2
KEMENTERIAN PEKERJAAN UMUM SATKER PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN NAMA PAKET : PEMBANGUNAN INFRASTRUKTUR KAWASAN KUMUH NANGGROE ACEH DARUSSALAM : KEC. SUKAKARYA KOTA SABANG PPK PENGEMBANGAN KAWASAN PERKOTAAN NO. KONTRAK : HK.02.03/91/PKPP/KONT/IV/2014 TANGGAL KONTRAK : 30 APRIL 2014 NILAI KONTRAK : Rp.1.593.000.000,- SUMBER DANA : APBN MURNI TAHUN 2014 KONTRAKTOR : CV. FATA PERDANA KONSULTAN : CV. ZARINDO STRUCTURE HARGA SATUAN JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT MC 0 (Rp.) (Rp.) (%) (Rp.) (%) (Rp.) (%) (Rp) (Rp.) (%) I 1 LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 0.28 2 Pembongkaran Saluran Lama M3 12.00 1,028,100.00 0.07 - - - 12.00 85,675.00 1,028,100.00 0.07 Pembongkaran Saluran Lama (harga nego) M3 - - 168.00 10,754,091.60 7.42 168.00 64,012.45 10,754,091.60 0.74 3 Papan Nama Proyek LS 1.00 600,000.00 0.04 1.00 600,000.00 0.04 4 Mobilisasi, demobilisasi dan Sewa Alat - - - - - - Water Tanker LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07 - Dump Truck LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07 - Jack Hammer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - - - Concreet Mixer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - - - Concreet Vibrator LS 1.00 350,000.00 0.02 1.00 350,000.00 - - - 5 Direksi keet LS 1.00 2,500,000.00 0.17 1.00 2,500,000.00 0.17 6 Dewatering LS 1.00 7,000,000.00 0.48 1.00 7,000,000.00 0.48 7 administrasi dan Dokumentasi LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 - - - 22,178,100.00 1.53 10,754,091.60 7.42 5,050,000.00 - 27,882,191.60 1.93 1 Galian Tanah Keras dan Badan Jalan M3 77,199.50 322.20 24,873,678.90 1.72 - - - 322.20 77,199.50 24,873,678.90 1.72 Galian Tanah Keras dan Badan Jalan (harga nego) M3 61,515.92 - - - 77.48 4,766,022.80 0.33 77.48 61,515.92 4,766,022.80 0.33 2 Galian Biasa Saluran M3 42,750.00 783.41 33,490,777.50 2.31 362.32 15,489,227.03 1.07 421.09 18,001,550.48 1.24 3 Pasangan Batu Gunung Pada Saluran M3 586,075.00 448.59 262,907,384.25 18.15 394.00 230,914,194.68 15.94 54.59 31,993,189.57 2.21 4 Plesteran Saluran 1Pc : 2Ps M3 43,908.00 2,233.50 98,068,518.00 6.77 1,150.15 50,500,878.41 3.49 1,083.35 47,567,639.59 3.28 5 Beton Saluran Type 2 (K - 175) M3 176.24 103,290,385.47 7.13 176.24 586,075.00 103,290,385.47 7.13 6 Pasir Urug dibawah Lantai kerja M3 58.09 11,747,160.96 0.81 58.09 202,240.00 11,747,160.96 0.81 419,340,358.65 28.95 119,803,569.22 8.27 296,904,300.11 20.50 242,239,627.76 16.73 1 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025 M3 3,690,443.10 - - - - - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025 M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050 M3 3,712,017.73 - - - - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050 M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075 M3 3,680,871.81 - - - - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075 M3 16.33 64,918,601.19 4.48 16.33 3,975,115.27 64,918,601.19 4.48 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100 M3 3,684,609.20 - - - - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100 M3 14.64 58,556,767.06 4.04 14.64 3,998,754.90 58,556,767.06 4.04 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125 M3 3,679,714.41 6.40 23,550,172.22 1.63 6.40 23,550,172.22 1.63 - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125 M3 9.94 39,843,109.59 2.75 9.94 4,009,369.52 39,843,109.59 2.75 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150 M3 3,691,495.47 8.63 31,857,605.91 2.20 8.63 31,857,605.91 2.20 - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150 M3 7.41 29,842,731.18 2.06 7.41 4,029,398.30 29,842,731.18 2.06 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175 M3 3,748,705.98 8.31 31,151,746.69 2.15 8.31 31,151,746.69 2.15 - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175 M3 8.16 32,712,150.99 2.26 8.16 4,010,685.18 32,712,150.99 2.26 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200 M3 3,701,286.47 9.06 33,533,655.42 2.32 9.06 33,533,655.42 2.32 - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200 M3 7.52 30,489,142.20 2.10 7.52 4,055,081.26 30,489,142.20 2.11 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225 M3 3,743,167.22 8.33 31,180,582.94 2.15 8.33 31,180,582.94 2.15 - - - Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225 M3 6.21 25,505,238.85 1.76 6.21 4,109,605.45 25,505,238.85 1.76 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+225 - 0+250 M3 3,693,321.49 9.34 34,495,622.72 2.38 9.34 34,495,622.72 2.38 - - SUB JUMLAH - B C. PEKERJAAN BETON BERTULANG JALUR C TU PEKERJAAN TAMBAH PEKERJAAN KURANG KUANTITAS MUTUAL CHEK AWAL (MC - 0) BOBOT AN KUANTITAS KUANTITAS JUMLAH HARGA DAFTAR KUANTITAS DAN HARGA MUTUAL CHECK AWAL (MC - 0) NOMOR MATA PEMBA- YARAN U R A I A N P E K E R J A A N SA KUANTITAS KONTRAK JUMLAH HARGA BOBOT PEKERJAAN TAMBAH KURANG HARGA SATUAN KONTRAK Pengukuran Lapangan 4,000,000.00 SUB JUMLAH - A B. PEKERJAAN TANAH DAN PASANGAN 4,000,000.00 A. PEKERJAAN PERSIAPAN 350,000.00 350,000.00 350,000.00 2,500,000.00 7,000,000.00 85,675.00 600,000.00 1,000,000.00 1,000,000.00 64,012.45

