4. Kuda-kuda SP2

Embed Size (px)

Citation preview

STUDIO PERANCANGAN I

PERENCANAAN KUDA-KUDAPembebanan Data yang diketahui :

Kemiringan Atap Jarak Antar Gording Jarak antar kuda-kuda

= 28 = 2,27 m =5 m = 5,5 kg/m )

Profil gording Light Lip Channels 150-50-20-3,5 ( berat profil

Sudut Kemiringan Atap. = 28: BEBAN : Beban mati = 70 = 5,5 kg/m2 x 5 x 2,27 kg/m x 5 = 794,5 kg = 46,35 kg = 596,443 = 1437,29 kg = (40-0,8) = (40-0,8x40) = 17,6 kg/m2 kg/m2 maka, = 199,76 kg = 283,75 kg kg +

Beban atap : Genting, usuk, reng Beban Gording Beban Sendiri kuda-kuda Beban mati total Beban Hujan

karena beban hujan tidak perlu diambil lebih dari 20

8 kg/m2 x 5 x 2,27 Beban Angin Beban Pekerja = 25 x 5 x 2,27 = 100 kg

Beban Kombinasi = 28: PU = 1,4PD = 1,4 x 1437,29 = 2012,21 kg = 1,2PD + 0,5(PH or PLa)

PU

STUDIO PERANCANGAN I= (1,2 x 1437,293) + (0,5 x 110) = 1779,75 kg = 1,2PD + 1,6(PH or PLa) + 0,8PW = (1,2 x 1437,293) + (1,6 x 110) + (0,8 x 283,75) = 2127,75 kg = 1,2PD + 1,3PW + 0,5(PH or PLa) = (1.2 x 1437,293) + (0,5 x 110) + (1,3 x 283,75) = 2148,63 kg

PU

PU

Kemudian dihitung gaya batang dengan menggunakan STAAD Pro. Berikut merupakan gambaran pembebanan setengah bentang kuda-kuda pada STAAD Pro:

Dari perhitungan gaya batang STAAD Pro didapatkan : Gaya batang maksimum untuk tekan Gaya batang maksimum untuk tarik = 11334,376 = 10008,63 kg (Batang 5, L = 1.63 m) kg (Batang 1, L = 1.25 m)

STUDIO PERANCANGAN IPERENCANAAN BATANG TEKAN Gaya maksimum tekan = Pu Bentang untuk gaya batang maksimum = L fy = 240 Mpa = 2400 kg/cm2 = 11.334,38 = 163 kg cm

E = 200000 Mpa Dicoba profil Double L 100 x 100 x 1010

100

100

10

b d 2A q

= = = =

7,5 1,2 33,4 3,77

cm cm cm2 kg/m

Ix Iy r

= = =

11 11 1

cm4 cm4 cm

KONTROL KELANGSINGAN ELEMEN PENAMPANG

c =

1 Lk r

fy E(SNI 2002 hal. 28)

1,800 c = Untuk 0.25 < c < 1.2 maka = 1.43/(1.6-0.67c) = 4,048 b/t < r untuk tekuk setempat (SNI 2002 hal. 55)

r =6,25 Pn Pn

250 fy< 16,1374306 (OK) = Ag. fcr = 33,4x (2400/4,048) = Ag. (fy/) = 19.802,77 kg

Pu Pn 11.334,38 < . 19.802,77 11.334,38< 16.832,35 (OK) Kontrol Kelangsingan Komponen Struktur Tekan :

=

Lk < 200 r

STUDIO PERANCANGAN I

163,2000< 200

(OK)

PERENCANAAN BATANG TARIK Gaya maksimum Bentang untuk gaya batang maksimum fy = fu = E= 240 Mpa = 2400 kg/cm2 410 Mpa = 4100 kg/cm2 200000 Mpa = Pu =L = 10.008,63 kg = 125 cm

Perencanaan Leleh Ag = Pn = Pn = 33,4 cm2 fy x Ag 80160 kg

Pu t.Pn t = 0.9

10.008,63 < 0.9 x 80160 10.008,63 < 72.144,00 (OK) Perencanaan Retak Rencana menggunakan 2 baut A307 dengan diameter 2.3 cm n = 2 baut

d = 1,4 cm d hole = 1,7175cm A lubang = 4,63540982cm2 Penentuan dimensi Diperlukan : Ag = Ae =

Pu 4092.47 = = 4,6336 0 .9 f y 0.9 2500 Pu 4092.47 = = 5,5603489 0.75 f y 0.75 2500Ae/0.9 6,1782 cm2 An + ALubang

cm2 cm2

Jika Ae = 0.9An, maka : An = An = Ag =

Ag = 6,1782+ 2(2.3 +0.3175)t Dicoba t = 1 cm Ag = 9,6132 cm2

STUDIO PERANCANGAN IAe = Pn = U x An fu x Ae = 8,1712 = 33.501,88 cm2 kg

Pu t.Pn t = 0.75 t x Pn = Kontrol : Pu 10.008,63 25.126,41 < t.Pn 25.126,41 (OK) kg

PERENCANAAN SAMBUNGAN BAUT Perencanaan Sambungan Baut Diameter baut () Tebal pelat fy = 2400 kg/cm2 fu = 4100 kg/cm2 Jarak lubang tepi terdekat dengan sisi pelat Jarak antar lubang Kuat tumpu baut (Rd) = f . Rn = 1.5 . baut = 1.5 x 1,4 cm = 2,1 cm = 3. baut = 3 x 1,4 cm = 4,20cm = f . 2.4. baut t . fu = 10.332,00 kg Berdasarkan SNI 2002 Pasal 13.2.2.1 hal 99 Kuat Geser baut (Vd) = f .Vn = f. r1 . fu . Ab = 0.75 x 0.6 x 4100 . ( x 2.3) = 1.893,44 kg Diambil yang terkecil yaitu 2 x 7665.53 = 1.893,44 kg = 1,4 cm = 1 cm

STUDIO PERANCANGAN IKEBUTUHAN BAUT UNTUK TIAP BATANG Data : Diameter baut = 1,4 cm Vd = 3786,88 kg

No Batang 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Gaya Batang batang (kg) -10008,23 -10008,23 -8002,822 0 -1065,827 11334,051 -4253,416 6798,344 9064,837 -10008,628 -10008,628 -8002,822 0 -1066,091 11334,376 6798,27 9064,937 2271,047 2919,248 2919,171 2271,521

Jumlah baut yang diperlukan (buah) -2,64 -2,64 -2,11 0,00 -0,28 2,99 -1,12 1,80 2,39 -2,64 -2,64 -2,11 0,00 -0,28 2,99 1,80 2,39 0,60 0,77 0,77 0,60

Jumlah baut yang dipasang (buah) 3 3 3 2 2 3 2 2 3 3 3 3 2 2 3 2 3 2 2 2 2