Upload
olina
View
35
Download
0
Embed Size (px)
DESCRIPTION
Update on a few activities And many things to do. AA-RR. A few changes since Zagreb. SAML 1.1 and PAPI protocol adaptors upgraded According to their usage HelloSAML has consolidated http://hellosaml.rediris.es/ SAGPoA Evolved from a PAPI component validator - PowerPoint PPT Presentation
Citation preview
Diego R. Lopez
AA-RR
Update on a few activitiesAnd many things to do
TF-EMC2 Malaga October 2006
A few changes since Zagreb
• SAML 1.1 and PAPI protocol adaptors upgraded According to their usage
• HelloSAML has consolidated http://hellosaml.rediris.es/
• SAGPoA Evolved from a PAPI component validator First implementation of a standalone PAPI component
• Does not require Apache
Acceptable performance• GPoAs are not under heavy load in a PAPI setup
• Presentation at next PST2006@Toronto
TF-EMC2 Malaga October 2006
Evolving HelloSAML
• Add support for different versions of SAML OpenSAML 2.0 seems stable enough
• Enhance the possibilities for configuring both the requests and the responder Beyond simple constructs Incorporate profile selection Control of X509 settings
• Improve log handling and enrich the information provided
TF-EMC2 Malaga October 2006
eduGAIN applications
• The eduGAIN Validation Facility Three eduGAIN BEs under testing and (at least) a
fourth to come Several other eduGAIN BEs planned
• perfSONAR AS, JRA3 Domain Manager
• Development of new components An independent tool to be distributed
• Initial deployment validation A model similar to HelloSAML
• Fast profile prototyping in new application areas
TF-EMC2 Malaga October 2006
eduroam-ng applications
• Whatever the solution chosen, it will be more complex than current RADIUS hierarchy
• And the growing pervasiveness of the eduroam infrastructure will require dependability
• A deployment validation facility can be built using AA-RR Specific protocol adaptors must be built
• And DAMe is around there as well...
TF-EMC2 Malaga October 2006
Eclipse applications
• In the framework of the OSIRIS projecthttp://www.itea-osiris.org/
• Intended for validating the deployment of Service Bus components
IDE Management
Development Tools
Modeling Tools
Monitoring
Monitoring Tools
RuntimesSecurity
Configuration
Deployment
Configuration and adaptation
DiscoveryOrchestration Composition ServiceContainer
AA-RR
TF-EMC2 Malaga October 2006
Your piece(s) here