A3 MC0 (awal)

Embed Size (px)

DESCRIPTION

Perhitungan MC0

Citation preview

Page 1: A3 MC0 (awal)

KEMENTERIAN PEKERJAAN UMUM

SATKER PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN NAMA PAKET : PEMBANGUNAN INFRASTRUKTUR KAWASAN KUMUH

NANGGROE ACEH DARUSSALAM : KEC. SUKAKARYA KOTA SABANG

PPK PENGEMBANGAN KAWASAN PERKOTAAN NO. KONTRAK : HK.02.03/91/PKPP/KONT/IV/2014

TANGGAL KONTRAK : 30 APRIL 2014

NILAI KONTRAK : Rp.1.593.000.000,-

SUMBER DANA : APBN MURNI TAHUN 2014

KONTRAKTOR : CV. FATA PERDANA

KONSULTAN : CV. ZARINDO STRUCTURE

HARGA SATUAN

JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT MC 0

(Rp.) (Rp.) (%) (Rp.) (%) (Rp.) (%) (Rp) (Rp.) (%)

I

1 LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 0.28

2 Pembongkaran Saluran Lama M3 12.00 1,028,100.00 0.07 - - - 12.00 85,675.00 1,028,100.00 0.07

Pembongkaran Saluran Lama (harga nego) M3 - - 168.00 10,754,091.60 7.42 168.00 64,012.45 10,754,091.60 0.74

3 Papan Nama Proyek LS 1.00 600,000.00 0.04 1.00 600,000.00 0.04

4 Mobilisasi, demobilisasi dan Sewa Alat - - - - -

- Water Tanker LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07

- Dump Truck LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07

- Jack Hammer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -

- Concreet Mixer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -

- Concreet Vibrator LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -

5 Direksi keet LS 1.00 2,500,000.00 0.17 1.00 2,500,000.00 0.17

6 Dewatering LS 1.00 7,000,000.00 0.48 1.00 7,000,000.00 0.48

7 administrasi dan Dokumentasi LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 - - -

