Upload
amit-tiwari
View
67
Download
0
Embed Size (px)
Citation preview
CURRICULUM VITAE
Amit Tiwari
C/0 Mr. Amitabh Dev Tiwari,Plot No- 41, FF-3, Gyankhand -1,Gyankhand, IndirapuramGhaziabad-201010Contact No. : +234-8057495272,+91- 9711139889E-mail : [email protected] No – N1037691
WORKING EXPERIENCE
Working as a Project Engineer (Mechanical)in Artee Group in Nigeria . Worked as a Project Cum Service Engineer North zone in Gandhi Automation Pvt Ltd Worked as a Site Engineer (Mechanical) in Navayuga Engineering Company Ltd for 6 lane
Elevated road over Hindon River Gaziabad, U.P till September 2015 . Worked as a SITE ENGINEER (MECHANICAL) in NAVAYUGA ENGINEERING COMPANY LTD.
For Dibang River Bridge Project at Lower Dibang Vally Arunachal Pradesh. Construction of 5.7 Km bridge Pill foundation, Segments casting & Lunching and 19 km approaching road (NH-52)
Worked as a SITE ENGINEER (MECHANICAL) in Navayuga Engineering Company limited , for Lohit River Bridge Project at Alubarighat, Arunachal Pradesh. Construction of 2.1 km Bridge Well Foundation, Pile Foundation, Segments Casting & Lunching and 10.7 km Approached Road (NH-52).From 1st September,2010.
RESPONSIBILITIES
In Artee Group
Supervise all the Civil and MEP work in On going project in Calabar Mall at Calabar.
In Gandhi Automation Pvt Ltd. Over see the Installation and Servicing of different types of Entrance Automation and
Loading Bay Equipment.
In Navayuga Engineering Company Ltd
Oversee the operation & maintenance activities of the Plant & Machinery Maintenance, operation & troubleshooting of construction related equipment such as
Material handling equipment like , Crane, Excavators, Loaders, paver, Grader, Roller& tipper , Hydra, Piling rig(BG-36),ICE550 Power pack With Vibro, TFC-75 Crane, QUY-65 Crane, 320 Cranes,EX-200i,Loder430z, Dozers ,AMWHyva, Transit Mixture, Concrete Pump, Sennebogen 835 Grab ,E.O.T. Cranes (80tons,10 tons), 250TPH Pazolana Crusher Plant,CP-30 Batching plants,DM-50hot mix plant etc
Designed and implemented special strategies related to maintenance procedures.
Performed routine maintenance inspections of equipment to identify and respond to problems in a timely manner, thus preventing breakdowns.
Provided solutions and fixed equipment malfunctioning, system faults and network errors – Used root-cause-failure techniques, corrective actions, modifications and performed replacements and/or new installation.
Assigned personnel and technical support teams to sites requiring 24/7 maintenance.
Utilized different reliability and testing strategies in plants to maintain and improve operation’s profitability.
Directed storage of equipment and assured safety measures were followed Preparation and timely submission of Equipment Status report, Equipment Availability Report, Performance Analysis (Fuel & Lubricants Consumption / Spares cost) report,
Fortnightly Breakdown report, equipment Monthly Summary to Head Office. Maintaining of records such as Equipment Log sheet, Equipment History Card, Equipment
wise monthly consumption and repair budget Preparing and Monitoring of Preventive Maintenance schedule for all plant and
Equipment. Supervise the fabrication activities of heavy steel structures.
CURRENT CTC : 2200000.00 (INR) EXPECTED CTC: NEGOTIABLE
EDUCATIONAL QUALIFICATION
Graduation : Course : B.Tech. with 62.1% in 2010 Branch : Mechanical Engineering College : K.C.N.I.T. BANDA (U.P.) University : Uttar Pradesh Technical University , Lucknow (U.P.) Intermediate : From C.B.S.E. Board in 2006. High School : From C.B.S.E. Board 2002
SEMINAR DELIVERED
Delivered a presentation on “Ansys Software “.
ACADEMIC PROJECT
Prepared a working model of “Solar Power Car “ as a final year project .
SUMMER TRAINING
Engine Blower Assembly in Pro/E – Wildfire 2.o Analysis on Cycle Frame in Ansys 8.0 Software.
ADDITIONAL QUALIFICATION
Programming and Operation in Hi – Tech. CNC (HMV 500) Professional in M- CADD.
(Auto CADD + Pro-E Wildfire 2.0 + Ansys 8.0)
COMPUTER SKILL
Microsoft office 95-2007, 2010 Internet
DECLARATION
I hereby inform that all information provided above is true to the best of my Knowledge and belief . Date : ............................. Amit Tiwari