAN MINYAK SEKALIGUS MEMBERSIHKAN PIPA DARI WAX, SEDIMEN DAN MENDORONG AIR YANG MENGENDAP DIBAGIAN BAWAH PIPA KE ARAH STATION PENERIMA.

BILA PIPE LINE TIDAK DIBERSIHKAN DENGAN PIG MAKIN LAMA SEDIMEN & WAX AKAN MENEMPEL DIDINDING DALAM PIPA YANG MENGAKIBATKAN ID PIPA AKAN MENGECIL DAN MENIMBULKAN FRIKSI & PRESSURE LOSS YANG MAKIN MENINGKAT

SEDANGKAN AIR AKAN MENGAKIBATKAN TIMBULNYA KOROSI PADA PIPA

NORMAL OPERATION

PIG DILUNCURKAN KE PIPE LINE SEMAKIN SERING SEMAKIN BAGUS. SETIAP 2 MINGGU SATU KALI PELUNCURAN SUDAH CUKUP BAIK. NAMUN HAL INI BISA DISESUAIKAN DENGAN KONDISI PIPA, DILIHAT DARI HASIL KOTORAN YANG DITERIMA DI PIG RECEIVER

MAKSUDNYA BILA DEPOSIT / KOTORAN YANG DITERIMA RELATIF SEDIKIT MAKA JADWAL RUTIN BISA DILANJUTKAN , NAMUN BILA DEPOSIT YANG DITERIMA MULAI MENINGKAT , MAKA FREKWENSI PELUNCURAN PIG BISA DITINGKATKAN

TYPICAL PIG LAUNCHER

NORMAL OPERATION BEFORE LAUNCHING PIG

B

A FROM PROCESS

PIGGING ACTIVITY & S.O.P.B

A FROM PROCESS

PERSIAPAN SEBELUM LAUNCHING - PIG1. 2. HUBUNGI STATION PENERIMA BAHWA ANDA AKAN MELUNCURKAN PIG, SUPAYA MEREKA MEMPERSIAPKAN PIG RECEIVER DALAM KONDISI SIAP MENERIMA TUNGGU RESPONSE / INFORMASI DARI STATION PENERIMA BAHWA MEREKA SUDAH SIAPSETELAH MENDAPAT KONFIRMASI , LAKUKAN PERSIAPAN PENGIRIMAN PIG DENGAN SEKSAMA SESUAI DENGAN S.O.P.

PERSIAPAN DI PIG LAUNCHER1. 2. 3. LIHAT PRESSURE GAUGE DI G DAN USAHAKAN MENCAPAI 0 PSIG BILA PEMBACAAN PADA G TIDAK ZERO = O PSIG,LAKUKAN DRAIN MELALUI VALVE K DENGAN PERLAHAN SAMPAI G MENUNJUKKAN ANGKA 0 PSIG TUTUP DRAI DAN TUNGGU BEBERAPA SAAT APAKAH PRESSURENYA BUILD UP BILA BUILD UP LAGI BERARTI ADA KEBOCORAN LAKUKAN PENGECEKAN DIMANA TERDAPAT KEBOCORAN & DAN BATALKAN PELUNCURAN PIG SAMPAI KEBOCORAN DIATASI

