กกก 15 12-14 2553 กกกกกกกกก : กก Instrumentation Deformation Behaviors of Concrete Face Rockfill Dam During Construction and First filling : Case of Khawae Noi Dam : 75 3 ก กก1.กกก 2.กกก 3.กกก กกกกกกกก ก ก กกก กก กกก(Wave wall) กกกก HS5(+96.00) ก 1.807 ก HS5 ก 1.935 กกกกกกกก ก 1.944 กก 3.50- 27.21 MPa กกกก 1.Inlicnometer กกกก 450. 2.Joint Meter JM2 กก JM1,JM3 Abutment กกก 3. Perimetric Joint Meter ก Opening,Normal to Perimetric Joint กกกก 3 PM2=4.58 .,PM5=8.14 . PM8=2.28 . ก ก 4 . กก 363x10 -6 ก (Strain)ก ก 0.0033 Abstract : Khwae Noi Dam is concrete face rockfill dam with a height 75 meter. Instrumentation behavior Dam is divided into 3 groups to behavioral engineering of dam.1. the measure of dam behavior settlement. 2. the measure of displancement behavior of concrete face slab.3.the measurement behavior seepage.The study found that the behavior of settlement is associated with dam construction, including time Time during .The during construction of rockfill, the diversion during construction ,construction of concrete concrete face slab, construction of wave wall and first filling. During the construction have maximum settlement of rockfill positions HS5 (+96.00) equal to 1.807 meters, dam construction period is complete maximum settlement HS5 position value equal to 1.935 meters settlement after construction of wave wall have low settlement rate and first filling found the settlement is equal to 1.944 meter. Data from the settlement of rockfill used to analyze the constructiom modulus of rockfill estimated 3.50-27.21 MPa.Displancement behavior of concrete face slab of the instrumentation. 1.Inlicnometer the value of deflection equal to 450 mm.2.Joint meter found that most middle river JM2 vertical movement converge and JM1,JM3 vertical abument are moving away from each other 3. Perimetric Joint Meter found that the vertical movement. Opening, Normal to Perimetric Joint value movements from both line 3 with maximum PM2 = 4.58 mm, PM5 = 8.14 mm and PM8 = 2.28 mm, the value of movement of boundaries concrete face slab that allow the maximum value less than 4 cm. The strain occurs in concrete face slab has estimated that up to 363x10 -6 , normal strain of concrete must be less than 0.0033, the concrete face slab are unlikely to crack. Keyword : Concrete Face Rockfill Dam, CFRD, Dam Instrumentation, Dam Behavior กก (Puchong Suwanpakprak) 1 (Suttisak Soralump) 2 1 ก ก ก ([email protected]) 2 ก ก ก ([email protected])

กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

����ก���ก���� ��������� �����������������ก�����กก������������� ������������ก��� ���� ��ก��ก �!����"��ก#$�%&����%�"�ก : ก�(�)*ก+��� ��"������

Instrumentation Deformation Behaviors of Concrete Face Rockfill Dam During Construction and First filling : Case of Khawae Noi Dam

$G���� � : )*+�� �� ,��)�- )*+�� �� ./�/� ,��� ก��� ���01�)*+�� 75 )�� )��+���+��/$%��ก��)*+�� �� ,������3/, 3 ก�����$%��ก�������ก��)*+�� �+�1.ก�����5�/$%��ก��ก�����/��*��)*+�� 2.ก�����5�/$%��ก��*��ก��)��+�� ��*���6� �� ก���/�/� ,� 3.ก�����5�/$%��ก��ก��3��78 5�กก���8ก&�$���$%��ก��ก�����/��*��)*+�� ���0�$� �9ก������)��ก��ก��0�,��3/,�ก� ���)��������ก��.�/��/�� ก��6� �:�������ก��ก��0�,�� ก��0�,���6� �� ก���/�/� ,� ก��0�,��ก:��$�ก� ��+� (Wave wall)���)���)กC� �:� ���������ก��ก��0�,���� .�ก�����/���ก���0�/����:��� �� HS5(+96.00) )���ก�� 1.807 )�� ���)��ก��0�,��)*+�� )0�C5�ก�����/���ก���0�/����:��� �� HS5 )���ก�� 1.935 )�� ���ก�����/������5�กก��0�,��ก:��$�ก� ��+� )0�C5������ก�����/�� ,�� ���)+��)���)กC�ก�ก �:�$����ก�����/�� )���ก�� 1.944 )�� *,�1�5�กก�����/��*���� . �� :�3��)�����9��� /1��0*���� .78����������K 3.50-27.21 MPa $%��ก��ก��)��+�� ��*���6� �� ก���/�/� ,�5�ก6�)��+���+��/ 1.Inlicnometer ����ก�� ก�����ก���0�/)���ก�� 450. K ���)K� ,���/�8ก���0�/ 2.Joint Meter $��� JM2 � ก����:� �:��ก��)��+�� ��)*,���ก� ��� JM1,JM3 � ��Abutment ����0��*,���ก��)��+�� ����ก5�กก� 3. Perimetric Joint Meter $���ก��)��+�� ��[ � Opening,Normal to Perimetric Joint ����ก��)��+�� ����ก5�กก� ���� 3 � /�����01�0�/ PM2=4.58 .,PM5=8.14 . ��� PM8=2.28 . ���ก��)��+�� ��*��������a*���6� �� ก���01�0�/�����[�,����3�)ก� 4 7. ��)����/���)ก�/*8� [ �6� �� ก���/�/� ,���������K3�)ก� 363x10-6 78���ก����)����/ (Strain)*���� ก����,������3�)ก� 0.0033 /��� �� �6� �� ก���/�/� ,�3��� ,���5���ก�,�[ *K������5�/

Abstract : Khwae Noi Dam is concrete face rockfill dam with a height 75 meter. Instrumentation behavior Dam is divided into 3 groups to

behavioral engineering of dam.1. the measure of dam behavior settlement. 2. the measure of displancement behavior of concrete face slab.3.the measurement behavior seepage.The study found that the behavior of settlement is associated with dam construction, including time Time during .The during construction of rockfill, the diversion during construction ,construction of concrete concrete face slab, construction of wave wall and first filling. During the construction have maximum settlement of rockfill positions HS5 (+96.00) equal to 1.807 meters, dam construction period is complete maximum settlement HS5 position value equal to 1.935 meters settlement after construction of wave wall have low settlement rate and first filling found the settlement is equal to 1.944 meter. Data from the settlement of rockfill used to analyze the constructiom modulus of rockfill estimated 3.50-27.21 MPa.Displancement behavior of concrete face slab of the instrumentation. 1.Inlicnometer the value of deflection equal to 450 mm.2.Joint meter found that most middle river JM2 vertical movement converge and JM1,JM3 vertical abument are moving away from each other 3. Perimetric Joint Meter found that the vertical movement. Opening, Normal to Perimetric Joint value movements from both line 3 with maximum PM2 = 4.58 mm, PM5 = 8.14 mm and PM8 = 2.28 mm, the value of movement of boundaries concrete face slab that allow the maximum value less than 4 cm. The strain occurs in concrete face slab has estimated that up to 363x10-6, normal strain of concrete must be less than 0.0033, the concrete face slab are unlikely to crack.

