Upload
ali-zain
View
95
Download
2
Embed Size (px)
Citation preview
Profile Summary ALI ZAIN SEC Approved
o Strong academic background in Electrical Engineering o Practical experience of working in a Transformer company
and project management. o Skilled at learning new concepts quickly, working well under
pressure, and communicating ideas clearly and effectively o Accustomed to living and working in a multi-cultural environment o Strong work experiences in Testing and Commissioning of Sub-
Station o Energetic, honest, enthusiastic, team player and responsible. o Final year project: GSM monitoring of tap changing transformer.
DOB: 25 March 1990
Tel: (+966-592780975)
E-mail:[email protected] Skype ID: elixain
XERVON SAUDI ARABIA L.L.C (Formerly Known as ThyssenKrupp Xervon)
Field Service Engineer (April 2015-Present)
Key Responsibilities : Execution of Testing & Commissioning of Sub- Stations upto 380kV
Device testing of upto 380kv Switchgear Design & Scheme Check of Protection & Control Systems
Projects Experience
380/230/115/13.8kV Sub-Station Doha(Al-Khobar) Testing and commissioning of devices
o Timing test of Circuit Breaker, Earth Switch , Isolator using TM 1600 and B10E o Current Transformer Testing ,Voltage Transformer Testing o Multifunction Meter Testing using FREJA 300 o Auxiliary Relays, Timers, UV Relay SIEMENS PD Supervision Relay
Also Perform the Function Check of 13.8KV
380/132/33kV Sub-Station Al Kharj-2(Al-Kharaj)
During my time in this Project I have done the Following activities
o Function Check of Bus-bar Protection Panel o Cable HI POT Test, SF6 Purity , Leakage and Dew Point Test o Contact Resistance Measurement, o Voltage Transformer Secondary loop Injection
380/132/13.8kV Sub-Station Sultana (Riyadh) During my time in this Project I have done the Following activities
o 380KV GIS LCC Panel Scheme Check o Breaker Failure Panel Function Check o Micom P142 Alstom o Current Transformer Secondary loop injection o Auxiliary Relays, Contactors, Metrosil Testing o Circuit Breaker , Earth Switch, Isolator timing test o Rectification of NCRs and Modification work
380KV Shuqaiq Steam Power Plant During my time in this Project I have done the Following activities
o 380KV GIS LCC Panel Scheme Check o Bus Bar Protection Panel Scheme Check o Breaker failure Protection Panel Scheme Check o DCDB Panels Scheme Check o Current Transformer Secondary loop Injection o Voltage Transformer Secondary loop Injection o Hydraulic Pump Motor Operation o Lockout relay ,CT Supervision relay ,TCS relay o Under voltage Relay, Metrosil, Gauges o VT Fuse Failure Relay o KAVS 100 Synchro Check Relay
Power link Company Pakistan Electrical Engineer
Key Responsibilities : Designing & Testing of Transformer
o Co-ordination of Electrical installation o Transformer Repairing o Transformer Testing o Manage Equipment Delivery o Co-ordination between client and main contractor
Testing
o CT ,VT testing o GIS Scheme Check(220kv Shalimar Substation) o DCDB Scheme Check o ACDB Scheme Check o Simple RelaysTesting
Equipment Used
o Freja300 o SF6 Percentage Volume Measuring Device(Dilo Make) o Sverker 760 o CT Analyzer o CPC100 o TM 1600,TM 200 o Primary Injection Kit o MIcroOhm Meter o Multimeter (Fluke 87) o Megger MT515 o Magnus o B10E
Educational Attainment
B.Sc. Electrical Engineering (Percentage 74.25%) UET Lahore (2007-2011)
Intermediate Pre-Engineering (Percentage 82.36%) The Educators College, Gujranwala (2005-2007)
Matriculation (Percentage 70%) BISE Gujranwala (2003-2005)
Reference : Reference will be provided on Demand