KEMENTERIAN PEKERJAAN UMUM
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN NAMA PAKET : PEMBANGUNAN INFRASTRUKTUR KAWASAN KUMUH
NANGGROE ACEH DARUSSALAM : KEC. SUKAKARYA KOTA SABANG
PPK PENGEMBANGAN KAWASAN PERKOTAAN NO. KONTRAK : HK.02.03/91/PKPP/KONT/IV/2014
TANGGAL KONTRAK : 30 APRIL 2014
NILAI KONTRAK : Rp.1.593.000.000,-
SUMBER DANA : APBN MURNI TAHUN 2014
KONTRAKTOR : CV. FATA PERDANA
KONSULTAN : CV. ZARINDO STRUCTURE
HARGA SATUAN
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT MC 0
(Rp.) (Rp.) (%) (Rp.) (%) (Rp.) (%) (Rp) (Rp.) (%)
I
1 LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 0.28
2 Pembongkaran Saluran Lama M3 12.00 1,028,100.00 0.07 - - - 12.00 85,675.00 1,028,100.00 0.07
Pembongkaran Saluran Lama (harga nego) M3 - - 168.00 10,754,091.60 7.42 168.00 64,012.45 10,754,091.60 0.74
3 Papan Nama Proyek LS 1.00 600,000.00 0.04 1.00 600,000.00 0.04
4 Mobilisasi, demobilisasi dan Sewa Alat - - - - -
- Water Tanker LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07
- Dump Truck LS 1.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07
- Jack Hammer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -
- Concreet Mixer LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -
- Concreet Vibrator LS 1.00 350,000.00 0.02 1.00 350,000.00 - - -
5 Direksi keet LS 1.00 2,500,000.00 0.17 1.00 2,500,000.00 0.17
6 Dewatering LS 1.00 7,000,000.00 0.48 1.00 7,000,000.00 0.48
7 administrasi dan Dokumentasi LS 1.00 4,000,000.00 0.28 1.00 4,000,000.00 - - -
22,178,100.00 1.53 10,754,091.60 7.42 5,050,000.00 - 27,882,191.60 1.93
1 Galian Tanah Keras dan Badan Jalan M3 77,199.50 322.20 24,873,678.90 1.72 - - - 322.20 77,199.50 24,873,678.90 1.72
Galian Tanah Keras dan Badan Jalan (harga nego) M3 61,515.92 - - - 77.48 4,766,022.80 0.33 77.48 61,515.92 4,766,022.80 0.33
2 Galian Biasa Saluran M3 42,750.00 783.41 33,490,777.50 2.31 362.32 15,489,227.03 1.07 421.09 18,001,550.48 1.24
3 Pasangan Batu Gunung Pada Saluran M3 586,075.00 448.59 262,907,384.25 18.15 394.00 230,914,194.68 15.94 54.59 31,993,189.57 2.21
4 Plesteran Saluran 1Pc : 2Ps M3 43,908.00 2,233.50 98,068,518.00 6.77 1,150.15 50,500,878.41 3.49 1,083.35 47,567,639.59 3.28
5 Beton Saluran Type 2 (K - 175) M3 176.24 103,290,385.47 7.13 176.24 586,075.00 103,290,385.47 7.13
6 Pasir Urug dibawah Lantai kerja M3 58.09 11,747,160.96 0.81 58.09 202,240.00 11,747,160.96 0.81
419,340,358.65 28.95 119,803,569.22 8.27 296,904,300.11 20.50 242,239,627.76 16.73
1 - Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025) M3 3,690,443.10 - - - - - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+000 - 0+025) M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050) M3 3,712,017.73 - - - - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+025 - 0+050) M3 15.19 60,069,175.47 4.15 15.19 3,955,172.05 60,069,175.47 4.15
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075) M3 3,680,871.81 - - - - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+050 - 0+075) M3 16.33 64,918,601.19 4.48 16.33 3,975,115.27 64,918,601.19 4.48
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100) M3 3,684,609.20 - - - - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+075 - 0+100) M3 14.64 58,556,767.06 4.04 14.64 3,998,754.90 58,556,767.06 4.04
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125) M3 3,679,714.41 6.40 23,550,172.22 1.63 6.40 23,550,172.22 1.63 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+100 - 0+125) M3 9.94 39,843,109.59 2.75 9.94 4,009,369.52 39,843,109.59 2.75
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150) M3 3,691,495.47 8.63 31,857,605.91 2.20 8.63 31,857,605.91 2.20 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+125 - 0+150) M3 7.41 29,842,731.18 2.06 7.41 4,029,398.30 29,842,731.18 2.06