22,178,100.00 1.53 10,754,091.60 7.42 5,050,000.00 - 27,882,191.60 1.93

1 Galian Tanah Keras dan Badan Jalan M3 77,199.50 322.20 24,873,678.90 1.72 - - - 322.20 77,199.50 24,873,678.90 1.72

Galian Tanah Keras dan Badan Jalan (harga nego) M3 61,515.92 - - - 77.48 4,766,022.80 0.33 77.48 61,515.92 4,766,022.80 0.33

2 Galian Biasa Saluran M3 42,750.00 783.41 33,490,777.50 2.31 362.32 15,489,227.03 1.07 421.09 18,001,550.48 1.24

3 Pasangan Batu Gunung Pada Saluran M3 586,075.00 448.59 262,907,384.25 18.15 394.00 230,914,194.68 15.94 54.59 31,993,189.57 2.21

4 Plesteran Saluran 1Pc : 2Ps M3 43,908.00 2,233.50 98,068,518.00 6.77 1,150.15 50,500,878.41 3.49 1,083.35 47,567,639.59 3.28

5 Beton Saluran Type 2 (K - 175) M3 176.24 103,290,385.47 7.13 176.24 586,075.00 103,290,385.47 7.13

6 Pasir Urug dibawah Lantai kerja M3 58.09 11,747,160.96 0.81 58.09 202,240.00 11,747,160.96 0.81

419,340,358.65 28.95 119,803,569.22 8.27 296,904,300.11 20.50 242,239,627.76 16.73

1 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025) M3 3,690,443.10 - - - - - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025) M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050) M3 3,712,017.73 - - - - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050) M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075) M3 3,680,871.81 - - - - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075) M3 16.33 64,918,601.19 4.48 16.33 3,975,115.27 64,918,601.19 4.48

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100) M3 3,684,609.20 - - - - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100) M3 14.64 58,556,767.06 4.04 14.64 3,998,754.90 58,556,767.06 4.04

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125) M3 3,679,714.41 6.40 23,550,172.22 1.63 6.40 23,550,172.22 1.63 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125) M3 9.94 39,843,109.59 2.75 9.94 4,009,369.52 39,843,109.59 2.75

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150) M3 3,691,495.47 8.63 31,857,605.91 2.20 8.63 31,857,605.91 2.20 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150) M3 7.41 29,842,731.18 2.06 7.41 4,029,398.30 29,842,731.18 2.06

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175) M3 3,748,705.98 8.31 31,151,746.69 2.15 8.31 31,151,746.69 2.15 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175) M3 8.16 32,712,150.99 2.26 8.16 4,010,685.18 32,712,150.99 2.26

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200) M3 3,701,286.47 9.06 33,533,655.42 2.32 9.06 33,533,655.42 2.32 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200) M3 7.52 30,489,142.20 2.10 7.52 4,055,081.26 30,489,142.20 2.11

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225) M3 3,743,167.22 8.33 31,180,582.94 2.15 8.33 31,180,582.94 2.15 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225) M3 6.21 25,505,238.85 1.76 6.21 4,109,605.45 25,505,238.85 1.76

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+225 - 0+250) M3 3,693,321.49 9.34 34,495,622.72 2.38 9.34 34,495,622.72 2.38 - -

SUB JUMLAH - B

C. PEKERJAAN BETON BERTULANG

JALUR C

TUPEKERJAAN TAMBAH PEKERJAAN KURANG

KUANTITAS

MUTUAL CHEK AWAL (MC - 0)

BOBOT

AN KUANTITAS KUANTITAS

JUMLAH HARGA

DAFTAR KUANTITAS DAN HARGA MUTUAL CHECK AWAL (MC - 0)