Keyword : Concrete Face Rockfill Dam, CFRD, Dam Instrumentation, Dam Behavior

LMN��� !M���(�ก"��ก (Puchong Suwanpakprak)1

!MGU�)�ก��V )������ (Suttisak Soralump)2

1����������� � ����ก������� ���������ก����� ����������ก�������� ([email protected]) 2012�3������4��� � ����ก������� ���������ก����� ����������ก�������� ([email protected])

Page 2: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

1. $G�&� ���ก��)*+�� �� ,�� �� ) +����5�ก$�����/:��� )�- ���ก������)กC� �:�* �/[�n� ������1��:�)'��/ �0.9 5����/$�&K� �ก /���1�'��[�,ก��/1��*��ก�������� 78��3/,��5,��ก ��� � �� &� � ��� � �8 ก & � [ ก � � � � ก � � � � � � � � �� � � ���ก��/,� ���&�� �onn� �� 7���� �9 5:�ก�/ ���&�� $� �� /9 7� �) 5) �9 5:�ก�/ ��� ���&�� ��7�009 )� 5�) ������ �� 7���� �09 5:�ก�/ ���3/,��5,��61,���5,��[ ก��ก��0�,��)*+�� 3/,�ก� ก�5ก�����,��1��7� )$�)��9 78�����ก��/,� ���&�� �1) ��� �� p��9)�� 5:�ก�/ ���&�� ���ก�ก�)���9 �����) �9 5:�ก�/ ������&�� )$�)��9-$� 5:�ก�/ (��� ) ��)*+�� [ ���ก��)*+�� �� ,�����ก��/,� 3 )*+�� ��/���ก� 3/,�ก� 1.)*+�� �� ,��)�- )*+�� �� .�� ก���/�/� ,� (Concrete Face Rockfill Dam,CFRD) 2.)*+�� 0� ��)��� )�- )*+�� �� .�ก /� )� �� (Earth Core Rockfill Dam) ��� 3.)*+�� �u/����)*���:� (Earth fill Dam))�- )*+�� /� ) +��)/��[1] �0/�[ '�$���1 �0/��1�)*+�� ����

)*+�� �� ,��)�- )*+�� �� ./�/� ,��� ก��� ���ก,��0� )*+�� 9 )�� �����0� )*+�� 570 )�� ��01�)*+�� 75 )�� ��/��0� ���� .��1������/��+ 133.50 .��ก. �ก:��$��� ก���ก� ��+� (Wave Wall) ����1�� 0� )*+�� /,� )� +� �:�01� 2 )�� ��/)*+�� /,� )� +� �:�����,�� �:� 1:1.4 (/���:���) ��/�,��)*+�� � Berm ��ก�����01� 20 )�� ���ก,�� 6 )�� ก��0�,�� /�[�,�� .� �/ Sandstone ��� �*���6� �� ก���/�/� ,� )���ก�� 0.30-0.56 .'�$��� 2 [1] �0/��1�� ,���/)*+�� �� ,��

L��G� 1 �1�)*+�� ���� (ก�������� 2545) [1]

L��G� 2 �����)���/0� ���ก��)*+�� �� ,��(ก�������� 2545) [1]

1. ����M��!���"����%����ก���&����ก�� [ ก���8ก&�$%��ก��)*+�� �� ,��(CFRD)5�ก)��+���+�

�/�*�� �� ก��/:�) � /���0/�[ '�$��� 3 /�)���5�กก�����*,�1�$+� z� *�� ���ก��78��)�- *,�1�)ก���ก��* �/ �1����� �:��� ������a*����)*+�� ���*�� �� ���ก��0�,��ก��.�/��/��)*+�� 78��3/,5�กก��)กC�*,�1�ก��ก��0�,��5��� �8ก&������)���/)��+���+��/ /�����ก���)��+���+��/��ก3/,)�- 3 ก�������ก&K�$%��ก�������5�/ �+� ก����/ก�����/�� ก����/ก��)��+�� ��*���6� �� ก���/�/� ,� ���ก����/ก��3��78*�� �:�'��[ ��)*+�� 61, )*�� 3/,��/��$%��ก��)��+���+��/����[ ���������ก��ก��0�,�����)0�C50�� ก��ก��0�,��)$+���8ก&�$%��ก�����)ก�/*8� 5���'��[ ��)*+�� 78��5�)�- *,�1�����0/�.8������/'��*����)*+�� 0:�����)*+�� �� ,��)�- )*+�� �� ./�/� ,��� ก��� 78��)�- )*+�� ���ก��0�,��3/,�/)�C���)*+�� ���)'� ���ก$��on��ก�����78*�� �:�6�� �����ก*���6� �� ก���/�/� ,� ) +���5�กก��)����� �1�*���0/�����������6� �� ก��� )�� )ก�/ก�����/��*���� .�ก)ก� 3� /�� �� ���+/���� ���������*C����*���� .��)*+�� 58����)ก���*,�� /����ก��ก��)��+�� ��*��)*+�� /�){$�����������)+������/� �:��ก���:��� 5� :�3�01�ก����ก*���6� �� ก���

���� ��58�) , $%��ก��ก�����/�����ก��)��+�� ��*��)*+�� 5�ก)��+����/$%��ก��[ ���������ก��ก��0�,�����)���)กC� �:� /�*,�1�5�กก�����/��*���� . ��0���. :�3��)�����9��� /1��0*���� .)$+�� :�3��)�����9ก�����/��*���� .���)ก�/*8� [ ���5:�������61,)*�� 5�3/,/:�) � ก���5�����3� ���� ��) +���5�ก$%��ก��ก�����/��*���� .���0�$� �9ก������)��[ ก��ก��0�,���6� �� ก���/�/� ,�����

)*+�� �� ,��

)*+�� 0� ��)���

)*+�� �u/����)*���:�

Page 3: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

��0�$� �9ก��*� ก��ก��0�,��)*+�� )�� ก��[�, �:�*K��/��/ ��01�*��ก���/��/���ก��6� �:�������ก��ก��0�,�� ก��)*,�[5$%��ก��ก��)����� �1�*��)*+�� CFRD ���5��:�[�,ก��ก��0�,��)*+�� ���.1ก�,�����0��6�[�,�/���[�,5���[ ก���:������ก&�[ � ���

L��G� 3 *�� �� ก��/:�) � ก��

2. ��� ������������ก����� ��"������ )��+���+��/$%��ก��)*+�� (Dam Instrumentation) �+�

���ก�K9���[�,��5�/���0����'�$���$%��ก��*��z� ��ก�����)*+�� ���)ก�/*8� 5��� 78����ก�:�ก����/����)��+���+��/[ �:��� ����� )���0��ก��ก�����6����.1ก�,��5����[�,0���.������.8�0.� ������/'��)*+�� ��+��0/�0���6�/�ก�����$%��ก����������3�0���.���)� 3/,/,���)���� )�� ������/� �:� ���ก��)��+�� �����6�/�ก�� |�| [2]

)��+���+��/$%��ก��)*+�� �� ,������3/, 3 ก�����$%��ก�������ก��)*+�� �+� 1.ก�����5�/$%��ก��ก�����/��*��)*+�� 3/,�ก� Hydrostatic Settlement Gauge, Crest Settlement point ���Surface Settlement point 2.ก�����5�/$%��ก��*��ก��)��+�� ��*���6� �� ก���/�/� ,� 3/,�ก� Inclinometer, Permetric Joint Meter Joint Meter, Strain Meter ��� Non-Stress Strain Meter 3.ก�����5�/$%��ก��ก��3��78 3/,�ก� V-Notch weir ��� Borehole Standpipe Piezometer

5:� )��+���+��/$%��ก��)*+�� �� ,�������/���������/� 10 � �/ 5:� 68 �:��� �� /���0/�[ �������� 1����:��� ��)��+���+��/$%��ก�� �0/�/��[ '�$��� 4-6 �����G� 1 5:� )��+���+��/)*+�� �� ,��

ก�M �����ก��� ��� ������������ก��� �&���� �&�"�� ������%� ����M��!���ก�����

ก�����/��)*+�� Hydrostatic Settlement Gauge 9 �� .��)*+�� �/ก�����/��*���� .

Crest Settlement point 6 � ก:��$�ก� ��+� �/ก�����/��*��0� )*+��

Surface Settlement point 13 . �,��)*+�� �/ก�����/��*����/)*+��

ก��)��+�� ��*�� Inclinometer 3 � �� ก���/,� � ,� ก�� ก����*���6� �� ก���

�6� �� ก���/�/� ,� Permetric Joint Meter 3 �������������6� �� ก��� ก��)��+�� �����������

Joint Meter 3 �������������6� �� ก��� ก��)��+�� �����������

Strain Meter 6 6�� ,�*���6� �� ก��� ��)����/[ �6� �� ก���

Non-Stress Strain Meter 6 [�,��� �6� �� ก��� ��)����/[�,�6� �� ก���

ก��3��78 V-Notch weir 4 $+� ���/,� �,�� �:� ����Kก��3��786�� ��)*+��

Borehole Standpipe Piezometer 9 $+� ���/,� �,�� �:� ��/�� �:�[�,/�

L��G� 4 �:��� ��*��)��+���+��/���/����)*+�� [1]

L��G� 5 �:��� ��)��+���+��/�����/����� �6� �� ก���/�/� ,� [1]

L��G� 6 � ,���/�ก%�)*+�� �����/����)��+���+��/ก�����/�� [1]

SM=Strain Meter NSM=Non-Stress Strain Meter

IN=Inclinometer PM=Perimetric Joint Meter JM=Joint Meter

���*,�1�$+� z� *�� ���ก��

�8ก&������)���/ )��+���+��/$%��ก��)*+��

�)�����9$%��ก��5�ก)��+���+��/ ก�����/��*��)*+��

ก��)��+�� ��*��)*+��

��� ���������*,�1�5�ก )��+���+��/$%��ก��)*+�� (1�.�.50-1ก.$.52)

��/����)��+���+��/$%��ก��)*+��

Page 4: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

4. ]�"��ก������������������ก��� ����������������ก����� ��"������

4.1 ��� ��������ก��G�M�������������� �� $%��ก��ก�����/��*��)*+�� �� ./�/� ,��� ก���

)�- $%��ก��0:���n78����ก)ก�/ก�����/��*���� .�ก)ก� 3�กC�:�[�,�6� �� ก���/�/� ,���ก�,� �������������6� �� ก����:���/��+���5�:�[�,�������������6� �� ก���ก���� ก���z� �� (Plinth) �:���/�:�[�,)ก�/ก�����786�� ��� �8� �:�)*,��[ ��)*+�� 3/, �o55�����)ก���*,��ก��ก�����/�� 3/,�ก� � �/*���� ., ����K �:�� , ����K �:����3��786�� ��)*+�� (���ก�K�) ��01�*��ก���/��/ ���� �����5�ก �:�� �ก*����)*+�� ก���)�����9ก�����/�����ก��/,�ก���)�����9*,�1�ก�����/��*���� .'��[ ��)*+�� �/3/,5�ก Hydrostatic Settlement Gauge ���ก���)�����9*,�1�ก�����/��� 0� )*+�� ����/3/,5�ก Crest Settlement Point

4.1.1 Hydrostatic Settlement Gauge (HS)

Hydrostatic Settlement Gauge )�- )��+���+����[�,��5�/ก��)����� ���������/��'��[ ��)*+�� /�0���.��5�/3/, /� Settlement Gauge �����/����ก��5��'��[ ��)*+�� ����5:� �����/ 9 5�/ /���0/�[ '�$��� 7 /�������3/,5��0/�ก�����/�� (Settlement)��+�ก���ก�� (Heave) K �:��� �� �� a )����ก���:��� �����)�- 5�/�,�����'�� �ก��)*+�� ���กก���:��� *�� Hydrostatic Settlement Gauge [�,���กก��)�+� ก���� �/��/��[ �� ก��0�,�� /�[�,0�������/�� �:� Hydrostatic Settlement Gauge ���ก��/,�ก,� �/��/�� �:������/����[ Terminal Structures 78����1�/,� �ก��)*+�� 5�)�+�����ก�� Gauge �����1�'��[ ��)*+�� ก����� ���ก�����/�� �� �,���:�ก����/ �:� /�ก���o� �:���ก�����ก�� ก���/)$+�����5�3����ก��[ ���/�ก,()�u/ Valve2,3)�����/ �:�)$+��3����ก�������ก� �����1�[ Gauge '��[ ��)*+�� ()�u/ Valve2,�u/Valve3) 5 �:�3����ก5�ก��� Drain ����5�ก �� �u/Valve2 �u/�o� �:����)�u/ Valve3 ��,�/��/�� �:�[ ���/�ก,กC5�����ก�����/��*��

�� .[ ��)*+�� /���0/�'�$��� 8 �����3�กC��[ ก��[�,�� 5����ก��/�/����)��+���+�)$+��[�,��� ���3/,���1�������ก:�� /

L��G� 7 �:��� �������ก&K�)��+���+� Hydrostatic Settlement Gauge

L��G� 8 ���กก���:��� *�� Hydrostatic Settlement Gauge

4.1.1.1 ]�ก��G�M������������ ก����/��� �)��+���+��/ก�����/��'��[ ��)*+�� 5�

/:�) � ก��)+��ก���/��/�� ..8���/�������/���� Hydrostatic Settlement Gauge 5�ก �� 58�0���.)���ก����5�/ก�����/��*����� �� �����1�[�,)��+���+� �� 3/, /���� �� . ��3/,)ก�/ก�����/��)ก�/*8� ��,���0� ก�� ก����/����)��+���+� ก��.�0/�)� +���/�������/����)��+���+��/ ��)0+� )�- �:�� �กก/���0��6�[�,�� ./,� ����)ก�/ก�����/�� [ ���������ก��ก��0�,�����)กC� �:��������ก5�$���)ก�/ก�����/��01� /���0/�[ '�$��� 9-11 78��0��)ก�3/,��ก�����/��[ /,� )� +� �:�)ก�/*8� ,��ก�����)K�ก ก���)*+�� ���/,� �,�� �:� ���� ��)�- )$�����/����

Page 5: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

z� ��ก*��)*+�� ���)K/,� )� +� �:�01����)K�ก ก���)*+�� ���/,� �,�� �:�

6�ก�����/��*���� .)*+�� �� ,��)+��$�5��K���0�$� �9ก�����/��*���� .ก������)��������ก��ก��0�,��������)กC�ก�ก �:� /���0/�[ '�$��� 12-14 ���0������ก�����/��*���� .���)ก�/*8� 5���)�����)����ก�����ก�����/��5�กก����/ก��K9 /�ก����ก���[ ���'������ก��ก��0�,��)*+�� )0�C5���)���)กC� �:� /���0/��������� 2 5�)�C 3/,�����ก�����/�����)ก�/*8� 5���ก�����5�กก����/ก��K9ก����ก���������ก����ก� �ก���0��)ก�3/,�����)��������ก��ก��0�,���� .)0�C5ก�����)��ก��0�,�� Concrete Face Slab )0�C5���������ก�����/����1�

L��G� 9 ก�����/��*���� .�����/�� +76.00 *�� HS 1,2,3

L��G� 10 ก�����/��*���� .�����/�� +96.00 *�� HS 4,5,6

L��G� 11 ก�����/��*���� .�����/�� +116.00 *�� HS 7,8,9

L��G� 12 ก�����/��*���� .ก�����)������a (HS1,4,7)

L��G� 13 ก�����/��*���� .ก�����)������a (HS2,5,8)

L��G� 14 ก�����/��*���� .ก�����)������a (HS3,6,9)

�����G� 2 ���ก�����/��*���� .���)ก�/*8� 5���)�����)����ก�����ก�����/��5�กก����/ก��K9 /�ก����ก���

N �����G� �����(� � �ก��G�M������������ � �ก��G�M��������������กก����ก"$$(�.) G� ก���*%�����(�.)

'������ก��ก��0�,��)*+�� )0�C5 0.43 1.935)���)กC� �:� 0.45 1.944

6�ก�����/��*���� .[ ���������ก��ก��0�,�����

)���)กC� �:��0/�/��'�$��� 15-17 5�)�C 3/,��ก�����/��*���� .)ก�/*8� [ �����3�กC������ก��ก��0�,���6� �� ก���/�/� ,� (Concrete Face Slab) $����ก�����/��*���� .��1��,�� /�){$�������/��+96.00 .8�0� )*+�� (HS7,8,9) /��'�$��� 17 0:��������ก�����/��*���� .����5�กก��0�,��ก:��$�ก� ��+� )0�C5 (Wave wall) ���)���)กC� �:��������ก$������������ก�����/��*���� . ,��

Page 6: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

����!�����U�ก��G�M����ก�$����!���������� (HS1,2,3)

-1,000

-900

-800

-700

-600

-500

-400

-300

-200

-100

0

100

3-Feb

-075-M

ar-07

4-Apr-

074-M

ay-07

3-Jun

-073-J

ul-07

2-Aug

-071-S

ep-07

1-Oct-

0731

-Oct-

0730

-Nov

-0730

-Dec

-0729

-Jan-0

828

-Feb

-0829

-Mar-

0828

-Apr-

0828

-May

-0827

-Jun-0

827

-Jul-0

826

-Aug

-0825

-Sep

-0825

-Oct-

0824

-Nov

-0824

-Dec

-0823

-Jan-0

922

-Feb

-0924

-Mar-

0923

-Apr-

0923

-May

-0922

-Jun-0

922

-Jul-0

921

-Aug

-0920

-Sep

-0920

-Oct-

0919

-Nov

-09

���

Settl

emen

t(mm.

)

0

10

20

30

40

50

60

70

Fille

d Heig

ht(m

.)

Settlement1

Settlement2

Settlement3

Fill Height1

Fill Height2

Fill Height3

L��G� 15 ก�����/��*���� .�����/�� +76.00 ( HS1,2,3 )

����!�����U�ก��G�M����ก�$����!���������� (HS4,5,6)

-2,200

-2,000

-1,800

-1,600

-1,400

-1,200

-1,000

-800

-600

-400

-200

0

19-M

ar-07

18-A

pr-07

18-M

ay-07

17-Ju

n-07

17-Ju

l-07

16-A

ug-07

15-Se

p-07

15-O

ct-07

14-N

ov-07

14-D

ec-07

13-Ja

n-08

12-Fe

b-08

13-M

ar-08

12-A

pr-08

12-M

ay-08

11-Ju

n-08

11-Ju

l-08

10-A

ug-08

9-Sep

-089-O

ct-08

8-Nov

-088-D

ec-08

7-Jan

-096-F

eb-09

8-Mar-

097-A

pr-09

7-May

-096-J

un-09

6-Jul-

095-A

ug-09

4-Sep

-094-O

ct-09

3-Nov

-093-D

ec-09

2-Jan

-101-F

eb-10

���

Settl

emen

t(mm

.)

0

5

10

15

20

25

30

35

40

Filled

Heig

ht(m

.)

Settlement4

Settlement5

Settlement6

Fill Height4

Fill Height5

Fill Height6

L��G� 16 ก�����/��*���� .�����/�� +96.00 ( HS4,5,6 )

����!�����U�ก��G�M����ก�$����!���������� (HS7,8,9)

-750-700-650-600-550-500-450-400-350-300-250-200-150-100-50

0

24-N

ov-07

24-D

ec-07

23-Ja

n-08

22-F

eb-08

23-M

ar-08

22-A

pr-08

22-M

ay-08

21-Ju

n-08

21-Ju

l-08

20-A

ug-08

19-S

ep-08

19-O

ct-08

18-N

ov-08

18-D

ec-08

17-Ja

n-09

16-F

eb-09

18-M

ar-09

17-A

pr-09

17-M

ay-09

16-Ju

n-09

16-Ju

l-09

15-A

ug-09

14-S

ep-09

14-O

ct-09

���

Settl

emen

t(mm.

)

0

2

4

6

8

10

12

14

16

18

20

Fille

d Heig

ht(m

.)

Settlement7

Settlement8

Settlement9

Fill Height7

Fill Height8

Fill Height9

L��G� 17 ก�����/��*���� .�����/�� +116.00 ( HS7,8,9 )

ก�����/��*��)*+�� ���0�$� �9ก������K �:�� ����ก���)K��)*+�� /�������ก����:�ก����5�/��� �*���� .� Settlement Gauge ���3�01��ก)+���� �ก0�0�ก3/,)ก�/ก�����/���������3�3/,�ก��.)*+�� )$�� ('�$��� 18) 0:�����ก�K����)ก�/ �:�3��6�� ��)*+�� /����/�� �:���1�01�ก����/��Settlement Gauge �����/��+76.00 /�� �� )��+���+� Hydrostatic Settlement Gauge �����/����'��[ ��)*+�� 58��/��/�� �:������1�/,� � Settlement Gauge /���0/�[ '�$��� 19 ��� 20 �����3�กC���o55�����ก����6����ก�����/��*���� .�����

)ก���*,��ก����01�*��ก���/��//���0/�[ '�$��� 21 ก���3/,��)+��)$����01�*��ก��.�/��/ก�����/��*���� .กC5�)$��*8� ���)+��ก�����/��.8���/��� 8����,�� )���)ก�/ก��� � ���ก �:�� �ก*���� .���)$��*8� 58�)����6� ,�������ก�����/��

ความสัมพันธการทรุดตัวกับปริมาณน้ําฝน

0

20

40

60

80

100

120

140

19/3

/200

7

9/4/

2007

30/4

/200

7

21/5

/200

7

11/6

/200

7

2/7/

2007

23/7

/200

7

13/8

/200

7

3/9/

2007

24/9

/200

7

15/1

0/20

07

5/11

/200

7

26/1

1/20

07

17/1

2/20

07

7/1/

2008

28/1

/200

8

18/2

/200

8

10/3

/200

8

31/3

/200

8

21/4

/200

8

12/5

/200

8

2/6/

2008

23/6

/200

8

14/7

/200

8

4/8/

2008

25/8

/200

8

15/9

/200

8

6/10

/200

8

27/1

0/20

08

17/1

1/20

08

8/12

/200

8

29/1

2/20

08

19/1

/200

9

9/2/

2009

2/3/

2009

23/3

/200

9

Date

Rai

nfa

ll(m

m.)

-2,500

-2,000

-1,500

-1,000

-500

0

Set

tlem

ent

(mm

.)

Rainfall

Settlement 4

Settlement 5

Settlement 6

L��G� 18 ก�����/��*���� .0�$� �9ก������K �:��

����!�����U�ก��G�M����ก�$����$�%&������� ��N ���%&�d*�] ������� ��(HS1,2,3)

-1,000

-800

-600

-400

-200

0

2003-F

eb-07

24-Fe

b-07

17-M

ar-07

7-Apr-

0728

-Apr-

0719

-May

-079-J

un-07

30-Ju

n-07

21-Ju

l-07

11-A

ug-07

1-Sep

-0722

-Sep-0

713

-Oct-

073-N

ov-07

24-N

ov-07

15-D

ec-07

5-Jan

-0826

-Jan-0

816

-Feb-0

88-M

ar-08

29-M

ar-08

19-A

pr-08

10-M

ay-08

31-M

ay-08

21-Ju

n-08

12-Ju

l-08

2-Aug

-0823

-Aug

-0813

-Sep-0

84-O

ct-08

25-O

ct-08

15-N

ov-08

6-Dec

-0827

-Dec

-0817

-Jan-0

97-F

eb-09

28-Fe

b-09

21-M

ar-09

���

ก��G

�M����

(��.

)

60

65

70

75

80

85

90

95

100

����$

�%&���

���� ��

(�.�G

ก.)

Settlement (HS1)

Settlement (HS2)

Settlement(HS3)

��/�� �:�� ,�)*+��

L��G� 19 ��6�/$��/[ ก����� ���ก�����/��*�� HS1,2,3

L��G� 20 3��6�� ��)*+�� �� ,�� ( Flow Through )

Completion of dam embankment

Finished concrete face slab 14-19

First Filling

Finished concrete face slab (21ก.�.51)

Filling of rockfill after Wave wall

Max. WL @ first filling

Completion of dam embankment

Finished concrete face slab 14-19

First Filling

Filling of rockfill after Wave wall

Max. WL@ first filling

Completion of dam embankment

Finished concrete face slab 14-19 First

Filling Filling of rockfill after Wave wall

Max. WL@ first filling

Finished concrete face slab (21ก.�.51)

Finished concrete face slab (21ก.�.51)

Page 7: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

L��G� 21 ก�����/��*���� .0�$� �9ก����01�ก���/��/

4.1.1.2 ก����������k�����!���������� �� ��� /1��0*���� .(Rockfill vertical deformation

modulus) )�- ��� /1��0[ ������ก��ก��0�,��0���.��3/, /�������%&������0��ก Fitzpatrick et al (1985) [3] 3/,)0 �ก������K����� /1��0*���� .��0ก����� 1����0/�[ '�$��� 22 /�[ ก�K�*��)*+�� �� ,��0���.�)�����93/,/���0/�[ '�$��� 23 /�� ������� �:�� �ก�� .)� +�)7���� strain �� ก�����/����� )����ก����01��� .[�,)7� ��0�$� �9������ stress ก�� strain �� ,)�- )0, ��� �����ก���/��+�$�กก��.)*+�� 5�� strain )$��*8� .8��,��3�)$�� stress 6�ก������K�� /1��0*���� .)*+�� �� ,���0/�[ '�$���24 /1��0*���� ./,� )� +� �:����� 3.50-27.21 MPa � �ก )*+�� ���� 5.52-21.71 MPa ���/,� �,�� �:�����3.56-20.264 MPa 78��5�)�C ��/,� )� +� �:�� /1��001�ก��/,� �,�� �:����:�/�������� /1��0*���� .���� ,��ก��)*+�� ��ก&K�)/��ก� /���0/�[ �������� 3 [8] ��� /1��0����)�����93/, ��0���. :�3��)�����9[ ���5:����)$+���8ก&�$%��ก��ก�����/�����ก��)��+�� ��*��)*+�� [ ���������ก��ก��0�,�����)+������/� �:��ก���:������/��)กC�ก�ก����a�����ก��)��+�� ��*���6� �� ก���/�/� ,�

s1rc HdE δγ /= (1) )+�� Erc = /1��0*���� .������ก��ก��0�,�� γ = ��� �� � *����� . H = ��01�*���� .)� +�)��+���+��/ (�1���� 19) d1= ��01�*���� .[�,)��+���+��/ δs= ���ก�����/��

L��G� 22 ก���)�����9 /1��0������ก��ก��0�,�� [3]

L��G� 23 Stress-strain relationship *���� .)*+��

L��G� 24 ��� /1��0�+/���� [ � /���*���� .)*+��

�����G� 3 ��� /1��0*���� .������K'�$��:�(Weak Rock) [8] ����N�%�G� ����!� �������"� �"��� Modulus

(%) (���/�.3) of compressibility

(MPa)

Da�ao Weathered sandstone - - 21-62

Yuitao Mudstone 6 2.28 6.5-54.8

Panshitou Shale 3 2.06 13.8-40.1

Shuibuya Shale 8.4 2 -

Shisanling Weathered basalt - - 16.5-52.1

�� �� ��!�M��

Page 8: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

4.1.2 Crest Settlement Point (CS)

Crest Settlement Point )�- )��+���+��/��50��ก�����/��*��)*+�� ��/����� Wave Wall ��กa 100 )���5:� �����/ 6 �:��� �� ���ก&K�)�- ���� Stainless Steel Ø12 mm.�� 20cm. /��:�ก���o�� 0� *�� Wave Wall ����ก��)����)5���1* �/ Ø 50 mm. �8ก 20 cm. ��ก&K�)��+���+�/���0/�[ '�$��� 25

L��G� 25 ��ก&K�)��+���+� Crest Settlement Point

Crest Settlement Point �/ก�����/�������/��0� )*+�� )+��)*+�� 3/,ก��0�,��)0�C5��,��+�3�� �:�� �กก���:������)*+�� ��ก ก����5�//:�) � ก������ก��ก��0�,��5���ก.8�ก��)����� ����*����/��0� )*+�� )+��)���)กC�ก�ก �:�[ �������ก���)+��[�,�� )*+��

[ �����ก*��ก����5�/$%��ก��ก�����/�����ก:��$�ก� ��+� ����5�ก0�� 0�/ก��ก��0�,�����)กC� �:�����ก����ก�����/����ก���0�/ K STA. 0+400 ����K 0.094 )�� /���0/�[ '�$��� 26 ������ก�����/�����3�)ก� ��� Design Line (+135.00.��ก.) 5�)�C ����������ก�����/�����3������78��������ก�����/��� 0� )*+�� 0.25 ./)/+� /��ก��5�กก����ก�����������ก�����/�����0� )*+�� 3�)ก� 0.5 ./)/+� [1] 78��5��:�[�,3�)ก�/� �����[ �� ก���/�/� ,�5 �:�[�,)ก�/ก����ก�,�3/, ���ก�����/�����0� )*+�� �)���ก�� 0.094 )�� [ ก����ก������ก�����/���,��3�)ก� �,���� 1 *����01�����)���ก�� 0.75 )��[1] 5�)�C 3/,�������ก�����/��� 0� )*+�� ���� ,��ก��5�กก����ก���78����1�[ )กK�9������/'��

L��G� 26 6�ก�����/�����ก:��$�ก� ��+� CS1-CS6

4.2 ��� ��������ก����� ��������"] ����ก����������

ก��)��+�� �����ก��)����� �1�*���6� �� ก���/�/� ,� )ก�/5�ก���'�� �ก����ก���:������)*+�� �������/� �:����/,� )� +� �:�,���/� �����[�,z� )*+�� ,���5�ก �:�� �ก*����)*+�� ก�����/�������ก����ก� *���0/��� .��5�:�[�,)ก�/ก����ก*���6� �� ก���/�/� ,� ���)K���0���.�:�[�,)ก�/ก����ก��+�)ก�/ก��)��+�� ��3/, �+� ���)K�������������6� �� ก���ก���6� �� ก���������)K�������6� �� ก���ก���� ก���z� �� (Plinth) ������)K Permetric Joint )��+���+����[�,��5�/$%��ก��ก��)��+�� �����ก��)����� �1�*���6� �� ก���/�/� ,� ���ก��/,� 1.����/ก��)��+�� ��*���6� �� ก���(Inclinometer) 2. ����/ก��)��+�� �������������� (Joint Meter) 3. ����/ก��)��+�� ���������6� �� ก���/�/� ,�ก���� ก���z� �� (Permetric Joint Meter) 4.����/ก���+/�/��*��6��� ก��� (Strain Meter) 5.����/ก���+/�/��*����� ก���[�,��� 6��� ก���/�/� ,� (Non � Stress Strain Meter)

CS1 CS2 CS3 CS4 CS5 CS6

CS6

ก��G�M���� Crest Settlement Point

134.90

135.00

135.10

135.20

135.30

135.40

135.50

135.60

135.70

135.80

STA.(KM.)

ELEV

ATIO

N(mM

SL.)

Settlement 24�.�.52Settlement 16$.�.52Settlement 23ก.�.52

Design Line 135.00 �.�Gก

CS1

CS2

CS3

CS4

CS5

CS6

CS3

Page 9: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

4.2.1 �������ก��kก �������"] ����ก���������� (Inclinometer,IN)

ก�����/����+������*���6� �� ก���/�/� ,�)ก�/5�ก�0/�����������6� �� ก���/�/� ,�)ก�/ก�����/��) +���5�ก���ก���:�*�� �:� ��K'�$ก���/��/�� . �3�.8��1�����*��� ,���/���0'�$z� ��ก)*+�� '�$��� 27 [4] �0/�[�,)�C ��[ ������ก��ก��0�,����/)*+�� ���/,� )� +� �:�����,�� �:�5�)ก�/ก������� ���)+��3/,)กC� �:���/�� ���/,� )� +� �:�5����/�����)��+�� ���3����/,� �,�� �:� ก��)��+�� �� ����5ก��[�,)ก�/ก����ก*���6� �� ก���/�/� ,���� :�3�01�ก��3��78*�� �:�6�� �����ก

L��G� 27 ก�����/��*��)*+�� CFRD ����ก��ก��0�,�����)กC� �:� [4]

Inclinometer )�- )��+���+���5�/ก�� ก����*�� Concrete Face Slab ��/��������/)*+�� /,� )� +� �:��5:� �����/ 3 �:��� �� ���ก�K9 �����ก&K�)�- �����1� ) �� (Aluminium Tube) ����� �� 3 )�� /���ก&K�*�����5�������ก 4 ����[ � 900 )$+��)�- ���������ก��)��+�� ���*������/[�,)�- 3�������������,��ก��/���0/�[ '�$��� 28

L��G� 28 ��ก&K�)��+���+� Inclinometer ��/��������/)*+��

���ก�� ก����*���6� �� ก���/�/� ,�3/,)������ ����������ก��0�,��)*+�� )0�C55 ก������)���)กC� �:��������ก 6�ก����5�/ก�� ก����*���6� �� ก���/�/� ,����� 3 � ,���/ �0/�/��'�$��� 29 �ก ����)�- ����������/)����*���� ก���/�/� ,�����ก � �0/����ก��)��+�� ��[ � ����{�กก������/)*+�� ���ก�� ก�����ก���0�/)ก�/*8� ������)K� ,���/�8ก���0�/ IN2 ����ก�� ก��������K 450 . 78��3�3/,��1�[ *��)*�ก�����/��*��)*+�� CFRD �+� a [4] (Marques et al, 1985) /���0/�'�$��� 30 ���)+��)�����)�������ก�� ก����*���6� �� ก���/�/� ,�5�กก����/ก��K9��ก���[ ���)กC�ก�ก �:�����)���ก�� 0.22 .[2] $������ก�� ก�������)ก�/*8� 5��������กก�����5�กก����ก���

(IN 1) (IN 2)

(IN 3)

L��G� 29 6�ก����5�/ก�� ก����*���6� �� ก��� IN 1,2,3

DISPLACEMENT FACE SLAB (Perpendicular to Dam Axis):IN 2

-120.00

-110.00

-100.00

-90.00

-80.00

-70.00

-60.00

-50.00

-40.00

-30.00

-20.00

-10.00

0.00

-100 -50 0 50 100

150

200

250

300

350

400

450

500

Displacement (mm.)

Dep

th (

m.)

62.533

72.533

82.533

92.533

102.533

112.533

122.533

132.533

142.533

152.533

162.533

172.533

182.533

Ele

vati

on

( ม.ร

ทก

)

Initial

3/10/51,WL +87.16

5/12/51,WL +108.90

9/12/51,WL +109.26

15/12/51,WL +109.64

18/12/51,WL +109.80

21/12/51,WL +109.95

24/12/51,WL +110.09

26/9/51,WL +95.93

Page 10: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

L��G� 30 ก�� ก����*���6� �� ก���*��)*+�� CFRD

(Marques et al, 1985) [4]

4.2.2 �������ก����� ��������� ������ � (Joint Meter) Joint Meter )�- )��+���+����[�,[ ก����50�����

��ก�������6� �� ก���/�/� ,�*��������6��5:� 3 5�/ /���ก&K�*�����ก�K95�)�- ��� Embedment Joint Meter 5��:�ก����/���� /��8/��/ก��)��Cก)0, )0���� ก������)K������� /���(Vertical Joint) *������6� �0/�[ '�$��� 31

L��G� 31 ��ก&K�)��+���+� Joint Meter ��/�����������6� �� ก���

ก��)��+�� ��*���6� �� ก���/�/� ,����)K������������6� (Vertical Construction Joint) $��� JM2 � ก����:� �:��ก��)��+�� ��)*,���ก� ����01�0�/ 0.31 .�0/���)ก�/�����/[ �6� �� ก��� ��� JM1,JM3 � �� Abutment ����0��*,���ก��)��+�� ����ก��ก5�กก� ����01�0�/ 0.263 .��� 0.056 .���:�/���0/���)ก�/���/8�[ �6� �� ก��� �0/�[ '�$��� 32,33 �0/�������������)ก�/*8� *���6� �� ก���[4] )+��)�����)�������ก��)��+�� ��ก����/�� �:�� ,�)*+�� �0/�[�,)�C �����/� �:�������$� ,�����ก��)��+�� �� �����3�กC��)+��)�����)�������ก��)��+�� ��ก��)*+�� CFRD �+� a [4] (Marques et al, 1985) /��'�$��� 34 $�����1�[ *��)*�ก��)��+�� ��*���������6� �� ก��� ���)+��)�����)�������ก��)��+�� ��*��������*���6� �� ก���/�/� ,�5�กก����/ก��K9��ก���[ *K�)กC� �:�����ก78��5��,������3�)ก� 4 7.[1] $�������3�

)ก� ������)� 3,)�� )/��ก� /�� �� ����Kก��)��+�� �����)ก�/*8� 5������� ,��ก�����5�กก����ก����������/)5

L��G� 32 ก��)��+�� ��*���6� �� ก��� JM1,JM2 ��� JM3

L��G� 33 ��ก&K�*�����ก���:�*���6� �� /�/ก���� ,� [4]

L��G� 34 ก��)��+�� ��*���������6� �� ก���*��)*+�� CFRD

(Marques et al, 1985)

4.2.3 �������ก����� ��������� ��"] ����ก������

����ก�$���ก���s����� (Perimetric Joint Meter,PM) ���)K�������������6� �� ก���/�/� ,�ก��Plinth 3/,

��/���� Perimetric Joint Meter )$+����50��ก��)��+�� ��*�������� /�5��ก����/����)$+����5�/������ 3 ������ �+� ����{�กก��������(Opening,Normal to Perimetric Joint) � * � ก��������(Shear,Parallel to Perimetric Joint) ���� /��� (Settlement,Normal to concrete face slab) �0/�[ '�$��� 35

Page 11: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

L��G� 35 Perimetric Joint Meter ���������ก��)��+�� ��

ก��)��+�� ��*���������������6� �� ก���/�/� ,�ก��

Plinth $������ก��)��+�� ������ ,��ก��10 . �0/�[ '�$��� 36-38 /���� PM2,5,8 �0/�ก��)��+�� ��[ � Opening,Normal to Perimetric Joint $�������ก��)��+�� ����ก5�กก� ���� 3 � /�����01�0�/ PM2 = 4.58 . PM5 = 8.14 .��� PM8 = 2.28 . /����0�$� �9ก��ก��)$����/�� �:��������/)5 PM1,4,7 �0/�ก��)��+�� ��[ � Settlement,Normal to concrete face slab $����ก��)��+�� �� ,����� PM4 � ก�����:� �:��ก�����/���ก���� 1.17 .��� ���0�$� �9ก����/�� �:�/,� � ,�)*+�� /��'�$��� 39 PM3,6,9 �0/�ก��)��+�� ��[ � Shear,Parallel to Perimetric Joint $����ก��)��+�� �� ,�� /�����01�0�/ 0.291 .

ก��)��+�� �����)Kก����:� �:� (PM4,5,6) 0��)ก�3/,�� PM4 �0/�ก��)��+�� ��[ � Settlement,Normal to concrete face slab �ก�����/��*���6� �� ก��� ��� PM5 �ก��)��+�� ����ก�������������6� �� ก���ก��Plinth

)+��)�����)����ก��)��+�� ��*��������ก��)*+�� CFRD �+� a /���0/�[ '�$��� 40 (Marques, 1985)[4] $�����1�[ *��)*�ก��)��+�� ��*���������6� �� ก��� ���)+��)�����)�������ก��)��+�� ��*������������a*���6� �� ก���/�/� ,����)ก�/*8� 5������� ,��ก�����5�กก����/ก��K9��ก���[ *K�)กC� �:�����ก5��,������3�)ก� 4 7.[1]

L��G� 36 ก��)��+�� ��� Opening,Normal to Perimetric Joint

L��G� 37 ก��)��+�� ��� Settlement,Normal to concrete face slab

L��G� 38 ก��)��+�� ��� Shear,Parallel to Perimetric Joint

L��G� 39 ก��)��+�� ��� Opening ���0�$� �9ก����/�� �:�� ,�)*+��

Page 12: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

L��G� 40 ก��)��+�� ��������)*+�� CFRD (Marques et al., 1985) [4]

4.2.4 �������ก���� ����� �����"] ����ก��� (Strain Meter,SM)

Strain Meter )�- )��+���+����[�,�/ก��)����� �1�����*�� ���0�,�� K 5�/����a /���/������5�/���)K6�� ,�*���6� �� ก����5:� �����/ 6 5�/ ก����/���� Strain Meter )�- ��� Rosette 45 ���� �0/�[ '�$��� 41 ���ก��/,� ��)����/[ 3 ������ �+� ����������{�กก���ก )*+�� ��������� �ก )*+�� ����������:�� 45 ����ก��� �ก )*+��

L��G� 41 ��ก&K�)��+���+� Strain Meter ���ก����/����

4.2.4 �������ก���� ����� �����������ก���t��N�%�

���"] ����ก���������� (Non u Stress Strain Meter,NSM) Non � Stress Strain Meter )�- )��+���+���5�/ก��

)����� �1�*����� ก������)K��/)*+�� [�,��� �6� �� ก���/�/� ,� �5:� �����/ 6 �:��� �����ก&K�)�� )/��ก�����ก�K9 Strain Meter ���5��������ก����/�������ก�K9� �/ �� Meter 5��o���1�[ Steel Case �0/�[ '�$��� 42

L��G� 42 ��ก&K�)��+���+� Non-Stress Strain Meter ���ก����/����

6�ก��)���� � �1��� ��*����� ก���[�,��� �6� �� ก���/�/� ,� �0/�[ '�$��� 43 $���NSM1-6 �����ก5�����ก��)����� �1�*����� ก������ *,���ก)ก�/5�ก0�)���ก��)����� ���� Temperature ,Chemical Change ��� Shrinkage and Expansion ����������ก��)����� ����)��������

L��G� 43 ก��)����� �����1�����*����� ก���[�,�6� �� ก���

��)����/��� )ก�/*8� [ �6� �� ก������ )ก�/5�กก��

)����� �������ก���:������)/������������)0�C5ก��ก��0�,��5 )���)กC� �:� ก��)����� ������)����/���� 3 ������ �,���ก�������ก,���5�ก)��+���+��/ Strain Meter ��� Non-Stress Strain Meter /���������� 3/,5�ก Strain Meter )�- ������)ก�/5�กก��)����� ������)����/5�ก�����$� Load , Temperature Chemical Change ��� Shrinkage and Expansion 0� ��������� 3/,5�กNon-Stress Strain Meter )�- ������)ก�/5�กก��)����� ������)����/5�ก Temperature ,Chemical Change ��� Shrinkage and Expansion /��� �� ก��$�5��K��������)����/���)ก�/5�ก���ก���:� �� 5��,�� :������)����/������ 5�ก Non-Stress Strain Meter ���ก��ก5�ก��������� 3/,5�ก Strain Meter /��'�$��� 44 $��������)����/���)ก�/*8� [ �6� �� ก�����������K 363x10-6 78�����ก����)����/*���� ก����,��3�)ก� 0.00333 /�� �� [ *K����)กC�*,�1��6� �� ก���/�/� ,�3��

Page 13: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

� ,���5���ก�,�) +���5�ก �:�� �ก �:��ก���:���+�ก��)��+�� ���ก�ก��

ปรับแกคา Strain Meter No.1

-400.0

-350.0

-300.0

-250.0

-200.0

-150.0

-100.0

-50.0

0.0

50.0

100.0

30-A

ug-0

8

6-S

ep-0

8

13-S

ep-0

8

20-S

ep-0

8

27-S

ep-0

8

4-O

ct-0

8

11-O

ct-0

8

18-O

ct-0

8

25-O

ct-0

8

1-N

ov-0

8

8-N

ov-0

8

15-N

ov-0

8

22-N

ov-0

8

29-N

ov-0

8

6-D

ec-0

8

13-D

ec-0

8

20-D

ec-0

8

27-D

ec-0

8

3-Ja

n-09

10-J

an-0

9

17-J

an-0

9

24-J

an-0

9

31-J

an-0

9

7-F

eb-0

9

14-F

eb-0

9

Date

Mic

rost

rain

Angle 0

Angle 45

Angle 90

L��G� 44 ��)����/5�กก��)����� �������ก���:� (SM1)

5. ก�����$G��$����ก����� ��"������ก�$�� �� Concrete Face Rockfill Dam �� �v

5.1 ��0�$� �9���������ก��ก��0�,��)*+�� �� .��01�*��)*+�� ������)��[ ก��ก��0�,�� [5] �0/�[ '�$��� 45

L��G� 45 �0/���0�$� �9��������ก��ก��0�,�� ��01�������)��ก��0�,��)*+��

5.2 ��0�$� �9��� Density *���� .)*+�� Concrete Face Rockfill Dam [6,7] /���0/�[ '�$��� 46

L��G� 46 ������ � *���� .)*+�� Concrete Face Rockfill Dam

5.3 ��0�$� �9*����� Void Ratio *���� .)*+��

Concrete Face Rockfill Dam [6,7] �0/�[ '�$��� 47

0.19 0.

22 0.23

0.26 0.27

7

0.2

0.33

0.24

0.30

8

0.29

0.27

0.23

0.18

0.23

4 0.29

0.41

0.25 0.26

60.

380.

262

0.2 0.

230.

230.

215 0.

302

0.47

0.27

0.20

4

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

Vo

id R

atio

Agu

amilp

aA

lto A

nchi

caya

Bas

tyan

Cet

hana

Che

ngbi

ngC

ogsw

ell

Cou

rtrig

htC

rotty

Dix

Riv

erF

oz D

o A

reia

Gol

illas Ita

Kan

garo

o C

reek

Kha

o La

emK

otm

ale

Littl

e P

ara

Low

er B

ear

No.

1Lo

wer

Bea

r N

o.2

Mac

kint

osh

Man

grov

e C

reek

Mur

chis

onR

eece

Sal

t Spr

ings

Sal

vajin

aS

cotts

Pea

kS

egre

doS

erpe

ntin

eS

hiro

roT

ians

heng

qia

Tul

laba

rdin

eW

hite

Spu

rW

inne

keW

isho

nX

ingo

Da'

ao D

amY

utia

oP

ansh

itou

Shu

ibuy

aS

hisa

nlin

gK

hwae

Noi

Dam

Void Ratio of Rockfill

L��G� 47 ��� Void Ratio*���� .)*+�� Concrete Face Rockfill Dam

5.4 ��0�$� �9��������01�*��)*+�� ก�����

Maximum internal settlement [5] �0/�[ '�$��� 48 /������� Maximum internal settlement �:� K3/,5�ก0ก�� 2 Maximum internal settlement = ∞ x Height (2 ) )+����� ∞ = 0.01-0.0229 (High Dam) ∞ = 0.005-0.01 (Medium Dam) ∞ = 0.001-0.005 (Small Dam)

L��G� 48 ��0�$� �9��������01�)*+�� ก��Maximum internal settlement

Page 14: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

5.5 ��0�$� �9*����� Construction modulus *���� .)*+�� �� ./�/� ,��� ก��� [6,7] �0/�[ '�$��� 49

19

014

5 160

135

78

500

3221

060 45 50 4075

225

160

390

4511

576

4590

180

3462 54

.840

.1 52.1

27.2

1

0

50

100

150

200

250

300

350

400

450

500

Mo

du

lus(

Mp

a.)

Agu

amilp

aA

lto A

nchi

caya

Bas

tyan

Cet

hana

Che

ngbi

ngC

ogsw

ell

Cou

rtrig

htC

rotty

Dix

Riv

erF

oz D

o A

reia

Gol

illas Ita

Kan

garo

o C

reek

Kha

o La

emK

otm

ale

Littl

e P

ara

Low

er B

ear

No.

1Lo

wer

Bea

r N

o.2

Mac

kint

osh

Man

grov

e C

reek

Mur

chis

onR

eece

Sal

t Spr

ings

Sal

vajin

aS

cotts

Pea

kS

egre

doS

erpe

ntin

eS

hiro

roT

ians

heng

qia

Tul

laba

rdin

eW

hite

Spu

rW

inne

keW

isho

nX

ingo

Da'

ao D

amY

utia

oP

ansh

itou

Shu

ibuy

aS

hisa

nlin

gK

hwae

Noi

Dam

Deformation modulus during construction

L��G� 49 /1��0�� . Concrete Face Rockfill Dam

5.6 ��0�$� �9��������� Construction modulus ก��

Void Ratio[5] �0/�[ '�$��� 50 /�)*+�� �� ,������ Construction modulus )���ก�� 27.21 MPa., Shape factor )���ก�� 5.79 ���Void ratio )���ก�� 0.201

L��G� 50 ��0�$� �9���Construction modulus�� .ก�� Void Ratio

5.7 ��0�$� �9��������� Construction modulus,Void Ratio ��� Shape factor [5] �0/�[ '�$��� 51

L��G� 51 ��0�$� �9������Construction modulus Void Ratio ��� Shape factor

5.10 ��0�$� �9���������ก��)��+�� ��*��Perimetric Joint �����������ก����01�)*+�� *��)*+�� Concrete Face Rockfill Dam [6,7] �0/�[ '�$��� 52

Perimetric Joint Movement

020406080

100120140160180200220240260

Agu

amilp

a

Alto

Anc

hica

ya

Bas

tyan

Cet

hana

Che

ngbi

ng

Cog

swel

l

Cou

rtrig

ht

Cro

tty

Dix

Riv

er

Foz

Do

Are

ia

Gol

illas Ita

Kan

garo

o C

reek

Kha

o La

em

Kot

mal

e

Littl

e P

ara

Low

er B

ear

No.

1

Low

er B

ear

No.

2

Mac

kint

osh

Man

grov

e C

reek

Mur

chis

on

Ree

ce

Sal

t Spr

ings

Sal

vajin

a

Sco

tts P

eak

Seg

redo

Ser

pent

ine

Shi

roro

Tia

nshe

ngqi

a

Tul

laba

rdin

e

Whi

te S

pur

Win

neke

Wis

hon

Xin

go

Da'

ao D

am

Yut

iao

Pan

shito

u

Shu

ibuy

a

Shi

sanl

ing

Khw

ae N

oi

Dam

He

igh

t(m

.)&M

ove

men

t(m

m.)

Height(m.)

Opening, normal to perimeterjoint(mm.)

Settlement, normal to concrete face(mm.)

Shear, parallel to joint(mm.)

L��G� 52 ��0�$� �9���������ก��)��+�� ��*�� Perimetric Joint

[ �����������ก����01�)*+��

6. !�M]�ก��)*ก+� 5�ก6�ก���)�����9$%��ก��5�ก)��+���+��/0���.

0�����$%��ก��ก�����/�����$%��ก��ก��)��+�� ��*���6� �� ก��� 3/,/�����3� ��

1. $%��ก��ก�����/��

6�ก�����/��*���� .)*+�� �� ,��)+��$�5��K���0�$� �9ก�����/��*���� .ก������)��������ก��ก��0�,��������)กC�ก�ก �:� $������������ก��ก��0�,���� .�ก�����/���ก���0�/����:��� �� HS5(+96.00) )���ก�� 1.807 )�� ����ก�����/�� ,�����0�/����:��� �� HS1(+76.00) )���ก�� 0.443 )��������)��ก��ก��0�,���� .)0�C5�ก�����/����ก���0�/����:��� �� HS5 )���ก��1.840 )�� /����)��ก��0�,�� Concrete Face Slab )0�C5�ก�����/����ก���0�/����:��� �� HS5 )���ก�� 1.935 )�� 78�����ก�����/������5�กก��0�,��ก:��$�ก� ��+� )0�C5������ก�����/�� ,�� �ก5�ก �� )+��)���)กC�ก�ก �:�$���ก�����/���)$��*8� )�- 1.944 )�� ก�����/�����0� )*+�� ����5�ก0�� 0�/ก��ก��0�,�����)กC� �:�����ก����ก�����/���ก���0�/ K STA. 0+400 ����K 0.094 )�� /���� /1��0*���� .5�กก���)�����9 /������*,�1�ก�����/��$�����������K 3.50-27.21 MPa

2. $%��ก��ก��)��+�� ��*���6� �� ก���/�/� ,�

2.1 Joint Meter ������������ก��ก��0�,��[ � /��� (Vertical Construction Joint) ���� 3 �:��� ��$��� JM2 �

Page 15: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

ก����:� �:��ก��)��+�� ��)*,���ก� /�����01�0�/ 0.31 . ��� JM1,JM3 � ��Abutment ����0��*,���ก��)��+�� ����ก5�กก� /�����01�0�/ 0.263 .��� 0.056 .���:�/��

2.2 Perimetric Joint ก��)��+�� ��*���������������6� �� ก���/�/� ,�ก��Plinth PM2,5,8 )�- ก��)��+�� ��[ � Opening,Normal to Perimetric Joint $�������ก��)��+�� ����ก5�กก� ���� 3 � /�����01�0�/ PM2=4.58 .,PM5 = 8.14.��� PM8 = 2.28 . )ก�/*8� [ *K������/�� �:�� ,�)*+�� )���01�*8� �0/�[�,)�C ����ก��/�� �:�01�*8� )�+���a���)�- 3�3/,���5��ก��)��+�� ���ก����*8� PM1,4,7 )�- ก��)��+�� ��[ � Settlement,Normal to concrete face slab $����ก��)��+�� �� ,����� PM4 � ก�����:� �:��ก�����/���ก���� 1.17 .������0�$� �9ก����/�� �:�/,� � ,�)*+�� PM3,6,9 )�- ก��)��+�� ��[ � Shear,Parallel to Perimetric Joint $����ก��)��+�� �� ,�� /�����01�0�/ 0.291 .���� �����ก��)��+�� ��*��������a*���6� �� ก���01�0�/5�กก����ก��������[�,����3�)ก� 4 7.

2.3 Inclinometer ก�� ก����*���6� �� ก���/�/� ,�� ����{�กก���ก )*+�� /���5�/�������ก��0�,��)*+�� )0�C55 )���)กC� �:��������ก����ก�� ก�����ก���0�/)ก�/*8� ������)K� ,���/�8ก���0�/ IN2 ����ก�� ก��������K 450 .78�������กก�������/ก��K95�กก����ก���

2.4 ��)����/��� )ก�/*8� [ �6� �� ก���/�/� ,���������K3�)ก� 363x10-6 78���ก����)����/ (Strain)*���� ก����,������3�)ก� 0.0033 /��� �� �6� �� ก���/�/� ,�3��� ,���5���ก�,�[ *K������5�/) +���5�ก�ก��)��+�� ���ก�ก����+�� �:�� �ก �:��ก���:�

3. ��� �� 95�ก)��+���+��/$%��ก�������/����[ )*+�� �� ,��[ ������ก��ก��0�,���:�[�,0���.���)� �����/'��)*+�� ��� :�6�ก�����)� 3�[�,[ ก�������� ก��0�,�� ��50����.1ก�,��*��ก����ก���)$+�� :�3���������ก����ก���)*+�� ��ก&K�)/��ก� [�,0�1�K9����*8� ���.1ก�,��

7. ก����ก�����ก�) *�*����K ก�������� ���ก��)*+�� �� ,�� �� ) +����5�ก$�����/:��� ก������&�������8ก&����61,���5,�����3/,ก���.8�[ ����, *������0:�����*,�1�����a��� :��[�,[ �� �5�� �� ���*�*����K�1 �9�5�����$�� ���ก���z$����z� ��ก �K���ก����0��9 ���������)ก&����0��9 ���0 ��0 � ก���5��

$��(��Mก��

[1] ก�������� (2545). ก���:� K)$+��ก����ก��������������ก�� ���ก���� ,�� 5����/$�&K� �ก. /����&�� �onn� �� 7���� �9 5:�ก�/, ���&�� $� �� /9 7� ������&�� ���)���p )�� ��� 5:�ก�/.

[2] ��ก� 3,)����.(2550).�1�+�ก���/$%��ก��)*+�� .$�$9�������� 3 ({������������ก,3*). �1 �9�5�����$�� ���ก���z$����z� ��ก ' � � � � � � � ก � � � � � � K � � � ก � � � � 0 � 0 � �9 ���������)ก&����0��9.

[3] Hunter, G. and Fell, R. (2003). Rockfill Modulus and Settlement of Concrete Face Rockfill Dams. Journal of Geotechnical and Geoenvironmental Engineering, Vol. 129, No. 10, pp. 909�917.

[4] Marques,F,P.L.,Maurer,E.,and Tuniatli,NB,1985.Deformation Characteristics of Fozdo Areia Concrete Face Rockfill Dam,as Revealed by a Simple Instrumentation System. 15th International Congress on Large Dam , Switzerland.

[5] Park,Han-Gyu.,Kim,Young-Seong.,Seo,Min-Woo.,Lim,Heui-Dae(2005).Settlement Behavior Characteristics of CFRD in Construction Period Case of Daegok Dam. Journal of Geotechnical Engineering,Vol.21,No.7,pp.91-105

[6] ICOLD, (2004). Concrete face rockfill dams: concepts for design and construction. Committee on Materials for Fill Dams.

[7] J.Barry Cook and Jame L. Sherard. (1985). Concrete Face Rockfill Dam �Design,Construction and Performance.

Page 16: กก ˘ˇ ก ˆก ก˙ ˇ ˝ ˛ ˇ ˙˚ ก ˝ ˙ กก !˘ ˝ ก#$ %&ˇ˚% ก : ก( )ก ... · ˚˚ก5กก 3. Perimetric Joint Meter $˜ ก) ˛+ˆ˚ [ Opening,Normal

ก����������ก����ก�� ������������������� 15 ������������������ � 12-14 $%&'�� 2553

[8] Xing, H.F. , Gong, X.N., Zhou, X.G. and Fu, H.F. (2006). Construction of Concrete-Faced Rockfill Dams with Weak Rocks. Journal of Geotechnical and Geoenvironmental Engineering, Vol. 132, No. 6. pp. 778-785.

[9] 0������ก/�� ����$9, �� �0 ����������, ��� 5� �ก���$�� 9 ������ $5 9�������.(2551).$%��ก��)*+�� �� .�� ก���/�/� ,� : 0'���ก������6� /� 3�. �1 �9�5�����$�� ���ก���z$����z� ��ก ' � � � � � � � ก � � � � � � K � � � ก � � � � 0 � 0 � �9 ���������)ก&����0��9.