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175) M3 3,748,705.98 8.31 31,151,746.69 2.15 8.31 31,151,746.69 2.15 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+150 - 0+175) M3 8.16 32,712,150.99 2.26 8.16 4,010,685.18 32,712,150.99 2.26
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200) M3 3,701,286.47 9.06 33,533,655.42 2.32 9.06 33,533,655.42 2.32 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+175 - 0+200) M3 7.52 30,489,142.20 2.10 7.52 4,055,081.26 30,489,142.20 2.11
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225) M3 3,743,167.22 8.33 31,180,582.94 2.15 8.33 31,180,582.94 2.15 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+200 - 0+225) M3 6.21 25,505,238.85 1.76 6.21 4,109,605.45 25,505,238.85 1.76
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+225 - 0+250) M3 3,693,321.49 9.34 34,495,622.72 2.38 9.34 34,495,622.72 2.38 - -
SUB JUMLAH - B
C. PEKERJAAN BETON BERTULANG
JALUR C
TUPEKERJAAN TAMBAH PEKERJAAN KURANG
KUANTITAS
MUTUAL CHEK AWAL (MC - 0)
BOBOT
AN KUANTITAS KUANTITAS
JUMLAH HARGA
DAFTAR KUANTITAS DAN HARGA MUTUAL CHECK AWAL (MC - 0)
NOMOR
MATA
PEMBA-
YARAN
U R A I A N P E K E R J A A N
SA
KUANTITAS
KONTRAK
JUMLAH HARGA BOBOT
PEKERJAAN TAMBAH KURANGHARGA SATUAN
KONTRAK
Pengukuran Lapangan 4,000,000.00
SUB JUMLAH - A
B. PEKERJAAN TANAH DAN PASANGAN
4,000,000.00
A. PEKERJAAN PERSIAPAN
350,000.00
350,000.00
350,000.00
2,500,000.00
7,000,000.00
85,675.00
600,000.00
1,000,000.00
1,000,000.00
64,012.45
HARGA SATUAN
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT MC 0
(Rp.) (Rp.) (%) (Rp.) (%) (Rp.) (%) (Rp) (Rp.) (%)
JALUR C
TUPEKERJAAN TAMBAH PEKERJAAN KURANG
KUANTITAS
MUTUAL CHEK AWAL (MC - 0)
BOBOT
AN KUANTITAS KUANTITAS
JUMLAH HARGA
NOMOR
MATA
PEMBA-
YARAN
U R A I A N P E K E R J A A N
SA
KUANTITAS
KONTRAK
JUMLAH HARGA BOBOT
PEKERJAAN TAMBAH KURANGHARGA SATUAN
KONTRAK
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+225 - 0+250) M3 7.07 28,732,619.56 1.98 7.07 4,064,738.40 28,732,619.56 1.98
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+250 - 0+275) M3 3,674,968.25 11.04 40,571,649.48 2.80 11.04 40,571,649.48 2.80 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+250 - 0+275) M3 7.07 28,732,619.56 1.98 7.07 4,064,738.40 28,732,619.56 1.98
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+275 - 0+300) M3 3,649,600.46 12.08 44,087,173.56 3.04 12.08 44,087,173.56 3.04 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+275 - 0+300) M3 9.38 37,315,299.36 2.58 9.38 3,980,298.60 37,315,299.36 2.58
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+300 - 0+325) M3 3,687,593.20 10.20 37,613,450.64 2.60 10.20 37,613,450.64 2.60 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+300 - 0+325) M3 10.88 42,736,941.64 2.95 10.88 3,929,833.71 42,736,941.64 2.95
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+325 - 0+350) M3 3,690,094.57 8.78 32,399,030.32 2.24 8.78 32,399,030.32 2.24 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+325 - 0+350) M3 9.94 39,843,109.59 2.75 9.94 4,009,369.52 39,843,109.59 2.75
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+350 - 0+375) M3 3,711,555.75 9.17 34,034,966.23 2.35 9.17 34,034,966.23 2.35 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+350 - 0+375) M3 8.44 33,786,296.50 2.33 8.44 4,004,301.81 33,786,296.50 2.33
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+375 - 0+400) M3 3,763,067.64 6.88 25,889,905.36 1.79 6.88 25,889,905.36 1.79 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+375 - 0+400) M3 7.88 31,605,563.97 2.18 7.88 4,013,404.95 31,605,563.97 2.18