NOMOR

MATA

PEMBA-

YARAN

U R A I A N P E K E R J A A N

SA

KUANTITAS

KONTRAK

JUMLAH HARGA BOBOT

PEKERJAAN TAMBAH KURANGHARGA SATUAN

KONTRAK

Pengukuran Lapangan 4,000,000.00

SUB JUMLAH - A

B. PEKERJAAN TANAH DAN PASANGAN

4,000,000.00

A. PEKERJAAN PERSIAPAN

350,000.00

350,000.00

350,000.00

2,500,000.00

7,000,000.00

85,675.00

600,000.00

1,000,000.00

1,000,000.00

64,012.45

Page 2: A3 MC0 (awal)

HARGA SATUAN

JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT MC 0

(Rp.) (Rp.) (%) (Rp.) (%) (Rp.) (%) (Rp) (Rp.) (%)

JALUR C

TUPEKERJAAN TAMBAH PEKERJAAN KURANG

KUANTITAS

MUTUAL CHEK AWAL (MC - 0)

BOBOT

AN KUANTITAS KUANTITAS

JUMLAH HARGA

NOMOR

MATA

PEMBA-

YARAN

U R A I A N P E K E R J A A N

SA

KUANTITAS

KONTRAK

JUMLAH HARGA BOBOT

PEKERJAAN TAMBAH KURANGHARGA SATUAN

KONTRAK

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+225 - 0+250) M3 7.07 28,732,619.56 1.98 7.07 4,064,738.40 28,732,619.56 1.98

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+250 - 0+275) M3 3,674,968.25 11.04 40,571,649.48 2.80 11.04 40,571,649.48 2.80 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+250 - 0+275) M3 7.07 28,732,619.56 1.98 7.07 4,064,738.40 28,732,619.56 1.98

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+275 - 0+300) M3 3,649,600.46 12.08 44,087,173.56 3.04 12.08 44,087,173.56 3.04 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+275 - 0+300) M3 9.38 37,315,299.36 2.58 9.38 3,980,298.60 37,315,299.36 2.58

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+300 - 0+325) M3 3,687,593.20 10.20 37,613,450.64 2.60 10.20 37,613,450.64 2.60 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+300 - 0+325) M3 10.88 42,736,941.64 2.95 10.88 3,929,833.71 42,736,941.64 2.95

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+325 - 0+350) M3 3,690,094.57 8.78 32,399,030.32 2.24 8.78 32,399,030.32 2.24 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+325 - 0+350) M3 9.94 39,843,109.59 2.75 9.94 4,009,369.52 39,843,109.59 2.75

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+350 - 0+375) M3 3,711,555.75 9.17 34,034,966.23 2.35 9.17 34,034,966.23 2.35 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+350 - 0+375) M3 8.44 33,786,296.50 2.33 8.44 4,004,301.81 33,786,296.50 2.33

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+375 - 0+400) M3 3,763,067.64 6.88 25,889,905.36 1.79 6.88 25,889,905.36 1.79 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+375 - 0+400) M3 7.88 31,605,563.97 2.18 7.88 4,013,404.95 31,605,563.97 2.18

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+400 - 0+425) M3 3,741,206.53 8.03 30,041,888.44 2.07 8.03 30,041,888.44 2.07 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+400 - 0+425) M3 9.06 36,145,714.55 2.50 9.06 3,991,245.22 36,145,714.55 2.50

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+425 - 0+450) M3 3,737,702.46 8.19 30,611,783.15 2.11 8.19 30,611,783.15 2.11 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+425 - 0+437) M3 3.99 16,117,045.53 1.11 3.99 4,042,399.18 16,117,045.53 1.11

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+450 - 0+475) M3 3,725,827.71 7.88 29,359,522.35 2.03 7.88 29,359,522.35 2.03 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+475 - 0+500) M3 3,694,721.78 9.36 34,582,595.86 2.39 9.36 34,582,595.86 2.39 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+500 - 0+525) M3 3,662,482.82 13.54 49,590,017.38 3.42 13.54 49,590,017.38 3.42 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+525 - 0+550) M3 3,698,279.18 14.63 54,105,824.40 3.74 14.63 54,105,824.40 3.74 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+550 - 0+575) M3 3,624,955.02 11.93 43,245,713.39 2.99 11.93 43,245,713.39 2.99 - -

