Poly-Met Megaliner™Innovative liner concept - improves mill
availability and worker safety
© Metso2
The Megaliner™ concept was developed to maximize mill availability and enhance worker safety during mill liner maintenance activities
© Metso
MegalinerTM
Application
• The Megaliner™ is suitable for large AG, SAG* and ball mills with large trunnions and where modern liner handlers are available
3
* Will be officially launched in the second half of 2013
© Metso
MegalinerTM
Features
• Each liner covers a large area,up to 4 m2
• Light-weight in relation to size- 30-60% of metallic liners of
equivalent size
• Each element integrates multiple lifter and shell plate rows
• Minimum number of attachment points
• Bolts inserted and removed from the outside of the mill
• Guiding markers facilitate easy positioning and alignment
4
© Metso
MegalinerTM
5
Maximized mill availability
Improved safety
Bolts are easy to remove and install
Safe and fast installation of new liners
Easy removal of worn liners
Main benefits
© Metso
Main benefitsMaximized mill availability
6
• Downtime is reduced due to few liner components and an innovative attachment system which enables quick and easy installation and removal of liners
0
5
10
15
20
25
Poly-Met 38' x 45' AG Boliden Aitik, Sweden
Steel 40' SAG, Australia
Steel 38' SAG, Chile
Installation time for shell liners
Inst
alla
tion
time
min
/m2
© Metso
Main benefitsImproved safety
7
• Attachment parts are insertedfrom the outside of the mill
• No need for the workers to bein the drop-zone of the linerswhile installing liner bolts
• Old liners can be stripped out and new liners installed by the operator of the liner handleracting alone
© Metso
Main benefitsEasy removal of worn liners
8
• Tool for taking out the first rowof liners
• A lifting eye attached to one of the existing mounting holesenables safe and easy removalof the liner
© Metso
Main benefitsSafe and fast installation of new liners
9
• Liners placed by the linerhandler operator acting alone
• Guiding markers facilitate easypositioning and alignment of liners
• New, patented liner positioningsystem uses camera technology
© Metso
Main benefitsBolts are quick and easy to install and remove
10
• Attachment parts inserted fromthe outside of the mill only
• Attachment bolts are wellprotected against dust, corrosion or general mechanical damage
• The bolts are easy to remove
© Metso
Success case
• AG mill 38’ x 45’ grinding sulphide ore- Shell completely lined with Skega Poly-Met® Megaliners™ since 2010- FE lined with conventional Skega Poly-Met®, DE lined with metallic grates- Member of the Boliden AB Group, a leading copper and gold producer
Result: 30-40% shorter shell liner change out time with Skega Poly-Met® Megaliners™ compared to conventional liners. Safer replacement since nobody needs to be in the drop-zone of the liners while inserting or removing liner bolts.
Boliden Aitik Sweden
11
Description
Feed end head lining:Wear life lifters inner/middle/outerWear life plates inner/middle/outer
24/12/6 months24/18/24 months
Wear life shell lining:Change out time shell lining (hours)
12 months54 hrs (454 m2)
Discharge end head lining:Wear life grates inner and outer 6 months
Power draw (MW) 15 MW
Liner positioning systemPatented
© Metso13
The liner positioning system was developed to reduce reline timeand improve grinding circuit availability
© Metso
Liner positioning system
14
• Using this system, the liner handler operator can act aloneto accurately position the liners without guidance from otherworkers
• Nobody other than the liner handler operator needs to be in the mill during liner installation
© Metso
Liner positioning system
15
• Video cameras are magneticallymounted to the outside of the mill
• The cameras capture images through the bolt holes, and transmit those images in real time to a split screen display mounted in front of the liner handler operator
© Metso
Liner positioning system
16
• Software corrects the orientation of the images so that the motions of the liner handler boom agree with whatthe operator views on the display
• Using the bolt holes in the millas targets, the operator simplyaligns the conical guides in the liners with the bolt holes in the mill
• Once the images coincide, the liner is in the correct position Operator screen view
© Metso
Liner positioning system
17
The operatorhas full controlof linerpositioning
Increased mill availability
Data can be stored and used for installation statistics
Less damages on components and mill backing
Safer installations
Main benefits
Megaliner SAG millsInstallation pictures
© Metso
Megaliner SAG mills
19
© Metso
Megaliner SAG millsInstallation
20
© Metso
Megaliner SAG millsInstallation
21
© Metso
Megaliner SAG millsLiner positioning system
22