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+400 - 0+425) M3 3,741,206.53 8.03 30,041,888.44 2.07 8.03 30,041,888.44 2.07 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+400 - 0+425) M3 9.06 36,145,714.55 2.50 9.06 3,991,245.22 36,145,714.55 2.50
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+425 - 0+450) M3 3,737,702.46 8.19 30,611,783.15 2.11 8.19 30,611,783.15 2.11 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+425 - 0+437) M3 3.99 16,117,045.53 1.11 3.99 4,042,399.18 16,117,045.53 1.11
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+450 - 0+475) M3 3,725,827.71 7.88 29,359,522.35 2.03 7.88 29,359,522.35 2.03 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+475 - 0+500) M3 3,694,721.78 9.36 34,582,595.86 2.39 9.36 34,582,595.86 2.39 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+500 - 0+525) M3 3,662,482.82 13.54 49,590,017.38 3.42 13.54 49,590,017.38 3.42 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+525 - 0+550) M3 3,698,279.18 14.63 54,105,824.40 3.74 14.63 54,105,824.40 3.74 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+550 - 0+575) M3 3,624,955.02 11.93 43,245,713.39 2.99 11.93 43,245,713.39 2.99 - -
- Beton Bertulang Badan Jalan (K-250) (Sta. 0+575 - 0+600) M3 3,674,399.97 11.59 42,586,295.65 2.94 11.59 42,586,295.65 2.94 - -
2 Beton Bertulang Penutup Saluran Type 1 (K - 250) M3 5,035,418.96 15.75 79,307,848.62 5.48 15.75 79,307,848.62 5.48 - - -
3 Beton Bertulang Penutup Saluran Type 2 (K - 250) M3 4,815,976.82 22.55 108,600,277.29 7.50 34.39 165,640,297.39 11.44 56.94 274,240,574.68 18.94
4 Beton Bertulang Penutup Saluran Type 3 (K - 250) M3 - - - - 20.79 82,790,697.02 5.72 20.79 3,982,236.51 82,790,697.02 5.72
5 Beton Cor Lantai Kerja (K - 125) M3 667,378.28 127.46 85,064,035.57 5.87 11.29 7,534,367.09 0.52 116.17 77,529,668.48 5.35
987,461,363.60 68.17 945,452,296.67 65.27 801,331,417.83 55.32 1,131,582,242.44 78.14
1 Buis Beton Ø 20 cm M' 80,000.00 49.85 3,988,000.00 0.28 2.23 178,400.00 0.01 47.62 80,000.00 3,809,600.00 0.26
2 Pipa Besi Gip Ø 3/4" M' 18,000.00 180.00 3,240,000.00 0.22 - - - 180.00 18,000.00 3,240,000.00 0.22
Pipa Besi Gip Ø 3/4" (harga nego) M' 15,200.00 - - - 213.60 3,246,720.00 0.22 213.60 15,200.00 3,246,720.00 0.22
3 Pipa PVC Ø 1" M' 15,000.00 180.00 2,700,000.00 0.19 - - - 180.00 15,000.00 2,700,000.00 0.19
Pipa PVC Ø 1" (harga nego) M' 12,500.00 - - - 213.60 2,670,000.00 0.18 213.60 12,500.00 2,670,000.00 0.18
4 Besi Pengangkat Ø 12 mm Kg 14,801.00 479.42 7,095,895.42 0.49 1,602.33 23,716,033.99 1.64 2,081.75 30,811,929.41 2.13
5 Besi Penutup Buis Beton (Dia. 12mm) Kg 14,801.00 - - - - - - - -
6 Pembersihan Akhir Ls 2,500,000.00 1.00 2,500,000.00 0.17 1.00 2,500,000.00 - - -
19,523,895.42 1.35 29,632,753.99 2.05 2,678,400.00 0.01 46,478,249.41 3.21
A 1,448,503,717.67 100.00 1,105,642,711.48 83.01 1,105,964,117.95 75.83 1,448,182,311.21 100.00
B 144,850,371.77 110,564,271.15 110,596,411.79 144,818,231.12
C 1,593,354,089.44 1,216,206,982.63 1,216,560,529.74 1,593,000,542.33
D 1,593,354,000.00 1,216,206,000.00 1,216,560,000.00 1,593,000,000.00
354,000.00 -354,000.00
NIP. 19771106 200701 1 002 Direktur Direktur
Pengembangan Kawasan Permukiman Perkotaan CV. ZARINDO STRUCTURE CV. FATA PERDANA
Nanggroe Aceh Darussalam
T. Davis F. Hamid, ST, MT M. Zardi, ST. MT Atailah
Pejabat Pembuat Komitmen Konsultan Supervisi Kontraktor
DIBULATKAN
D. PEKERJAAN LAIN - LAIN
SUB JUMLAH - D
JUMLAH HARGA SELURUHNYA
PAJAK PERTAMBAHAN NILAI (PPn) = 10 % X (A)
JUMLAH (Termasuk PPn 10 %) = (A) + (B)
SUB JUMLAH - C
Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :