  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    1/85

    T.C

    SELUK NVERSTES

    MHENDSLK-MMARLIK FAKLTES

    EVRE MHENDSL BLM

    SU TEMN VE KANALZASYON YIL UYGULAMASI

    051201028 MERVE SOANCIOLU041201053 FULYA BZDEN

    DO.DR. M. FAK SEVML

    AR. GRV. SERKAN AHNKAYA

    NDEKLER

    SAYFA NO :

    BLM 1: MESKUN BLGENN TANITIMI 1

    1.1.Corafi Yap 1

    1

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    2/85

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    3/85

    4.1.Serbest Yzeyli Su Tabakasndan Kuyularla Su Alnmas 32

    4.1.2.Kuyu Donatm 35

    4.1.2.1.Emme Borusunun Boyutlandrlmas 35

    4.1.2.2.Filtre Borusunun Boyutlandrlmas 35

    4.2.Basnl Su Tabakasndan Kuyularla Su Alnmas 364.2.1.Optimum Debi ve Seviye Alalmas 36

    4.2.2.Kuyu Donatm 39

    4.2.2.1.Emme Borusunun Boyutlandrlmas 39

    4.2.2.2.Filtre Borusunun Boyutlandrlmas 39

    BLM 5:SALE HATTININ GERLMES 40

    5.1.Cazibeli sale 40

    5.1.1.Hazne Yerinin Tesbiti 405.1.2.Vana Ksma Oran 41

    5.1.3.Maksimum letme Kapasitesinin Bulunmas 41

    5.2.Terfili sale 42

    5.2.1.Ekonomik Boru apnn Tespiti 42

    5.2.2.Przllk Katsaysnn Tespiti 43

    5.2.3.letme Masrafnn Tespiti 44

    5.2.4.Pompa Seimi 44

    5.2.5.Hava Kazan Hacminin Tespiti 45

    5.2.6.Darbe Hesab 46

    BLM 6:MESUYU HAZNES 47

    6.1.Hazne Hacminin Hesab 48

    6.2.Haznenin Boyutlandrlmas 48

    6.3.Havalandrma Bacas Hesab 49

    6.4.Hazne Dolu Savak Hesab 49

    6.5.Hazne Dip Sava Hesab 50

    BLM 7:MESUYU EBEKES 51

    7.1.Kesafet Katsaylarnn Tespiti 52

    7.2.ebekenin l Nokta Metoduna Gre zm 52

    7.3.Kapanma Hatalarnn Tespiti 54

    BLM 8: KANALZASYON AI HESABI 55

    BLM 9: YAMURSUYU KANALI AI HESABI 79

    3

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    4/85

    1.MESKUN BLGENN TANITIMI

    1.1.Corafi Yap

    Bolvadin, 31 derece 2 dakika dou meridyeni ile 38 derece 43 dakika kuzey paralelinin kesitii

    noktada, derin ve uzun bir alvyon ova zerine kurulmutur.

    4

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    5/85

    Ege blgesinin Bat Anadolu kesminde yer alan Bolvadin gneyden Sultandalar, kuzeydoudan

    Emirdalar ile evrilidir.

    Ulam asndan Anadolu, Ege ve Akdeniz blgelerini birbirine balayan kilit noktadadr. Deniz

    seviyesinden ortalama ykseklii 1016 metre ve yzlm 1108 km2 dir. Afyonyzlmnn %12.85' n oluturur.

    1.2.Tarihi Yap

    Bolvadin, Anadolu'nun en eski yerleim yerlerinden biridir. Mevcut vesikalara gre 10.000 yllk

    gemii vardr. Bolvadin, antik Paroreos Phrygia (Yank Frigya) vadisinde kurulmutur. Bu vadide

    M.. 8000'de yerleik hayata geilmitir.

    Arkaik devirde bir site ehri olan Bolvadin, Afyon blgesindeki 52 yerleim biriminden birisiydi.

    Anadolu'daki btn tarihi devirleri yaamtr. Romallar zamannda Polybotum isminde il

    merkezidir. hykler mevkisinde nemli bir yerleim merkezi olan Kayster Pedion ehri M.. 401

    tarihinde Persler tarafndan yakldktan sonra Polybotum hzla gelimitir. Grek tarihisi Ksnefon,

    "Anabasis" isimli kitabnda Kayster Pedion ehri iin yollarn birletii yerde kalabalk bir ehirdir

    der.

    M.S. 133 tarihinde Polybotum'u ziyaret eden Roma kral Hadrianus adna 3 cins para baslmtr.Kraln heykelleri form ve agoralar sslemitir. Bizans zamannda "Polybotos" ismiyle anlmtr.

    evresini etkileyen sosyal ve kltr ehri olmutur. Bizans'n son zamanlarnda Trk ve Arap

    aknlarnn tesiri ile ehir klm, nfus dalmtr. Bizans tarihisi Anne Comnenus "Alexia"

    isimli eserinde bu ehrin evresinin merkezi olduunu yazar. IX. asrn balarnda byk bir deprem

    geirir. ehrin surlar ve binalar yklr. Bizans Kral Aleksi Comnenus imdiki Hisar Mahallesi'nin

    olduu yere byk bir kale yaptrr, halkn bir ksm ile askerleri buraya tar, byk bir km ise

    Sivrihisar ve Seyitgazi'ye tanr. 732 ylnda Emevi komutan Mesleme byk bir ordu ile Bolvadin'egelir. Burada Akrenon (Afyon) kalesi kuatlr. Kuatmada Seyyid Battal Gazi ve Peygamberimizin

    sahabesi Abdl Vahap Gazi yaralanr. Seyit Battal Gazi, Seyit Gazi'de; Abdl Vahap Gazi de

    Bolvadin'de lrler. Trbeleri bu yerdedir. Bu olaylarn hatras olan Sahabe Abdl Vahap Gazi'nin

    trbesi Eber Gl kenarnda bir hyk zerindedir.

    Bolvadin, Malazgirt Sava'ndan sonra 1107 tarihinde yaplan Bolvadin Sava sonunda Emir

    Menklek Bey tarafndan Trklerin eline gemitir. Bolvadin Sava, Anadolu'nun Trklemesinde

    nemli bir rol oynamtr.

    5

    http://tr.wikipedia.org/wiki/Malazgirt_Sava%C5%9F%C4%B1http://tr.wikipedia.org/wiki/Malazgirt_Sava%C5%9F%C4%B1
  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    6/85

    Trklerin eline getikten sonra Bolvadin'e Yazr, Avar, Karkn, epni boylar gelip yerlemilerdir.

    Daha sonra airetlerin iskanlar srasnda eitli airetler, cemaatler yerletirilmitir. Bugnk

    Bolvadin ve civarndaki halkn kkleri bu airetlere dayanr.

    Bolvadin merkezinde Yazr ve Karkn airetleri etkindir. Daha sonra Sarkeili, Karakeili, Honaml

    ve Tekeli Yrkleri gelmilerdir. Civarda ise Morcaali Trkmenleri (Kemerkaya), Karainbeyli

    Trkmenleri (ay), Karaba Trkmenleri (Bykkaraba, Ortakaraba, Derekaraba), Tabanl

    Trkmenleri (Kurucaova Ky), Seluklu Yrkleri (Dili Kasabas), Avar Yrkleri (zburun

    Kasabas), Karakeili Yrkleri (Yrkkaracaren ve civar) yerlemitir.

    Bolvadin Seluklular zamannda "Karahisar- Devle" ismiyle anlan Afyon'a bal 10 kadlktan birisi

    olup yeniden imar edilmitir. Bu devirde 11 nahiyesi (Han, Bayat, Musluca, Gmen Akviran,

    Nevahi-i Barknl, shaklu, ay, Karamk, uhut, Karaadilli, labat), 326 ky, 11 mahallesi vard.

    Byk bir ticaret merkeziydi. Seluklular'dan gnmze kadar yalnzca Alaca Camii ulamtr.

    Alaca emesi ve Ali Efendi Camisi'nin yalnz kitabeleri ulaabilmitir. Mevlana'nn olu Sultan

    Veled, Afyon'u ziyareti srasnda "Bolvadin Mevlevihanesi"ni amtr.

    Bolvadin, Seluklular ykldktan sonra Erefoullar, Sahipataoullar ve Karamanllar'n eline

    gemitir. Bu devirde Erefolu Klliyesi ve Erkmenhisar Camii yapld. Bu eserleriden gnmze

    Erefolu Camisi'nin kitabesi ve Erkmenhisar Camisi'nin minaresi (Krk Minare) gelebilmitir.

    Bolvadin, Sultan I. Murat zamannda Osmanl topraklarna katld. Osmanl dneminde, nceleri

    Germiyan vilayetine (Ktahya), 1839'dan sonra Hdavendigar vilayetine (Bursa) bal kaza merkezi

    oldu. 1850 ylnda Muhassla ykseldi. Karahisar- Sahip Sanca (Afyon) iki Muhassla

    ayrlmtr:

    1. Karahisar- Sahip Muhassl: Merkez Afyon, Sandkl, al, ivril, Sincanl kazalar

    2. Bolvadin Muhassl: Merkez Bolvadin, Han, Bayat, Musluca (Emirda), Nevahid-i Barnl

    (Kemerkaya), shakl, Karamk, ay, uhut, Karaadilli, labat kazalar

    Bolvadin, Kurtulu Savanda stratejik ynden nemli bir merkez olmutur. Birinci ve kinci Ordu

    Bolvadin'de kurulmutur. Byk bir kltr merkezi olan Bolvadin'de ticari hayat ve sanat ok

    gelimitir. 1831 ylnda yaplan nfus saymndaki istatistiklere gre 150 eit meslek grubu vardr.

    Ziraat Bankas 22. ubesini 1873 ylnda Bolvadin'de amtr. Bunu takiben Osmanl Bankas ve

    Akehir Bankas da ube amlardr. Daha sonra Bolvadinliler 1 Haziran 1914 ylnda, Osmanl

    Dneminin ilk zel bankalarndan olan "Bolvadin ktisadi Osmani Bankas"n kurmutur.

    6

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    7/85

    Kltr hayatn temsil eden medreselere, tekkelere, ahi kurulularna Seluklular zamannda raslanr.

    Bu tekilatlar Osmanl zamannda gelimitir. Nakibendi, Kadri, Rufai ve azeli tarikatlarnn

    merkezi olmutur. Arivlerdeki vesikalara gre 14 tekke vardr. 1924 ylnda medreselerin kaldrld

    tarihte, 28 tane medrese bulunuyordu. Ayn tarihte Afyon'da 19, Sandkl'da 6, Aziziye (Emirda)'de 1

    medrese vard. 1839'dan sonra medreselerin yansra kurulan okullardan Bolvadin'de 7 ibtidaiye(ilkokul), 1 rtiye (ortaokul) vardr. Ayrca 63 tane sbyan (mahalle mektebi) bulunuyordu.

    1.3.klim

    Bolvadin'in arazileri genellikle ovadr. lenin yzlmnn ortalama %40' tarmsal saha olup

    byk bir ksmnda tahl retilmekte, ikinci sray meyvelik, ba ve bahe sahalar almaktadr. lenin

    dalarnda sar mee, ard ve am ormanlar vardr.

    Bolvadin iklim bakmndan Anadolu Blgesi ile Ege Blgesi arasnda yer aldndan, zaman

    zaman karasal, zaman zaman lman hava ktlelerinin tesiri altnda kalmaktadr. Genel olarak yazlar

    kurak ve scak, klar souk ve kar yal gemektedir.

    1.4.Su Kaynaklar

    Bolvadin yeralt sular bakmndan zengin bir kuakta yer almasna ramen akarsular bakmndan

    fakirdir. Blgedeki tek akarsu Ahr Dalarndan doup, Bolvadin'in gneyinden geerek Eber Glne

    dklen Akaray'dr. zerinde Altgz, Develi, Krkgz ile Srt kprs gibi kprler vardr.

    Eber Gl, Bolvadin'in gneydousunda bulunur. Bolvadin, ay ve Sultanda ilelerine kys

    vardr. Denizden ykseklii 967 metre ve yzlm 125 km2 dir. Akaray ve Sultandalarndan

    gelen sel sular ile beslenmekte olup, glde yetien kam, hasrotu ile glde bulunana sazan ve turna

    balklar gl evresinde bulunan kyller iin geim kayna salamaktadr.

    Eber Gl, Bolvadin, Afyon: Gller blgesinde yer alan Eber Gl Bolvadin snrlar iinde yer

    alr.Sultan Dalarnn kuzeyi ve Emir Dann gneyinde uzanan kntl alanda yer almaktadr.

    30-40 yl ncesine kadar ku ve balk cenneti olan Eber Gl, nmeli bir geim kayna olan kam

    ve sazlklaryla da nl. Gl evresindeki halkn byk blm balklk ve gl kam ile geimini

    salyor. Ancak Gldeki kirlilik, ku ve balk trlerinin yannda blge halkn da tehdit eder bir

    seviyeye ulat. Blgede yalarn az olmas nedeniyle son yllarda gl yeterince beslenemiyor.Akaray Akarsuyu, gl besleyen en nemli ve tek kaynak. Buharlamann yannda sulama iin

    7

    http://tr.wikipedia.org/wiki/Ovahttp://tr.wikipedia.org/wiki/Eber_G%C3%B6l%C3%BChttp://tr.wikipedia.org/wiki/Ovahttp://tr.wikipedia.org/wiki/Eber_G%C3%B6l%C3%BC
  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    8/85

    ekilen su gln su seviyesinin dmesine neden oluyor. knt gldr. Bu sebeple yl ierisinde

    yzlm farkllk gsterir. En dk su seviyesi Ekim 1991 de grlmtr. Gl alan 62 km ye

    kadar dmtr. En yksek su seviyesi ise Mays 1969'da grlmtr. Gl alan 164.5 km ye

    ulamtr.

    Gl Trkiye'nin en ilgi ekici gllerindendir. ok byk bir gl olmasna ramen zerinde bulunankamlardan dolay byk ksm gl deilde ayrlk gibi grlr. zellikle avclarn urak yeridir.

    zerinde yzlerce yzen adack bulunur. Bu adacklara kopak denir. Kopaklar kalnlaan kam

    kklerinin topraktan ayrlarak zerine zamanla rzgarn etkisiyle toprak birikmesiyle meydana gelir.

    Baz kopaklar o kadar byktr ki zerlerinde balk ve kamlarn geici evleri bile bulunur.

    Gl eski zamanlarda akehir gl ile byk tek bir gl halindeydi. fakat zamanla su kaynaklarnn

    azalmas ile Akehir Gl Eber glnden ayrlarak ayr bir gl oluturdu. Halen eber gl bir kanalvastasyla akehir glne su aktarmaktadr.

    1.5.Ekonomi

    Bolvadin'de ekonomik hayat tarm, hayvanclk, ticaret ve sanayiye baldr. Halkn geim

    kaynandaki ana unsur tarm ve hayvanclktr. Buday, arpa, msr, nohut, fasulye, yeil mercimek,

    ekerpancar, haha, ayiei yetitirilmekte; elma, armut, kays, vine, kiraz gibi meyveler de

    retilmektedir. Hayvanclkta zellikle kk ba hayvan yetitiricilii yaygndr.

    Bolvadin'in arazileri genellikle ovadr. lenin yzlmnn ortalama %40' tarmsal saha olup

    byk bir ksmnda tahl retilmekte, ikinci sray meyvelik, ba ve bahe sahalar almaktadr. lenin

    dalarnda sar mee, ard ve am ormanlar vardr

    Bolvadin'deki en nemli sanayi kurulularndan biri olan Afyon Alkoloid Fabrikas 1981 ylnda

    deneme retimi ile hizmete girmitir. Trkiye'deki tek Alkoloid fabrikasdr. Yaklak olarak 500

    alanyla ylda 50-90 ton arasnda afyon (morfin, hidrat, kodein v.s.) imal edilmekte ve bu imaltn

    byk bir blm ihra edilmektedir. Dier bir nemli sanayi kurulularndan biri de emaye mutfak

    eyalar retimi yapan Avar Emaye Sanayidir. Bu fabrikada yaklak 500 ii almaktaolup, imal

    edilen mutfak eyalarnn %90'n bata Avrupa lkeleri olmak zere Ortadou ve Afrika lkelerine

    ihra edilmektedir. Bunlarn dnda kereste, yem, un ve tula fabrikalar bulunmaktadr.

    8

    http://tr.wikipedia.org/wiki/Ak%C5%9Fehir_G%C3%B6l%C3%BChttp://tr.wikipedia.org/wiki/Ak%C5%9Fehir_G%C3%B6l%C3%BC
  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    9/85

    ekil 1.1 Afyon il haritas

    9

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    10/85

    ekil 1.2 Bolvadin ile haritas

    10

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    11/85

    2.SU HTYACININ TAYN

    2.1.Nfus Hesaplar

    Tablo 2.1. Yllara gre nfus dalm

    2.1.1.ller Bankas Metoduna Gre Nfus Hesab

    P : ller bankas art katsays

    N2 : Son nfus saym

    N1 : lk nfus saym

    g : ki nfus saym arasndaki yl fark

    g

    g

    y

    N

    NP (= 100)1

    5

    12375

    16026(1 =P 306,5100)1 =

    51602620139(2 =P 674,4100)1 =

    5

    20139

    25417(3 =P 765,4100)1 =

    5

    25417

    29218(4 =P 826,2100)1 =

    YIL 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000

    NFUS 12375 16026 20139 25417 29218 30599 35509 44969 54917 55233

    11

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    12/85

    5

    29218

    30599(5 =P 927,0100)1 =

    5

    30599

    35509(6 =P 021,3100)1 =

    5

    35509

    44969(7 =P = 100)1 4,837

    5

    44969

    54917(8 =P 077,4100)1 =

    5

    54917

    55233(9 =P 114,0100)1 =

    OrtP=3,394 P, 3ten byk olduu iin P=3 alnr

    n

    yg

    pNN +++= 530)

    1001(

    )20002008(530)100

    31(55233 +++=gN

    196879=gN kii (2043 yl nfusu)

    2043 ylndan yola karak 2028 yl nfusunu da hesaplarsak;

    g

    g

    y

    N

    NP (= 100)1

    15196879

    (3N

    = 100)1 ise N=126369 kii (2028 yl nfusu)

    2.1.2. Aritmetik Art Metoduna Gre Nfus Hesaplama

    12

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    13/85

    Ka=12

    12

    -

    -

    tt

    NN

    Ka : Aritmetik art katsays

    N2 : Son nfus saym

    N1 : lk nfus saymt2 : N2 nfusunun sayld yl

    t1 : N1 nfusunun sayld yl

    2,73019551960

    1237516026

    12

    1211

    =

    =

    =tt

    NNKa

    6,8225

    160262013912

    =

    =aK

    6,10555

    20139254173 =

    =aK

    2,7605

    25417292184 =

    =aK

    2,2765

    29218305995 =

    =aK

    9825

    30599355096 =

    =aK

    18925

    35509449697 =

    =

    a

    K

    13

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    14/85

    6,19895

    44969549178 =

    =aK

    2,635 54917552339 ==aK

    aortK =952,06

    N )( 11 ttKN gag +=

    N 06,95255233 +=g ( 2043 2000 )

    N 96171=g kii (2043 yl nfusu)

    2043 ylndan yola karak 2028 yl nfusunu da hesaplarsak;

    96171=N+952,06(2043-2028)

    N=81890 kii (2028 yl nfusu)

    2.1.3.GEOMETRK ARTI METODUNA GRE NFUS HESAPLAMA

    Kg=12

    12

    tt

    NlnNln

    -

    -

    Kg : Geometrik art katsays

    N2 : Son nfus saym

    N1 : lk nfus saym

    t2 : N2 nfusunun sayld yl

    t1 : N1 nfusunun sayld yl

    K =

    =12

    12 .1.1

    tt

    NnNng

    12

    )ln( 21tt

    N

    N

    051,05

    )ln(16026123751 ==gK

    045,05

    )ln(20139160262 ==gK

    046,05

    )ln(25417201393 ==gK

    14

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    15/85

    027,05

    )ln(29218254174 ==gK

    009,0

    5

    )ln(30599292185 ==gK

    029,05

    )ln(35509305996 ==gK

    047,05

    )ln(44969355097 ==gK

    039,05

    )ln(54917449698 ==gK

    011,05

    )ln(55233549179 ==gK

    ort gK =0,034

    Gelecekteki nfus (2043 yl)

    )(.1.1 11 ttKNnNn ggg += )20002043(034,0552331.1 += nNn g kiiNg 238307=

    2043 ylndan yola karak 2028 yl nfusunu da hesaplarsak;

    )20282043(034,01238307.1 += nNn

    N=143102 kii (2028 yl nfusu)

    15

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    16/85

    Tablo 2.2 Aritmetik art metoduna gre yllara gre nfuslar

    2005 2008 2013 2018 2023 2028 2033 2038 204359993 62849 67610 72370 77130 81890 86651 91411 96171

    16

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    17/85

    0

    20000

    40000

    60000

    80000

    100000

    120000

    1940 1960 1980 2000 2020 2040 2060

    Zaman(yl)

    Nfus(kii)

    ekil 2.1.Aritmetik art metoduna gre nfus art grafii

    Tablo 2.3 ller Bankas metoduna gre yllara gre nfuslar

    17

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    18/85

    0

    50000

    100000

    150000

    200000

    250000

    1940 1960 1980 2000 2020 2040 2060

    Zaman(yl)

    Nfus

    (kii)

    ekil 2.2.ller Bankas metoduna gre nfus art grafii

    2005 2008 2013 2018 2023 2028 2033 2038 204364030 69967 81111 94030 109007 126369 146496 169829 196879

    18

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    19/85

    Tablo 2.4 Geometrik art metoduna gre yllara gre nfuslar

    2005 2008 2013 2018 2023 2028 2033 2038 204365467 77598 91977 109021 1129223 143102 181551 215194 238307

    19

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    20/85

    0

    50000

    100000

    150000

    200000

    250000

    300000

    1940 1960 1980 2000 2020 2040 2060

    Zaman(yl)

    Nfus

    (kii)

    ekil 2.3.Geometrik art metoduna gre nfus art grafii

    2.2.Debi Hesaplar

    Gelecekteki nfus her metoda gre hesapland. Su ihtiyac ller Bankas metodu ile tahmin edilen

    gelecekteki nfusa bal olarak hesaplanacaktr.

    Gelecekteki nfusa bal olarak 1 gnlk maksimum birim su sarfiyatlar

    Beldenin Gelecekteki Nfusu 1 / gn / kii

    3.000e kadar 60

    3.001 - 5.000 aras 70

    5.001 - 10.000 aras 80

    20

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    21/85

    10.001 - 30.000 aras 100

    30.001 - 50.000 aras 120

    50.001 - 100.000 aras 170

    100.001 - 200.000 aras 200

    200.001 - 300.000 aras 225Daha nceki blmde llerBankas metoduna gre ;

    2028 yl nfusunu:126369 kii

    2043 yl nfusunu:196879 kii

    olarak hesaplamtk.

    Bu nfus deerlerine gre 2028 yl ve 2043 yl iin ortalama gnlk debi ,maksimum gnlk debi ve

    ebeke debisini hesaplayacak olursak;

    2028 yl iin;

    2028 yl maksimum birim su sarfiyat qmax=200 l/s

    maksimim gnlk debi=Qmax=qmaxxN/86400 =200x126369/86400 =292,52 l/s

    ortalama gnlk debi=Qort = Qmax / 1,5 = 292,52 / 1,5 = 195,03 l/s

    maxQsaat = Qmaxx1,5= 292,52x1,5 = 438,78 l/s (ebeke debisi)

    2043 yl iin;

    2043 yl maksimum birim su sarfiyat qmax=200 l/s

    maksimim gnlk debi=Qmax=qmaxxN/86400 =200x196879/86400 =455,738 l/s

    ortalama gnlk debi=Qort = Qmax / 1,5 = 455,738 / 1,5 = 303,82 l/s

    maxQsaat = Qmaxx1,5= 455,738x1,5 = 638,607 l/s (ebeke debisi)

    Ayrca 2008-2043 yllar arasnda yine ortalama ,maksimum gnlk debiler ve ebeke debisinin

    hesaplanm halide tabloda gsterilmitir.

    Tablo2.4. Yllara gre ortalama gnlk debi,maksimum gnlk debi ve ebeke debileri

    21

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    22/85

    Yllar

    Ortalama

    Gnlk Debi (l/s)

    Maksimum

    Gnlk Debi(l/s)

    ebeke

    Debisi (l/s)

    2008 91,77 137,66 206,48

    2013 106,39 159,59 239,37

    2018 123,34 185,01 277,51

    2023 168,22 252,33 378,49

    2028 195,01 292,52 438,78

    2033 226,07 339,11 508,66

    2038 262,08 393,12 589,68

    2043 303,82 455,73 683,60

    22

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    23/85

    0

    50

    100

    150

    200

    250

    300

    350

    2005 2010 2015 2020 2025 2030 2035 2040 2045

    Yl

    OrtalamaGnlkD

    ekil 2.4. Ortalama gnlk debi-zaman grafii

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    2005 2010 2015 2020 2025 2030 2035 2040 2045

    Yl

    Maksimum

    GnlkD

    ekil 2.5. Maksimum gnlk debi -zaman grafii

    0

    100

    200

    300

    400

    500

    600

    700

    800

    2005 2010 2015 2020 2025 2030 2035 2040 2045

    Yl

    ebekeD

    ebisi(

    ekil 2.6. ebeke debisi-zaman grafii

    23

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    24/85

    3.Membalardan Su Alnmas

    Gelecekteki nfusun %30unun ihtiyac membalardan (yama, yatay tabaka, eimli tabaka) temin

    edilecektir.Buna gre;

    738,455max =Q L/s bu debinin %30u 721,13630,0738,455 ==Q L/s dir.

    3.1 Yama Membasndan Su Alnmas

    Gelecekteki nfusun su ihtiyacnn %10u yama membandan temin edilecektir.

    573,4510.0738,455max ==Q L/s=0,04573 m3/sdir.

    3.1.2 Kum tutucunun boyutlandrlmas

    5,0Re ise ( ) vdg

    V s

    2

    118 =

    v

    dV =Re

    Kumun zgl arl: 65.2=s g/cm3=2650kg/m3

    Kinematik vizkozite : 61022.1 =v m2/s= 21022.1 cm2/s

    Tutulmas istenen kum tanesi ap: 005.0=d cm

    Yerekimi ivmesi: 981=g cm2/s

    5aV cm/s olmas gerektiinden 75,0=aV cm/s olarak seelim.

    aV yatay ak hznn ald yol c, V dey hzn ald yol h olmak zere;

    5.19.0 =h m arasnda seilmelidir. 2,1=h m seelim.

    Memba sular kum srklemekte olup 1/200 cmden byk boyuttaki kum tanelerinin tutulmasistenmektedir.

    ( ) ( ) 184273,0

    1022,1

    005,0165,2

    18

    9811

    18

    2

    22

    =

    == v

    dgV s cm/s

    Kontrol;

    5,0075522.01022.1

    005.0184273.0Re

    2=

    =

    = v

    dV olduundan yaplan kabul dorudur.

    a V

    h

    V

    c= ise

    sm

    m

    sm

    c

    /00184273.0

    2,1

    /0075.0= ise 588,4 =c m elde edilir.

    cbVhbVQ a ==

    24

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    25/85

    08,52,10075.0

    04573,0=

    =

    =

    hV

    Qb

    a

    =5 m

    3.1.3 Su alma blmesinin boyutlandrlmas

    H=Savak Yk=10-20 cm arasnda ve hava pay=5-20 cm arasnda olmas gerektiinden;H=Savak yk=15 cm seilmitir.

    Hava pay=5cm seilmitir.

    Ayrca su alma yapsnda hz art 10=V cm/s olmaldr.

    Su derinlii= = Hhe hava pay

    e=1,2-0.15-0,05=1 m su derinlii

    eaVAVQ == ifadesinden

    80.010.004573.0 = a 90.057,0 =a m olduundan a=0.90 m seildi.

    2/38,1 HbQ =

    b = savak genilii2/315.08.104573,0 = b ise

    437.0=b m 45.0=b m alnd.

    3.1.3 Su alma borusunun boyutlandrlmas

    Su alma borusunda hz art 5.16.0 =V m/s arasnda olmaldr.

    V=1 m/s seeldi.

    AVQ = ifadesinde V=1 m/s yerine yazlrsa;

    4104573.0

    2D=

    den D=0,241 m seilen 25.0=D m

    Hz kontrol;

    93,0

    4

    25.0

    04573.0

    4

    22=

    =

    =

    D

    QV

    m/s hz snrlar arasnda olduu iin uygundur.

    3.1.4 Szgecin boyutlandrlmas

    25

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    26/85

    Szgete hz art V=0,15-0,30 m/s arasnda olmaldr.

    V=0,30 m/s seildi.

    152.030.0

    04573.0===

    V

    QA m2 (Deliklerin Alan)

    = A2 Toplam alan= 304.0152.02=

    m

    2

    4304.0

    2D=

    den D=0,62 m bulunur.

    3.2 Yatay Tabaka Membasndan Su Alnmas

    Gelecekteki nfusun su ihtiyacnn %10u yatay tabaka membasndan temin edilecektir.Buna gre

    debi;

    Q=10maxQ =

    10573,45 =45,573 lt/sn =0,04573 m3/s

    d=1/100 cm s=2650kg/m3=2,65 g/cm3 10 oC ( = 1,33110-6 m2/s )

    (051201028 a=8, b=2 )

    Su tabakas kalnl H=4,8+0,2=5 m

    Elek analizi sonularna gre granlometri erisi izilmitir ve zeminin arlka %10unun getii

    elek ap, 10d hesaplanp permeabilite katsays (k) hesaplanmtr.

    Tablo 3.1 Elek Analizi Sonular

    Dane ap(mm)

    Verilen Deer-ler ArasndaKalan MalzemeOran %

    1.8-2.50 7,41.40-1.80 47,5

    0.80-1.40 20,20.63-0.80 7,80.50-0.63 8,90.40-0.50 6,20.28-0.36 2,0

    26

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    27/85

    Granlometri E

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0,0 0,2 0,4 0,6 0,8 1,0 1,2 1,4 1,6 1,8 2,0 2,2 2,4 2,6

    E lek ap(m

    GeenMalzeme(%)

    27

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    28/85

    3.2.1 Szdrma borularnda sabit apa gre boyutlandrlma

    Yatay tabaka membasnda hz 4.02.0 =V m/s arasnda olmaldr.

    V=0.35 m/s seelim.

    ekil 3.2 deki grafikten 10d

    =0,520 mm olarak alnmtr.Permebilite katsays (k) hesaplanrken aadaki formlden faydalanlmtr.

    ( ) 2210 52.00116.00116.0 == dk =31013,3 m/s

    Dren borular yar dolu ak iin boyutlandrlacaktr.

    2

    AVQ

    = 35.0

    804573.0

    2

    =D

    D=0,576 m 600 lik boru seilip hz kontrol yaplrsa;

    32,0==A

    QV m/s 0.2-0.4 m/s arasnda olduundan uygundur.

    R =Etki yarap(m)

    L=Toplam galeri boyu(m)

    31013,32

    60.053000

    23000

    =

    = k

    DHR =788,84 m

    0,04573788,84

    2

    60.05

    L1013,3

    2

    2

    322

    =

    =

    =

    R

    hHLkQ L=463 m

    Yatay tabaka memba tek kollu olarak boyutlandrlmtr.

    3.2.2 Szdrma borularnn deiken apa gre boyutlandrlmas

    Yatay tabaka membada hz 4.02.0 =V m/s olmaldr. V=0.3 m/s seildi.

    100 mmden itibaren 600 mm boru apna kadar hesap yaplmtr.

    D =100 mm iin;

    31013,32

    10.053000

    23000

    =

    = k

    DHR =830,804 m

    Qbbirim boya gelen debi olmak zere; (L=1)

    5-

    2

    2

    322

    109,417830,804

    2

    10.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    28

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    29/85

    32

    1025,18

    10,032,0 =

    ==

    AVQ sm /3

    34,1310417,9

    1025,15

    3

    =

    ==

    bQ

    QL m

    D =150 mm iin;

    31013,32

    15.053000

    23000

    =

    = k

    DHR =826,608 m

    5-

    2

    2

    322

    109,46826,608

    2

    15.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    1082,28

    15.032.0 =

    ==

    AVQ sm /3

    171046,9

    1025,11082,25

    33

    =

    ==

    bQ

    QL m

    D =200 mm iin;

    31013,32

    2.053000

    23000

    =

    = k

    DHR =822,41 m

    5-

    2

    2

    322

    109,51822,41

    2

    2.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    1002,58

    2.032.0 =

    ==

    AVQ sm /3

    241051,9

    1082,21002,55

    33

    =

    ==

    bQ

    QL m

    D =250 mm iin;

    3

    1013,32

    25.0

    5300023000

    =

    = kD

    HR =818,21 m

    29

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    30/85

    5-

    2

    2

    322

    109,55818,21

    2

    25.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    1085.78

    25.032.0 === AVQ sm /3

    301055,9

    1002,51085,75

    33

    =

    ==

    bQ

    QL m

    D =300 mm iin;

    31013,32

    3.053000

    23000

    =

    = k

    DHR =814,02 m

    5-

    22

    322

    109,6814,02

    23.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    103,118

    3.032.0 =

    ==

    AVQ sm /3

    36106,9

    1085,7103,115

    33

    =

    ==

    bQ

    QL m

    D =350 mm iin;

    31013,32

    35.053000

    23000

    =

    = k

    DHR =809,82 m

    5-

    2

    2

    322

    109,65809,82

    2

    35.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    104,158

    35.032.0 =

    ==

    AVQ sm /3

    431065,9

    103,11104,155

    33

    =

    ==

    bQ

    QL m

    D =400 mm iin;

    31013,32

    4.053000

    23000

    =

    = k

    DHR =805,62 m

    30

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    31/85

    5-

    2

    2

    322

    109,69805,62

    2

    4.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    10208

    4.032.0 === AVQ sm /3

    471069,9

    104,1510205

    33

    =

    ==

    bQ

    QL m

    D =450 mm iin;

    31013,32

    45.053000

    23000

    =

    = k

    DHR =801,43 m

    5-

    22

    322

    1067,9801,43

    245.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    10258

    45.032.0 =

    ==

    AVQ sm /3

    521067,9

    102010255

    33

    =

    ==

    bQ

    QL m

    D =500 mm iin;

    31013,32

    50.053000

    23000

    =

    = k

    DHR =797,23m

    5-

    2

    2

    322

    1079,9797,23

    2

    50,05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    104,318

    50.032.0 =

    ==

    AVQ sm /3

    651079,9

    1025104,315

    33

    =

    ==

    bQ

    QL m

    D =550 mm iin;

    31013,32

    55.053000

    23000

    =

    = k

    DHR =793,04 m

    31

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    32/85

    5-

    2

    2

    322

    109,83793,04

    2

    55.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    10388

    55.032.0 =

    ==

    AVQ sm /3

    671083,9

    104,3110385

    33

    =

    ==

    bQ

    QL m

    D =600 mm iin;

    31013,32

    6.053000

    23000

    =

    = k

    DHR =793,84 m

    5-

    2

    2

    322

    109,82793,84

    2

    6.05

    1013,3 =

    =

    =

    R

    hHLkQb msm //

    3

    32

    1023,458

    60.032.0 =

    ==

    AVQ sm /3

    74

    1082,9

    10381023,45

    5

    33

    =

    ==

    bQ

    QL

    m

    D =600 mm lik borudan 76-4=68 m yeterlidir.

    Toplam galeri boyu:

    L=14+17+24+30+36+43+47+52+65+67+68

    463=L m

    32

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    33/85

    Tablo 3.2. Szdrma (dren) borularnn tabloda artan apa gre gsterimi

    3.2.3 Toplama Odasnn Boyutlandrlmas

    3.2.3.1 Kum tutucunun boyutlandrlmas

    5,0Re ise ( )v

    dgV s

    2

    118

    =

    v

    dV =Re

    Kumun zgl arl: 65.2=s g/cm3=2650 kg/m3

    Kinematik viskozite : 610331.1 =v m2/s= 210331.1 cm2/s

    Tutulmas istenen kum tanesi ap: 01.0=d cm

    Yerekimi ivmesi: 981=g cm2/s

    5aV cm/s 5.1=aV cm/s olarak seelim.

    aV yatay ak hznn ald yol= c,

    V dey hzn ald yol = h olmak zere;

    5.19.0 =h m arasnda seilmelidir. 1=h m seelim.

    ( ) ( ) 675.010331.1

    01.0165.2

    18

    9811

    18 2

    22

    =

    ==v

    dgV s cm/s

    Kontrol;

    5,05,0Re ==v

    dV olduundan yaplan tahmin dorudur.

    Dren ap

    (mm)

    100 150 200 250 300 350 400 450 500 550 600

    Tesiryarap(m)

    830,804

    826,608

    822,41

    818,21

    814,02

    809,82

    805,62

    801,43

    797,23

    793,04

    793,84

    Birim boydebisi(l/s.m)

    0,09417

    0,0946

    0,0951

    0,0955

    0,0960

    0,0965

    0,0969

    0,0967

    0,0979

    0,0983

    0,0982

    Borukapasitesi(l/s)

    1,25 2,82 5,02 7,85 11,3 15,4 20 25 31,4 38 45,23

    Boru boyu

    (m) 14 17 24 30 36 43 47 52 65 67 68Tm drenboyu (m)

    14 31 55 8512

    1164 211 263 328 395 463

    33

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    34/85

    a V

    h

    V

    c= ifadesinden

    00675.0

    1

    015.0=

    c 30.222.2 =c m elde edilir.

    LbVhbVQ a == ifadesi yardmyla 04,31015.004573.0

    =

    =

    =hV

    Qb

    a

    3.2.3.2 Su alma blmesinin boyutlandrlmas

    H=Savak Yk=10-20 cm arasnda ve hava pay=5-20 cm arasnda olmaldr.

    H=Savak yk=15 cm seilmitir.

    hava pay=5cm seilmitir.

    10=V cm/s olmaldr (standart)

    = Hhe hava pay=1-0.15-0.05=0.80 su derinlii

    eaVAVQ == ifadesinden

    80.010.004573.0 = a 90.059125.0 =a m olduundan a=0.90 m seilir.2/38,1 HbQ =

    2/315.08.104573.0 = b ise

    43.0=b m 45.0=b m alnd.

    3.2.3.3 Su alma borusunun boyutlandrlmas

    Su alma borusunda 5.16.0 =V m/s arasnda olmaldr.

    V=0,8 m/s seelim.

    AVQ = ifadesinde V=1 m/s yerine yazlrsa;

    4104573.0

    2D=

    den D=0.241 m 25.0=D m alnd.

    Hz kontrol yaplrsa;

    931,0

    4

    25.0

    04573.0

    4

    22 === DQ

    V m/s, 0.6-1.5 m/s arasndadr.

    3.3 Eimli Tabaka Membasndan Su Alnmas

    Gelecekteki nfusun su ihtiyacnn %10u da eimli tabaka membasndan karlanacaktr.

    Su tabakas kalnl(H): 3.8+0.2=4 m

    ( ) 2210 52.00116.00116.0 == dk =31013,3 m/s S=eim=0,011

    34

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    35/85

    3.3.1 Szdrma borularnda sabit apa gre boyutlandrlma

    V=0,2 0,4 m/sn seilen V=0,3 m/sn

    Q=VA

    04573,0 =0,3 8

    2

    D ise D=0,623 m seilen D=600 mm

    Hz kontrol yaplrsa;

    04573,0 =V8

    )6,0( 2V=0,323 m/s uygun

    Q=k S L H Burada

    Q: Debi (m3/s) H: Su tabakasnn kalnl (m)

    S: Su yz eim L: Galeri(dren) boyu (m) k: Permeabilite katsays

    0,04573=0,011 3,1310-3 4 L ise

    L=332,05 m , L=332 m alnmtr.

    3.3.2 Szdrma borularnn deiken apa gre boyutlandrlmas

    D =100 mm iin;

    Qb: birim boy debisiQb=S H k=0,011 4 3,1310-3 =1,37 10-4 m3/s/m

    Q: boru kapasitesi

    Q=V8

    2D= 0,323

    8

    1,0 2= 12,6 10-4 m3/sn

    L1 = 12,6 10-4 = 9,19 m 10 m1,37 10-4

    D =150 mm iin;

    Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    15,0 2= 2,85 10-3 m3/sn

    L2 = 2,85 10-3 -12,6 10-4 = 11,6 12 m 1,37 10-4

    35

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    36/85

    D =200 mm iin;Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    20,0 2= 5,07 10-3 m3/sn

    L2== 5,07

    10-3 - 2,85

    10-3 = 16,2 m 17 m1,37 10-4

    D =250 mm iin;

    Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    25,0 2= 7,92 10-3 m3/sn

    L2 = 7,92 10-3- 5,07 10-3 = 21 m

    1,37 10-4D =300 mm iin;Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    30,0 2= 114 10-4 m3/sn

    L2= 114 10-4 -6,74 10-3 = 35 m

    1,37 10-4

    D =350 mm iin;

    Qb=1,37 10-4

    m3

    /sn/m

    Q=V8

    2D=0,323

    8

    35,0 2= 155 10-4 m3/sn

    L2=155 10-4 -114 10-4 = 29,92 30 m

    1,37 10-4

    D =400 mm iin;Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    40,0 2= 202 10-4 m3/sn

    L2=202 10-4 -155 10-4 = 34,3 m 35m

    1,37 10-4

    D =450 mm iin;Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    45,0 2= 256 10-4 m3/sn

    L2=256 10-4 -202 10-4 = 39,41 m 40m

    1,37 10-4

    36

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    37/85

    D =500 mm iin;

    Qb=1,37 10-4 m3/sn/m

    Q=V 8

    2

    D =0,323 850,02

    = 317 10-4 m3/sn

    L2 = 317 10-4 -256 10-4 =44,52 m 45m

    1,37 10-4

    D =550 mm iin;

    Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    55,0 2= 383,7 10-4 m3/sn

    L2=383,7 10-4-317 10-4 = 48,69 m 49m

    1,37 10-4

    D =600 mm iin;

    Qb=1,37 10-4 m3/sn/m

    Q=V8

    2D=0,323

    8

    60,0 2= 456,6 10-4 m3/sn

    L2= 456,6

    10-4 -383,7

    10-4 = 53,21 m 54m

    1,37 10-4

    Toplam L uzunluu =348 m bulunmutur.

    D=600 mm lik borudan 54 - 13 = 41 m yeterlidir.bylece toplam galeri boyu 335 m olmaktadr.

    Tablo 3.3. Szdrma (dren) borularnn tabloda artan apa gre gsterimi

    Drenap(mm)

    100 150 200 250 300 350 400 450 500 550 600

    Birimboydebisi(l/s.m)

    0,137 0,137 0,137 0,137 0,137 0,137 0,137 0,137 0,137 0,137 0,137

    Borukapasitesi (l/s)

    1,26 2,85 5,07 7,92 11,4 15,5 20,2 25,6 31,7 38,3 45,66

    Boruboyu (m)

    10 12 17 21 35 30 35 40 45 49 41

    Tmdren

    boyu (m)

    10 22 39 60 95 125 160 200 245 294 335

    37

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    38/85

    28 m

    221 m

    4.KUYULARDAN SU ALINMASI

    Gelecekteki nfusun %70inin su ihtiyac serbest yzeyli ve basnl kuyulardan temin edilecektir.

    Yer alt sularnn kuyularla alnaca blgede yer alt suyunun kalite durumu ve zemin zelliklerini

    tayin maksad ile gzetleme kuyular almtr.

    4.1 Serbest Yzeyli Su Tabakasndan Kuyularla Su Alnmas

    Serbest yzeyli su tabakasnn bulunduu blgede zemin hidrolik iletkenliini tayin etmek maksad

    ile yaplan deneylerde ana kuyudan 20 L/s debiyle su ekilmi, 28 m uzaklktaki gzetleme

    kuyusundaki alalma 2.70 m ve 221 m uzaklktaki gzetleme kuyusundaki alalma 0.90 m olarak

    llmtr.

    Basnsz akifer iin su tabakas kalnl: H=20+2+8=30 m

    Basnsz akifer iin statik su seviyesinin yeryzne mesafesi:2+8+2=12 m

    28 m uzaklktaki kuyuda su seviyesi:=302,70=27,3

    221 m uzaklktaki kuyuda su seviyesi=30-0,90=29,1 m

    =

    r

    R

    yykQ

    ln

    21

    22

    ( ) ( )

    =

    28

    221ln

    3.271,291020

    223 k

    ise k=1,3 x 10-4 m/s

    Hidrolik iletkenlik katsays:k=1,3 x10-4 m/s

    Optimim seviye alalmas iin md QQ = olmaldr.

    =

    r

    R

    hHkQd

    ln

    22

    302

    khrQm =

    ksR = 3000

    Kuyu ap=D=0.6 m seilmitir. O halde r = 0.3 m olur

    htiya Debisi= gihtiya xQQ 4,0= =0,4x0,45573=0,182292m3/s (Gelecekteki Debinin %40)

    Tablodan ; Sopt=5,05 m

    Qiht=0,182292 m3/s Qopt=0,01786 m3/s

    Kuyu Says=N= Qiht/ Qopt=0,182292/0,01786=10,2 kuyu 11 + 1 yedek=12 kuyu

    38

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    39/85

    Tablo 4.1 Optimum Debinin hesaplanmas

    S (m) h (m) R (m) ln R/r h H-h Qd (m/s) Qm (m/s)

    0 30 0,000 0 900 0 0 0,021481 29 34,205 4,73635 841 59 0,00508 0,020762 28 68,411 5,4295 784 116 0,00872 0,02005

    3 27 102,616 5,83496 729 171 0,01196 0,019334 26 136,821 6,12265 676 224 0,01493 0,018625 25 171,026 6,34579 625 275 0,01769 0,0179

    5,05 24,95 172,737 6,35574 622,503 277,498 0,01782 0,017866 24 205,232 6,52811 576 324 0,02026 0,017187 23 239,437 6,68226 529 371 0,02266 0,01647

    8 22 273,642 6,81579 484 416 0,02491 0,01575

    9 21 307,847 6,93358 441 459 0,02702 0,0150410 20 342,053 7,03894 400 500 0,029 0,0143211 19 376,258 7,13425 361 539 0,03084 0,013612 18 410,463 7,22126 324 576 0,03256 0,0128913 17 444,668 7,3013 289 611 0,03416 0,01217

    14 16 478,874 7,37541 256 644 0,03564 0,0114615 15 513,079 7,4444 225 675 0,03701 0,01074

    16 14 547,284 7,50894 196 704 0,03827 0,0100217 13 581,489 7,56957 169 731 0,03942 0,00931

    18 12 615,695 7,62672 144 756 0,04046 0,0085919 11 649,900 7,68079 121 779 0,0414 0,0078820 10 684,105 7,73208 100 800 0,04223 0,0071621 9 718,311 7,78087 81 819 0,04297 0,00644

    22 8 752,516 7,82739 64 836 0,0436 0,0057323 7 786,721 7,87185 49 851 0,04413 0,00501

    24 6 820,926 7,91441 36 864 0,04456 0,004325 5 855,132 7,95523 25 875 0,0449 0,00358

    26 4 889,337 7,99445 16 884 0,04514 0,0028627 3 923,542 8,03219 9 891 0,04528 0,00215

    28 2 957,747 8,06856 4 896 0,04533 0,0014329 1 991,953 8,10365 1 899 0,04528 0,0007230 0 1026,158 8,13755 0 900 0,04515 0

    39

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    40/85

    0

    5

    1 0

    1 5

    2 0

    2 5

    3 0

    3 5

    0 0,0

    05

    0,0

    1

    0,0

    15

    0,0

    2

    0,0

    25

    0,0

    3

    0,0

    35

    0,0

    4

    0,0

    45

    0,0

    5

    D e b i (

    SeviyeAlalmas(m

    )

    Q d Q m

    ekil 4.1 Seviye alalmas ile debi deiimi

    40

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    41/85

    4.1.2 Kuyu donatm

    d10 =0,52mm, d60=1,67mm , d80=2,22mm , d90=2,47mm olarak tespit edilmitir.

    4.1.2.1 Emme borusunun boyutlandrlmas

    V=0,7-1 m/s Seilen V=1 m/s

    Q=VA 0,01786=0,74

    D2D=0,1507 mm D=150 mm alnd.

    Hz kontrol yaplrsa;

    V=4/15,0

    01786,02

    =1,0 m/s seilen ap uygundur.

    Klape d ap=Dk=150+75=225 mm

    4.1.2.2 Filtre borusunun boyutlandrlmas

    Filtre borusunun i ap Dfi =Klape d ap + (40100) mm

    Dfi= 225+ 100mm boluk = 325 mm

    D ap= Dfd =Dfi+2e

    e=et kalnl e=15mm alnd.

    Dfd =325+215=355 mm

    600-355=245 mm (toplam boluk) 245/2=122,5 mm (tek tarafl boluk)

    Tek tabakal ;

    Kuyu ap=0,6m

    600-355=245 =toplam boluk

    245/2=122,5 mm tek taraftaki boluk

    Hz kontrol V=

    4

    325,0

    01786,02

    = 0,215 m/s

    0,215 m/s < 0,5 m/s olduu iin boyutlandrma dorudur.

    u=d60/d10 ise u= 1,67/0,52=3,21

    dd=4d90=42,4=9,88 mm dd=8-12 mm olur.

    41

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    42/85

    ift tabakal

    Di=4dd=4 (8-12)=25-35 mm

    Hz kontrol V=

    4

    325,0

    01786,02

    = 0,215 m/s

    Hz kontrol yaplrsa; Kuyunun iki tabakal yaplmas uygun grlmtr.nk tabakal yapabilmek iin kuyununetrafndaki malzeme bykl standartlarn stne kmaktadr ve byle bir kuyunun da donatlmas

    pek istenmez.

    4.2 Basnl Su Tabakasndan Kuyularla Su Alnmas

    Basnl akiferin hidrolik iletkenliini tayin etmek maksadyla ana kuyuya boya enjekte edilmi ve 30

    m ilerdeki kuyuda 60 saat sonra maksimum konsantrasyon llmtr.Boya konsantrasyonunun

    lld kuyudan su ekildiinde iki kuyu arasnda oluan piyezometre izgisi eimi 0.12 olaraktespit edilmitir.

    n porozite , gV gerek hz , fV filtre hz olmak zere;

    n%(1a+b)=%(18+2) n=20 L=30 m S=0.12 t=60 saat k=?

    4103888.1606060

    30 =

    ==t

    LVgerek m/s

    54 1077,22.0103888.1 === nVV gfiltre m/s

    45

    1031,212.0

    1077,2

    =

    ==S

    Vk

    f m/s

    Basnl akiferin su tabakas kalnl(m)5+8+2=15 m

    Statik su seviyesinin yeryzne mesafesi:8+2=10 m

    Basnl akiferde piyezometrik ykseklik:30+8+2=40 m

    4.2.1 Optimum debi ve seviye alalmas

    Kuyu ap D=0.60 m seilmitir.

    =

    r

    RhHkmQd

    ln

    2

    302

    kmrQm = S=H-h

    Bu formllere gre seviye alalmasna bal olarak optimum debi hesab yaplm olup aadakitabloda gsterilmitir.Elde edilen deerlere gre seviye alalmas debi deiimi grafiioluturulmutur.

    kSR = 3000 r=0.3 m k=0,000231 m/s m=15 mQiht=0,455730,3=0,136m3/s Tablodan Qopt= 0,01432 m3/s

    Kuyu Says=N= Qiht/ Qopt=0,136/0,01432=9,49 10+1 yedek=11 kuyu

    42

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    43/85

    Tablo 4.2. Optimum Debinin hesaplanmas

    S (m) H (m) h (m) R lnR/r Qd (m/s) Qm (m/s)0 40 40 0 0 0 0,014321 40 39 45,5961 5,02379 0,00433 0,014322 40 38 91,1921 5,71694 0,00762 0,014323 40 37 136,788 6,12241 0,01067 0,014324 40 36 182,384 6,41009 0,01359 0,01432

    4,25 40 36 193,783 6,47071 0,0143 0,014325 40 35 227,98 6,63323 0,01641 0,014326 40 34 273,576 6,81555 0,01917 0,014327 40 33 319,172 6,9697 0,02187 0,014328 40 32 364,768 7,10324 0,02452 0,014329 40 31 410,364 7,22102 0,02713 0,0143210 40 30 455,961 7,32638 0,02972 0,0143211 40 29 501,557 7,42169 0,03227 0,0143212 40 28 547,153 7,5087 0,03479 0,0143213 40 27 592,749 7,58874 0,03729 0,01432

    14 40 26 638,345 7,66285 0,03977 0,0143215 40 25 683,941 7,73184 0,04224 0,0143216 40 24 729,537 7,79638 0,04468 0,0143217 40 23 775,133 7,85701 0,0471 0,0143218 40 22 820,729 7,91417 0,04952 0,0143219 40 21 866,325 7,96823 0,05191 0,0143220 40 20 911,921 8,01953 0,05429 0,0143221 40 19 957,517 8,06832 0,05666 0,0143222 40 18 1003,11 8,11484 0,05902 0,0143223 40 17 1048,71 8,15929 0,06137 0,01432

    24 40 16 1094,31 8,20185 0,0637 0,0143225 40 15 1139,9 8,24267 0,06603 0,0143226 40 14 1185,5 8,28189 0,06835 0,0133627 40 13 1231,09 8,31963 0,07065 0,0124128 40 12 1276,69 8,356 0,07295 0,0114529 40 11 1322,29 8,39109 0,07524 0,010530 40 10 1367,88 8,42499 0,07752 0,0095431 40 9 1413,48 8,45778 0,07979 0,0085932 40 8 1459,07 8,48953 0,08206 0,0076433 40 7 1504,67 8,5203 0,08432 0,00668

    34 40 6 1550,27 8,55015 0,08657 0,0057335 40 5 1595,86 8,57914 0,08882 0,0047736 40 4 1641,46 8,60731 0,09106 0,0038237 40 3 1687,05 8,63471 0,09329 0,0028638 40 2 1732,65 8,66138 0,09551 0,0019139 40 1 1778,25 8,68736 0,09773 0,0009540 40 0 1823,84 8,71267 0,09995 0

    43

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    44/85

    0

    5

    1 0

    1 5

    2 0

    2 5

    3 0

    3 5

    4 0

    0 0 , 0 2 0 , 0 4 0 , 0 6 0 , 0 8 0 , 1

    D e b i (

    evy

    e

    amasm

    Q d Q m

    ekil 4.2. Seviye alalmas ile debi deiimi

    4.2.2 Kuyu donatm

    44

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    45/85

    Blm 3.2 de izilen granlometri erisinden aadaki deerler elde edilmitir.

    d10 =0,52mm d60=1,67mm , d80=2,22mm , d90=2,47mm

    4.2.2.1 Emme borusunun boyutlandrlmas

    V=0,7-1 m/s Seilen V=0,7 m/s

    Q=VA 0,01432=0,74

    2DD=0,161 m D=150 mm alnd

    hz kontrol V=4/15,0

    01432,02

    =0,81 m/s seilen ap uygun.

    D=150 mm alnd.

    Klape d ap=150+75 =225 mm

    4.1.2.2 Filtre borusunun boyutlandrlmas

    ap Dfi =225+ 100 mm boluk

    Dfi= 325 mm

    D ap Dfd=Dfi+2e

    e=et kalnl e=15mm alnrsa

    Df =325+215=355 mmKuyu ap=600 mm

    600-355=245 mm (toplam boluk) 245/2=122,5 mm (tek taraftaki boluk)

    Tek tabakal;

    Hz kontrol V=

    4

    325,0

    01432,02

    = 0,172m/s < 0,5 m/s

    u=d60/d10 ise u= 1,67/0,52=3,21dd=4d90=42,47=9,88 mm dd = 8-12 mm seilmitir. D tabaka kalnl=122,5 mm

    ift tabakal;

    Hz kontrol V=

    4

    325,0

    01432,02

    = 0,172m/s < 0,5 m/s -

    u=d60/d10 ise u= 1,67/0,52=3,21

    dd=4d90=42,47=9,88 mm dd = 8-12 mm i tabaka iin seilmitir.D kalnlk=60 mm

    Di=4dd=4(8-12)=25-35 mm kalnlk=70 mm

    45

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    46/85

    tabakal;

    di=4dd=4(25-35)=100-270 mm olacandan, yani hesapladmz bu malzeme boyutu nc birtabakaya msaade etmedii iin nc bir tabaka yaplmas uygun grlmemitir.

    5.SALE HATTININ GERLMES

    5.1 Cazibeli sale

    Gelecekteki nfusun su ihtiyacnn % 30u cazibeli isale ile temin edilecektir.

    Qmax = 455,73 l/s

    Q%30 =136,671 l/s

    Bu debiye bal olarak katologtan Pakplast HDPE 100 tipi polietilen boru tercih edilmitir.

    D ap: 400 mm

    ap: 389 mm

    Et kalnl:9,7 mm

    Bu boruyu tercih sebebi;

    50 yl servis mr vardr. Suyun doal zelliklerini korur, hijyendir. Kangal ve boy olarak retilebilir. zellikle kangal borularda ok hzl hat deme imkan

    salar. Esnek olmas nedeniyle kavisli arazilerde (et kalnlna bal olarak boru apnn 18-50

    katna kadar bklebilme zelliinden dolay ) kolay ve ekonomik zm salar. (Daha azdirsek kullanm salar.)

    Deprem ve yer kaymas gibi toprak hareketlerine uyum salar. Gvenli ve pratik balant zmleri sunar. Modern deme teknikleri uygulanabilir. Kimyasallara kar yksek diren salar, korozyona uramaz. UV katks nedeniyle gne ndan etkilenmez. Boru i yzeyinin przsz olmasndan dolay akkan iindeki partikller boru i yzeyine

    tutunamaz ve zamana bal kesit daralmalar olmaz. Daha yksek debi geii salar. Borularn i yzeyinde yosun tutmaz ve bakteri retmez.

    5.1.1 Hazne yerinin tesbiti

    Haznedeki su ykseklii=6 m

    2043 yl nfusu 50000 den byk olduu iin;

    saledeki minumum iletme basnc (p/g)min =30 mss alnmtr ( ller Bankas artnamesine gre).

    hazne kotu = ehir kotu + (p/g)min + haznedeki su ykseklii + yk kayplar(tahmini)

    hazne kotu = 1660 + 30 + 6 + 4= 1700 m

    izohips haritasna gre kaynak kotu=1708 m , isale hatt en dk kotu=1647 m

    46

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    47/85

    kaynak kotu isale hatt en dk kotu=1708-1647=61 m

    61 m < 100 m olduundan maslaa gerek yoktur.

    Katalogtan debiye gre seilen ve hz snrlarn salayan boru ap 400 mm olarak tespit edilmitir.

    V=1,39 m/s , S=0,00405 , ks=0.02 mm deerleride 400 mm lik apa gre boru basn kayb

    tablosundan tepit edilmitir.

    5.1.2 Vana ksma oran

    Memba ile hazne arasndaki srekli yk kayplar;

    LShf = L:Hazne ile memba arasndaki uzaklk S=katologtan elde edilen eim

    mxhf 54,300405,0875 ==

    H =(Kaynak kotu-hazne kotu-yk kayb)= 1708-1700-3,54 =4,45 m

    H = Vana ksma orang2

    V 2

    4,45=Vana ksma oran 81,92

    39,1 2

    Vana ksma oran=45,14

    Vana 1/8 orannda kslabilir.

    5.1.3 Maksimum iletme kapasitesinin bulunmas

    Smax=Kaynak kotu-(hazne kotu+(p/g)min isale) L

    Smax =234

    )31700(1708 += 0,021

    Ks sabit =0,02

    389

    02,0=

    D

    ks= 5,1410-5 Re = 61022,1

    389,039,1

    =

    DiV= 443204

    przllk ifadesi = ,0=f 014 olarak alnr.

    Smax = 52

    2max8

    Dg

    Qf

    =52

    2

    max

    389,081,9

    014,08

    Q= 0,021 Qmax = 0,402 m3/s

    Hz kontrol yaplrsasm

    A

    QV /38,3

    4

    389,0

    402,02=

    == >

    sale hatlarnda ller Bankas artnamesine gre maksimium hz 1,8 m/s olmaldr.

    3,38 m/s>1,8 m/s olduu iin hz 1,8 m/s alrz.Bu durumda;

    47

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    48/85

    smQ

    A

    QV /8,1

    4

    389,0 2=

    == Qmax=0,213 m3/s =maksimum iletme kapasitesi

    olacaktr.

    5.2Terfili sale

    Su kayna kotunun, ehir kotundan dk olduu durum iin uygun isale hatt geirilmitir.

    Ekonomik boru ap ve pompa gc bulunmutur. Faiz ve amortisman toplam %10, elektrik kw-st

    fiyat 15 YKr ve pompalarn gnlk alma sresi (10+numarann son rakam ) saattir. Boru

    aplarna gre birim boru maliyetleri, boru firmalarndan temin edilmitir. Seilen borunun azami

    iletme basnc 100 mss nu amayacaktr.Terfili isale hattnda Pakplast HDPE 100 PN10 polietilen

    boru seilmitir.Terfili isale hatt kuyulara uygulandndan gelecekteki su ihtiyacnn %70i kullanlmtr.

    MaxQg = 456.070.0 = 0.3192 3m /s

    Terfi sresi = 10+8 = 18 saat olduundan;

    Q T = gMaxQT

    24

    formlnden;

    TQ = 2.31918

    24 = 425.6 L/s = 1532.16 3m /h

    5.2.1.Ekonomik boru apnn tespiti

    V= 0.6 1.5 m/s arasndadr.

    Bresse formlne gre;

    Dek = 1.5 TQ den;

    Dek =1.5 4256.0 0.978 m

    D = 1000 mm iin;

    Q =V A 0.4256 = V 4

    12 V = 0.54 m/s < 0.6 m/s old.dan uygun deildir.

    Max ve Min hz snrlar iin;

    V = 1.5 m/s 0.4256 = 1.54

    2D

    D = 600 mm

    V= 0.6 m/s 0.4256 = 0.64

    2D

    D= 950 mm

    D = 630 mm seildi.

    48

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    49/85

    Q = V A 0.4256 = V4

    63.0 2

    V = 1.365 m/s < 1.5 m/s

    5.2.2. Przllk katsaysnn tespitiD= 630 mm iin;

    k = 0.02 mm

    D

    k=

    630

    02.0= 3.17 10 5

    Re = 610331.1

    63.0365.1

    = 646093

    Moody diyagramndan;

    f= 0.0098 bulundu.

    Yk kayb tespiti;

    S =g

    V

    D

    f

    2

    2

    formlnden;

    S =81.92

    365.1

    630.0

    0098.02

    0.00147

    Tablo 5.1. aplara gre V, f, s deerleri:

    D (mm) V (m/s) f s630 1.365 0.0098 0.00147710 1.074 0.0094 0.00077800 0.846 0.0092 0.00041900 0.669 0.0091 0.00023

    Hgeo = Hazne kotu Kaynak kotu + 2 m

    Hgeo = 1700 1607 + 2 = 95 m

    Hman = Hgeo + 52

    28

    Dg

    fLQ

    Hman = 95 +52

    2

    63.081.9

    4256.015000098.08

    97.21 m

    = 0.7 olsun.

    N =

    310. gHmanQ

    49

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    50/85

    N =7.0

    1021.974256.09810 3 579.8 Kw

    Pompann bir yllk alma sresi ;

    b= 18 365 6570 saat

    5.2.3.letme masrafnn tespiti

    A1 =

    310gQHmanEb

    A1 =7.0

    10657015)(4256.09810 3+ SLHgeo

    L=1 m seilirse , Hgeo sabit olur. Bunun iin Hgeo ihmal edilirse;

    A1 = 587799504 S

    6.4. naa Masraf

    A 2 = c

    = 0.10

    C: birim boy maliyeti

    Tablo 5.2 Ekonomik boru apnn tespiti

    D (mm) S C A1 A 2 21 AA +630 0.00147 449,30 864065.27 44.93 864110.2710 0.00077 570,06 452605.61 57.006 452662616800 0.00041 723,18 240997.79 72.318 241070108900 0.00023 914,87 135193.88 91.487 2135285367

    Ekonomik boru ap tabloda grld gibi 630 mm dir.

    5.2.4. Pompa seimi

    Pompa seimi ve verimi, pompa firmalarndan temin edilmitir. Debi ve pompa karakteristik erileri

    izilerek gerekli pompa says bulunmutur.

    Terfili isale hattnda darbe hesaplar yaparak gerekli hava kazan hacmi hesaplanmtr.

    Terfili isale hattnda Gksu pompadan temiz su dalg pompa tercih edilmitir.Tercih sebebi;

    Dalg pompalar genellikle su temini, sulama, sprinkler sistemleri, yer alt su seviyelerininkontrolnde kullanlr.

    50

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    51/85

    Derin kuyular ve tnellerde kullanlr.

    Bakm gerektirmemesi ve sadece akkan ierisine tamamen daldrldktan sonra

    kullanlabilmesi nedeniyle herhangi bir bina veya zel yer hazrl gerektirmez.

    Tamamen akkan ierisinde altklarndan grlt ve titreime neden olmazlar.

    Seilen boruap:630 mm idi.

    k= 0.02 mm

    e= 37.1 mm

    D = 630 mm

    a=

    e

    Dk+3.48

    9900

    1.37

    63002.03.48

    9900

    + a 1420 m/s

    Q T = 425.6 L/s

    L = 1500 m

    k= 0.02 mm

    e= 37.1 mm

    D = 630 mm

    a=

    e

    Dk+3.48

    9900

    1.37

    63002.03.48

    9900

    + a 1420 m/s

    5.2.5.Hava kazan hacminin tespiti

    P =23.4 mss

    V = 1.365 m/s

    V = DP

    VV

    1)(6400

    2

    20

    V = 114.23

    )365.1(64002

    2

    20.78 m 3

    51

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    52/85

    5.2.6.Darbe hesab

    hs =1

    )(80 0

    +

    D

    V

    VV

    k

    163.0

    21

    365.180

    +

    18.63 mss

    h d =1

    )()80( 03

    +

    D

    V

    VVL

    k

    163.0

    21

    365.1)150080( 3

    +

    15.97 mss

    6. MESUYU HAZNES

    Tablo 4 de verilen gelecekteki nfusumuza bal olarak (N ,50000den byk) su sarfiyat

    salnmlarna gre hazne hacmi hesaplanmtr.Tablo 6.1.Dzeltilmi debi yntemi ile hazne hacmi hesab

    52

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    53/85

    T(saat) %SarfiyatSarfiyat

    %Eklenik(Vc)

    CazibeileGelen

    % Eklenik

    Terfi ile gelen% Eklenik

    ToplamGelen %

    EklenikDzeltilmi

    (Vg)Vg' - Vc

    0-1 1,50 1,5 1,25 0 1,25 10,25 8,75

    1-2 1 2,5 2,5 0 2,5 11,5 9

    2-3 0,4 2,9 3,75 0 3,75 12,75 9,85

    3-4 0,4 3,3 5 0 5 14 10,7

    4-5 0,5 3,8 6,25 0 6,25 15,25 11,45

    5-6 2,2 6 7,5 0 7,5 16,5 10,5

    6-7 3 9 8,75 0 8,75 17,75 8,75

    7-8 4 13 10 0 10 19 6

    8-9 4 17 11,25 0 11,25 20,25 3,25

    9-10 4,5 21,5 12,5 0 12,5 21,5 0

    10-11 5,5 27 13,75 7 20,75 29,75 2,75

    11-12 8,5 35,5 15 14 29 38 2,5

    12-13 9,5 45 16,25 21 37,25 46,25 1,25

    13-14 9 54 17,5 28 45,5 54,5 0,5

    14-15 8,1 62,1 18,25 35 53,25 62,75 0,65

    15-16 4,9 67 20 42 62 71 4

    16-17 3 70 21,25 49 70,25 79,25 9,25

    17-18 3,5 73,5 21,25 49 78,5 87,5 14

    18-19 7,5 81 23,75 63 86,75 95,75 14,75

    19-20 7 88 25 70 95 104 16

    20-21 4 92 26,25 0 26,25 105,25 13,25

    21-22 3,5 95,5 27,5 0 27,5 106,5 11

    22-23 2,5 98 28,75 0 28,75 107,75 9,75

    23-24 2 100 30 0 30 109 9

    6.1.Hazne hacminin hesab

    %30 cazibeli , %70 terfili iletim yaplacaktr. 06.00-24.00 saatleri arasnda toplam 18 saat terfi

    yaplacaktr.

    Hazneye hem terfili hem de cazibeli sistemden su gelecenden;

    Vh=1/3 Vg alnr.

    53

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    54/85

    Vh:Hazne hacmi(m3) Vg:Gnlk su tketimi(m3)

    1/3 = 0.33 (%33.3)

    14.75 2000 6

    Tablo 6.2 Hazne hacmine bal hazne su ykseklikleri

    Tablo 6.3 Nfusa bal yangn debileri

    Vh:Hazne hacmi

    Vy:Yangn hacmi=360 m3

    Vh = 1/3 39376 + Vy

    Vh = 1/3 39376 + 360

    Vh = 13485 m 3 >2000 h=hazne su ykseklii = 6 m dir.

    x ve y haznedeki bir gz iin duvar uzunluklar olmak zere ;

    ller Bankas ynetmeliine gre x/y=3/4 tr.

    1.gz 2.gz

    N Vy ( m3)

    N < 10000 3610000 < N < 50000 72

    N > 50000 360

    54

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    55/85

    A =h

    VhA1 = A/2

    A = 13485 / 6 = 2247.5 m 2

    A1 = 2248 / 2 = 1124 m2

    3k 4k = 12 k2

    12 k 2 = 1124

    k= 9.678

    x= 29.034 m m29

    y= 38.712 m m39

    6.3.Havalandrma bacas hesabHaznedeki suyun havalandrlmasn salamak iin havalandrma bacalar yaplr. ller Bankas

    Ynetmeliine gre hazne hacmi 1000 m3e kadar olan haznelerde her 20 m3 iin, daha byk

    hacimlerde her 40 m3 iin bir havalandrma yaplr.

    n=baca says olmak zere

    Vh 33740

    13485100013485 33 ==>= nmm adet baca gereklidir.

    6.4.Hazne dolu savak hesabHaznelerde sularn istenmeyen ksmlara tanmasn ve istenmeyen basn altnda kalmasn nlemek

    amacyla dolu savak kullanlr.Dolu savaklar byk haznelerde savak eklinde olur.Savak yk h=7-

    10 cm arasnda alnr.Cd debi katsaysn ifade etmek zere 0,5-0,8 arasnda seilir.

    Dolu savak hesabnda Poleni forml kullanlrsa ;

    Q= ghbCd

    23

    2 5,1 (m3/s)

    b=savak genilii b= D

    y

    xx

    y 1.gz

    55

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    56/85

    h < 0,22 .D olmaldr.

    h : savak yk= 8 cm seildi.cd : Debi katsays = 0,5 seildi.

    Qmax=455,738 L/s =0,45573 m3/s

    Dolu savaktan toplam debinin %25 i kadar bir debi debi geecektir.

    mDDQ 08,181,9208,0*5,03

    2

    4

    45573,0 5,1 ===

    h < 0,22 .D olmas gerektiinden 0,22*1,08=0,23 h=0,08

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    57/85

    ebekede nfuslar,alanlar ile orantl olduundan her bir borunun hizmet verdii alan ve bu alan

    karlk gelen nfus hesaplanmtr.

    Tablo 7.1 ebekedeki borularn hizmet verdii alan ve bu alanlara karlk gelen nfuslar

    Boru No Hizmet Verdii Alan Karlk Gelen Nfus

    1-3 0,337 93003-5 0,1746 4818

    5-7 0,3132 8643

    7-28 0,977 26963

    1-22 0,842 23237

    22-24 0,244 6734

    24-26 0,3457 9540

    26-28 0,1805 4981

    3-24 1,826 50393

    5-26 1,894 52269TOPLAM 7,134 196879

    L

    Nk= =kesafet katsays

    N=alana den nfus

    L=cadde uzunluu

    Tablo 7.2 ebekedeki borulara karlk gelen kesafet katsaylar

    Kesafet katsays 0,5-3 aralnda bir deer almas gerekir.Bu yzden N/L deerlerine gre kesafet

    katsaylar orantl bir ekilde datlmtr.

    7.2.ebekenin l nokta metoduna gre zm

    l noktalar metoduna gre ap hesaplar yaplp tabloda gsterilmitir.

    Hesaplamalarda Williams Hazen cetvelinden faydalanlmtr.

    Hazne ehir aras mesafe =875 mebeke ana borusundaki debi=(Q1-22)ba+(Q1-3)ba+Qyangn

    Boru No N L N/L k

    1-3 9300 110 84,54 2,003-5 4818 98 49,16 1,005-7 8643 122 70,84 1,507-28 26963 98 275,13 3,001-22 23237 97 239,55 2,5022-24 6734 95 70,88 1,5024-26 9540 226 42,21 1,0026-28 4981 230 21,65 1,003-24 50393 223 225,97 2,505-26 52269 234 223,37 2,50

    57

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    58/85

    =218,77+565,19+10

    =793,96 L/s

    Williams Hazen cetveline gre Q=793,96 L/s debisi iin

    V=1,6 m/s S=0,00590 D=900 mm olarak tespit edilir.

    hf=S*Lhf=0,00590*875 =5,17 m

    Bu hazne yeri hesabnda kabul ettiimiz yk kayb deerine yakn bir deer olduu iin seilen hazne

    yeri uygundur.

    Buna gre 1 noktasnn piyezometre kotu=1700-5,17=1694,83 m

    Bu deerden yola karak ebeke zerindeki dier noktalarnda piyezometre kotlar ve bu kotlara

    bal olarak iletme basnlar hesaplanmtr.Tm bu hesaplar Tablo7.3te gsterilmitir.

    58

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    59/85

    Tablo 7.3. l Noktalar Metoduna Gre ebeke Hesap Tablosu

    BoruNo

    Lgerek

    kkesafet

    Litibari

    Qd=Li.qi

    Qu0dei

    lse

    Qi=0,5

    5Qd

    Qu=0ise

    Qi=0,5

    77Qd

    Qu

    Qba=Qu+Qd

    Qah=Qu+Qi

    Qyangn

    QHESAP

    =Qah+Qyan

    D S SL V

    ZEMN KOTUPYEZOMETREKOTU

    SU KOTU

    Ba Son Ba Son Ba Son

    - m - m l/s l/s l/s l/s l/s l/s l/s l/s mm - m m/s m m m m m m

    1-3 110 2,00 220,00 53,24 29,28 - 511,95 565,19 541,23 10 551,23 700 0,004357 0,47927 1,43 1659 1658,2 1694,83 1694,35 35,83 36,15

    3-5 98 1,00 98,00 23,72 13,04 - 349,09 511,95 362,13 10 372,13 550 0,00687 0,67326 1,5 1658,2 1657,9 1694,35 1693,68 36,15 35,78

    5-7 122 1,50 183,00 44,29 24,36 - 169,88 349,09 194,24 10 204,24 500 0,00356 0,43432 1,05 1657,9 1656,1 1693,68 1693,24 35,78 37,14

    22-24 98 1,50 147,00 35,57 19,57 - 46,46 82,04 66,03 10 76,03 300 0,00698 0,68404 1,08 1654 1653,4 1694,04 1693,36 40,04 39,96

    24-26 97 1,00 97,00 23,47 12,91 - 22,99 46,46 35,90 10 45,90 300 0,00283 0,27451 0,633 1653,4 1652,6 1693,36 1693,08 39,96 40,48

    26-28 95 1,00 95,00 22,99 12,64 - 0 22,99 12,64 10 22,64 200 0,000044 0,00418 0,93 1652,6 1651,5 1693,08 1693,08 40,48 41,58

    1-22 226 2,50 565,00 136,73 75,20 - 82,04 218,77 157,24 10 167,24 450 0,00349 0,78874 0,95 1651,5 1654 1694,83 1694,04 43,33 40,04

    3-24 230 2,50 575,00 139,15 - 80,29 0 139,15 80,29 10 90,29 300 0,00925 2,1275 1,255 1658,2 1653,4 1694,35 1692,22 36,15 38,82

    5-26 223 2,50 557,50 134,92 - 77,85 0 134,92 77,85 10 87,85 300 0,00816 1,81968 1,17 1657,9 1652,6 1693,68 1691,86 35,78 39,26

    7-28 234 3,00 702,00 169,88 - 98,02 0 169,88 98,02 10 108,02 350 0,0045 1,053 0,94 1656,1 1651,5 1693,24 1692,19 37,14 40,69

    59

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    60/85

    ller Bankas ynetmeliine gre nfusu 50000e kadar olan yerlerde minumum iletme basnc

    20 m, 50000den byk olan yerlerde ise 30 m dir.Maksimum iletme basnc ise 80 myi

    amamaldr.

    Tablo 7.3 te yaplan hesaplamalar gsterilmitir.Bu tablodaki iletme basnlarna bakldnda

    nfusumuz 50000den byk olduuna gre hesaplanan iletme basnlarnn ynetmelieuyduu grlmektedir.Dolaysyla seilen boru aplar uygundur.

    NOT:ebeke borular zemin kotunun 1 m altnda denmitir.Dolaysyla tablodaki

    hesaplamalarda boru eksen kotu baz alnmtr.

    7.3 Kapanma hatalarnn tespiti

    1.gz iin;

    (hk)1-22+(hk)22-24-(hk)1-3-(hk)3-24=

    0,788+0,684-0,47927-2,1275=1,13 (kabul edilebilir)

    2.gz iin;

    (hk)1-22+(hk)22-24+(hk)24-26-(hk)1-3-(hk)3-5-(hk)5-26=

    0,788+0,684+0,2451-0,47927-0,67326-1,81968=1,25(kabul edilebilir)

    3.gz iin;

    (hk)1-22+(hk)22-24+(hk)24-26+(hk)26-28-(hk)1-3-(hk)3-5-(hk)5-7-(hk)7-28=

    0,788+0,684+0,2451+0,00418-0,47927-0,67326-0,43432-1,053=0,91 (kabul edilebilir)

    ller Bankas Ynetmeliine gre (N>50000 ise) kapanma hatalarnn 2den kk olmas

    gerekir.Bulduumuz sonulara gre seilen aplar uygundur.

    60

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    61/85

    8.KANALZASYON AI HESAPLARIYerleim yerinin gnlk max. su ihtiyac 200 L/N.G olarak nceden belirlenmitir.Verilen

    alann nfusu ise 761 kii olarak hesaplanmtr. Kanala gelecek toplam atksu miktarn bulmak iiniller bankasnn tavsiye ettii deeri 10 olarak alnd. Bunlara gre aadaki forml ile yerleimyerinin toplam atksu miktar hesapland;

    N=Toplam(ksmi alanlar*verilen nfus younluklar)=761 kii

    .3600

    . max

    qNQkanal = => 360010

    200761

    =kanalQ => Qkanal= 4,22 L/sn

    Vmin=0,57 m/sn ve Vmax=2,95 m/sn iin manning formlnden n=0,0013 ve D=20 cm deerleri yerinekonularak Jmin ve Jmax deerleri bulundu.

    2/13/21 JRn

    V= =>2/1

    min3/2)

    4

    2,0(

    0013,0

    157,0 J= => Jmin=0,003

    2/13/21 JRn

    V= =>2/1

    min3/2)

    4

    2,0(

    0013,0

    195,2 J= => Jmax=0,08

    Toplam alan 5,87 ha olarak bulundu. Kanallara birim alandan gelen debi ise aadaki forml ilebulundu.Kanallarn boyutlandrlmasnda ksmen dolu aka gre (h/D) %60a gre boyutlandrld. Kanal apolarak min. 20 cm ve min. derinlik 1,8-3 m arasnda max. derinlik 4,5-6 m olarak alnd. Muayene

    baca aralklar ise kanal aplarna gre ve baca fonksiyonlarna gre 50-70 mde konuldu.

    1-2 Kanalnn Hesab;

    60

    12,7053,70 =caddeJ => Jcadde= 0,007 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    62/85

    1-27 Kanalnn Hesab;

    Jcadde= 0,01 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    63/85

    28-29 Kanalnn Hesab;

    Jcadde= 0,008 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    64/85

    2-25 Kanalnn Hesab;

    Jcadde= 0,002 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    65/85

    26-30 Kanalnn Hesab;

    Jcadde= 0,010 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    66/85

    31-32 Kanalnn Hesab;

    Jcadde= 0,00875 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    67/85

    Jcadde= 0,013 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    68/85

    Jcadde= 0,008 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    69/85

    Jcadde= 0,013 Jmin

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    70/85

    Qd

    Q=

    21

    107,0= 0,005 =

    Vd

    V0.273

    D

    h= % 5

    V = 0,18 m/s h = 1 cm

    3 4 Kanalnn hesab :

    Scadde = 0.006Skanal = %06Q = 0.168 L/sD = 20 cmKutter Tablosundan Qd = 21 L/s Vd = 0,68 m/s

    Qd

    Q=

    21

    168.0= 0.008 =

    Vd

    V0.319

    D

    h= % 6.2

    V = 0.21 cm/s h = 1.24 cm

    4 6 Kanal :

    Scadde = 8.16 10 3

    Skanal = %08

    69.7 m

    69.28 m

    67.28 m

    67 m

    67.7 m

    69.28 m

    68.79 m

    66.77m

    60 m

    67.26 m

    Doluluktan

    70

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    71/85

    Q = 0.208 L/sD = 20 cmKutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    Qd

    Q= 0.009 =

    Vd

    V0.322

    D

    h= % 6.5

    V = 0.25 m/s h = 1.3 cm

    6 8 Kanal :

    Scadde = 9.16 310Skanal = %09Q = 0.409 L/s

    D = 20 cmKutter Tablosundan Qd = 25 L/s Vd = 0.83 m/s

    Qd

    Q= 0.016 =

    Vd

    V0.389

    D

    h= % 8.6

    V = 0.32 m/s h = 1.72 cm

    8 10 Kanal :

    68.79 m

    68.24 m

    66.22 m

    60 m

    66.77 m

    Doluluktan

    Doluluktan

    71

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    72/85

    Scadde = 0.011Skanal = %011

    Q = 1.175 L/sD = 20 cm

    Kutter Tablosundan Qd = 28 L/s Vd = 0.98 m/s

    Qd

    Q= 0.04 =

    Vd

    V0.505

    D

    h= %13.4

    V = 0.494 m/s h = 2.6 cm

    10 11 Kanal :

    Scadde = 2.43 310Skanal = %02Q = 1.655 L/sD = 20 cmKutter Tablosundan Qd = 12 L/s Vd = 0.30 m/s

    68.24 m

    67.48 m

    65.46 m

    67 m

    66.22 m

    67.48 m

    67.39 m

    65.37 m

    37 m

    65.46 m

    Doluluktan

    Doluluktan

    72

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    73/85

    Qd

    Q= 0.13 =

    Vd

    V0.64

    D

    h= %0.23

    V = 0.19 m/s h = 4.6 cm

    14 36 Kanal :

    Scadde = 0.011Skanal = %011Q = 2.409 L/sD = 20 cmKutter Tablosundan Qd = 28 L/s Vd = 0.92 m/s

    Qd

    Q= 0.086 =

    Vd

    V0.627

    D

    h= % 19.6

    V = 0.57 m/s h = 3.92 cm25 5 Kanal :

    Scadde = 6.41 310Skanal = %06Q = 2.409 L/sD = 20 cmKutter Tablosundan Qd = 21 L/s Vd = 0.68 m/s

    Qd

    Q= 0.11 =

    Vd

    V0.62

    D

    h= 0.21

    66.47 m

    66.03 m

    64.01 m

    40 m

    64.45 m

    69.68 m

    69.25 m

    67.23 m

    67 m

    67.66 m

    Doluluktan

    Doluluktan

    73

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    74/85

    V = 0.42 m/s h = 4.2 cm

    11 13 Kanal :

    Scadde = 0.015Skanal = %015Q = 1.741 L/sD = 20 cmKutter Tablosundan Qd = 33 L/s Vd = 1.07 m/s

    Qd

    Q= 0.052 =

    Vd

    V0.543

    D

    h= %15.2

    V = 0.58 m/s h = 3.04 cm

    13 14 Kanal :

    Scadde = 8 310Skanal = %08Q = 2.333 L/sD = 20 cm

    Kutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    67.39 m

    66.79 m

    64.77 m

    40 m

    65.37 m

    66.79 m

    66.47 m

    64.45 m

    40 m

    64.77 m

    Doluluktan

    Doluluktan

    74

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    75/85

    Qd

    Q= 0.11 =

    Vd

    V0.62

    D

    h= %21

    V = 0.48 m/s h = 4.2 cm

    5 6 Kanal :

    Scadde = 7.07 310Skanal = %07Q = 0.264 L/sD = 20 cmKutter Tablosundan Qd = 23 L/s Vd = 0.73 m/s

    Qd

    Q= 0.011 =

    Vd

    V0.347

    D

    h= %7.2

    V = 0.25 m/s h = 1.44 cm26 7 Kanal :

    Scadde = 9.07 310Skanal = %09Q = 0.250 L/sD = 20 cmKutter Tablosundan Qd = 25 L/s Vd = 0.83 m/s

    69.25 m

    68.79 m

    66.77 m

    65 m

    67.23 m

    69.21 m

    68.62 m

    66.6 m

    65 m

    67.19 m

    Doluluktan

    Doluluktan

    75

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    76/85

    Qd

    Q= 0.01 =

    Vd

    V0.341

    D

    h= %6.9

    V = 0.28 m/s h = 1.38 cm

    7 8 Kanal :

    Scadde = 6.02 10 3

    Skanal = %06Q = 0.625 L/sD = 20 cm

    Kutter Tablosundan Qd = 21 L/s Vd = 0.68 m/s

    Qd

    Q= 0.029 =

    Vd

    V0.460

    D

    h= %11.5

    V = 0.31 m/s h = 2.3 cm

    30 9 Kanal :

    Scadde = 8.15 310Skanal = %08Q = 0.192 L/s

    D = 20 cm

    Kutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    68.65 m

    68.24 m

    66.24 m

    68 m

    66.65 m

    68.53 m

    68 m

    65.97 m

    65 m

    66.50 m

    Doluluktan

    Doluluktan

    76

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    77/85

    Qd

    Q= 0.008 =

    Vd

    V0.319

    D

    h= 6.2

    V = 0.24 m/s h = 1.24 cm

    9 10 Kanal :

    Scadde = 7.64 310Skanal = %07Q = 0.393 L/sD = 20 cmKutter Tablosundan Qd = 23 L/s Vd = 0.73 m/s

    Qd

    Q= 0.017 =

    Vd

    V0.395

    D

    h= %8.8

    V = 0.28 m/s h = 1.76 cm32 12 Kanal :

    Scadde = 4.303

    10

    Skanal = %04Q = 0.248 L/sD = 20 cmKutter Tablosundan Qd = 17 L/s Vd = 0.55 m/s

    Qd

    Q= 0.014 =

    Vd

    V0.375

    D

    h= %8.1

    68 m

    67.48 m

    65.46 m

    68 m

    65.98 m

    67.65 m

    67.37 m

    65.35 m

    65 m

    65.63 m

    Doluluktan

    Doluluktan

    77

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    78/85

    V = 0.20 m/s h = 1.62 cm

    12 13 Kanal :

    Scadde = 0.014Skanal = %014Q = 0.517 L/sD = 20 cmKutter Tablosundan Qd = 32 L/s Vd = 1.03 m/s

    Qd

    Q= 0.016 =

    Vd

    V0.396

    D

    h= % 8.6

    V = 0.40 m/s h = 1.72 cm

    6 15 Kanal :

    Scadde = 0.00828

    Skanal = %08

    Q = 0.026 L/s

    D = 20 cm

    67.37 m

    66.39 m

    64.35 m

    68 m

    65.33 m

    68.79 m

    68.5 m

    66.46 m

    35 m

    66.75 m

    Doluluktan

    78

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    79/85

    Kutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    Qd

    Q= 0.0010 =

    Vd

    V0.210

    D

    h= %3

    V = 0.16 m/s h = 0.6 cm

    15 16 Kanal :

    Scadde = 0.010Skanal = %010Q = 0.056 L/sD = 20 cm

    Kutter Tablosundan Qd = 27 L/s Vd = 0.87 m/s

    Qd

    Q= 0.002 =

    Vd

    V0.213

    D

    h= %3.2

    V = 0.185 m/s h = 0.64 cm

    8 17 Kanal :

    Scadde = 8.25 310Skanal = %08Q = 0.067 L/s

    D = 20 cm

    Kutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    68.5m

    68.07 m

    66.07 m

    42 m

    66.5 m

    68.24 m

    67.91 m

    65.87 m

    40 m

    68.20 m

    Doluluktan

    Doluluktan

    Doluluktan

    79

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    80/85

    Qd

    Q= 0.00279 =

    Vd

    V0.319

    D

    h= %6.2

    V = 0.248 m/s h = 1.24 cm

    17 18 Kanal :

    Scadde = 7.85 310Skanal = %07Q = 0.133 L/sD = 20 cmKutter Tablosundan Qd = 23 L/s Vd = 0.73 m/s

    Qd

    Q= 0.00578 =

    Vd

    V0.28

    D

    h= %5

    V = 0.204 m/s h = 1 cm

    10 -19 Kanal :

    Scadde = 9.75 310Skanal = %05Q = 0.083 L/sD = 20 cmKutter Tablosundan Qd = 19 L/s Vd = 0.62 m/s

    Qd

    Q= 0.0043 =VdV 0.263 Dh = %4.5

    V = 0.136 m/s h = 0.9 cm

    67.91 m

    67.58 m

    65.56 m

    42 m

    65.89 m

    67.48 m

    67.25 m

    65.23 m

    40 m

    65.46 m

    Doluluktan

    Doluluktan

    80

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    81/85

    13 22 Kanal :

    Scadde = 7.25 310Skanal = %07Q = 0.067 L/sD = 20 cmKutter Tablosundan Qd = 23 L/s Vd = 0.73 m/s

    Qd

    Q= 0.0029 =

    Vd

    V0.461

    D

    h= %11.4

    V = 0.33 m/s h = 2.28 cm

    22 23 Kanal :

    Scadde = 0.013Skanal = %013Q = 0.067 L/sD = 20 cm

    Kutter Tablosundan Qd = 31 L/s Vd = 1 m/s

    Qd

    Q= 0.0046 =

    Vd

    V0.527

    D

    h= % 14.4

    V = 0.527 m/s h = 2.88 cm

    66.79 m

    66.5 m

    64.48 m

    40 m

    64.77 m

    66.5 m

    65.85 m

    63.85 m

    47 m

    64.5 m

    Doluluktan

    Doluluktan

    81

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    82/85

    16 18 Kanal :

    Scadde = 8.90 310Skanal = %08Q = 0.089 L/sD = 20 cmKutter Tablosundan Qd = 24 L/s Vd = 0.78 m/s

    Qd

    Q= 0.0037 =

    Vd

    V0.261

    D

    h= 4.3

    V = 0.20 m/s h = 0.86 cm

    18 20 Kanal :

    Scadde = 0.012Skanal = %012Q = 0.257 L/sD = 20 cmKutter Tablosundan Qd = 30 L/s Vd = 0.96 m/s

    Qd

    Q= 0.0085 =

    Vd

    V0.324

    D

    h= %6.5

    V = 0.31 m/s h = 1.3 cm

    68.07 m

    67.58 m

    65.55 m

    55 m

    66.04 m

    67.58 m

    66.83 m

    64.81 m

    60 m

    65.56 m

    Doluluktan

    Doluluktan

    82

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    83/85

    20 21 Kanal :

    Scadde = 0.013Skanal = %013Q = 0.453 L/s

    D = 20 cmKutter Tablosundan Qd = 31 L/s Vd = 1 m/s

    Qd

    Q= 0.014 =

    Vd

    V0.375

    D

    h= %8.1

    V = 0.375 m/s h = 1.6 cm

    21 23 Kanal :

    Scadde =0.012Skanal = %012Q = 0.467 L/sD = 20 cmKutter Tablosundan Qd = 30 L/s Vd = 0.96 m/s

    Qd

    Q= 0.015 =

    Vd

    V0.38

    D

    h= %8.3

    V = 0.36 m/s h = 1.6 cm23 24 Kanal :

    66.83 m

    66.3 m

    64.27 m

    40 m

    64.80 m

    66.3 m

    65.85 m

    63.85 m

    35 m

    64.3 m

    Doluluktan

    Doluluktan

    83

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    84/85

    Scadde = 0.01625Skanal = %016Q = 0.635 L/sD = 20 cm

    Kutter Tablosundan Qd = 31 L/s Vd = 1.10 m/s

    Qd

    Q= 0.020 =

    Vd

    V0.415

    D

    h= %9.6

    V = 0.456 m/s h = 1.9 cm

    24 38 Kanal :

    Scadde = 0.011

    Skanal = %011Q = 0.655 L/sD =20 cmKutter Tablosundan Qd = 28 L/s Vd = 0.92 m/s

    Qd

    Q= 0.023 =

    Vd

    V0.43

    D

    h= %10.25

    V = 0.39 m/s h = 2.05 cm

    9)YAMUR SUYU KANAL AI HESAPLARIYerleim blgesinin ;rasat yamur deerleri, n=2 , tr=6 dk ,H=11 dk ve ir=1,83 mm/dk olarak hesapland.

    65.85 m

    65.2 m

    63.18 m

    40 m

    63.83 m

    65.12 m

    64.75 m

    62.75 m

    33 m

    63.12 m

    Doluluktan

    Doluluktan

    84

  • 8/2/2019 Afyon Bolvadin Su Temini Projesi

    85/85

    Hesap yamuru iin ise n=2 th=10 dk , C=0,8 olarak verildi.

    Bu verilenlere gre hesap yamuru iin ya iddeti hesapland kanallara gelen debiler hesapyamurun verimiyle hesaplanr.

    99,02)910(

    24

    35,0

    =+

    =xh

    34,12)96(

    24

    35,0

    =+

    =xr

    h

    r

    h

    r

    i

    i

    = ise99,0

    34,183,1=

    hi

    ih=1,352 mm/dk olarak bulundu .Verim ise r=166,67x ih L/sn.ha =225,33 L/sn.ha olarak bulundu.

    Hesaplamalarda sadece bu verim deeri kullanld.

    1-2 Kanalnn Hesab;

    Lkanal=58m , F=0,075ha , kanaldaki ak sresi(ta)Q=13,51 L/sn

    60

    12,7053,70 =caddeJ => Jcadde= 0,00683 Jc