PIGGING ACTIVITY & S.O.P.B

FROM PROCESS

A

PERSIAPAN LAUNCHING PIG / BILA KONDISI SEMUA DALAM KEADAAN ACCEPTABLE NORMAL1. 2. 3. 4. 5. 6. 7. BILA PRESSURE GAUGE G MENUNJUK = O PSIG YAKINKAN DENGAN MEMBUKA DRAIN VALVE F DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP BERIKUTNYA DAPAT DILAKUKAN BUKA PIG DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN ADA KEBOCORAN BILA OK LANJUTKAN STEP BERIKUTNYA MASUKKAN PIG KEDALAM PIG LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE B ( YANG PENTING DIDEPAN DARI INLET VALVE C TUTUP PIGDOOR DAN DRAIN VALVE F MULAI MEMBUKA BY PASS VALVE C SECARA PERLAHAN & SAMPAI PENUH TERBUKA , DAN MONITOR TEKANAN PADA G BILA TEKANAN SUDAH SAMA DENGAN DI MAIN PIPE LINE DI H MAKA MULAI MEMBUKA VALVE DI PIG LAUNCHER B PERLAHAN DAN SAMPAI PENUH TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE A SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG PIG SAMPAI TERDENGAR SUARA / GETARAN BAHWA PIG SUDAH MELEWATI VALVE B . TUTUP VALVE B DAN TUTUP VALVE C BUKA DRAIN VALVE K YANG KE SUMP PILE SEACAR PERLAHAN SAMBIL MONITOR PRESSURE GAUGE G SAMPAI MENUNJUK ANGKA NOL = 0 YAKINKAN LAGI DENGAN MEMBUKA DRAIN VALVE F BAHWA TIDAK ADA GAS YANG KELUAR. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL. TUTUP PIG DOOR D DAN VALVE F MELUNCURKAN PIG KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA SEDANG

8. 9. 10.

HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS KEDATANGANNYA

PERSIAPAN LAUNCHING PIG / BILA KONDISI SEMUA DALAM KEADAAN ACCEPTABLE NORMAL

1.

BILA PRESSURE GAUGE G MENUNJUK = O PSIG YAKINKAN DENGAN MEMBUKA DRAIN VALVE F DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP BERIKUTNYA DAPAT DILAKUKAN BUKA PIG DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN ADA KEBOCORAN BILA OK LANJUTKAN STEP BERIKUTNYA MASUKKAN PIG KEDALAM PIG LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE B ( YANG PENTING DIDEPAN DARI INLET VALVE C TUTUP PIGDOOR DAN DRAIN VALVE F MULAI MEMBUKA BY PASS VALVE C SECARA PERLAHAN & SAMPAI PENUH TERBUKA , DAN MONITOR TEKANAN PADA G BILA TEKANAN SUDAH SAMA DENGAN DI MAIN PIPE LINE DI H MAKA MULAI MEMBUKA VALVE DI PIG LAUNCHER B PERLAHAN DAN SAMPAI PENUH TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE A SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG PIG SAMPAI TERDENGAR SUARA / GETARAN BAHWA PIG SUDAH MELEWATI VALVE B . TUTUP VALVE B DAN TUTUP VALVE C BUKA DRAIN VALVE K YANG KE SUMP PILE SEACAR PERLAHAN SAMBIL MONITOR PRESSURE GAUGE G SAMPAI MENUNJUK ANGKA NOL = 0 YAKINKAN LAGI DENGAN MEMBUKA DRAIN VALVE F BAHWA TIDAK ADA GAS YANG KELUAR. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL. TUTUP PIG DOOR D DAN VALVE F KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA SEDANG MELUNCURKAN PIG

2. 3. 4.

5. 6.

7.

8. 9.

10. HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS KEDATANGANNYA

PIG DALAM PERJALANAN

B

A FROM PROCESS

LIHAT JALANNYA PIG DIDALAM PIPAPIG SETELAH MELEWATI VALVE B DAN T MAKA AKAN TERUS BERJALAN MENGIKUTI ALIRAN MINYAK SAMPAI KE STATION PENERIMA

TYPICAL PIG RECEIVERNORMAL OPERATION RECEIVEING PIG

ESD

G

AF

C BK

E

D

SETELAH MENDAPAT INFORMASI BAHWA STATION LAIN AKAN MENGIRIM PIG KE STATION ANDA1. 2. PERSIAPKAN PIG RECEIVER DENGAN BAIK DAN MENGIKUTI S.O.P.

TO SUMP TANK

PERHATIKAN PRESSURE GAUGE G BILA MENUNJUKKAN ANGKA O, MAKA COBA BUKA DRAIN VALVE F PERLAHAN DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP SELANJUTNYA BISA DILAKSANAKAN SEBELUM MEMBUKA VALVE B PADA RECEICER , BUKA DULU BY PASS VALVE C PERLAHAN SAMPAI FULLY OPENED, CEK APAKAH ADA KEBOCORAN, BILA TIDAK ADA LANJUTKAN STEP BERIKUTNYA SETELAH TEKANAN SAMA DANGAN MAIN LINE, SECARA PERLAHAN BUKA PENUH MAIN VALVE B PIG RECEIVER DAN SETELAH TIDAK ADA KEBOCORAN MAKA PIG RECEIVER BISA DITINGGAL SEBELUM MENINGGALKAN HARAP DI PIG RECEIVER DIKASIH TANDA BENDERA, BAHWA ANDA SEDANG DALAM PROSES PENERIMAAN PIG SAMPAIKAN KE STATION YANG AKAN MENGIRIM PIG BAHWA ANDA SIAP MENERIMA.

3.

4. 5. 6. 7. 8.

BILA SUDAH DILUNCURKAN DARI STATION PENGIRIM , CATAT JAM PENGIRIMANNYA , JADI ESTIMASI KEDATANGAN PIG BISA DIPREDIKSI BIASANYA ADA PIG SIGNAL YANG MEMBRI TANDA BAHWA PIG SUDAH DATANHG

PERJALANAN PIG DARI STATION A KE B

SUMP PILE

SEA FLOOR

MACAM MACAM PIG

MACAM MACAM PIG

PIPE LINE - PIGS

Scraper - Pig

Brush - Pig

Sphere - Pig

Poly - Pig

Smart - Pig

TYPES OF PIGS - CLEANING PIGS ( BRUSH & CUP )THERE ARE A VARIETY OF TYPES INCLUDING THOSE MADE ENTIRELY OF POLY-URETHANE, AND THOSE MADE OF STEEL WITH URETHANE CUPS TO SEAL THE PIG ON THE PIPE WALL. THE URETHANE PIGS COME IN GENERAL TYPES: HARD URETHANE (THE CONSISTENCY OF RUBBER), AND THE SOFTER POLY-URETHANE (CALLED POLY PIGS, BEING THE CONSISTENCY OF FURNITURE CUSHIONS). THE POLY PIG IS THE SOFTEST PIG, AND BECAUSE OF ITS FLEXIBILITY IS USUALLY THE FIRST PIG RUN THROUGH A PIPELINE. THEY CAN BE COATED IN HARDER URETHANE TO PROTECT THE SOFT POLY-URETHANE FROM RIPPING OR ABSORBING FLUID IN THE PIPELINE. THEY CAN ALSO BE MOLDED WITH WIRE BRUSHES IMBEDDED TO INCREASE CLEANING CAPABILITY.

GAUGE, CALIPER AND INERTIAL TOOLS. THE SIMPLEST GEOMETRY TOOL IS ROUND GAUGE PLATES OF DIFFERENT SIZES ATTACHED TO A PIG. DENTS, DEFORMATIONS AND TIGHT BENDS WILL DEFORM THE GAUGE PLATE OF THE CORRESPONDING SIZE OF THE DEFECT. ALTHOUGH THE GAUGE PIG CAN DETERMINE THE MINIMUM BORE AND BEND RADIUS OF A PIPELINE, IT DOES NOT LOG THE LOCATION. CALIPER TOOLS LOG THE INSIDE BORE OF THE PIPELINE AND HAVE AN ODOMETER TO LOG THE DISTANCE TO DEFECTS. INERTIAL TOOLS CONSIST OF SOPHISTICATED INERTIAL GUIDANCE SYSTEMS, WHICH LOG THE 3D PROFILE OF THE PIPELINE.

MAGNETIC FLUX LEAKAGE INSPECTION TOOLS. THESE ARE THE OLDEST AND MOST COMMON INSPECTION TOOLS, WHICH MAGNETIZE THE PIPE WITH A STRONG MAGNETIC FIELD AND THEN MAP THE MAGNETIC FIELD. THE MAGNETIC FIELD INCREASES AND DECREASES IN STRENGTH ACCORDING TO THE WALL THICKNESS AND HARDNESS OF THE STEEL. THESE TOOLS ARE OFTEN RUN EVERY THREE TO FIVE YEARS TO MONITOR GROWTH OF CORROSION AND NEW MECHANICAL DAMAGE ON THE PIPELINE.

ULTRASONIC INSPECTION TOOLS. THIS IS THE MOST ADVANCED AND EXPENSIVE INSPECTION METHOD, CAPABLE OF DETECTING SMALL CORROSION PITS (