Menghitung Volume/luas Pekerjaan Bangunan 12345 Jangan diedit 12345 edit sesuai uk A Volume Galian Tanah/Pondasi 63.00 M3 - lebar galian 70.00 cm - dalam galian 90.00 cm - total panjang galian 100.00 m' B Volume Pasangan Pondasi Batu kali 72.00 M3 - alas pondasi 60.00 cm - atas pondasi 30.00 cm - dalam pondasi 80.00 cm - total panjang pondasi 200.00 m' C Luas Pasangan Dinding Bata Merah 327.44 M2 tinggi - tinggi dinding 3.25 m' - total panjang dinding 100.75 m' D Luas Lantai 267.75 M2 - panjang lantai 10.50 m' - lebar lantai 25.50 m' E Volume Lantai Beton Bertulang 8.06 M3 - panjang lantai 12.00 m' - lebar lantai 5.60 m' - tebal lantai 12.00 cm F Luas Atap 147.00 M2 lebar denah 7.00 m' panjang denah 12.00 m'

Alat Menghitung Biaya Bangunan

Embed Size (px)

DESCRIPTION

1

Citation preview

Page 1: Alat Menghitung Biaya Bangunan

Menghitung Volume/luas Pekerjaan Bangunan

12345 Jangan diedit !

12345 edit sesuai ukuran di lapangan

A Volume Galian Tanah/Pondasi 63.00 M3

- lebar galian 70.00 cm - dalam galian 90.00 cm dalam

- total panjang galian 100.00 m'lebar

B Volume Pasangan Pondasi Batu kali 72.00 M3 - alas pondasi 60.00 cm - atas pondasi 30.00 cm dalam

- dalam pondasi 80.00 cm - total panjang pondasi 200.00 m'

C Luas Pasangan Dinding Bata Merah 327.44 M2 tinggi

- tinggi dinding 3.25 m' - total panjang dinding 100.75 m' total panjang dinding

D Luas Lantai 267.75 M2 - panjang lantai 10.50 m' - lebar lantai 25.50 m'

E Volume Lantai Beton Bertulang 8.06 M3 - panjang lantai 12.00 m' - lebar lantai 5.60 m' - tebal lantai 12.00 cm

F Luas Atap 147.00 M2lebar denah 7.00 m'panjang denah 12.00 m'

Anda cukup edit ukuran yang diblok warna ABU2, maka BIAYA secara otomatis berubah

Page 2: Alat Menghitung Biaya Bangunan

edit sesuai ukuran di lapangan

panjang

atas

panjang

alas

total panjang dinding

Anda cukup edit ukuran yang diblok warna , maka BIAYA secara otomatis berubah

Page 3: Alat Menghitung Biaya Bangunan

No Pekerjaan Volume Satuan Harga Satuan (Rp) Sub Total TOTALA Galian Tanah/Pondasi 63.00 M3 2,328,480

Pekerja oh 1,988,280 Mandor oh 229,320 Alat Bantu oh 110,880

B Pasangan Pondasi Batu kali 72.00 M3 26,438,436Batu Belah 86.40 m³ 126,000.00 10,886,400 P C (50 kg) 67.97 zak 55,000.00 3,738,240 Pasir Pasang 30.96 m³ 178,250.00 5,518,620 Pekerja 90.00 org 45,000.00 4,050,000 Tukang 36.00 org 60,000.00 2,160,000 Mandor 1.22 org 70,000.00 85,176

C Pasangan Dinding Bata Merah 327.44 M2 24,765,834Bata merah 22920.63 bh 400.00 9,168,250 P.C (50 kg) 67.90 zak 55,000.00 3,734,359 Pasir pasang 18.99 m³ 178,250.00 3,385,213 Pekerja 105.37 org 45,000.00 4,741,622 Tukang 59.10 org 60,000.00 3,546,148 Mandor 2.72 org 70,000.00 190,241

D Lantai Keramik (30 x 30) 267.75 M2 23,842,258Keramik KW 1 DN putih polos 270.43 m² 42,768.00 11,565,643 P.C (50 kg) 42.84 zak 55,000.00 2,356,200 Pasir pasang 8.11 m³ 178,250.00 1,446,111 Semen warna 3.48 kg 10,120.00 35,225 Pekerja 50.20 org 45,000.00 2,259,141 Tukang 100.41 org 60,000.00 6,024,375 Mandor 2.22 org 70,000.00 155,563

E Lantai Beton Bertulang 8.06 M3 6,662,475Semen Portland (50 kg) 54.19 zak 55,000.00 2,980,454 Pasir Beton 4.35 M3 191,245.00 832,788 Batu pecah 1 - 2 6.53 M3 212,750.00 1,389,649 Pekerja 16.13 Oh 45,000.00 725,760 Tukang 2.82 Oh 60,000.00 169,344 Mandor 8.06 Oh 70,000.00 564,480

F Tutup Atap (Genting Plentong Jatiwangi) 147.00 M2 6,897,240Atap Genteng Plentong pres Bakar KW 1 3,675.00 bh 1,500.00 5,512,500 Tukang 8.82 org 60,000.00 529,200 Pekerja 17.64 org 45,000.00 793,800 Mandor 0.88 org 70,000.00 61,740

JMLH A-F 90,934,723

Perhitungan Biaya (Bahan & Upah Kerja) Yang Diperlukan (diproteksi)

Page 4: Alat Menghitung Biaya Bangunan

Untuk lantai beton tebal 10 cmper M2 diperlukan biaya

Rp666,248belum termasuk besi & bekisting

Hanya Pasang Tutup Atap, belum terma-suk rangka atap & genting bubungan.

Perhitungan sudah Otomatis ! Anda hanya perlu mengedit harga satuan upah & bahan sesuai harga setempat pada worksheet Bahan dan Upah

Page 5: Alat Menghitung Biaya Bangunan

SATUAN HARGA SATUAN Rp.

Abu Batu m³ 144,000.00 Acustik Amstrong 60 x 120 lbr 112,200.00 Alat-alat bantu bh 35,000.00 Aluminium foile m² 7,920.00 Ampelas lbr 2,070.00 Atap Aluminium Natural USR 26 ( JAINDO ) m² 139,920.00 Atap Aluminium Warna USR 26 ( JAINDO ) m² 161,436.00 Atap Asbes Gel. Besar 4 mm 80 x 180 lbr 69,432.00 Atap Asbes Gel. Kecil 5 mm 80 x 180 lbr 96,360.00 Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr 74,580.00 Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr 36,960.00 Atap Genteng Beton Warna 14,5/m2 m² 85,932.00 Atap Genteng Flam pres Molen Oven Jatiwangi bh 1,518.00 Atap Genteng Kodok bh 1,254.00 Atap Genteng Plentong pres Bakar KW 1 bh 1,122.00 Atap Genteng Plentong pres Molen Oven Jatiwangi bh 1,518.00 Atap Genteng Plentong pres Molen Oven KW1 bh 1,320.00 Atap Plastik Gelombang 80 x 180 lbr 20,328.00 Atap Seng Gelombang 3 mm 80 x 180 lbr 46,200.00 Atap Seng Gelombang 5 mm 80 x 180 lbr 69,960.00 Atap Tegola Kubota, lengkap m² 488,400.00 Plafond Asbes Semen 5 mm m² 13,200.00 Plafond Enternit 4 mm lbr 54,780.00 Plafond hardpleks 5 mm 120 x 240 m² 16,896.00 Plitur Kripik ( Sirlak India ) kg 79,200.00 Bak KM Fiber 60 x 60 bh 206,580.00 Bak KM Taraso 60 x 60 bh 130,416.00 Bak Taraso WC 40 x 40 bh 43,560.00 Bambu Gombong bt 9,200.00 Bambu Ø 5 s.d 7 bt 13,200.00 Bambu Ø 7 s.d 10 bt 33,000.00 Bata Karawang bh 6,600.00 Bata Merah Bakar Kelas I bh 400.00 Bata Merah Bakar Kelas II bh 375.00 Bata Merah Oven ( Klingker ) bh 990.00 Batako Besar 8 x 20 x 30 bh 1,980.00 Batako kecil 8 x 10 x 20 bh 600.00 Bath Cape Washteren unit 2,152,920.00 Batu Belah Pondasi m³ 126,000.00 Batu Bronjol ( Untuk Bronjong ) m³ 126,000.00 Batu Gosok ( Apung ) kg 13,464.00 Batu Gunung ( Quarry ) m³ 110,880.00 Batu Koral Beton Kali m³ 110,880.00 Batu Pecah Mesin 0,5-1 cm (abu batu) m³ 144,000.00 Batu Pecah Mesin 1/2 m³ 212,750.00 Batu Pecah Mesin 2/3 m³ 175,375.00 Batu Pecah Mesin 3/5 m³ 149,500.00 Batu Pecah Mesin 5/7 m³ 134,800.00 Batu Pecah Tersaring Bergradasi m³ 144,000.00 Batu Pinggir Beton 10 x 20 x 35 bh 10,164.00 Batu Pinggir Beton 15 x 35 x 50 ( K -225 ) bh 36,300.00

DAFTAR BAHAN BANGUNAN (diurutkan berdasarkan abjad)

Page 6: Alat Menghitung Biaya Bangunan

Batu Telor m³ 92,400.00 Batu Tempel Hitam m² 73,656.00 Bensin Premium lt 5,000.00 Besi Beton U-24 Rata - Rata kg 8,100.00 Besi Beton U-39 / U-32 Rata - Rata kg 8,100.00 Besi Beugel kuda - kuda kg 10,956.00 Besi C Lip Chanel kg 6,563.00 Besi Galvanisir kg 12,650.00 Besi Pipa Hitam Ø 1" t=2 mm bt 98,340.00 Besi Pipa Hitam Ø 2" t=2 mm bt 198,000.00 Besi Pipa Hitam Ø 3" t=2 mm bt 357,720.00 Besi Pipa Hitam Ø 4" t=2 mm bt 472,560.00 Besi Pipa Hitam Ø 6" t=2 mm bt 660,000.00 Besi Pipa untuk Hydrant BSP Ø 1" bt 147,840.00 Besi Pipa untuk Hydrant BSP Ø 1,25" bt 203,280.00 Besi Pipa untuk Hydrant BSP Ø 1,5" bt 224,400.00 Besi Pipa untuk Hydrant BSP Ø 2" bt 314,820.00 Besi Pipa untuk Hydrant BSP Ø 2,5" bt 459,096.00 Besi Pipa untuk Hydrant BSP Ø 3" bt 597,300.00 Besi Pipa untuk Hydrant BSP Ø 4" bt 851,400.00 Besi Pipa untuk Hydrant BSP Ø 6" bt 1,433,520.00 Besi Profil DN SII kg 6,563.00 Besi Profil Ex LN kg 6,563.00 Besi Strip kaca nako kg 6,563.00 Bilik Bambu ( dengan kulit ) m² 14,000.00 Bilik Bambu ( tanpa kulit ) m² 9,500.00 Bilik Bambu Hitam Variasi m² 19,800.00 Bondek m² 137,280.00 Bubung Genteng pres Bulat Ex Jatiwangi bh 5,676.00 Bubung Murando Glasur bh 7,524.00 Bubung Murando Natural bh 5,676.00 Bubungan Genteng Keramik bh 6,600.00 Bubungan Genteng Kodok bh 3,630.00 Cangkul bh 25,000.00 Cat Besi kg 33,120.00 Cat Besi Duco Danaglos/ICI kg 83,160.00 Cat Bron kg 44,352.00 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 70,422.00 Cat Kayu Sieve kg 42,900.00 Cat Marka / Spotlight kg 60,500.00 Cat Primer Marka kg 60,500.00 Cat Tahan Asam kg 23,958.00 Cat Tembok ICI Eksterior kg 31,680.00 Cat Tembok ICI Eksterior ( BETON ) lt 75,504.00 Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt 75,504.00 Cat Tembok Sanlex kg 11,080.00 Cat Tembok Vinilex kg 18,480.00 Cat Tembok Vinilex gln 85,800.00 Check Valve 1/2 " bh 71,280.00 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,705,440.00 Closet Duduk Warna Standard lengkap INA bh 1,300,200.00 Closet Jongkok Lengkap Sistem Jet TOTO unit 1,805,760.00 Closet Jongkok Poslin warna TOTO unit 198,000.00 Closet Jongkok Standard Putih Poslin TOTO unit 174,240.00 Compresor 210 m3 /jam 81,500.00 Compresor Blower /jam 81,500.00 Compresor Jack Hammer /jam 81,500.00

Page 7: Alat Menghitung Biaya Bangunan

Con Blok 8 x 20 x 40 bh 3,960.00 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories ) m² 87,120.00 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories ) m² 129,360.00 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m² 171,600.00 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m² 129,360.00 Deep Well dengan kelengkapannya kap. 150 liter/menit unit 200,000,000.00 Demobilisasi Alat Berat setelah pekerjaan OverlayDempul Duco kg 28,090.00 Dempul Halus / Imfra ( Wood Filler ) kg 26,136.00 Dempul Kayu Cap Kucing kg 22,176.00 Dempul Lilin kg 21,780.00 Dempul Plastik kg 24,394.00 Dempul Plitur kg 23,958.00 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit 566,606,700.00 Dolken 5 s/d 7 bt 14,000.00 Dolken 7 s/d 10 bt 18,700.00 Door Closer Kelas Rendah unt 184,140.00 Door Closer Kelas Standard ( Kelas Baik ) unt 543,180.00 Door Closer Kelas Standard ( Kelas Sedang ) unt 380,556.00 Double Neple 1/2 " bh 26,400.00 Down Light + SL 25 W bh 271,920.00 Down Light +SL 25 W bh 116,160.00 Engsel Harmonika m1 11,220.00 Engsel Jendela Unilon ps 10,824.00 Engsel Patrun ps 6,600.00 Engsel Pintu Unilon Standard ps 15,576.00 Espangolet ps 36,960.00 Exhouse Fan H 100 W 40 x 40 cm unit 865,700.00 Exhouse Fan H 360 W 60 x 60 cm unit 4,878,500.00 Exhouse Fan H 380 W CFM 55 x 55 cm unit 5,500,000.00 Fire House 1.5 x 30 m + nose unit 4,725,600.00 Formika 120 x 240 lbr 146,520.00 Formika Ukuran Pintu lbr 110,484.00 Gate Walve 1/2 " bh 52,800.00 Genteng Beton Natural m² 72,527.00 Genteng Beton Warna m² 84,084.00 Genteng Bubungan Beton bh 8,976.00 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 3,960.00 Genteng Keramik Glasur Premium 14,5 / m2 m² 131,736.00 Genteng Keramik Glasur Special 14,5 / m2 m² 117,084.00 Genteng Keramik Glasur Standard 14,5 / m2 m² 110,484.00 Genteng Keramik Natural Intan 14,5 / m2 m² 98,340.00 Genteng Metal ( Rainbow Roof ) m² 216,216.00 Genteng Metal Hana m² 155,760.00 Genteng Murando Glasur 1m2 = 18 bh bh 5,280.00 Genteng Murando Glasur 1m2 = 20 bh bh 2,904.00 Genteng Press Plentong JTW KW 1 bh 1,500.00 Genteng Murando Natural 1m2 = 20 bh bh 2,904.00 Glass Block DN 20 x 20 ( Kedawung ) bh 20,856.00 Glass Block DN 20 x 20 Ex LN bh 80,520.00 Granit Alam DN Ukuran Besar m² 300,300.00 Granit Alam DN Ukuran Kecil m² 204,600.00 Granit Alam LN Ukuran Besar m² 250,300.00 Granit Alam LN Ukuran Kecil m² 170,500.00 Granito Tile Essenza 60 x 60 Polis m² 1,795,200.00 Granito Tile Essenza 60 x 60 Unpolis m² 1,227,600.00 Granito Tile Essenza Ukuran 40 x 40 Polis m² 1,785,200.00

Page 8: Alat Menghitung Biaya Bangunan

Granito Tile Essenza Ukuran 40 x 40 Unpolis m² 1,518,000.00 Grass Blok 20 x 20 bh 4,514.00 Grass Blok 30 x 30 bh 5,702.00 Grendel 15 cm bh 33,000.00 Grendel 5 cm bh 3,300.00 Ground Reservoir 100 m3 unit 267,894,000.00 Ground Reservoir 1000 m3 unit 1,778,700,000.00 Ground Reservoir 200 m3 unit 529,980,000.00 Ground Reservoir 300 m3 unit 726,000,000.00 Ground Reservoir 50 m3 unit 76,832,580.00 Ground Reservoir 500 m3 unit 987,360,000.00 Gypsum 120 x 240 t = 9 mm ex DN lbr 62,832.00 Gypsum 120 x 240 t = 9 mm ex Luar lbr 60,720.00 Hak Angin Jendela Antik ps 21,120.00 Hak Angin Kait Jendela Biasa ps 4,620.00 Hak Angin Sendok Stainless / Kuningan bh 25,872.00 Hand Oil Pump unit 4,510,000.00 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 366,960.00 Hot Roller Sheet (Lataston) / HRS ton 753,250.00 Injuk kg 5,000.00 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 163,284.00 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit 66,104,016.00 Kabel NYA 1x 1.5 Prima (1 rol = 50 m') ROLL 76,560.00 Kabel NYA 1x 2.5 Prima (1 rol = 50 m') ROLL 114,312.00 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') m' 2,838.00 Kabel NYM 2 x 10 Supreme (1 rol = 50 m') m' 14,256.00 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m') m' 3,828.00 Kabel NYM 2 x 4 Prima (1 rol = 50 m') m' 4,752.00 Kabel NYM 2 x 6 Supreme (1 rol = 50 m') m' 8,580.00 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') m' 6,072.00 Kabel NYM 3 x 10 Supreme (1 rol = 50 m') m' 18,876.00 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m') m' 6,600.00 Kabel NYM 3 x 4 Prima (1 rol = 50 m') m' 10,824.00 Kabel NYM 3 x 6 Supreme (1 rol = 50 m') m' 11,352.00 Kabel NYM 4 x 10 Supreme (1 rol = 50 m') m' 20,790.00 Kabel NYM 4 x 16 Supreme (1 rol = 50 m') m' 28,380.00 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m') m' 5,676.00 Kabel NYM 4 x 4 Prima (1 rol = 50 m') m' 15,180.00 Kabel NYM 4 x 6 Supreme (1 rol = 50 m') m' 15,180.00 Kabel NYY 2 x 4 Supreme (1 rol = 50 m') m' 8,580.00 Kabel NYY 2 x 6 Supreme (1 rol = 50 m') m' 8,514.00 Kabel NYY 2 x 10 Supreme (1 rol = 50 m') m' 15,180.00 Kabel NYY 3 x 4 Supreme (1 rol = 50 m') m' 11,352.00 Kabel NYY 3 x 6 Supreme (1 rol = 50 m') m' 14,190.00 Kabel NYY 3 x 10 Supreme (1 rol = 50 m') m' 20,724.00 Kabel NYY 4 x 4 Supreme (1 rol = 50 m') m' 18,876.00 Kabel NYY 4 x 6 Supreme (1 rol = 50 m') m' 17,556.00 Kabel NYY 4 x 10 Supreme (1 rol = 50 m') m' 25,476.00 Kabel NYY 4 x 16 Supreme (1 rol = 50 m') m' 40,524.00 Kaca 6 mm Gravver m² 1,188,000.00 Kaca Patri EX Luar negeri terpasang m² 3,405,600.00 Kaca Patri Lokal Terpasang ( ASAHI ) m² 1,254,000.00 Kaca Polos 2 mm ( ASAHI ) m² 39,600.00 Kaca Polos 3 mm ( ASAHI ) m² 57,552.00 Kaca Polos 5 mm ( ASAHI ) m² 85,008.00 Kaca Rayband 12 mm ( ASAHI ) m² 266,200.00 Kaca Rayband 5 mm ( ASAHI ) m² 85,800.00

Page 9: Alat Menghitung Biaya Bangunan

Kaca Rayband 8 mm ( ASAHI ) m² 437,300.00 Kait Angin alumunium ps 101,640.00 Kanstin / Kerb Beton Pracetak P = 50 cm bh 30,000.00 Kanstin / Kerb Beton Pracetak P = 60 cm bh 35,000.00 Kanstin Paving Blok m1 22,000.00 Kape Kayu bh 4,356.00 Kape Tembok bh 4,356.00 Kapur Bakar m³ 1,001,880.00 Kapur Pasang/ kapur tembok m³ 300,960.00 Kapur Sirih kg 6,336.00 Karet Asisoris Kusen / Pintu Alumunium m1 5,676.00 Karet Penyekat Air/Rubber Water Stop Lebar 150 cm m 99,600.00 Karet Penyekat Air/Rubber Water Stop Lebar 225 cm m 133,200.00 Karpet Kelas Baik LN m² 801,768.00 Karpet Kelas Sedang LN m² 316,800.00 Karung Plastik bh 900.00 Kawat BC ( Tembaga ) kg 36,960.00 Kawat Beton kg 9,660.00 Kawat Bronjong 3 mm kg 12,375.00 Kawat Bronjong 4 mm kg 14,375.00 Kawat Duri m1 2,661.00 Kawat Harmonika 2 cm m² 21,120.00 Kawat Harmonika 4 cm m² 31,680.00 Kawat Kasa 1 x 1 cm ( Putih ) m² 26,400.00 Kawat Las Listrik kg 16,700.00 Kawat Las Listrik kg 9,693.00 Kawat Las Listrik kg 16,500.00 Kawat Pengikat m1 813.00 Kawat Tembaga kg 27,720.00 Kayu Albasia m³ 1,250,000.00 Kayu Balok Borneo Super m³ 2,731,250.00 Kayu Balok Kamper Banjar m³ 3,600,000.00 Kayu Balok Kamper Medan (kruing) m³ 3,200,000.00 Kayu Balok Kamper Samarinda m³ 6,090,000.00 Kayu Balok Rasamala m³ 1,980,000.00 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m³ 1,848,000.00 Kayu Jati Jabar dia. 40 cm kebawah m³ 5,322,240.00 Kayu Jati Jabar Tua dia. 40 cm m³ 5,940,000.00 Kayu Jati Jateng Tua dia. 40 cm m³ 12,276,000.00 Kayu Jati Jateng Tua Lepas Mata dari dia. 80 cm ke atas m³ 22,605,000.00 Kayu Jati Jatim Tua dia. 40 cm m³ 12,276,000.00 Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) m³ 3,484,800.00 Kayu Papan Borneo Super m³ 2,300,000.00 Kayu Papan Kamper Banjar m³ 3,900,000.00 Kayu Papan Kamper Medan (Kruing) m³ 3,400,000.00 Kayu Papan Kamper Samarinda m³ 5,400,000.00 Kayu Papan Untuk Bekisting m³ 2,300,000.00 Kayu Reng 2/3 Borneo Super m³ 2,442,000.00 Kayu Reng 2/3 Kamper Banjar m³ 2,640,000.00 Kayu Reng 3/4 Kamper Banjar m³ 2,640,000.00 Kayu Terentang m³ 1,350,000.00 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia m² 42,768.00 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m² 44,352.00 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Mulia m² 49,896.00 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip Roman m² 43,560.00 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Mulia m² 53,064.00 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip Roman m² 38,016.00

Page 10: Alat Menghitung Biaya Bangunan

Keramik 20 x 20 (KM) KWI DN Putih Polos Roman m² 38,525.00 Keramik 20 x 20 (KM) KWI DN Putih Polos Mulia m² 53,856.00 Keramik 20 x 25 Dinding KM KWI DN Corak Mulia m² 58,608.00 Keramik 20 x 25 Dinding KM KWI DN Corak Roman m² 63,360.00 Keramik 30 x 30 KW I DN putih polos Mulia m² 57,816.00 Keramik 30 x 30 KW I DN putih polos Roman m² 69,696.00 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Mulia m² 52,272.00 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) Roman m² 63,360.00 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 1,138,896.00 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 1,702,800.00 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 371,976.00 Kotak Baja untuk menyimpan data bh 123,400.00 Kran Bebek ITAP 1/2 " bh 47,520.00 Kran Bebek Sun Eui 1/2 " bh 142,560.00 Kran Panas Dingin San Eui Standard bh 198,000.00 Kran stain less Lokal Kait bh 45,144.00 Kran Tembok ITAP dia. 1/2 " bh 31,680.00 Kran Tembok Sun Eui dia. 1/2 " bh 79,200.00 Kumpon kg 29,568.00 Kunci KM Bulat ALFA 76,560.00 Kunci 2 Slaag Ancor Asli bh 118,000.00 Kunci 2 Slaag ISO bh 165,000.00 Kunci 2 Slaag Kuda Terbang bh 75,240.00 Kunci 2 Slaag ROYAL bh 109,560.00 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 243,100.00 Kunci 2 Slaag Silinder Utama Standard bh 489,720.00 Kunci Gembok Besar bh 59,400.00 Kunci KM Bulat Kualitas Biasa bh 39,600.00 Kunci Silinder ALFA untuk Pintu Alumunium bh 285,800.00 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1 98,340.00 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 130,000.00 Kwas 1 1/2" bh 6,785.00 Kwas 3" bh 9,900.00 Lampu Baret 30 cm + Neon bh 184,800.00 Lampu Mercuri 80 W bh 98,340.00 Lampu Neon Arcrilik 2 x 40 W lengkap bh 673,200.00 Lampu Neon TL Philip 20 W bh 19,800.00 Lampu Neon TL Philip 40 W bh 23,760.00 Lampu pijar 25 Watt s/d 100 Watt bh 7,524.00 Lampu Sirkel TL 20 W Lengkap bh 59,400.00 Lampu SL Philip 25 W bh 118,800.00 Lampu Taman + Tiang + Lampu 1 Buah bh 271,920.00 Lapis`Aspal Perekat ? Tack Coat ton 5,060.00 Lapis`Aspal Resap Pengikat / Prime Coat ton 5,060.00 Lem Fox kg 21,780.00 Lem Kuning (aibond) kg 26,400.00 Lem Paralon tb 5,676.00 Linggis bh 25,000.00 List profil kamper 1 cm m' 1,980.00 List profil kamper 10 cm m' 3,300.00 List profil kamper 2 cm m' 7,524.00 List profil kamper 4 cm m' 11,220.00 List profil kamper 5 cm m' 23,496.00 Macam2 Sambungan GIP Ø 1 1/2" bh 18,480.00 Macam2 Sambungan GIP Ø 1 1/4" bh 16,500.00 Macam2 Sambungan GIP Ø 1 3/4" bh 22,572.00 Macam2 Sambungan GIP Ø 1" bh 10,824.00