- Beton Bertulang Badan Jalan (K-250) (Sta. 0+575 - 0+600) M3 3,674,399.97 11.59 42,586,295.65 2.94 11.59 42,586,295.65 2.94 - -

2 Beton Bertulang Penutup Saluran Type 1 (K - 250) M3 5,035,418.96 15.75 79,307,848.62 5.48 15.75 79,307,848.62 5.48 - - -

3 Beton Bertulang Penutup Saluran Type 2 (K - 250) M3 4,815,976.82 22.55 108,600,277.29 7.50 34.39 165,640,297.39 11.44 56.94 274,240,574.68 18.94

4 Beton Bertulang Penutup Saluran Type 3 (K - 250) M3 - - - - 20.79 82,790,697.02 5.72 20.79 3,982,236.51 82,790,697.02 5.72

5 Beton Cor Lantai Kerja (K - 125) M3 667,378.28 127.46 85,064,035.57 5.87 11.29 7,534,367.09 0.52 116.17 77,529,668.48 5.35

987,461,363.60 68.17 945,452,296.67 65.27 801,331,417.83 55.32 1,131,582,242.44 78.14

1 Buis Beton Ø 20 cm M' 80,000.00 49.85 3,988,000.00 0.28 2.23 178,400.00 0.01 47.62 80,000.00 3,809,600.00 0.26

2 Pipa Besi Gip Ø 3/4" M' 18,000.00 180.00 3,240,000.00 0.22 - - - 180.00 18,000.00 3,240,000.00 0.22

Pipa Besi Gip Ø 3/4" (harga nego) M' 15,200.00 - - - 213.60 3,246,720.00 0.22 213.60 15,200.00 3,246,720.00 0.22

3 Pipa PVC Ø 1" M' 15,000.00 180.00 2,700,000.00 0.19 - - - 180.00 15,000.00 2,700,000.00 0.19

Pipa PVC Ø 1" (harga nego) M' 12,500.00 - - - 213.60 2,670,000.00 0.18 213.60 12,500.00 2,670,000.00 0.18

4 Besi Pengangkat Ø 12 mm Kg 14,801.00 479.42 7,095,895.42 0.49 1,602.33 23,716,033.99 1.64 2,081.75 30,811,929.41 2.13

5 Besi Penutup Buis Beton (Dia. 12mm) Kg 14,801.00 - - - - - - - -

6 Pembersihan Akhir Ls 2,500,000.00 1.00 2,500,000.00 0.17 1.00 2,500,000.00 - - -

19,523,895.42 1.35 29,632,753.99 2.05 2,678,400.00 0.01 46,478,249.41 3.21

A 1,448,503,717.67 100.00 1,105,642,711.48 83.01 1,105,964,117.95 75.83 1,448,182,311.21 100.00

B 144,850,371.77 110,564,271.15 110,596,411.79 144,818,231.12

C 1,593,354,089.44 1,216,206,982.63 1,216,560,529.74 1,593,000,542.33

D 1,593,354,000.00 1,216,206,000.00 1,216,560,000.00 1,593,000,000.00

354,000.00 -354,000.00

NIP. 19771106 200701 1 002 Direktur Direktur

Pengembangan Kawasan Permukiman Perkotaan CV. ZARINDO STRUCTURE CV. FATA PERDANA

Nanggroe Aceh Darussalam

T. Davis F. Hamid, ST, MT M. Zardi, ST. MT Atailah

Pejabat Pembuat Komitmen Konsultan Supervisi Kontraktor

DIBULATKAN

D. PEKERJAAN LAIN - LAIN

SUB JUMLAH - D

JUMLAH HARGA SELURUHNYA

PAJAK PERTAMBAHAN NILAI (PPn) = 10 % X (A)

JUMLAH (Termasuk PPn 10 %) = (A) + (B)

SUB JUMLAH - C

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :