Node:
TATA STEEL LTD
KALINGANAGARHAZOP WORK SHEET
PROPANE STORAGE & PROPANE DILUTION SYSTEM
EQMS INDIA PRIVATE LIMITED
TATA STEEL LIMITED - KALINGANAGARHAZOP STUDY FOR PROPANE STORAGE & PROPANE DILUTION SYSTEMHAZOP WORK SHEETS
(Rev. 0)
EQMS INDIA PRIVATE LIMITED
304 & 305, Rishabh Corporate Tower, Plot No. 16,
Community Centre, Karkardooma, Delhi 110 092
S. No.SectionPage No.
1.Propane Storage System4
2.Dilution System14
List of NodesSL NONODE-NO SYSTEMPAGE NO
1301ROAD TANKER TO PROPANE STORAGES4
2302SUPPLY OF PROPANE TO CONSUMER9
3303PROPANE DILUTION SYSTEM14
Node: 301Propane Storage SystemP&ID No. G/P&I/6654/2013
Design IntentTanker to Storage
DeviationCauseConsequenceSafeguardRecommendationRemark/Action
No/ Less FlowCompressor C- 01/02/03 MalfunctionLow filling rate in storage tank T1/T2/T3 Standby Compressor Provided C- 01/02/03
ROV-1 Stuck Close No filling in Storage tankT1/T2/T3
Increase in Pressure in TankerCompressor Trip at 21Kg/cm2Tanker designed for 21kg/cm2
Pressure gauge &, Pressure safety Valve has been provided on tankerPressure Safety valve testing should be incorporated in maintenance schedule
More FlowMore pressure difference in Tanker and TankStatic Charge possibleLine ,Tanker and Tank is EarthedDuring operation of propane liquid filling from Road Tanker to Storage Tank, due to More or high flow, Stating Charge is generated. To avoid the hazard from static Charge in pipeline and Propane storage tank, Jumper made of Copper, Alluminium or G.I. strip for electrical continuity is to be provided in all flanges
R-1Resistance is to be checked for all earthing Strip and Earth pit and a record is to be maintained..
Reverse FlowNot possible
Higher Pressure
Over pressurization by compressorDamage of tankTank is designed for high pressure. compressor trip at 21kg/cm2
Lower PressureCovered in Less flow
Higher TemperatureExternal fireFire and Explosion HazardHigh pressurePRV-01 and PG-01,12,13,14 Provided
Gas detector provided GLD 1, 2, 3 Provided.
Water Sprinkler provided for the Storage tanks and Tanker unloading station
PSV provided.
Lower TemperatureNo Issue
Higher Level(Storage Tank T-1,2,3)Transfer not stopped at high levelTank PressurizationLT-11/21/31 ,PT11,21,31 are provided in the tank same will close respective ROV-11/21/31
Lower LevelNo Issue
Concentration
NA
ImpurityNA
Utility FailurePowerNo Transfer of Propane from Tanker to Storage Tank.Compressor C-01, C-02 & C-03 will stop.All ROV and SV will CloseDG should be provided for backup power for the operation of Propane storage systemR-2
Start-upProper SOP is to be made for attending Start Up & Shutdown of Propane system
Shut-down
MaintenanceProper Isolation,
N2-purging &
Permit System
Should be included SOP
LeakageCorrosion of lineExcess flow of liquid and temperature fallExcess Flow Check at Tankers
Node: 302Propane Storage SystemP&ID No. G/P&I/6654/2013 R1
Design IntentTo Supply Propane to Consumer
DeviationCauseConsequenceSafeguardRecommendationRemark/Action
No/ Less FlowROV stuck closeNo supply to CustomerStandby System ProvidedFlow meter No-91A/B/C provided
More FlowLeakageFall In temperatureExcess flow Pipe lineEFV-16/26/36 provided
More consumption from Customer sideEFV-16/26/36 provided
Reverse FlowNot possibleNRV-41/51/61 provided
Higher PressureCovered in higher Temperature below
Lower PressureCovered in Low flow
Higher TemperatureVaporizer V-1/2/3 malfunctionWater level low
Chances of burst PipeFire and explosion hazardRTD 41/51/61
WLI-41/51/61(Water level indicator)
PRV-41/51/61 provided
Lower TemperatureCovered in more flow
Higher LevelWater in vaporizer
V-1/2/3SV-42/52/62 stuck openNo IssueWLI-41/51/61
indicates
Lower Level
Water in vaporizer
V-1/2/3SV-42/52/62 stuck closedPropane gas will not be generated, Liquid may flow in outlet lineRTD 41/51/61
SV-41/51/61 will close at less than
55 0CPS-41/51/61
Higher ConcentrationNA
Lower ConcentrationNA
ImpurityNA
Utility FailurePower failureInstrument Air FailureNo vaporization and hence no supplyControl valves failureNoneNoneDG should be provided for backup power (R-2)Provide N2 Line as a standby for Air(R-3)
Start-upTo be considered laterProper SOP is to be made for attending Start Up & Shutdown of Propane system
Shut-downTo be considered later
MaintenanceTo be considered laterProper Isolation,
N2-purging &
Permit System
Should be included S OP
LeakageCorrosion of lineExcess flow of liquid and temperature fallExcess Flow Check Valves-16/26/36 provided
Node: 303Propane Dilution SystemP&ID No.
Design IntentTo Dilute Propane
DeviationCauseConsequenceSafeguardRecommendationRemark/Action
No/ Less Flow(Propane)No/Less Flow
(Air)
Power Failure
Filter choke-TIF1
Diluted propane not available
No Flow
Less PressureNone
PGs-PG2,PG9 inlet and outlet
PI-103 DG should be provided for backup power (Mentioned in R-2)Bypass line with isolating valve to be provided for the filter/ Standby Filter (R-4)Provide Low pressure Alarm. (R-5)
Mr .Arindam Panigrahi
Line Drain and filter replacement process to be incorporated in SOP
Lack of supply of Air(tank empty)
Power FailureDiluted propane not available
Diluted propane not available
Standby Tank Provided
NoneAs Propane Dilution System will be away from Propane storage one more DG should be provided for backup power in Dilution area.-R-6
Mr .Arindam Panigrahi
More Flow(Propane/Air)
PCV 101,102 malfunction the ratio Chances of explosive mixtureSSV 101,102(6 nos for 3 Mixers) Provided with PCV 102(propane) being controlled by PCV 101(Air)
Reverse Flow(Propane/Air)
Not PossibleNRV is Provided
NRV-101 & 102
Higher Pressure
Covered in more flow
Lower Pressure
Covered in No/Less Flow
Higher Temperature
(Propane)
External Fire
Hot Supply from VaporiserFire/ExplosionFire Fighting System
Interlocks in Vaporizer V1,2,3 provided
Lower Temperature
(Propane)
Considered in leakage(below)
Higher LevelNA
Lower LevelNA
Impurity/ Contaminant
Dust Improper mixtureFilter Provided-TIF-1Bypass line to be Provided for the Filter
(R-4)
Other materialNA
Utility FailurePower failure (Covered Above)
Calorimeter will not work NoBattery backup may be provided for Dilution system (R-7).
Sampling
NA
MaintenanceTo be considered laterProper Isolation,
N2-purging &
Permit System
Should be included S OP
Loss of containment/ LeakagePropane Pipe line failure/ Flange or Gasket Failure
Methyl Mercaptan pipe line failure. Fire/Explosion
Fall in temperature in Pipeline
Toxic releaseLeak detector and Firefighting System Provided
Gas masks and AnalyzerDuring any leakage in the field, in the Propane Dilution area for taking immediate action , One/ or two CCTV camera may be provided in the field, so that any leakage in the system is immediately noticed by the Control Room official and proper action can be taken without delay.
(R-8)
Proper SOP to be made to attend leakage/ Emergency Handling
HSE/ ergonomic issuesMethyl Mercaptan
Toxic release Gas masks and Portable Analyzer Methyl Mercaptan atmospheric concentration meter may be provided near working area for continuous
monitoring..(R-9)
Regulatory issuesNone
Start-upTo be considered laterProper SOP is to be made for attending Start Up & Shutdown of Propane system
Shut-downTo be considered later
G/P&I/6855/2013
PAGE Page 20 of 21