Page 11: Alat Menghitung Biaya Bangunan

Macam2 Sambungan GIP Ø 1/2" bh 5,478.00 Macam2 Sambungan GIP Ø 2 1/2" bh 48,180.00 Macam2 Sambungan GIP Ø 2" bh 37,752.00 Macam2 Sambungan GIP Ø 3" bh 65,208.00 Macam2 Sambungan GIP Ø 3/4" bh 6,600.00 Macam2 Sambungan GIP Ø 4" bh 102,960.00 Macam2 Sambungan Paralon Ø 1 1/2" bh 6,600.00 Macam2 Sambungan Paralon Ø 1 1/4" bh 6,534.00 Macam2 Sambungan Paralon Ø 1 3/4" bh 7,524.00 Macam2 Sambungan Paralon Ø 1" bh 2,904.00 Macam2 Sambungan Paralon Ø 1/2" bh 2,310.00 Macam2 Sambungan Paralon Ø 2 1/2" bh 19,800.00 Macam2 Sambungan Paralon Ø 2" bh 13,200.00 Macam2 Sambungan Paralon Ø 3" bh 26,400.00 Macam2 Sambungan Paralon Ø 3/4" bh 2,541.00 Macam2 Sambungan Paralon Ø 4" bh 33,000.00 Marmer Alam Lampung Ukuran Besar m² 277,200.00 Marmer Alam Lampung Ukuran Kecil m² 184,800.00 Marmer Alam Citatah Ukuran Besar m² 475,200.00 Marmer Alam Citatah Ukuran Kecil m² 319,440.00 Marmer Sintetis m² 122,760.00 MCB 1 PAS bh 43,560.00 MCB 3 PAS bh 54,780.00 Melamik kg 34,003.00 Melamin 4 mm 120 x 240 lbr 72,600.00 Melamin TOK 4 mm lbr 119,592.00 Meni Kayu / Besi kg 14,500.00 Multiplek 12 mm 120 x 240 lbr 178,900.00 Multiplek 18 mm 120 x 240 lbr 234,500.00 Multiplek 9 mm 120 x 240 lbr 137,000.00 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh 5,280.00 Mur Baut dia.19 / panjang 60 cm bh 48,972.00 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 8,976.00 Nako Lengkap Tralis 1 Daun dn 21,780.00 Nok Atas Metal ( Rainbow Roof ) m1 140,712.00 Nok Atas Metal Hana m1 75,636.00 Nok Pinggir Hana m1 95,304.00 Nok Pinggir Metal ( Rainbow Roof ) m1 97,416.00 Oker kg 19,140.00 Oten (Pewarna Plitur ) bks 3,300.00 Oyan bks 1,742.00 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) m² 118,800.00 Paku 1 cm s/d 3 cm kg 10,000.00 Paku 4 cm s/d 7 cm kg 9,085.00 Paku 8 cm s/d 12 cm kg 9,085.00 Paku Beton 2 cm s/d 5 cm bh 2,244.00 Paku Cacing kg 42,240.00 Paku Kait Lengkap bh 660.00 Palu 0,5 kg bh 17,500.00 Papan Eksploitasi bh 617,300.00 Papan Nama Bendung bh 370,700.00 Papan Nama Bendung/Nomenklatur bh 623,300.00 Papan Nama Saluran bh 98,700.00 Papan Operasi Bendung bh 617,300.00 Pasir Beton m³ 191,245.00 Pasir Pasang Kali m³ 178,250.00 Pasir Teras m³ 89,496.00

Page 12: Alat Menghitung Biaya Bangunan

Pasir Urug m³ 132,250.00 Patok Hektometer (Pengairan) bh 99,100.00 Patok Hm bh 90,000.00 Paving Blok Natural 6 cm m² 47,000.00 Paving Blok Natural 8 cm m² 58,000.00 Paving Blok Warna 6 cm m² 60,000.00 Paving Blok Warna 8 cm m² 74,800.00 Pegangan Tangga profil Jati m' 130,284.00 Pegangan Tangga profil Kamper m' 37,752.00 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt 40,656.00 Pemberesan kembali Areal lapangan setelah pekerjaan OverlayPemecah 30 t/j 185 HP /jam 350,000.00 Pengisi Sambungan/Joint Sealer tebal 10 m² 116,400.00 Pengisi Sambungan/Joint Sealer tebal 20 m² 150,000.00 Pengki bh 12,500.00 Pengopenan Kayu m³ 396,000.00 Pengukuran Site + Patok m² 1,188.00 Pentanahan Panel ttk 165,000.00 Pentanahan Penangkal Petir ttk 382,800.00 Penutup Sambungan/Joint Sealer tebal 25 m 116,400.00 Penyambungan Listrik PLN 1 watt 792.00 Penyambungan PDAM untuk Rumah unit 726,000.00 Penyediaan Acces Road Alat - alat Berat dari AMP ke Lokasi Proyek Penyediaan Acces Road Dump Truck Hotmix dari AMP ke Lokasi Proyek Penyekat Poslin Urinoar TOTO lbr 475,860.00 Penyekat Poslin Urinoir TOTO lbr 396,600.00 Pheumatic Drill Hammer /jam 90,000.00 Pintu Angkat type IB = 0,30 Meter bh 617,300.00 Pintu Angkat type IB = 0,40 Meter bh 740,800.00 Pintu Angkat type IB = 0,50 Meter bh 1,111,200.00 Pintu Angkat type IIB = 0,30 Meter bh 864,500.00 Pintu Angkat type IIB = 0,40 Meter bh 110,100.00 Pintu Angkat type IIB = 0,50 Meter bh 1,356,400.00 Pintu Sorong Baja type 1A ukuran (B=0,30-0,60)&(H=0,30-0,60) bh 2,744,280.00 Pintu Sorong Baja type 2A ukuran (B=0,60-0,80)&(H=0,30-1,00) bh 2,287,560.00 Pintu Sorong Baja type 3A ukuran (B=0,80-1,20)&(H=0,40-1,50) bh 2,744,280.00 Pintu Sorong Baja type 4A ukuran (B=1,00-1,00)&(H=0,50-2,00) bh 3,202,320.00 Pintu Sorong Baja type 5A ukuran (B=1,00-1,50)&(H=0,70-0,90) bh 3,659,040.00 Pintu Sorong Baja type 6A ukuran (B=1,60-2,00)&(H=0,90-1,35) bh 4,117,080.00 Pintu Sorong Baja type 7A ukuran (B=2,10-2,50)&(H=1,35-1,70) bh 4,573,800.00 Pintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigiPintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigiPintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigiPintu Sorong Baja type dua Draadstang Ulir dengan 3 stel roda gigiPipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 260,700.00 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 236,016.00 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt 330,660.00 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt 167,640.00 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bh 98,340.00 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt 489,192.00 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt 347,556.00 Pipa GIP Medium A Ø 3" ( 6 m1 ) bt 651,684.00 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 115,236.00 Pipa GIP Medium A Ø 4" ( 6 m1 ) bt 868,824.00 Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt 47,916.00 Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt 36,300.00 Pipa PVC MASPION ABU Ø 1" (AW) bt 25,846.00

Page 13: Alat Menghitung Biaya Bangunan

Pipa PVC MASPION ABU Ø 1/2" (AW) bt 16,698.00 Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt 96,558.00 Pipa PVC MASPION ABU Ø 2" (AW) bt 69,696.00 Pipa PVC MASPION ABU Ø 3" (AW) bt 137,491.00 Pipa PVC MASPION ABU Ø 3/4" (AW) bt 20,328.00 Pipa PVC MASPION ABU Ø 4" (AW) bt 192,192.00 Pipa PVC 4" berlobang jenis AW m1 32,076.00 Pipa PVC Diameter 110 mm btg 297,660.00 Pipa PVC Diameter 140 mm btg 598,950.00 Pipa PVC Diameter 160 mm btg 631,620.00 Pipa PVC Diameter 20 mm btg 13,200.00 Pipa PVC Diameter 200 mm btg 1,110,780.00 Pipa PVC Diameter 225 mm btg 1,510,080.00 Pipa PVC Diameter 25 mm btg 17,424.00 Pipa PVC Diameter 250 mm btg 1,709,730.00 Pipa PVC Diameter 315 mm btg 2,671,680.00 Pipa PVC Diameter 32 mm btg 35,381.00 Pipa PVC Diameter 355 mm btg 3,884,100.00 Pipa PVC Diameter 40 mm btg 51,546.00 Pipa PVC Diameter 400 mm btg 4,573,800.00 Pipa PVC Diameter 50 mm btg 92,565.00 Pipa PVC Diameter 500 mm btg 8,058,600.00 Pipa PVC Diameter 63 mm btg 108,537.00 Pipa PVC Diameter 630 mm btg 12,850,200.00 Pipa PVC Diameter 75 mm btg 173,151.00 Pipa PVC Diameter 90 mm btg 225,060.00 Pipa PVC RUCIKA type AW Ø 1 1/2" bt 78,408.00 Pipa PVC RUCIKA type AW Ø 1 1/4" bt 63,888.00 Pipa PVC RUCIKA type AW Ø 1" bt 47,916.00 Pipa PVC RUCIKA type AW Ø 1/2" bt 23,232.00 Pipa PVC RUCIKA type AW Ø 2 1/2" bt 135,036.00 Pipa PVC RUCIKA type AW Ø 2" bt 107,448.00 Pipa PVC RUCIKA type AW Ø 3" bt 198,924.00 Pipa PVC RUCIKA type AW Ø 3/4" bt 39,930.00 Pipa PVC RUCIKA type AW Ø 4" bt 304,920.00 Pipa PVC RUCIKA type AW Ø 6" bt 580,800.00 Pipa PVC RUCIKA type AW Ø 8" bt 842,160.00 Piser dia. 12 s/d 20 cm bh 4,356.00 Plamir Tembok kg 11,220.00 Plat Alumunium 0.1 mm m² 45,540.00 Plat Alumunium 0.2 mm m² 74,580.00 Plat Alumunium 0.3 mm m² 95,568.00 Plat Alumunium 0.4 mm m² 116,820.00 Plat Alumunium 0.5 mm m² 137,544.00 Plat Alumunium 0.6 mm m² 159,324.00 Plat Bed Truck /jam 95,000.00 Plat Besi 10 mm Ke atas kg 10,032.00 Plat Besi 2 mm s/d 5 mm kg 10,032.00 Plat Besi 6 mm s/d 10 mm kg 10,032.00 Plat Besi Tipis 0.5 mm kg 13,068.00 Plat Besi Tipis 1 mm kg 12,144.00 Plat Besi Tipis 10 mm ke atas kg 10,900.00 Plat Besi Tipis 2 - 5 mm kg 10,900.00 Plat Besi Tipis 6 - 10 mm kg 10,900.00 Plat Karet untuk Perletakan Jembatan Type 4 Kx m 216,000.00 Plat Srip Ø 2 x 30 mm ( 6 m1) bt 25,740.00 Plat Srip Ø 3 x 30 mm ( 6 m1) bt 33,000.00

Page 14: Alat Menghitung Biaya Bangunan

Plat Tanda Muka Air/Peil Schal bh 123,400.00 Play Wood 18 mm 120 x 240 lbr 303,600.00 Plin Taraso 10 x 30 bh 6,336.00 Plin Tegel PC 10 x 20 bh 1,307.00 Plin Tegel PC 15 x 30 bh 1,518.00 Plin Tegel Warna 10 x 20 bh 1,584.00 Plin Tegel Warna 15 x 30 bh 2,376.00 Plincote kg 17,424.00 Plus Oil lt 1,320.00 Pompa Air (50 mm) 30 m3/jam /jam 33,500.00 Pompa Dragon Asli unit 760,320.00 Pompa Dragon Tegal unit 249,876.00 Pompa Kodok unit 173,844.00 Pompa Submersible kap. 150 liter/menit 3 kW unit 31,152,000.00 Pompa Zet pump 250 W - Sanyo unit 5,280,000.00 Pompa Zet pump 450 W - Sanyo unit 8,580,000.00 Poslin 11 x 11 Warna Khusus DN m² 50,028.00 Poslin 11 x 11 Warna Standar DN m² 43,296.00 Presure Tank kap. 500 liter lengkap unit 33,132,000.00 Ram Ayam m² 8,870.00 Ram Kawat 1 x 1 cm m² 10,349.00 Ram Nyamuk Aluminium m² 18,216.00 Ram Nyamuk Hijau m² 11,827.00 Readymix Beton K 175, tanpa pompa ( selang ) m³ 518,400.00 Readymix Beton K 225, tanpa pompa ( selang ) m³ 567,600.00 Readymix Beton K 250, tanpa pompa ( selang ) m³ 585,000.00 Readymix Beton K 300, tanpa pompa ( selang ) m³ 602,000.00 Readymix Beton K 350, tanpa pompa ( selang ) m³ 640,000.00 Rel Henderson Lengkap bh 760,188.00 Rel Maraton I Pintu unt 163,680.00 Rool Cat Tembok bh 14,520.00 Rool Meter 30 meter ( Bahan Plastik ) bh 75,000.00 Rool Meter 5 meter ( Bahan Besi ) bh 15,000.00 Roster Beton 20 x 20 bh 4,620.00 Roster Beton 30 x 30 bh 5,940.00 Rumah Panel 30 x 60 cm (kosong) unt 141,240.00 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh 98,208.00 Saklar Broko Seri Standard ( 1 Phase ) bh 19,800.00 Saklar Broko Tunggal Standard ( 1 Phase ) bh 16,500.00 Sambungan Pipa PVC Jenis AW 4 " TY bh 79,200.00 Saringan Air Lt KM Stainless Steel bh 52,800.00 Sekop bh 25,000.00 Selang Plastik untuk Water Pas dia. 0.5 cm bh 1,452.00 Semen PC / 50 kg zak 55,000.00 Semen Putih zak 62,100.00 Semen Warna kg 10,120.00 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1 29,304.00 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1 42,372.00 Seng Plat BJLS 28 (80 X 180 ) lbr 55,440.00 Seng Plat BJLS 30 (80 X 180 ) lbr 42,320.00 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) rool 1,438,800.00 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) rool 2,072,400.00 Ship Foot Roller /jam 160,000.00 Shower Dengan Tiang bh 178,200.00 Shower Tanpa Tiang bh 99,000.00 Sincromat kg 29,568.00 Singkup bh 25,000.00

Page 15: Alat Menghitung Biaya Bangunan

Sirap Kelas I ( 80 / m2 ) bh 944.00 Sirtu m³ 110,000.00 Skring Kas 2 grop Biasa unt 172,656.00 Skring Kas 3 grop Biasa unt 206,580.00 Skring Kas 5 grop Biasa unt 434,280.00 Sloot Jendela Tunggal bh 8,580.00 Sloot Pintu berikut Rantai bh 25,872.00 Solatip Leideng gl 3,300.00 Soligneum 1 blek 5 lt 25,410.00 Sondir Rata-rata ttk 244,200.00 Spirtus lt 3,630.00 Stop Kontak Broko 3 Phase ( In Bow ) bh 130,284.00 Stop Kontak Broko 3 Phase ( Out Bow ) bh 76,560.00 Stop Kontak Broko Standard ( 1 Phase ) bh 18,480.00 Stop Kontak Handle 3 Phase bh 76,428.00 Stop Kran 1 " KIT bh 118,800.00 Stop Kran 1 1/2 " KIT bh 205,920.00 Stop Kran 2 " KIT bh 285,120.00 Stop Kran 2 1/2" KIT bh 712,800.00 Stop Kran 3 " KIT bh 807,840.00 Stop Kran 3/4 " KIT bh 85,800.00 Supercon m² 47,520.00 Tacon ( tahan bakar ) m² 110,800.00 Tahanan 50 A Merk Fuji bh 489,192.00 Tali Rami rool 6,600.00 Tanah Liat m³ 20,000.00 Tanah Urug m³ 34,500.00 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 651,552.00 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,031,184.00 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 2,061,840.00 Taraso Kerang 30 x 30 m² 27,456.00 Tarikan Almari Rata - rata bh 11,220.00 Tarikan Pintu Alumunium bh 342,989.00 Teak Wood 3 mm 120 x 240 lbr 112,100.00 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr 85,800.00 Teak Wood 4 mm 120 x 240 lbr 127,000.00 Teak Wood ukuran Pintu 4 mm lbr 101,244.00 Tegel Badak PC 30 x 30 bh 2,100.00 Tegel PC 20 x 20 bh 1,518.00 Tegel PC 30 x 30 bh 2,244.00 Tegel Wafel PC 20 x 20 bh 1,584.00 Tegel Wafel Warna 20 x 20 bh 1,848.00 Tegel Warna 20 x 20 bh 1,848.00 Tegel Warna 30 x 30 bh 2,772.00 Tempat Sabun Poslin bh 45,540.00 Terpentin lt 4,500.00 Thermo Plastik kg 31,500.00 Timah kg 36,960.00 Timah Hitam kg 32,340.00 Tiner A lt 13,530.00 Tiner B lt 14,800.00 Trapo TL 20 W ( Philip ) bh 27,720.00 Trapo TL 20 W ( Sinar ) bh 23,100.00 Trapo TL 40 W ( Philip ) bh 33,000.00 Trapo TL 40 W ( Sinar ) bh 27,324.00 Triplek 3 mm 120 x 240 lbr 40,900.00 Triplek 4 mm 120 x 240 lbr 55,440.00

Page 16: Alat Menghitung Biaya Bangunan

Triplek 4 mm Ukuran Pintu lbr 44,880.00 Triplek 6 mm 120 x 240 lbr 103,400.00 Triplek 9 mm 120 x 240 lbr 154,440.00 Truck bak terbuka /jam 95,000.00 Truck Fuso /jam 95,000.00 Truck Tangki Air 115 HP /jam 85,000.00 Urinoir Lengkap TOTO Warna Standard lengkap unit 1,762,200.00 Vinyl Lantai standar m² 26,400.00 Wall Flashing ( Rainbow Roof ) m1 97,284.00 Wall Flashing Hana m1 75,636.00 Wall Paper ( kls menengah ) m² 46,200.00 Wastafel Bulat Warna Standard Lengkap unit 1,166,880.00 Wastafel Lengkap INA unit 681,780.00 Wastafel Lengkap TOTO LW 230 unit 1,030,920.00 Water Mur 1/2 " bh 41,448.00 Water Pas Alumuniumm 60 cm bh 30,000.00 Water Profing Emulsion kg 42,108.00 Water Profing Membrance ml 72,600.00 Whell Loader 115 HP /jam 95,000.00 Wiremesh M6 m² 32,076.00 Wiremesh M8 m² 39,468.00

Page 17: Alat Menghitung Biaya Bangunan

Silahkan Edit sesuai harga setempat agar perhitungan biaya sesuai dengan tempat anda

Page 18: Alat Menghitung Biaya Bangunan

865,700.00

Page 19: Alat Menghitung Biaya Bangunan

x

Page 20: Alat Menghitung Biaya Bangunan

DAFTAR UPAH PEKERJA BANGUNAN

NO. JENIS PEKERJA BANGUNAN HARGA UPAHRp.

1 PEKERJA 45,000

4 TUKANG (Batu, Kayu. Besi) 60,000

20 MANDOR 70,000

Page 21: Alat Menghitung Biaya Bangunan

SATUAN WAKTU

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

1 ORANG/ HR/ 8 JAM

Page 22: Alat Menghitung Biaya Bangunan

ANALISA HARGA SATUAN PEKERJAAN

NO. URAIAN KOEF SAT. HARGA SAT.

1 2 3 4 5B002 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'

Pekerja 0.5260 org 60,000.00 Mandor 0.0520 org 70,000.00 Alat Bantu 0.0500 lot 35,200.00 Jumlah Dibulatkan

F001 1 M3 PASANGAN ANSTAMPING BATU BELAHBatu Belah 1.2000 m³ 20,328.00 Pasir Urug 0.1000 m³ 132,250.00 Pekerja 0.5000 org 45,000.00 Tukang 0.5625 org 60,000.00 Mandor 0.0563 org 70,000.00 Jumlah Dibulatkan

F004 1 M3 PASANGAN BATU BELAH 1 : 6Batu Belah 1.2000 m³ 126,000.00 P C (50 kg) 0.9440 zak 55,000.00 Pasir Pasang 0.4300 m³ 178,250.00 Pekerja 1.2500 org 45,000.00 Tukang 0.5000 org 60,000.00 Mandor 0.0169 org 70,000.00 Jumlah Dibulatkan

F005 1 M3 PASANGAN BATU BELAH 1 : 5Batu Belah 1.2000 m³ 126,000.00 P C (50 kg) 1.0800 zak 55,000.00 Pasir Pasang 0.4400 m³ 178,250.00 Pekerja 1.2500 org 45,000.00 Tukang 0.5000 org 60,000.00 Mandor 0.0169 org 70,000.00 Jumlah Dibulatkan

1 M3 ADUKAN BETON (1 PC : 2 Pasir : 3Krikil)Semen Portland (50 kg) 6.7200 zak 55,000.00 Pasir Beton 0.5400 M3 191,245.00 Batu pecah 1 - 2 0.8100 M3 212,750.00 Pekerja 2.0000 Oh 45,000.00 Tukang 0.3500 Oh 60,000.00 Mandor 1.0000 Oh 70,000.00 Dibulatkan

G001 1 M2 DINDING KERAMIK 10/20 DAN 20/20 DN PUTIHKeramik KW 1 DN putih 1.0100 m² 42,768.00 P.C (50 kg) 0.1600 zak 55,000.00 Pasir pasang 0.0300 m³ 178,250.00 Semen warna 0.0130 kg 10,120.00 Pekerja 0.1875 org 45,000.00 Tukang 0.3750 org 60,000.00 Mandor 0.0188 org 70,000.00 Jumlah

Page 23: Alat Menghitung Biaya Bangunan

Dibulatkan G003 1 M2 LANTAI KERAMIK 20/20 BERCORAK/ANTI SLIP KAMAR MANDI

Keramik KW 1 DN bercorak / anti slip 1.0100 m² 42,768.00 P.C (50 kg) 0.2400 zak 55,000.00 Pasir pasang 0.0300 m³ 178,250.00 Semen warna 0.0130 kg 10,120.00 Pekerja 0.1875 org 45,000.00 Tukang 0.3750 org 60,000.00 Mandor 0.0282 org 70,000.00 Jumlah Dibulatkan

G005 1 M2 LANTAI KERAMIK 30/30 DN PUTIH POLOSKeramik KW 1 DN putih polos 1.0100 m² 42,768.00 P.C (50 kg) 0.1600 zak 55,000.00 Pasir pasang 0.0300 m³ 178,250.00 Semen warna 0.0130 kg 10,120.00 Pekerja 0.1875 org 45,000.00 Tukang 0.3750 org 60,000.00 Mandor 0ss.0188 org 70,000.00 Jumlah Dibulatkan

G006 1 M2 LANTAI KERAMIK 30/30 DN BERCORAK/BERWARNAKeramik KW 1 DN bercorak berwarna 1.0100 m² 42,768.00 P.C (50 kg) 0.1600 zak 55,000.00 Pasir pasang 0.0300 m³ 178,250.00 Semen warna 0.0130 kg 10,120.00 Pekerja 0.1875 org 45,000.00 Tukang 0.3750 org 60,000.00 Mandor 0.0188 org 70,000.00 Jumlah Dibulatkan

H004 1 M2 PASANGAN BATA MERAH 1 : 5Bata merah 70.0000 bh 400.00 P.C (50 kg) 0.2074 zak 55,000.00 Pasir pasang 0.0580 m³ 178,250.00 Pekerja 0.3218 org 45,000.00 Tukang 0.1805 org 60,000.00 Mandor 0.0083 org 70,000.00 Jumlah Dibulatkan

H006 1 M2 PASANGAN BATAKO BESAR PRES 8 X 20 X 30 AD 1:4P.C (50 kg) 1.740 Zak 55,000.00 Pasir pasang 0.279 m3 178,250.00 Batako 142.000 Bh 1,980.00 Tukang 1.500 Org 60,000.00 Pekerja 4.500 Org 45,000.00 Mandor 0.225 Org 70,000.00 Jumlah Dalam 1 M3 Dalam 1 M2 Keuntungan Max. Jumlah Dibulatkan

H011 1 M2 PLESTERAN DINDING 1 : 5 + ACIANP.C (50 kg) 0.1000 zak 55,000.00 Pasir pasang 0.0190 m³ 178,250.00 Pekerja 0.2860 org 45,000.00 Tukang 0.2140 org 60,000.00

I102
user:
Page 24: Alat Menghitung Biaya Bangunan

Mandor 0.0200 org 70,000.00 Jumlah Dibulatkan

H014 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)Galian tanah 2.2500 m³ #REF!Pasir urug 0.1071 m³ 132,250.00 Lantai kerja 1.1250 m³ #REF!Pas. bata 1 PC : 2 PS + Plesteran 7.5000 m² #REF!Plat beton penutup & balok 0.1500 m³ #REF!Pipa PVC 4" jenis AW + sambungan 9.0000 m1 #REF!Pipa GIP 1 1/2" 0.6000 btg #REF!Galian tanah untuk rembesan 1.6875 m³ #REF!Pas. injuk 2.7000 kg #REF!Urugan kerikil 3,5 cm 0.5250 m³ #REF!Pipa PVC 4" berlobang jenis AW 9.0000 m1 #REF!Urugan kembali perataan tanah 0.5625 m³ #REF!Tambahan upah 0.0650 ls #REF! Jumlah Dibulatkan

I003 1 M2 PENGECATAN DINDING VINILEX (3x)Cat tembok Vinilex 0.1750 kg 139,920.00 Plamir tembok 0.1600 kg 11,220.00 Rol cat 0.0100 bh 14,520.00 Ampelas 0.5000 lbr 2,070.00 Pekerja 0.1600 org 45,000.00 Tukang 0.2800 org 60,000.00 Mandor 0.0100 org 70,000.00 Steger Werk 0.0450 lot 52,161.40 Jumlah Dibulatkan

I005 1 M2 PENGECATAN PLAFOND VINILEX (3x)Cat tembok Vinilex 0.2000 kg 139,920.00 Plamir tembok 0.1600 kg 11,220.00 Rol cat 0.0100 bh 14,520.00 Ampelas 0.5000 lbr 2,070.00 Pekerja 0.2000 org 45,000.00 Tukang 0.2800 org 60,000.00 Mandor 0.0100 org 70,000.00 Steger Werk 0.0425 lot 57,459.40 Jumlah Dibulatkan

J001 1 M2 PAS. PLAFOND TRIPLEK 6 MM BERIKUT RANGKA K-BANJARTriplek 6 mm 0.3470 lbr 40,900.00 Kaso-kaso 5/7 banjar 0.0140 m³ #NAME?Kayu 5/10 Banjar 0.0070 m³ #NAME?Paku 0.2200 kg 44,352.00 Pekerja 0.2800 org #NAME?Tukang 0.4000 org #NAME?Mandor 0.0140 org 70,000.00 Jumlah Dibulatkan

K003 1 M3 KUSEN KAYU KAMPER SAMARINDAKayu kamper Samarinda 1.1000 m³ #NAME?Paku 1.2500 kg #REF!Lem Putih (FOX) 1.0000 kg #REF!Pekerja terampil 4.0000 org #REF!Tk. kayu terampil 15.0000 org #REF!

Page 25: Alat Menghitung Biaya Bangunan

Kep. tukang kayu 2.7000 org #REF!Mandor 0.5000 org #REF! Jumlah Dibulatkan

K005 1 M2 DAUN PINTU PANIL KAYU SAMARINDARangka + panil kayu kamper samarinda 0.0500 m³ #NAME?Lem putih ( FOX ) 0.7500 kg #REF!List kayu profil 4.0000 m1 #NAME?Pekerja terampil 0.6000 org #REF!Tk. kayu setengah terampil 2.6000 org #REF!Kep. tukang kayu 0.2600 org #REF!Mandor 0.0260 org #REF! Jumlah Dibulatkan

K007 1 M2 DAUN PINTU DOUBLE TEAKWOODRangka Kayu Banjar 0.0150 m³ #NAME?Teakwood untuk pintu uk. 4 mm 2.0000 lbr #NAME?Lem putih (FOX) 0.0050 kg #REF!Paku triplek 0.2000 m1 83,160.00 Pekerja terampil 0.3000 org #REF!Tk. kayu setengah terampil 1.5000 org #REF!Kep. tukang kayu 0.2000 org #REF!Mandor 0.0200 org #REF! Jumlah Dibulatkan

K010 1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS FORMIKA (KM/WC)Rangka kayu kamper Banjar 0.0150 m³ #REF!Triplek 4 mm (ukuran pintu) 2.0000 lbr #REF!Formika ukuran pintu 1.0000 lbr #NAME?Paku triplek 0.2000 kg #REF!lem putih (FOX) 0.5000 kg #REF!Lem kuning (Ica Aibon) 1.0000 kg #NAME?Pekerja setengah terampil 0.3000 org #REF!Tk. kayu terampil 1.3000 org #REF!Kep. tukang kayu 0.1300 org #REF!Mandor 0.0130 org #REF! Jumlah Dibulatkan

K012 1 M2 DAUN JENDELA KACA (TANPA KACA)Rangka kayu kamper Samarinda 0.0170 m³ #NAME?Lem Putih (FOX) 0.3000 kg #REF!List Kayu 4.0000 m1 #NAME?Pekerja setengah terampil 0.3000 org #REF!Tk. kayu terampil 1.2000 org #REF!Kep. tukang kayu 0.1200 org #REF!Mandor 0.0200 org #REF! Jumlah Dibulatkan

K013 1 M2 DAUN PINTU KACA (TANPA KACA)Rangka Kayu Kamper Samarinda 0.0200 m³ #NAME?Lem putih (FOX) 0.6000 kg #REF!List Kayu 4.0000 m1 #NAME?Pekerja setengah terampil 0.4000 org #REF!Tk. kayu terampil 1.4000 org #REF!Kep. tukang kayu 0.1400 org #REF!Mandor 0.0140 org #REF! Jumlah

Page 26: Alat Menghitung Biaya Bangunan

Dibulatkan L002 1 M3 KUDA-KUDA BORNEO SUPER

Kayu balok Borneo Super 1.1000 m³ #NAME?Paku 8 s.d. 12 cm 5.8000 kg 70,422.00 Pekerja setengah terampil 3.0000 org #REF!Tk. kayu setengah terampil 5.0000 org #REF!Kep. Tukang kayu 2.0000 org #REF! Jumlah Dibulatkan

L008 1 M2 RANGKA ATAP GENTENG PLENTONG BORNEO SUPER (HANYA RANGKANYA)Kayu kaso 5/7 Borneo Super 0.0168 m³ #NAME?Kayu kaso 2/3 Borneo Super 4.0000 m1 #NAME?Paku 5 s.d. 7 cm 0.2500 kg #REF!Pekerja setengah terampil 0.1500 org #REF!Tk. kayu terampil 0.1500 org #REF!Kep. Tukang kayu 0.0100 org #REF!Mandor 0.0050 org #REF! Jumlah Dibulatkan

L010 1 M2 RANGKA ATAP BAJA RINGAN (BERIKUT RANGKA KUDA-KUDA & RENG) Trusses ZAM-75 t=0.80 mm rangka utama 1.9850 m' 25,000.00 Trusses ZAM-75 t=0.50 mm rangka pembagi(web) 2.5850 m' 16,000.00 Reng/G-DB Roof battens t= 0.48 mm 5.1750 m' 8,000.00 Foot plate (dudukan kuda-kuda) 1.20 mm 0.3250 bh 5,000.00 PLD - Diafragma plate 14.0000 bh 1,500.00 Wind Braching (tali angin) 0.7150 m' 1,200.00 Tensioner (pengaku tali angin) 0.2500 bh 5,000.00 Baut besar 54.0000 pcs 200.00 Baut kecil 80.0000 pcs 95.00 Dynabolt 0.8750 pcs 7,500.00 Tukang Besi 0.0250 org #NAME?Kepala Tukang Besi 0.3074 org #NAME?

Pekerja 0.3500 org 45,000.00

Mandor 0.0100 org 70,000.00

Jumlah Dibulatkan

M002 1 M2 PENUTUP ATAP GENTENG PLENTONGAtap Genteng Plentong pres Bakar KW 1 25.000 bh #NAME?

Tukang batu terampil 0.060 org #NAME?

Kepala tukang batu 0.006 org #NAME?

Pembantu tukang 0.120 org #NAME?

Mandor 0.006 org 70,000.00 Jumlah Dibulatkan

M004 1 M2 PENUTUP ATAP GENTENG BETONAtap Genteng Beton 10.000 bh #NAME?

Tukang batu terampil 0.010 org #REF!

Kepala tukang batu 0.010 org #REF!

Pembantu tukang 0.200 org #NAME?

Mandor 0.010 org #REF! Jumlah Dibulatkan

M007 1 M1 PEK. BUBUNGAN ATAP GENTENG PLENTONG EX JATIWANGIGenteng bubungan genteng ex Jatiwangi 4.0000 bh #NAME?PC (50 kg) 0.1304 zak #NAME?

Page 27: Alat Menghitung Biaya Bangunan

Pasir pasang 0.2100 lbr #NAME?Pekerja setengah terampil 0.1500 org #NAME?Tk. batu terampil 0.2000 org #NAME?Kep. Tukang batu 0.0100 org #NAME?Mandor 0.0050 org 70,000.00 Peralatan 0.0650 lot #NAME? Jumlah Dibulatkan

M008 1 M1 PEK. BUBUNGAN ATAP GENTENG BETONGenteng bubungan genteng beton 3.0000 bh #NAME?PC (50 kg) 0.1304 zak #NAME?Pasir pasang 0.2100 m³ #NAME?Pekerja setengah terampil 0.1500 org #NAME?Tk. batu terampil 0.2000 org #NAME?Kep. Tukang batu 0.0100 org #NAME?Mandor 0.0050 org 70,000.00 Peralatan 0.0950 lot #NAME? Jumlah Dibulatkan

Q007 1 Bh PAS. KUNCI TANAM

Tukang kayu terampil 0.500 org #REF!

Kunci tanam 1.000 bh #NAME? Jumlah Dibulatkan

Q008 1 Bh PAS. KUNCI TANAM

Tukang kayu terampil 0.500 org #REF!

Kunci tanam 1.000 bh #NAME? Jumlah Dibulatkan

Q009 1 Bh PAS. KUNCI TANAM

#NAME?

Tukang kayu terampil 0.500 org #REF!

Kunci tanam 1.000 bh #NAME? Jumlah Dibulatkan

Q010 1 Bh PAS. KUNCI TANAM

Tukang kayu terampil 0.500 org #REF!

Kunci tanam 1.000 bh #NAME? Jumlah Keuntungan Max. Jumlah Dibulatkan

Q011 1 Bh PAS. ENGSEL Pintu

Tukang kayu terampil 0.150 org #REF!

Engsel Pintu 1.000 bh #NAME? Jumlah Keuntungan Max. Jumlah Dibulatkan

Q012 1 Bh PAS. ENGSEL JENDELA

Tukang kayu terampil 0.150 org #REF!

Engsel Pintu 1.000 bh #NAME? Jumlah Dibulatkan

Q013 1 m2 PAS. KACA POLOS TEBAL 3 mm

Page 28: Alat Menghitung Biaya Bangunan

Tukang kayu terampil 0.150 org #NAME?

Pembantu tukang 0.150 org #NAME?

Kaca polos tebal 3 mm 1.000 m2 #NAME? Jumlah Dibulatkan

Q014 1 m2 PAS. KACA POLOS TEBAL 5 mm

Tukang kayu terampil 0.150 org #NAME?

Pembantu tukang 0.150 org #NAME?

Kaca polos tebal 5 mm 1.000 m2 #NAME? Jumlah Dibulatkan

R001 1 Bh PAS. WASHTAFEL

WASHTAFEL 1.0000 bh #NAME?Semen Portland 0.1200 zak #NAME?Pasir Pasang 0.0100 m³ #NAME?Pekerja Setengah Terampil 1.2000 org #NAME?Tukang Batu Setengah Terampil 1.4500 org #NAME?Kepala Tukang Batu 0.1500 org #NAME?Mandor 0.1000 org 70,000.00 Jumlah Dibulatkan

R002 1 Bh PAS. BAK MANDI FIBRE

Bak Mandi Fiber 1.0000 bh #NAME?Pekerja Setengah Terampil 2.1000 org #NAME?Tukang Batu Setengah Terampil 0.7500 org #NAME?Kepala Tukang Batu 0.0700 org #NAME?Mandor 0.1100 org 70,000.00 Jumlah Dibulatkan

R003 1 Bh BAK MANDI PAS. BATA MERAH VOL. 0.3 M3

Bata Merah 200.0000 bh #NAME?Semen Portland 2.4000 zak #NAME?Pasir Pasang 0.3000 m³ #NAME?Pekerja 6.0000 org 45,000.00 Tukang Batu Setengah Terampil 3.0000 org #NAME?Kepala Tukang Batu 0.3000 org #NAME?Mandor 0.3000 org 70,000.00 Jumlah Dibulatkan

R004 1 Bh PAS. KLOSET JONGKOK

Closet Jongkok 1.0000 bh #NAME?Pekerja Setengah Terampil 1.0000 org #NAME?Tukang Batu Setengah Terampil 1.5000 org #NAME?Kepala Tukang Batu 0.1500 org #NAME?Mandor 0.1600 org 70,000.00 Jumlah Dibulatkan

Page 29: Alat Menghitung Biaya Bangunan

ANALISA HARGA SATUAN PEKERJAAN

JUMLAH

6 = ( 3 x 5 )

31,560.00 3,640.00 1,760.00 36,960.00 36,960.00

24,393.60 13,225.00 22,500.00 33,750.00 3,941.00 97,809.60 97,800.00

151,200.00 51,920.00 76,647.50 56,250.00 30,000.00 1,183.00 367,200.50 367,200.00

151,200.00 59,400.00 78,430.00 56,250.00 30,000.00 1,183.00 376,463.00 376,460.00

369,600.00 103,272.30 172,327.50 90,000.00 21,000.00 70,000.00

43,195.68 8,800.00 5,347.50 131.56 8,437.50 22,500.00 1,316.00 89,728.24

Page 30: Alat Menghitung Biaya Bangunan

89,720.00

43,195.68 13,200.00 5,347.50 131.56 8,437.50 22,500.00 1,974.00 94,786.24 94,780.00

43,195.68 8,800.00 5,347.50 131.56 8,437.50 22,500.00

#VALUE!#VALUE!#VALUE!

43,195.68 8,800.00 5,347.50 131.56 8,437.50 22,500.00 1,316.00 89,728.24

#REF!

28,000.00 11,404.80 10,338.50 14,481.00 10,830.00 581.00 75,635.30

#REF!

95,700.00 49,731.75 281,160.00 90,000.00 202,500.00 15,750.00 734,841.75 58,787.34 5,878.73 64,666.07 64,660.00

5,500.00 3,386.75 12,870.00 12,840.00

Page 31: Alat Menghitung Biaya Bangunan

1,400.00 35,996.75

#REF!

#REF! 14,163.97

#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!

24,486.00 1,795.20 145.20 1,035.00 7,200.00 16,800.00 700.00 2,347.26 52,161.40 52,160.00

27,984.00 1,795.20 145.20 1,035.00 9,000.00 16,800.00 700.00 2,442.02 57,459.40

#REF!

14,192.30 #NAME?#NAME?

9,757.44 #NAME?#NAME?

980.00 #NAME?

#REF!

#NAME?#REF!#REF!#REF!#REF!

Page 32: Alat Menghitung Biaya Bangunan

#REF!#REF!

#NAME?#REF!

#NAME?#REF!

#NAME?#REF!#REF!#REF!#REF!

#NAME?#REF!

#NAME?#NAME?

#REF! 16,632.00

#REF!#REF!#REF!#REF!

#NAME?#REF!

#REF!#REF!

#NAME?#REF!#REF!

#NAME?#REF!#REF!#REF!#REF!#REF!#REF!

#NAME?#REF!

#NAME?#REF!#REF!#REF!#REF!

#NAME?#REF!

#NAME?#REF!

#NAME?#REF!#REF!#REF!#REF!

#NAME?

Page 33: Alat Menghitung Biaya Bangunan

#REF!

#NAME? 408,447.60

#REF!#REF!#REF!

#NAME?#REF!

#NAME?#NAME?

#REF!#REF!#REF!#REF!#REF!

#NAME?#REF!

49,625.00 41,360.00 41,400.00 1,625.00 21,000.00 858.00 1,250.00 10,800.00 7,600.00 6,562.50

#NAME?#NAME?

15,750.00

700.00

#NAME?#REF!

#NAME?

#NAME?

#NAME?

#NAME?

420.00 #NAME?

#REF!

#NAME?

#REF!

#REF!

#NAME?

#REF!#NAME?

#REF!

#NAME?#NAME?

Page 34: Alat Menghitung Biaya Bangunan

#NAME?#NAME?#NAME?#NAME?

350.00 #NAME?#NAME?

#REF!

#NAME?#NAME?#NAME?#NAME?#NAME?#NAME?

350.00 #NAME?#NAME?

#REF!

#REF!

#NAME?#REF!#REF!

#REF!

#NAME?#REF!#REF!

#REF!

#NAME?#REF!#REF!

#REF!

#NAME?#REF!#REF!#REF!#REF!

#REF!

#NAME?#REF!#REF!#REF!#REF!

#REF!

#NAME?#REF!#REF!

Page 35: Alat Menghitung Biaya Bangunan

#NAME?

#NAME?

#NAME?#NAME?

#REF!

#NAME?

#NAME?

#NAME?#NAME?

#REF!

#NAME?#NAME?#NAME?#NAME?#NAME?#NAME?

7,000.00 #NAME?

#REF!

#NAME?#NAME?#NAME?#NAME?

7,700.00 #NAME?

#REF!

#NAME?#NAME?#NAME?

270,000.00 #NAME?#NAME?

21,000.00 #NAME?

#REF!

#NAME?#NAME?#NAME?#NAME?

11,200.00 #NAME?

#REF!