122

Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Annexure-IList of OCC Members

Fax No1 Chief Engineer (L D) GETCO Gotri 0265-23520192 Chief Engineer (Generation) GSECL Vadodara 0265-234473423388473 Superintendent Engineer (CP amp SS) GETCO Vadodara 0265-2337918 23381644 Chief Engineer (L D) MPPTCL Jabalpur 0761-26643435 Chief Engineer (OampMGen) MPPGCL Jabalpur 0761-266457226680506 Chief Engineer (L D) MSETCL Kalwa 022ndash276017697 Chief Engineer (PP) MSEDCL Mumbai8 Chief Engineer (Works)MSPGCL Mumbai 022-264738969 Superintending Engineer (LD) MSETCL Ambazari 07104-22027510 Chief Engineer (L D) CSPTCL Raipur 0771-257417411 Chief Engineer (OampMGEN) CSPGCL Raipur 0771-257442512 Executive Director PGCIL Raipur13 General Manager POSOCO Mumbai 022-2820263014 General Manager (WRTS-I) Powergrid Nagpur 0712-264136615 General Manager (O amp M)WRTS-II PGCILVadodara 0265-248754216 Chief Engineer (Transmission) NPCIL Mumbai 255807412556335017 Station Director TAPS Tarapur 1 amp 2 02525-28212524412518 Station Director TAPS Tarapur 3 amp 4 02525-24402124416919 Station Director KAPP Kakrapar 02626-23123120 General Manager (OS) NTPC Mumbai 022-2821669221 General Manager NTPC Korba 07759- 23746223755222 General Manager (OS) NTPC HQ-II Raipur 0771-254455023 General Manager NTPC Vindhyachal MP 07805 ndash24771124 General Manager NTPC SIPAT CG 07752-24650425 General Manager NTPC LARA26 General Manager NTPC Solapur27 General Manager NTPC Kawas Surat 0261-286029028 General Manager NTPC Gandhar 02642-28740229 General Manager NTPC Mouda 07115-28122128121930 CLD TPC Mumbai 022-255419086717538531 Head (O) Dahanu TPS Dahanu 02528-22203932 Sr V P Reliance Transmission Pune 0124-3917982020-

3047155533 Vice President (Generation) Torrent Power Ltd Ahmedabad 079-2750667934 Executive Director Sugen CCPP Torrent Power Ltd Surat 02621-66115135 Vice President (O ampM) APL Mundra Gujarat 02838-26636436 Head Operation CGPL Mundra37 Vice President (Opn) Jindal Power LtdRaigarh 07767-28199328199538 AGM(OS) NSPCL Delhi 011-267173632671736639 GENERAL MANAGER ( POWER) RGPPL Ratnagiri 02359-241071 24101140 Member (Power) NCA Indore 0731-255988841 Chief Engineer (PM amp C) NHDC Bhopal 0755 4030188403013042 E E Elect (Ponda) Goa 0832-231378043 Executive Engineer DD (UT) Daman 0260-22307712250889223055044 Executive Engineer DNH (UT) Silvassa 0260-264233845 Secretary CERC New Delhi 011-243600102375392346 CEO JSW Energy ltd 011-460323432618354647 VP-Power Infra-Essar Hazira Surat 0261-6688498022-6708219848 Chief Electrical Distribution Engineer CR 022-2262106049 Vice President EPTCL Hazira Surat 0261-668274750 COO Korba West Power Co Ltd Raigarh51 VP(COMML) Essar Power MP Ltd MP52 GM Torrent power grid ltd Ahmedabad Gujarat53 Adani Power Maharashtra Ltd Tiroda54 CGM R K M Powergen Pvt Ltd55 ED Athena Chattishgarh Power Ltd56 Head(OampM) Dhariwal Infra Ltd Crsquopur57 Head Operation Jaypee Nigrie STPP Singrauli58 VP(OampM) GCEL Chhattishgarh59 Head Operation DB Power Chhattishgarh60 Head operation Hindustan Power Anuppur MP61 Head operation GMR Warora Energy ltd62 Head OampM Sterlite Grid Ltd Bhopal63 Head Operation Balco Chhattishgarh

Minutes of 508thOCC meeting held on 14th June 2018 Page 1

Western Regional Power CommitteeMumbai

Title Minutes of the MeetingNumber 508

Name of meeting Operation amp Coordination sub-Committee

Date amp venue 14th June 2018 at WRPC Mumbai

508th meeting of Operation amp Co-ordination sub-Committee (OCC) of Western

Regional Power Committee (WRPC) was held on 14th June 2018 at WRPC

Mumbai The list of participants is enclosed at Annexure-A

Member Secretary (MS) WRPC extended warm welcome to all the participants of

the 508th OCC meeting He informed the forum about some of the important

operational highlights of WR grid during month of May 2018

MS WRPC informed that power scenario during the last month was

satisfactory except last week of the May month during which wherein

approximately 1200 MW load shedding was observed in Gujarat system

due to 2000MW increase in summer peak demand

He expected good monsoon this year amp hope for more hydro generation

He informed that frequency remained within IEGC band for 7006 of the

time only and 2252 of the time frequency is below 4990 Hz He further

stated that increase in of time frequency below 499 Hz might be due

increase in summer load and reduced availability of generation

He informed that peak shortage of WR was recorded as 1399MW during

the last month and under interregional exchange WR exported 6312

MUs to other regions

He appreciated the efforts by all constituents for maintaining the grid

discipline in WR despite less availability of generation due to many

reasons

Minutes of 508thOCC meeting held on 14th June 2018 Page 2

He informed that there are no major grid disturbance events in WR and

he appreciated WRLDC for maintaining the operation of grid within the

limits of various parameters

He mentioned about ldquoMechanism for implementation of new

environmental norms for thermal power plants supplying power to

distribution licensees under long term and medium term power

purchasing agreementsrdquo under which MoP assigned the task to Honrsquoble

CERC for framing the guidelines for addressing the compensation for

installing the FGD

He informed that ldquoDraft amendments relating to captive power plants in

Electricity rules-2005rdquo is available in MoP website for comments and

requested all utilities for submitting comments if any by 18th June 2018

He also informed that ldquoProposed amendment to tariff policy-2016rdquo draft

amendments are available in MoP website for comments up to 20th June

2018

He announced that SLDC Gujarat brought out the ldquoAnnual Reportrdquo

summarizing all important aspects of Gujarat power system and

congratulated Chief Engineer SLDC Gujarat for their efforts in preparing

the document

After the opening remarks the agenda items were taken up for discussion by

Superintending Engineer (Opn) WRPC

Item no 1 Confirmation of the MinutesMinutes of 507th meeting of Operation amp Coordination Sub-Committee (OCC) of

WRPC held on 15th May 2018 at WRPC Mumbai were forwarded vide letter No

WRPCOPNOCC-Minutes2018-194720 dated 28052018

OCC discussed a comment received from ED SLDC Chhattishgarh for inclusion

in the MoM and opined that the since addition wanted by SLDC Chhattishgarh

was not a part of discussion in 507th OCC and therefore the request of CSPTCL

cannot be acceded

Sub-Committee confirmed the Minutes of 507thOCC without any modifications

Minutes of 508thOCC meeting held on 14th June 2018 Page 3

Item no 2 Review of System Operation during the month of May 201821 A Frequency Particulars (May 2018)

The frequency profile for last three months was as under

Discussions

SE (Opn) WRPC informed the statistics of frequency recorded during the

month of May 2018 The frequency particulars are enclosed at Annex-21

Chief engineer SLDC Gujarat expressed concern about frequency touching to

4957 Hz He said that that no defense mechanism is available up to 492 Hz

due to which there was no AULF operation even when the grid was being

operated at a very alarming condition It is very difficult for system operator to

manage the grid without any help of automatic load shedding He further stated

that first AULFS stage must be set at least 495 or 496 Hz with appropriate

quantum of load shedding instead of 494 Hz as agreed during AULFS meeting

He informed that they operated Gujarat power grid without any reserve in the

month of May 2018

MP SLDC representative stated that as frequency is same in integrated grid

operation the load relief implemented should be implemented proportional in

all regions of India

Range01st ndash 31st

March2018( time)

01st ndash30thApril2018( time)

01st ndash 31st May2018( time)

IEGC band(499 lt f lt5005 Hz)

7929 7957 7006

lt 499 Hz 1299 1280 2252

gt 5005 Hz 772 763 742

Particulars Frequency Date TimeMaximuminstantaneous

5022 Hz 3rd May 2018 040310 hrs

Minimuminstantaneous

4957Hz 26th May 2018 194910 hrs

Average 4995 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 4

Gujarat SLDC representative suggested that load relief mechanism implemented

at 496 Hz may be designed such that frequency should rise by 01 Hz to 497

Hz after load shedding He stated that All India power number is around 9000-

10000 MW load shedding required for increasing frequency by 01Hz will be

1000 MW when divided between states it will be less than 50 MW

SE (Opn) informed that during special meeting of AULFS on 1342018 held at

WRPC it was agreed to increase first stage setting to 494 Hz with the same

State-wise quantum of load shedding and therefore the quantum of load

shedding will be decided by NPC after studying the proposals received from

different regions He further informed that the matter is under consideration of

NPC and the same would be deliberated thoroughly in upcoming NPC meeting

before taking any decision with regard to stages and State-wise quantum of load

shedding

Representative from WRLDC informed as below

The minimum frequency during the month of Mayrsquo18 was 4957 HZ

during which Maharashtra was over drawing in Western Region

Section 71 of CERC (Deviation Settlement Mechanism and related

matters) Regulations 2014 mandates that no over drawal of electricity by

any buyer shall be permissible when grid frequency is ldquobelow 4970 HZrdquo

All states are informed to initiate the actions immediately through load

sheddingincrease the intrastate generation when the frequency touches

4990HZ

GM WRLDC opined that there shall be margin available with all the states for

contingencies and if frequency is going downward it will be better to pick up

from available margin He further informed that system operators shall initiate

actions at 499 Hz downwards itself

SE(Opn)WRPC informed that NPC vide its letter dated 30052018 has given

two options for UFR operation considering power number of 7000 MW

Option 1 Increasing the State-wise quantum of load shedding by keeping the

frequency slabs same ie 492 490 488 and 486 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 2: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 1

Western Regional Power CommitteeMumbai

Title Minutes of the MeetingNumber 508

Name of meeting Operation amp Coordination sub-Committee

Date amp venue 14th June 2018 at WRPC Mumbai

508th meeting of Operation amp Co-ordination sub-Committee (OCC) of Western

Regional Power Committee (WRPC) was held on 14th June 2018 at WRPC

Mumbai The list of participants is enclosed at Annexure-A

Member Secretary (MS) WRPC extended warm welcome to all the participants of

the 508th OCC meeting He informed the forum about some of the important

operational highlights of WR grid during month of May 2018

MS WRPC informed that power scenario during the last month was

satisfactory except last week of the May month during which wherein

approximately 1200 MW load shedding was observed in Gujarat system

due to 2000MW increase in summer peak demand

He expected good monsoon this year amp hope for more hydro generation

He informed that frequency remained within IEGC band for 7006 of the

time only and 2252 of the time frequency is below 4990 Hz He further

stated that increase in of time frequency below 499 Hz might be due

increase in summer load and reduced availability of generation

He informed that peak shortage of WR was recorded as 1399MW during

the last month and under interregional exchange WR exported 6312

MUs to other regions

He appreciated the efforts by all constituents for maintaining the grid

discipline in WR despite less availability of generation due to many

reasons

Minutes of 508thOCC meeting held on 14th June 2018 Page 2

He informed that there are no major grid disturbance events in WR and

he appreciated WRLDC for maintaining the operation of grid within the

limits of various parameters

He mentioned about ldquoMechanism for implementation of new

environmental norms for thermal power plants supplying power to

distribution licensees under long term and medium term power

purchasing agreementsrdquo under which MoP assigned the task to Honrsquoble

CERC for framing the guidelines for addressing the compensation for

installing the FGD

He informed that ldquoDraft amendments relating to captive power plants in

Electricity rules-2005rdquo is available in MoP website for comments and

requested all utilities for submitting comments if any by 18th June 2018

He also informed that ldquoProposed amendment to tariff policy-2016rdquo draft

amendments are available in MoP website for comments up to 20th June

2018

He announced that SLDC Gujarat brought out the ldquoAnnual Reportrdquo

summarizing all important aspects of Gujarat power system and

congratulated Chief Engineer SLDC Gujarat for their efforts in preparing

the document

After the opening remarks the agenda items were taken up for discussion by

Superintending Engineer (Opn) WRPC

Item no 1 Confirmation of the MinutesMinutes of 507th meeting of Operation amp Coordination Sub-Committee (OCC) of

WRPC held on 15th May 2018 at WRPC Mumbai were forwarded vide letter No

WRPCOPNOCC-Minutes2018-194720 dated 28052018

OCC discussed a comment received from ED SLDC Chhattishgarh for inclusion

in the MoM and opined that the since addition wanted by SLDC Chhattishgarh

was not a part of discussion in 507th OCC and therefore the request of CSPTCL

cannot be acceded

Sub-Committee confirmed the Minutes of 507thOCC without any modifications

Minutes of 508thOCC meeting held on 14th June 2018 Page 3

Item no 2 Review of System Operation during the month of May 201821 A Frequency Particulars (May 2018)

The frequency profile for last three months was as under

Discussions

SE (Opn) WRPC informed the statistics of frequency recorded during the

month of May 2018 The frequency particulars are enclosed at Annex-21

Chief engineer SLDC Gujarat expressed concern about frequency touching to

4957 Hz He said that that no defense mechanism is available up to 492 Hz

due to which there was no AULF operation even when the grid was being

operated at a very alarming condition It is very difficult for system operator to

manage the grid without any help of automatic load shedding He further stated

that first AULFS stage must be set at least 495 or 496 Hz with appropriate

quantum of load shedding instead of 494 Hz as agreed during AULFS meeting

He informed that they operated Gujarat power grid without any reserve in the

month of May 2018

MP SLDC representative stated that as frequency is same in integrated grid

operation the load relief implemented should be implemented proportional in

all regions of India

Range01st ndash 31st

March2018( time)

01st ndash30thApril2018( time)

01st ndash 31st May2018( time)

IEGC band(499 lt f lt5005 Hz)

7929 7957 7006

lt 499 Hz 1299 1280 2252

gt 5005 Hz 772 763 742

Particulars Frequency Date TimeMaximuminstantaneous

5022 Hz 3rd May 2018 040310 hrs

Minimuminstantaneous

4957Hz 26th May 2018 194910 hrs

Average 4995 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 4

Gujarat SLDC representative suggested that load relief mechanism implemented

at 496 Hz may be designed such that frequency should rise by 01 Hz to 497

Hz after load shedding He stated that All India power number is around 9000-

10000 MW load shedding required for increasing frequency by 01Hz will be

1000 MW when divided between states it will be less than 50 MW

SE (Opn) informed that during special meeting of AULFS on 1342018 held at

WRPC it was agreed to increase first stage setting to 494 Hz with the same

State-wise quantum of load shedding and therefore the quantum of load

shedding will be decided by NPC after studying the proposals received from

different regions He further informed that the matter is under consideration of

NPC and the same would be deliberated thoroughly in upcoming NPC meeting

before taking any decision with regard to stages and State-wise quantum of load

shedding

Representative from WRLDC informed as below

The minimum frequency during the month of Mayrsquo18 was 4957 HZ

during which Maharashtra was over drawing in Western Region

Section 71 of CERC (Deviation Settlement Mechanism and related

matters) Regulations 2014 mandates that no over drawal of electricity by

any buyer shall be permissible when grid frequency is ldquobelow 4970 HZrdquo

All states are informed to initiate the actions immediately through load

sheddingincrease the intrastate generation when the frequency touches

4990HZ

GM WRLDC opined that there shall be margin available with all the states for

contingencies and if frequency is going downward it will be better to pick up

from available margin He further informed that system operators shall initiate

actions at 499 Hz downwards itself

SE(Opn)WRPC informed that NPC vide its letter dated 30052018 has given

two options for UFR operation considering power number of 7000 MW

Option 1 Increasing the State-wise quantum of load shedding by keeping the

frequency slabs same ie 492 490 488 and 486 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 3: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 2

He informed that there are no major grid disturbance events in WR and

he appreciated WRLDC for maintaining the operation of grid within the

limits of various parameters

He mentioned about ldquoMechanism for implementation of new

environmental norms for thermal power plants supplying power to

distribution licensees under long term and medium term power

purchasing agreementsrdquo under which MoP assigned the task to Honrsquoble

CERC for framing the guidelines for addressing the compensation for

installing the FGD

He informed that ldquoDraft amendments relating to captive power plants in

Electricity rules-2005rdquo is available in MoP website for comments and

requested all utilities for submitting comments if any by 18th June 2018

He also informed that ldquoProposed amendment to tariff policy-2016rdquo draft

amendments are available in MoP website for comments up to 20th June

2018

He announced that SLDC Gujarat brought out the ldquoAnnual Reportrdquo

summarizing all important aspects of Gujarat power system and

congratulated Chief Engineer SLDC Gujarat for their efforts in preparing

the document

After the opening remarks the agenda items were taken up for discussion by

Superintending Engineer (Opn) WRPC

Item no 1 Confirmation of the MinutesMinutes of 507th meeting of Operation amp Coordination Sub-Committee (OCC) of

WRPC held on 15th May 2018 at WRPC Mumbai were forwarded vide letter No

WRPCOPNOCC-Minutes2018-194720 dated 28052018

OCC discussed a comment received from ED SLDC Chhattishgarh for inclusion

in the MoM and opined that the since addition wanted by SLDC Chhattishgarh

was not a part of discussion in 507th OCC and therefore the request of CSPTCL

cannot be acceded

Sub-Committee confirmed the Minutes of 507thOCC without any modifications

Minutes of 508thOCC meeting held on 14th June 2018 Page 3

Item no 2 Review of System Operation during the month of May 201821 A Frequency Particulars (May 2018)

The frequency profile for last three months was as under

Discussions

SE (Opn) WRPC informed the statistics of frequency recorded during the

month of May 2018 The frequency particulars are enclosed at Annex-21

Chief engineer SLDC Gujarat expressed concern about frequency touching to

4957 Hz He said that that no defense mechanism is available up to 492 Hz

due to which there was no AULF operation even when the grid was being

operated at a very alarming condition It is very difficult for system operator to

manage the grid without any help of automatic load shedding He further stated

that first AULFS stage must be set at least 495 or 496 Hz with appropriate

quantum of load shedding instead of 494 Hz as agreed during AULFS meeting

He informed that they operated Gujarat power grid without any reserve in the

month of May 2018

MP SLDC representative stated that as frequency is same in integrated grid

operation the load relief implemented should be implemented proportional in

all regions of India

Range01st ndash 31st

March2018( time)

01st ndash30thApril2018( time)

01st ndash 31st May2018( time)

IEGC band(499 lt f lt5005 Hz)

7929 7957 7006

lt 499 Hz 1299 1280 2252

gt 5005 Hz 772 763 742

Particulars Frequency Date TimeMaximuminstantaneous

5022 Hz 3rd May 2018 040310 hrs

Minimuminstantaneous

4957Hz 26th May 2018 194910 hrs

Average 4995 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 4

Gujarat SLDC representative suggested that load relief mechanism implemented

at 496 Hz may be designed such that frequency should rise by 01 Hz to 497

Hz after load shedding He stated that All India power number is around 9000-

10000 MW load shedding required for increasing frequency by 01Hz will be

1000 MW when divided between states it will be less than 50 MW

SE (Opn) informed that during special meeting of AULFS on 1342018 held at

WRPC it was agreed to increase first stage setting to 494 Hz with the same

State-wise quantum of load shedding and therefore the quantum of load

shedding will be decided by NPC after studying the proposals received from

different regions He further informed that the matter is under consideration of

NPC and the same would be deliberated thoroughly in upcoming NPC meeting

before taking any decision with regard to stages and State-wise quantum of load

shedding

Representative from WRLDC informed as below

The minimum frequency during the month of Mayrsquo18 was 4957 HZ

during which Maharashtra was over drawing in Western Region

Section 71 of CERC (Deviation Settlement Mechanism and related

matters) Regulations 2014 mandates that no over drawal of electricity by

any buyer shall be permissible when grid frequency is ldquobelow 4970 HZrdquo

All states are informed to initiate the actions immediately through load

sheddingincrease the intrastate generation when the frequency touches

4990HZ

GM WRLDC opined that there shall be margin available with all the states for

contingencies and if frequency is going downward it will be better to pick up

from available margin He further informed that system operators shall initiate

actions at 499 Hz downwards itself

SE(Opn)WRPC informed that NPC vide its letter dated 30052018 has given

two options for UFR operation considering power number of 7000 MW

Option 1 Increasing the State-wise quantum of load shedding by keeping the

frequency slabs same ie 492 490 488 and 486 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 4: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 3

Item no 2 Review of System Operation during the month of May 201821 A Frequency Particulars (May 2018)

The frequency profile for last three months was as under

Discussions

SE (Opn) WRPC informed the statistics of frequency recorded during the

month of May 2018 The frequency particulars are enclosed at Annex-21

Chief engineer SLDC Gujarat expressed concern about frequency touching to

4957 Hz He said that that no defense mechanism is available up to 492 Hz

due to which there was no AULF operation even when the grid was being

operated at a very alarming condition It is very difficult for system operator to

manage the grid without any help of automatic load shedding He further stated

that first AULFS stage must be set at least 495 or 496 Hz with appropriate

quantum of load shedding instead of 494 Hz as agreed during AULFS meeting

He informed that they operated Gujarat power grid without any reserve in the

month of May 2018

MP SLDC representative stated that as frequency is same in integrated grid

operation the load relief implemented should be implemented proportional in

all regions of India

Range01st ndash 31st

March2018( time)

01st ndash30thApril2018( time)

01st ndash 31st May2018( time)

IEGC band(499 lt f lt5005 Hz)

7929 7957 7006

lt 499 Hz 1299 1280 2252

gt 5005 Hz 772 763 742

Particulars Frequency Date TimeMaximuminstantaneous

5022 Hz 3rd May 2018 040310 hrs

Minimuminstantaneous

4957Hz 26th May 2018 194910 hrs

Average 4995 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 4

Gujarat SLDC representative suggested that load relief mechanism implemented

at 496 Hz may be designed such that frequency should rise by 01 Hz to 497

Hz after load shedding He stated that All India power number is around 9000-

10000 MW load shedding required for increasing frequency by 01Hz will be

1000 MW when divided between states it will be less than 50 MW

SE (Opn) informed that during special meeting of AULFS on 1342018 held at

WRPC it was agreed to increase first stage setting to 494 Hz with the same

State-wise quantum of load shedding and therefore the quantum of load

shedding will be decided by NPC after studying the proposals received from

different regions He further informed that the matter is under consideration of

NPC and the same would be deliberated thoroughly in upcoming NPC meeting

before taking any decision with regard to stages and State-wise quantum of load

shedding

Representative from WRLDC informed as below

The minimum frequency during the month of Mayrsquo18 was 4957 HZ

during which Maharashtra was over drawing in Western Region

Section 71 of CERC (Deviation Settlement Mechanism and related

matters) Regulations 2014 mandates that no over drawal of electricity by

any buyer shall be permissible when grid frequency is ldquobelow 4970 HZrdquo

All states are informed to initiate the actions immediately through load

sheddingincrease the intrastate generation when the frequency touches

4990HZ

GM WRLDC opined that there shall be margin available with all the states for

contingencies and if frequency is going downward it will be better to pick up

from available margin He further informed that system operators shall initiate

actions at 499 Hz downwards itself

SE(Opn)WRPC informed that NPC vide its letter dated 30052018 has given

two options for UFR operation considering power number of 7000 MW

Option 1 Increasing the State-wise quantum of load shedding by keeping the

frequency slabs same ie 492 490 488 and 486 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 5: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 4

Gujarat SLDC representative suggested that load relief mechanism implemented

at 496 Hz may be designed such that frequency should rise by 01 Hz to 497

Hz after load shedding He stated that All India power number is around 9000-

10000 MW load shedding required for increasing frequency by 01Hz will be

1000 MW when divided between states it will be less than 50 MW

SE (Opn) informed that during special meeting of AULFS on 1342018 held at

WRPC it was agreed to increase first stage setting to 494 Hz with the same

State-wise quantum of load shedding and therefore the quantum of load

shedding will be decided by NPC after studying the proposals received from

different regions He further informed that the matter is under consideration of

NPC and the same would be deliberated thoroughly in upcoming NPC meeting

before taking any decision with regard to stages and State-wise quantum of load

shedding

Representative from WRLDC informed as below

The minimum frequency during the month of Mayrsquo18 was 4957 HZ

during which Maharashtra was over drawing in Western Region

Section 71 of CERC (Deviation Settlement Mechanism and related

matters) Regulations 2014 mandates that no over drawal of electricity by

any buyer shall be permissible when grid frequency is ldquobelow 4970 HZrdquo

All states are informed to initiate the actions immediately through load

sheddingincrease the intrastate generation when the frequency touches

4990HZ

GM WRLDC opined that there shall be margin available with all the states for

contingencies and if frequency is going downward it will be better to pick up

from available margin He further informed that system operators shall initiate

actions at 499 Hz downwards itself

SE(Opn)WRPC informed that NPC vide its letter dated 30052018 has given

two options for UFR operation considering power number of 7000 MW

Option 1 Increasing the State-wise quantum of load shedding by keeping the

frequency slabs same ie 492 490 488 and 486 Hz

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 6: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 5

Option 2 Increasing the quantum of load shedding and frequency slabs of

operation of UFR setting ie at 494 492 490 488 Hz

However in that letter NPC welcomed any different principle for computation of

load relief by RPCsNLDC

The Sub-Committee noted as above

21 B State wise Power Scenariosrsquo of the Region amp PSP

System operation during the month of May 2018 was satisfactory The regionaldemand (Ex-bus) was 53817 MW The corresponding peak shortfall was in therange of 1399 MW (peak deficit of 260 ) The energy requirement during thesaid period was 35134 MUs (Ex-bus)The power supply position for the month of May 2018 was as follows

Peak Demand AvailabilityUnrestricted Requirement (Ex-Bus) In (MW)

GUJ MP CG MAH GOA DD DNH ESIL WR

REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817

AVAILABILITY 15818 8745 3652 23254 530 350 778 838 52418

SHORTFALL 1198 19 11 141 2 0 0 0 1399

SHORTFALL 704 021 030 060 042 000 000 000 260

Energy Availability Requirement etc(Ex-Bus) in (MUs)

GUJ MP CG MAH GOA DD DNH ESIL WR

Net ActualEnergySupplied 10572 5754 2330 15182 391 224 527 139 35118

UnrestrictedRequirement 10584 5754 2333 15182 391 224 527 139 35134

SHORTFALL 1282 000 274 001 000 000 000 000 1557

SHORTFALL 0121 0000 0117 0000 0000

0000 0000 0000 0044

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 7: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 6

DiscussionsSE (Opn) requested CESLDC Gujarat to inform the OCC forum the reasons for1198 MW load shedding done by Gujarat during last month

CESLDC Gujarat informed that power shortage occurred in Gujarat due topersistent high demand non availability of large generator non availability ofpower in bilateral market non availability of central sector generator for which PPAlinked non availability of KAPS power

SE (Opn) enquired with Mauda TPS representative for under generation of MaudaTPS

Mauda TPS representative informed that less generation is due to coal shortage inMauda plant He informed that due to logistical issues with railways the plant isnot getting full supply of coal and management is taking up this issue withrailways He also informed that wagon tipplers have developed cracks due to whichunloading of coal became difficult He hoped that power situation at Mauda TPSwill be improved by 22nd June 2018

MSWRPC enquired why coal shortage is present with pithead plants of NTPC

NTPC Sipat representative informed that plant is receiving less coal from minesthan requirement leading to coal shortage

MSWRPC enquired with CGPL representative about unit10 forced outage

CGPL representative informed that steam from gland of HP turbine was coming outwhich necessitated forced outage of unit10

SE(Opn) requested CGPL to make available URS power to WR needy States incases when NR beneficiaries donrsquot need power and they give their approval forsupply of power to WR states He also requested CGPL to revive unit 50 at theearliest so that the WR States in general and Gujarat in particular can easily meetthe demand with supply

WRPC requested to update the status of revival of KAPS unit 1 amp 2 Representativefrom NPCIL informed that KAPS unit 1 amp 2 will be expected to revive in the monthof October 2018 amp June 2019 respectively

In view of the power shortage faced by the states WRPC and WRLDC requested allthe central sector and State generators to pick up generation available with themwhen frequency falls below 4990 Hz

WRPC and WRLDC also requested all states to take corrective measures whenfrequency falls below 4990Hz

The Sub-Committee noted as above

21 Inter-Regional Exchanges (May-2018)There was a net inter-regional export of 6312 MUs from WR to other regionsagainst net export schedule of 6236 MUs

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 8: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350

Minutes of 508thOCC meeting held on 14th June 2018 Page 7

(Figures are in MU)

IR link SCH DRAWL ODUD

WR-ER-206 -1006 -800

WR-NR-4357 -4746 -390

WR-SR-1674 -559 1114

WR NET-6236 -6312 -76

(+ import - export)

The Sub-Committee noted as above

23 Voltage ProfileVoltage profile at some of 765400 kV sub-stations furnished by WRLDC

is enclosed at Annexure-23

DiscussionOCC forum discussed about high voltages at Dhule substation Chief

Engineer SLDC Maharashtra informed that vendor is not supporting forreviving the 2x50MVAR bus reactors at Dhule substation A new bus reactor of125 MVAR will be coming into service by July 2018Representative from WRLDC stated as below

Reverse reactive power flow (ie from LV side to HV side) is observed at

Karad (MSETCL) and Kolhapur (MSETCL) even when the voltages in the

system are high which leads to further increase in system voltages

The reactive energy from wind stations is injected into system irrespective

of the system voltages in Maharashtra in compliance to their SERC

regulations In view of this Maharashtra is suggested to take up the

matter with their SERC for regulatory changes so that wind stations will

absorb the MVAR during high voltage condition

Generators also have to contribute in controlling high voltage by

absorbing MVAR during high voltage or at least by not injecting MVAR by

maintaining unity pf

OCC forum requested SLDCs to advise all DISCOMs and wind generators tocontrol MVAR flow to HV side at the time of High voltage

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 8

24 UF Relay OperationsAs per WRLDC records the system frequency didnrsquot reach 492 Hz and no

UFR operation was reported to WRLDC

The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures as furnished by the State utilitiesare given in Annex 25DiscussionSE(opn) thanked all OCC members for giving power cut report in uniform format

The Sub-Committee noted as above

26 Details of Generating Units under Forced outages

Details of generating units under forced outages are given in Annex-26

Discussions

SE (Opn) WRPC enquired about the status of revival of Wanakbori unit no 6

GPCC unit 2 GPEC unit 3 Uran unit 8 Ghatghar unit 1SGTPS unit 5JPL stg

II unit 1

CE SLDC Gujarat informed that Wanakbori unit 6 was revived on 12th Jun2018GPCC unit 2 and GPEC unit 3 are on reserve shutdown SGTPS unit 5revived on 08th Jun 2018

SE(opn) requested for early revival of Ghatghar unit no 1 considering lessavailability of power in the region

During the discussion WRPC and WRLDC requested all entities to continuouslyupdate the reasons given for forced unit outage so that updated information can bemaintained regarding forced unit outages

The Sub-Committee noted the information

27 Details of Generating Units under Planned outages

The updated details of generating units under Planned Outages are given inAnnex-27

The Sub-Committee noted the same

28 Presentation on operational aspects by SLDCs amp RLDCThe group members noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 9

29 List of New Grid Elements added list of elementsdecommissioned

The list of New Elements added in WR Grid is attached at Annexure-29

The Sub-Committee noted the same

210 List of grid elements failureAll constituents are requested to furnish the details of grid elements failure

(ie Generators EHV transmission elements etc)

Discussions

Members were agreed to furnish the details

The Sub-Committee noted the same

Item no 3 Operational Planning31 Proposed planned maintenance programme of generating units

The maintenance programme of generating units for the month of May 2018amp June 2018 was discussed The finalised list of maintenance programme ofgenerating units for the months April 2018 amp May 2018is given in Annexure31DiscussionsRepresentative from Gujarat informed that Sikka TPS unit 3 which is proposed foroutage from 10-07-2018 was postponed and unit will be taken out on 20-07-2018

Representative from Madhya Pradesh informed that Satpura TPS unit 6 was underoutage for AOH from 06th Jun 2018 Jhabua power representative informed thatunit no 1 will be under outage from 22nd July 2018 to 13th august 2018 for AOH

Representative of Maharashtra informed that Khaparkeda unit 5 will be taken outinstead of proposed unit no 1 from 25th July 2018 Koradi unit no 8 outage willnot be taken Parli unit 6 will be taken out for AOH from 01072018 instead ofproposed unit no 7 JSW unit no 2 will be taken out from 01st august 2018against scheduled date of 1st July 2018

Representative of NTPC Vindhyachal informed that unit no 12 will be taken outfrom 27th July to 20th August 2018 against scheduled outage from 1st July 2018He also requested for outage of unit no 8 from 19th June to 28th July 2018 forwhich OCC consented

Representative of NTPC Solapur informed that unit no 1 will be taken outage from31st July 2018 to 20th August 2018 against scheduled date of 26th June 2018

The Sub-Committee noted as above

Minutes of 508thOCC meeting held on 14th June 2018 Page 10

32 Outage programme of Transmission LinesElementsList of proposals for transmission elements outage to be availed during the

month of July 2018 is given in Annex 32

WRPC opined that for planning the outages of transmission elements completeinformation about the elements is essential It was also felt that some of theagencies are not properly describing the name of elements due to which lot ofdifficulty is being faced for considering outages Outages planning group alsoopined the followings

1 In order to reduce the post OCC outage proposals regular outages periodfor the consideration of OCC and its approval should be from fifth dayfrom the date of OCC to the last day of next calendar month basis (ieD+5+ Next complete calendar Month where D is date of OCC meeting)For example If OCC is conducted on 16th June then outage proposalswill be discussed for the period from 21st June to 31st July ( on an average40 days approximately)

2 The above procedure should be implemented with effect from July 2018month OCC(ie planning for outages for the period consisting some partof July amp complete August 2018)

3 If above procedure is implemented then there would be some overlappingperiod for which outages might have already been approved in previousOCC and therefore review of these previous OCC approved outages shouldbe done in current OCC

4 Two Separate lists of outage proposal would be prepared First list wouldcomprise regular outage whereas second list would comprise list ofoutages to be reviewed in OCC

5 Transmission element outage which have been planned shall be adheredto by all the concern entities

6 PostndashOCC outages shall be minimised for better grid operation7 The transmission licensees shall propose clearly the name of the elements

describing its name and transmission agency particulars of the elementin detail and reason for outage in detail else it will not be consideredduring planning of outages

8 If OCC approved outage of elements are not availed and deferred byconcerned transmission agency during the last two months this outageshall not be considered in next two month planning provided element isdeferred for system constraints Post-OCC outages plan shall be on D-5basis only

9 Sometimes outages for a particular element is requested by the agenciesother than the owner of these elements It is therefore to be noted thatonly Owner of transmission elements are entitled to request outages oftheir elements If request is made by other entity the same shall bedenied

10 The Outages planning group agreed the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 11

DiscussionsIn addition to outage planning for July 2017 additional OCC outages for

the month of June 2017 were also discussed in the meeting This was discussedto reduce the post OCC outages proposals However the outages approved by507th OCC meeting for June 2018 month will be the first priority in the outageplan The practice will be continued for next month onwards

The Sub-Committee noted and agreed as above

33 Anticipated power supply position for the months ndashJune amp July2018Details of anticipated restricted amp un-restricted demands for the months ofJune amp July 2018 are given in Annex 33

Maharashtra Gujarat MP amp Chhattisgarh updated the anticipated data

The Sub-Committee noted the information

Item no 4 Operational Statistics for the month of May 2018The details of actual generation demand drawl of power from grid

exchanges etc are given in the following Annexure

Annexure 41 - Actual generation and requirement

Annexure 42 - Peak demand data

Annexure 43 - Integrated operation of the system and operation of

Inter-state tie-lines

Annexure 47 ndash Details of level of major reservoirs in Western Region

The Sub-Committee noted the information

Item no 5 System Disturbances in Western RegionThere was no major grid disturbance in the Western Region during the

month of May 2018 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee noted as above

Item no 6 Healthiness status of SERsDRs of equipmentin the systemThe updated status of Constituents who have furnished the status of

healthiness of SERDRs in their systems is given at Annexure-6

Minutes of 508thOCC meeting held on 14th June 2018 Page 12

WRPC enquired about entities who have not submitted the status of

SERsDRs of equipment in the system Constituents assured to submit the status

on time

The Sub-Committee noted as above

Item No 7 Status of completion of ongoing schemes in WR71 Status of Commissioning of Reactors

72 Status of Transmission schemes - 765400 kV and above73 Status of Commissioning of new Generating units in WR

The updated status of above items is at Annexure-7

The Sub-Committee noted the above information

Item no 8 Miscellaneous Operational Items81 Quarterly review of Crisis Management Plan (CMP) and Physical amp

Cyber Security (PampCS) in power sectorAll constituents are requested to submit current status of CMP and PampCS

report (constituent wise) for the Fourth quarter (January to March 2018) as performat enclosed at Annexure-81Discussions

The forum requested all other constituents to submit the reports positively

and timely

Sub-committee noted and agreed as above

82 Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings RPC may follow up with the

utilities regularly in OCC to expedite the completion of various approvedschemes by giving due priority Accordingly WRPC has been taking up thisissue in OCC forum for discussion

In this matter the details related to State-wise sanctioned grant anddisbursement amount for the approved schemes to be funded from PSDF isattached at Annexure-82A

Also as per the procedure the utilities are required to furnish theinformation in the prescribed format by first week of every month on regularbasis to Member Convener PSDF project monitoring group (AGM NLDC

Minutes of 508thOCC meeting held on 14th June 2018 Page 13

POSOCO) with a copy to NPC amp WRPC division A copy of prescribed format isattached at Annexurendash82B

DiscussionsThe utilities were requested to update the current status of progress of scheme

under PSDF

The Sub-committee noted as above

83 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 15 (ii) of IEGC ldquoRPC shall file

monthly report on installation of capacitors by states vis-a-vis the

requirementtargets as decided in the RPCrdquo

SLDCrsquos DISCOMs are therefore requested to expedite the matter and

ensure to furnish the status of capacitor report in format attached at Annexure83 on monthly basis regularly SLDCrsquos are also requested to compile the details

of various utilities and send the compiled report of entire state by 8th day of

every month

The Sub-Committee noted and agreed to furnish the same

84 Review of LILO arrangement of 400 KV CGPL - Chorania atBhachau and Power order on plusmn 500 KV HVDC Mundra -Mohindergadh line

Chief Engineer SLDC Gujarat vide email dated 07062018 informedthat at present generation at various nodes in Gujarat is as under

APL Mundra on 400 KV Bus 1500

APL Mundra on 220 KV Bus Zero MW

CGPL Mundra 3000 MW

EPGL Vadinar Zero MW

Wind generation in Kutch 700 to 800 MW

Power order on HVDC Mundra ndashMohindergadh bipolar

More than APL generation

Minutes of 508thOCC meeting held on 14th June 2018 Page 14

He informed that under such conditions the loading on 400 KV DC

Bhachau - Varsana line remains 500 MW in each circuit To control loading

on 400 KV DC Bhachau ndash Varsana line 400 KV Varsana ndash Kansari or 400 KV

Varsana ndash Hadala line keeps open frequently

In order to avoid above situation CE SLDC Gujarat suggested that

the LILO arrangement of 400 KV CGPL ndash Chorania line at Bhachau to be

removed to reduce injection at Bhachau node OR the power order on plusmn 500 KV

HVDC Mundra - Mohindergadh line to be kept below generation at APL Mundra

complex

DiscussionsCE SLDC Gujarat briefed OCC forum that under the conditions stated in the

above table frequent opening of STU lines is occurring In order to avoid this

condition one of the CGPL-Bhachau line may be connected directly at

Chorania He informed that STU lines are being opened frequently because of

constraints in CTU network He also informed that availing of outages at

Bhachau and Varsana substations are becoming difficult in the present

scenario

Representative from WRLDC stated as below

Studies have been already carried out to review bypassing of LILO

arrangement of 400kV CGPL-Chorania at Bhachau It is observed from

the studies that there is very less impact of bypassing LILO arrangement

at Bhachau on the loading of 400kV DC Bhachau-Varsana DC line The

results were already shared with SLDC Gujarat Further less generation

at APL and Bachhau-Versana being very short line is the main reason for

overloading

In the real time grid operation the LILO has helped to reduce the loading

on CGPL-Bachhau lines during full generation at CGPL and no generation

backing down is required for single ckt outage from CGPL SPS at CGPL

as suggested by WRLDC in 132nd PCM( removal of SPS for single ckt

outage of Bachhau lines and double ckt outage of Jetpur lines) is also

implemented by CGPL

Minutes of 508thOCC meeting held on 14th June 2018 Page 15

400 KV Varsana ndash Kansari or 400 kV Varsana ndash Hadala linesare not being

opened frequently to control the loading on 400kV DC Bhachau-Varsana

line except for extreme contingencies In May 18 CGPL generation was

around 3000MW and APL generation also picked up around 1200-

1800MW therefore Bachhau-Versana loadings were normal

During the month of Junersquo18 (up to 140618) 400kV Varsana-Kansari

was opened only once (0822 hrs of 050618 to 1102 hrs of 070618)

when HVDC Mundra-Mohindragarh flow was increased when there were

multiple trippings in the grid due to tower collapse Due to forced

outages of 765kV Agra-Gwalior-1 765kV Satna-Bina-2 800kV Champa-

Kurukshetra HVDC Pole-2 power flow on Mundra-Mohindergarh-HVDC

Bipole increased for line load controlling on 765kV Satna-Oraiduring

which the maximum power flow on 400kV Bachau-Varsana DC was

570MWCkt

The power flow pattern of important WR-NR lines Bachhau-Varsana-DC

lines and HVDC line flows for the month of Mayrsquo18 is shown below

MS WRPC informed that as the plan is approved in SCM change of network

conditions requires SCM approval

Minutes of 508thOCC meeting held on 14th June 2018 Page 16

After long delibration DGM WRLDC agreed that 400 KV Varsana ndash Kansari or

400 kV Varsana ndash Hadala lines will not be opened regularly to control line

loading but in case of credible contingency in the grid appropriate actions will

be taken to ensure grid security

Decision(1) WRLDC shall not open 400 KV Varsana ndash Kansari or 400 kV Varsana ndash

Hadala lines regularly during normal operation of grid(2) In case of contingency in the grid WRLDC shall take appropriate action

including opening of above lines based on real time situation(3) Status quo shall be maintained for LILO arrangement of 400 KV CGPL -

Chorania at BhachauThe Sub-Committee noted the same

85 Creation of GIS based energy map of India by NITI AayogNITI Aayog is developing a user friendly GIS based Energy map of India

which would provide true locations of all energy resources in India including

power plants coal and oil reserves transmission lines refineries etc MoP

designated CEA as the nodal agency to collect all the data pertaining to the

power sector of India by collecting it from different utilities of power sector and

submit it to NITI Aayog for early development of GIS energy map of India

Accordingly CEA sent letters dated 09022018 and

01052018(Attached as Annexure-851) vide which DPampT Division of CEA

requested heads of DISCOMsPower departments of states to furnish data as

per format attached at Annexure-852 However data not have been received by

DPampT Division from the DISCOMs

All SLDC are requested to coordinate with Discoms and provide data in

prescribed format attached at Annexure-852 by 22062018 to CEA vide email

to cedpd-ceagovin under intimation to this office on email (opc-wrpcnicin)

Discussion

SE(Opn)requested all the SLDCs to coordinate with concerned DISCOMs

and Transcos to furnish the requisite information in prescribed format directly

Minutes of 508thOCC meeting held on 14th June 2018 Page 17

to CEA through email on cedpd-ceagovin under intimation to WRPC on email

(opc-wrpcnicin)

CE SLDC Gujarat informed that the information with regard to 11 KV and

above substations are available with GETCO and therefore they coordinate

with STU to furnish the information in time

CE SLDC Maharashtra informed that in Maharashtra network 33 KV

substations are maintained by DISCOM and 132 KV and above Substations are

maintained by MSETCL and therefore they will coordinate with them to give

details in time For Maharashtra the requisite information would be furnish by

DISCOMs and STU

SE(opn) requested SLDC Maharashtra representative to coordinate with Private

DISCOMs such as Reliance Infrastructure BEST and TATA Power Co for

furnishing information to CEA CE SLDC Maharashtra agreed to coordinate

with Private DISCOMs in Maharashtra

SLDC Madhya Pradesh representative informed that in MP 33 KV substations

are maintained by DISCOM and 132 KV Substations are maintained by

MPPTCL and therefore data will be provided by DISCOMs and STU

SLDC Chhattisgarh representative informed that in Chhattisgarh 33 KV

substations are maintained by DISCOM and 132 KV Substations are

maintained by CSPTCL He further stated that they would coordinate with them

to furnish details to CEA in time

Member Secretary WRPC requested all Transco amp Discoms to furnish the data

in prescribed format in time bound manner

After long discussion the members agreed on following

(1) All SLDC shall coordinate with their DISCOMs and STU to furnish the

information in prescribed format to CEA in time

(2) Maharashtra SLDC shall also coordinate with the private DISCOMs ie

Reliance Infrastructure BEST and TATA Power Co to furnish the

information in prescribed format to CEA in time

The Sub-Committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 18

86 Additional RoE for transmission elements of PGCIL underldquointer-regional system strengthening scheme in WR and NR(part-b)rdquo project commissioned within CERC specifiedtimeline

AGM (commercial) PGCIL requested WRPC to issue certificate for earlycommissioning of transmission elements as per CERC tariff regulation 2014-19 Chapter 6 clause 24(iii) which states that

ldquoadditional RoE of 05 may be allowed if any element of the transmissionproject is completed within the specified timeline and it is certified by theregional power committeenational power committee that commissioning ofthe particular element will benefit the system operation in theregionalnational gridrdquo

SrNo

Name of theproject

Name of the asset Zerodate ofproject

Timeline ofproject issuedby CERC (inmonths)

DOCO

1

Inter-RegionalSystemstrengtheningscheme in WR andNR (Part-B)

Conversion of existingline reactor at Gwaliorend of Satna-GwaliorCkt-1 TL (to be LILO atOrai) in to switchableline reactor 24th Dec

2014

36(Targeted dateof completion24th Dec 2017)

01st

April2017

2 765 KV Dc JabalpurPooling station - Orai TLalong with 2330 MVARLine Reactor along withBay Extension at765400 kV JabalpurPooling Station amp 02 nos765 Jabalpur Line baysalong with 2330 MVARline reactor at Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

3 LILO of one circuit of 765KV Satna-Gwalior TLalong with 765 kV SatnaLine Bay at Orai SubStation amp 240 MVARLine Reactor at Orai Ssand 765 kV Gwalior bayat Orai Ss

40 (Targeteddate ofcompletion 24th

April 2018)

31st

March2018

Minutes of 508thOCC meeting held on 14th June 2018 Page 19

Discussion

SE(opn) briefed the OCC forum about the request made by Ms PGCIL and asked

AGM(Commercial) PGCIL for additional clarifications

1 Whether Conversion of line reactor into switchable line reactor is eligible for

additional RoE

2 Whether the time line of 36 month for carrying out the work listed at sr no

1 is in line with the regulations

3 PGCIL may furnish details of discussion with regard to planning of the

elements in SCM PGCIL representative replied that all the elements

mentioned at sr No 1 to 3 are part of Inter-Regional System strengthening

scheme in WR and NR (Part-B) He stated that the time line given against

element at sr No 1 is actually a time line for a transmission line given in

regulation During discussion CE SLDC Gujarat and CE SLDC

Maharashtra agreed that the commissioning of all the elements mentioned

above have definitely benefitted the system operation in the regional grid

however they expressed their disagreement on 36 month time line for

element at sr No 1 (for conversion of line reactor into switchable line

reactor) They jointly stated that the work of conversion of line reactor into

switchable line reactor need very little time and expressed concern about the

timeline of Sr No1 and requested to review the timeframe

SLDC MP representative said that Element at Sr No1 does not qualify for RoE

WRLDC representative informed that

1 Switchable line reactor isolates the reactor in case of fault in reactor andline tripping will be avoided

2 Due to the commissioning of Jabalpur Orai double ckts along with linereactors ATC and TTC of WR to NR increased

3 Due to the LILOing of Satna-Gwalior at Orai Ss loading of Gwalior-Agralines has been reduced substantially

After long discussion all states agreed that the elements at sr No 2 and 3 are

beneficial for system operation in the regional grid may qualify for additional

RoE

Minutes of 508thOCC meeting held on 14th June 2018 Page 20

At the end of discussion the following decision were taken

(1) PGCIL amp WRLDC shall prepare list of benefits due to early commissioningof all the three elements which are under consideration for additionalROE in accordance with the regulation

(2) WRLDC shall explain the listed benefits due to early commissioning of allthe three elements to the forum in the next OCC meeting

The Sub-Committee noted the same

Item No 9 WRLDC Agenda Items

1 Primary Frequency ResponseThe average primary response of generators for last three events are

shown below

SNo

GeneratorStation

Event-1 Event-2 Event-3 AverageResponseas ofIdeal

ER-1250 SR-935 WR-3090300118104620

070318093820

230418104200

4990 4998 50034984 5005 4972-006 007 -031

1Mouda-II (1x660) 125 27 51 68

2 Mouda-I(2x500) 134 0 54 633 KSTPS-II(3x500) 35 85 30 50

4APMLTiroda(5x660)

39 50 14 35

5 TRN (1x300) 7 86 0 316 VSTPS-V(1x500) 36 37 14 297 SKS (1x300) 5 75 0 268 APL-III(3x660) 48 28 0 259 KSTPS-I (3x200) 37 12 25

10Kawas(4x106+2x116)

0 40 20 20

11 DB Power(1x600) 0 53 0 18

12JPL Tamnar (StageII)(3x600)

43 1 8 17

13GMR Warora(2x300)

48 2 0 17

14 Jhabua (1x600) 48 0 0 1615 MB Power(1x600) 14 17 10 1416 SIPAT-I(3x660) 11 19 4 1117 Balco (4x300) 9 17 1 9

Minutes of 508thOCC meeting held on 14th June 2018 Page 21

18 SIPAT-II(2x500) 22 0 4 919 Lanco (2x300) 24 0 0 820 VSTPS-IV(2x500) 0 15 8 821 CGPL(5x830) 9 3 9 722 SASAN(6x660) 18 0 4 7

23Gandhar(3x144+1+224)

19 0 0 6

24 VSTPS-I (6x210) 13 0 0 425 MCPL (1x300) 12 0 0 426 VSTPS-III(2x500) 0 0 6 227 JPL I (4x250) 5 0 0 2

28EssarMahan(1x600)

0 0 1 0

29 NSPCL (2x250) 0 1 0 030 VSTPS-II(2x500) 0 0 0 031 JP NIGRIE(2x600) 0 0 0 032 SSP-CBPH (5x50) 0 0 0 0

Generating stations whose frequency response is below 40 may apprise OCC

actions being taken to improve the frequency response

DiscussionsRepresentative from WRLDC stated as under

Vide its order dated 31st July 2017 and 5th amendment of IEGC Honrsquoble

CERC reiterated the mandate for providing primary frequency response

Non-compliance of FGMORGMO provision is liable for penal actions

under Section 142 reduction of 1 on RoE

Honrsquoble CERC had mandated conducting of periodic check-up of the

governing system by independent agencies at the cost of the generating

stations being tested

Procedure for testing of primary frequency response of generators as per

IEGC clause 52(g) is being prepared by NLDC and the same would be

submitted to Honrsquoble CERC for approval

In view of the above all generating stations mentioned above whose

response is below 35 are requested to ensure compliance to the

regulations

CGPL and NSPCL informed that the governor tuning at their stations was

completed and now the governors are compliant of IEGC Regulations 52 (f) (g)

(h) amp (i)

Minutes of 508thOCC meeting held on 14th June 2018 Page 22

VSTPS-II informed that governor tuning was completed and the new logic would

be implemented by 310518

VSTPS-I III IV amp V stated that the logic implemented for frequency response

would be reviewed and further tuning of governors will be done

The sub-committee noted the same

2 Voltage Regulation in Western Region

In the month of Aprilrsquo18 voltages were above IEGC band at 765kV Durg 400

kV Dhule Wardha Raigarh Kalwa Dehgam and Karad The Voltage Deviation

Index of above nodes are tabulated below

S No Voltage(kV)

StationName

time Voltage isgt than IEGCthreshold

VoltageDeviationIndex

1 765 Durg 1483 015

2 400 Dhule 5347 053

3 400 Wardha 3370 0344 400 Raigarh 3006 0305 400 Kalwa 2328 0236 400 Dehgam 2190 0227 400 Karad 1446 014

Concerned utilities to update the status of revival of following bus and line

reactors that are under prolonged outage

SNo Element Owner Outage Date Reason

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

3 80 MVAR LR of400 kV Karad-Lonikhand-1Karad

MSETCL 14092017 RampY Phase LABurst

Minutes of 508thOCC meeting held on 14th June 2018 Page 23

4 50MVAR LR of400kVChandrapur-Parli Ckt-3 LR atboth ends

MSETCL - -

5 80MVAR LR of400kVKhandwa-Seoni-2 LR Seoni

POWERGRID 111217 ForCommissioningof new TBEAmake LR

6 63MVAR LR of400kVVindhyacha-Jabalpur-2Jabalpur

POWERGRIS 300418 High AcetyleneGas contentissue

7 50MVAR LR ofVindhyachal-Satna-3Satna

POWERGRID 010418 Heavy oilleakage in RPhase bushing

8 80 MVAR BR atEssar Mahan

Mahan 040418 Bus ReactorAbnormal Sound

OCC members may like to deliberate on the following issues

a All the SLDCs may apprise the OCC regarding the actions taken to

control the over voltages at above mentioned nodes

b Concerned utilities to expedite revival of the bus reactors and line

reactors under prolonged Outage LR would further help in for better

voltage regulation

DiscussionsRepresentative from WRLDC stated as under

Concerned states to ensure the voltage regulation near by the above

mentioned substations by regulating MVAR injection from nearby

generating stations and through capacitor switching

In the coming months during Monsoon the voltage profile is expected to

be on further higher side All states to closely monitor and control the

MVAR flow from LV side to HV sideand taking up with SS personnel to

switch off capacitors at LV and down below level

Minutes of 508thOCC meeting held on 14th June 2018 Page 24

Concerned utilities to restore bus reactors and line reactors which are

under prolonged outage

Status given by concerned utilities is as under

SNo Element Owner Outage Date Reason Expected revivaldate (Status in507th OCC)

1 80 MVAR BR atDhariwal

DIL 22072017 Oil leakage Decrsquo18

2 50 MVAR LR of400 kV Parli-Lonikhand_New-2 Parli (MH)

MSETCL 30102015 Fire Accident inLR

240518

3 50MVAR LR of400kVChandrapur-Parli Ckt-3 LRat both ends

MSETCL - - Junersquo18

WRPC would communicate to GMR Chhattisgarh who were not present in the

OCCM to revive 125MAVR BR at the earliest

Further the group formed as per decision in 506th OCCM would study and

submit the report with remedial suggestions to control high voltage

The sub-committee noted the same

3 MVAR absorption by Generating station to control high voltageEven after taking Bus Reactors Line Reactors Switchable Shunt Reactors inservice and opening lightly loaded lines high voltages are observed at most ofthe EHV nodes during night hours In view of inadequate shunt reactivecompensation the generating units are being advised to contribute in voltageregulation by operating their units in under-excited mode (absorb ReactivePower) within the capability curve The MW MVAR and Voltage of generatingunits was analyzed for the month of May 18 with the help of SCADA dataavailable at WRLDC The list of generators injecting MVAR into the grid evenwhen the bus voltage is above nominal are given below

1 IPPs Essar Mahan RKM GMR-CG Dhariwal DB Power Jhabua TRN2 ISGS KSTPS (U3 U2) Mouda-I3 Gujarat Essar Vadinar (U1 amp U2) Wanakbori (U4 U5 amp U6)4 Maharashtra Koradi (U8 amp U9) Bhuswal (U4 amp U5)

Chandrapur(U7)

Minutes of 508thOCC meeting held on 14th June 2018 Page 25

5 MP JP Bina(U1 U2) Satpura (U10 amp U11) Singhaji (U1 amp U2)All the concerned utilities to update the plan to adjust setting of the AVR GTtap so as to enable generating units to contribute in voltage regulation withincapability curve

DiscussionsWRLDC informed generating stations whose contribution is inadequate for

reviewingadjustment of AVR settings and GT tap so as to enable generating

units to contribute in voltage regulation within capability curve

The sub-committee noted the same

4 Tower collapse due to bad weather condition in Maharashtra and MadhyaPradesh

It was observed that due to widespread rain and storm in Maharashtra and

Madhya Pradesh following EHV lines tripped

SNo Element Name Owner

OutageDate

Outage Time Reason

1

765kVJabalpur(PS)-Bhopal(BDTCL)-SC

Sterlite 18052018 1629 R-E fault Tower damaged

location 2A3

2765kVSatna(PG)-Bina(PG)-II

PGCIL 30052018 1931 R-Y FaultTower bent at

location 63

3 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015

Suspension tower is collapsedat location 357(1318KM)ampcaused damage to theadjoining towers

4 400kV Dhule-Bableshwar-II

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-122

5 400kV Dhule-Bableshwar-1

MSETCL

01062018 1642 R-Y-B fault Towers collapsed

between locations 118-123

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802

Tower Collapse at locations121 amp 122(Revived on 110518 at2218 hrs)

The outage of 765kV Satna(PG)-Bina(PG)-II has reduced the security ingeneration evacuation from VSTPS Sasan Rihand-III and Jaypee NigrieTripping of one of 765kV Satna-Bina765 Satna-Gwalior765kV Satna-Oraicircuits would require forced generation backing down of about 2000 MW atSasanRihand-III amp Vchal IVV amp Jaypee Nigire

Minutes of 508thOCC meeting held on 14th June 2018 Page 26

Concerned utilities are requested to restore the above mentioned lines onEmergency Restoration Scheme (ERS)

DiscussionsDuring the meeting status given by concerned utilities is as under

SNo

Element Name OwnerOutageDate

OutageTime

Expected revivaldate(Status in 508th

OCC)

1 765kV Jabalpur(PS)-Bhopal(BDTCL)-SC Sterlite 18052

018 1629160618(NormalRestoration)

2 765kV Tiroda-Koradi(3)-II ATIL 02062

018 2015 160618 (ERS)

3 400kV Dhule-Bableshwar-II MSETCL 01062

018 1642 310718

4 400kV Dhule-Bableshwar-1 MSETCL 01062

018 1642 310718

5 400kV Birsingpur-Damoh I amp II MPPTCL 12062

018 1950 -

6 765kV Bilaspur-Dharamjaygarh PGCIL 27042

018 1802Revived on110518 at2218 hrs

7 765kV Satna(PG)-Bina(PG)-II PGCIL 30052

018 1931Revived on110618 at1309 hrs

Concerned utilities are informed to revive the reactors at the earliest for better

voltage regulation

The sub-committee noted the same

5 Tripping of Kalwa(MSETCL) 400220kV ICT-2 at 0102hrs of 010618400220kV ICT-2 (600MVA) at Kalwa tripped at 0102hrs of 010618 due tooperation of PRV and differential protection Subsequently 400220kV ICT-1(500MVA) at Kalwa was hand tripped at 0130hrs of 010618 to avoid thespreading of fire from ICT-2Due to this load trimming scheme was operated and load was effected to a partof Navi Mumbai and Mulund Load loss of around 304 MW was reported byMaharashtra Subsequently the damaged cables were replaced with new cablesand the ICT-1 was charged on 030618 at 1342 hrs

Minutes of 508thOCC meeting held on 14th June 2018 Page 27

Further the telemetry data of 220kV Maharashtra system is not available atWRLDC due to which the assessment of real time conditions in the affectedarea is not possibleIn view of the above Maharashtra is requested to expedite the restoration of400220kV ICT-2 (600MVA) at Kalwa and take necessary actions to make220kV telemetry data available at WRLDC

SLDC Maharashtra may apprise the OCC regarding the actions taken to controlthe Kalwa ICT loading and the details of load management in Mumbai area inview of above contingency

DiscussionsMaharashtra informed that following actions were taken to control the Kalwa

ICT loading on 010618

LTS scheme operated and 250MW load relief was obtained

Generation from Tata hydrogas increased

Ghatghar unit-1 (125MW) taken in service

Maharashtra said that the ICT-IV at Kalwa would be commissioned within 4

months

The sub-committee noted the same

6 Constraints in keeping the thermal units on-bar to manage the highdemand in day time and less demand during off peak hours

It was observed that due to bad weather condition and rains the demand inWestern Region during off peaks hours was less and the demand in day timewas considerably high Due to less demand in off peak hours the states weresurrendering their share in IGGS generators leading to the condition of belowtechnical minimum schedule in some ISGS thermal generators It is observedduring last week that the difference in WR maximum demand to minimumdemand is ranging from 5000MW to 6500MW In order to meet the highdemand in day time the thermal generating stations for which schedule isbelow technical minimum are supported up to technical minimum Thevariation in WR demand for a typical day (020618) is shown below

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 28

All states are requested to stagger their load to avoid the condition of technicalminimum in thermal stations during off peak hours in view of high anticipateddemand in day time

DiscussionsWRLDC informed all states to stagger their load and give the requisition to avoid

the condition of below technical minimum in thermal stations during off peak

hours in view of high anticipated demand in day time

The sub-committee noted the same

7 DelayedNon submission of DR for grid eventsThe utilities need to submit the DREL details for Grid events to RLDC within24 hours of occurrence as per IEGC 52(r)The non-submission delayedsubmission of details from utilities lead to delay in detailed analysis of theevent For the events DREL is still pending is attached at Annexure 97DiscussionsAll the concerned utilities mentioned above are informed to submit the DRER

by 180618 and comply IEGC 52(r) for future grid events

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 29

8 Grid Occurrence on 03rd June 2018 at ACBIL Power station due to Badweather conditions

On 03rd June 2018 at 1622 Hrs 400 kV MCCPL- Bilaspur tripped Further at1626Hrs 400 kV ACBIL-MCCPL and 400 kV ACBIL-Bilaspur tripped Thisresulted in tripping of all the generators in both the power station due to loss ofevacuation path and led to a loss of 654 MW generation The list of elementstripped are given below-

400 kV MCCPL- Bilaspur 400 kV ACBIL - Bilaspur 400 kV MCCPL- ACBIL Unit 1 ACBIL (135 MW) Unit2 ACBIL (135 MW) Unit1 ACBIL Chakabura (30 MW) Unit2 ACBIL Chakabura (30 MW) Unit1 SCPL (50 MW) Unit2 SCPL (50 MW) Unit1 MCCPL (300 MW)

Discussions

WRLDC informed that the 400kV MCCPL-Bilaspur tripped on 030618 at

1622 hrs on B phase to Earth fault during which AR at MCCPL was

unsuccessful ACBIL to share the complete tripping details during the next

Protection Committee Meeting (PCM)

The sub-committee noted the same

9 Updating the ldquoList of Important Grid Elements in Western Region ndash2018rdquo

In compliance with IEGC-52(c) document titled ldquoList of Important GridElements in Western Regionrdquo has been updated in coordination with WR stakeholders during the 498th 503rd and 507th OCCM The updated document isavailable at following URL links

a httpwrldcorgdocsLIST20OF20IMPORTANT20GRID20ELEMENTS20Updated20on20May202018pdf

b httpwrldcincontent363_1_Proceduresaspx

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 30

10 Updating the ldquoOperating Procedure for Western Regional GridrdquoIn compliance with IEGC-51(f) document titled ldquoOperating Procedure forWestern Regional Gridrdquo was prepared and was last updated on 20th Julyrsquo2017The document is available at following link

a httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

WR entities may provide the feedback and suggestions for updating OperatingProcedure for Western Regional Grid for the year 2018

DiscussionsWRLDC informed all utilities to give feedback and suggestions by 250618 for

updating Operating Procedure for Western Regional Grid for the year 2018

The sub-committee noted the same

11 Black Start mock drill Exercise in Western RegionAs mandated by IEGC the Black start capable units need to conduct mockblack start exercises once in every 6 months Western Region has 29 generatingstations with black start capability As per the information available withWRLDC only 8 black Start stations have completed the Mock exercise in theyear 2018 as given below

SNO Generating Station Date of mock drill exercisedone

1 CLIPL Gujarat 2nd Jan 20182 Tons Madhyapradesh 23rd Jan 20183 GIPCL-I Gujarat 6th Feb 2018

4 Indira SagarMadhyapradesh 10th Feb 2018

5 Kadana Gujarat 4th March 20186 Ukai Gujarat 4th March 20187 Bargi Madhyapradesh 11th April 20188 Pench Madhyapradesh 11th April 2018

Constituentsregional entities are requested to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGCregulation 58(b)

DiscussionsWRLDC informed all Constituentsregional entities to complete the mock

exercise of their black start units in compliance to IEGC regulation 58(b)

Minutes of 508thOCC meeting held on 14th June 2018 Page 31

Maharashtra informed that the black start mock drill exercise of Koyna isplanned in the last week of Junersquo18 The exact date would be communicated toWRLDC once it is finalized

The sub-committee noted the same

12 Follow-up of agenda items discussed in past OCC meetingi Installation of PMU for observability of dynamic performance of

STATCOMsFor dynamic reactive VAR compensation in Western Region fourSTATCOMrsquos were approved in 36th SCM of WR In order to monitor thedynamic performance of the STATCOM+ MSR MSC it is desired toinstall PMUs at STATCOM locations (SATNA PG Gwalior PG AurangabadPG and Solapur PG) The matter was already discussed in the 505th 506th

and 507th OCC meetingDiscussionsPOWERGRID informed that the STATCOMs can be integrated with the existing

PMUs by replacing any one of the feeders integrated to PMU

WRLDC informed that the list of lines to be replaced with STATCOMs for

integration with existing PMUs would be forwarded to POWERGRID

The sub-committee noted the same

ii Synchronous Condenser Mode of Operation at GhatgharDuring 505thamp 506thOCC meeting WRLDC advised Maharashtra SLDCto explore the possibilities of operating Ghatghar machines insynchronous condenser mode of operation to improve the voltageprofile at 220 kV Ghatghar and 220 kV Kalwa

Maharashtra SLDC vide its email dated 230418 submitted theconcerns of Ghatgar Hydro Power Stations to operate the machines incondenser mode as given below Operation in condenser mode requires the continuous water

depression of draft tube This is achieved by the pressurized airfrom the water depression compressor These compressors areimported compressors and there are issues in the procurement ofthe spares for these compressors

There is no mention about the operation of machines in condensermode in the power purchase agreement (PPA) Being a policymatter the proposal to be put up with higher officials

During 507th OCCM it was requested Maharashtra to submit the finalopinion by 220518 after discussion with their higher management

Minutes of 508thOCC meeting held on 14th June 2018 Page 32

And it was also requested to share the detailed concerns for operatingGhatgar machines in condenser mode

DiscussionsWRLDC said that the proposal is being discussed from 505th OCCM The

view and concerns from Maharashtra are yet to be received Maharashtra

is once again informed to take up the matter with their higher

management and inform the same at the earliest

The sub-committee noted the same

iii Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveRegulation Part II (B2) (3) and Part II (B3) of the CEA (TechnicalStandards for Connectivity to the Grid) Amendment Regulations 2013notified on 15th October 2013 and the CERC order dated 050116 inPetition No420MP2014 mandates compliance of LVRT in all WindTurbine Generators (except for Stall Type WTGs) having capacity morethan 500 kW connected to voltage level of 66 kV and above

During 504th 506th OCCM and 3rd REIF meeting WRLDC highlightedthe importance of LVRT to prevent simultaneous loss of generationfrom RES All SLDCs were informed to compile the information asfollowinga Capacity of RES in the State that is exempted from LVRT Stall

type Capacity below 500 kWb Capacity of RES in the State that is mandated to have LVRTc Capacity of RES in the State that is LVRT compliantd The present methodology of checking LVRT compliance in vogue for

giving clearance for integrationGujarat and Madhya Pradesh submitted the data during 3rd REIF heldon 170418

DiscussionsMaharashtra informed that the required inputs has been sent to WRLDC

on 130618

WRLDC informed that the inputs received would be verified and updated

The sub-committee noted the same

Minutes of 508thOCC meeting held on 14th June 2018 Page 33

iv Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR These lines are operated in radial mode to supplypower from Maharashtra to KarnatakaDuring 505thamp 506th OCC meeting WRLDC shared the merits ofutilization of 220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kVTalangade-Chikodi lines for inter-regional power transfer with ISTSstatusDuring 507th OCCM WRPC informed Maharashtra to take up thematter with Maharashtra STU and Karnataka with a copy ofcommunication to WRPC and WRLDC

DiscussionsMaharashtra raised the concerns on overloading on Kolhapur ICTs during

summer

WRLDC informed that ICT loading was analyzed for last one year and

shared during 505th OCCM in which ICTs loading were normal except few

days And this ICTs overloading can be addressed by implementing inter

tripping scheme

Maharashtra requested WRLDC to share the analysis on Kolhapur ICTs to

take up the matter with STU WRLDC agreed to sharethe study results

with Maharashtra

Members of OCC suggested that the lines may be taken into operation as

there are constraints only during few months In case of high loading of

Kolhapur ICTs in any time the lines can be opened He requested MSLDC

to take action for parallel operation

The sub-committee noted the same

Item No 10 Date and venue of next OCC meeting

The date amp venue of 509th OCC meeting will be intimated later on

The sub-committee noted the same

ANNEXURE A

SlNo Organisation Name amp Designation Mobile No E-mail Address

I WRPC1 Shri A Balan MS 9483540528 ms-wrpcnicin2 Shri JK Rathod SE 9987910799 opc-wrpcnicin3 Shri KB Jagtap SE 86527760334 Shri LKS Rathore EE 9833371844 lksr_iesnicin5 Shri P Peddi Reddy AD-I 7840894702 peddireddynicin6 Shri BV Sandeep AD-I 8527622170 bvsandeepnicin

II GETCo GSECL7 Shri BB Mehta CE 9879200736 celdgebmailcom8 Shri BM Shah DE 9925212836 sldcdemisgetcogebmailcom9 Shri GK Gohel 9925208588 ggohilgetcogujaratcom

III MSETCL MSEDCLMahaGencoMSPGCL10 Shri Anil V Kolap CE 7030964444 cesldcmahasldcin11 Shri PS Sharma SE 9769213865 seoperationmsldcgmailcom

IV MPPTCL MPPGCL12 Shri SS Patel SE 9425805270 sspatel_2261yahoocom13 Shri Sushil Kumar Pal AE 9425806638 shushil_55190yahoocom14 Shri Shikhar Nema AE 9425805299 shikharnema07gmailcom

V CSPTCL15 Shri AK Shrivastava AddlCE 9827177466 akshrivastava712gmailcom

VI POSOCOWRLDC16 Shri Abhimanyu Gartia GM 9869088058 agartiaposocoin17 Shri K Muralikrishna DGM 9869450219 kmuralikrishnaposocoin18 Shri N Roy DGM 9869080265 nroyposocoin19 Smt Pushpa S Asst GM 9869404482 pushpaposocoin20 Shri Pradeep Kumar Sanodiya Sr Eng 8452045338 psanodiyaposocoin21 Shri Ch Jagadeesh Sr Eng 9869469376 cjagadeeshposocoin22 Shri Absar Ahmad Sr Eng 8080484278 absarahmadposocoin

VII POWERGRID23 Shri KK Thakur AGM 9428819594 kkthakurpowergridindiacom24 Shri Kuleshwar Sahu DGM 9425294214 kuleshwarpowergridindiacom25 Shri Manoj Kumar Tripathi Asst GM 8275025586 tripat_mpowergridindiacom26 Shri Sanjoy Das CM 9429976244 sanjoydaspowergridindiacom27 Shri Onkar Singh Dy Mgr 9428371368 onkargbpccgmailcom

VIII NTPC28 Shri P Sreenivas GM 9004677573 psreenivasntpccoin29 Shri NP Shahar AGM 9428511769 npshaharntpccoin30 Shri P Mondal DGM 9424141560 pribratamondalntpccoin31 Shri P Chandankhede DGM 9403780553 prashantchandankhedentpccoin32 Shri CP Agarwal Sr Mgr 9423877192 cpagarwalntpccoin33 Shri Bhaskar Maheshwari 8275045062 mbhaskarntpccoin34 Shri Manas Kapoor Mgr 9425177986 manaskapoorntpccoin

LIST OF PARTICIPANTS OF 508th OCC MEETING OF WRPC HELD AT WRPC MUMBAI ON 140618

IX NSPCL35 Shri Pavan Kumar Nukala 9425293596 pknukalanspclcoin

X NPCIL36 Shri A Sarmasarkar SOG 9423982702 asarmasarkarnpcilcoin37 Shri Sonu Singh SOE 9403642631 sonusinghnpcilcoin38 Shri Samir Pathan SOE 9409309743 samirpathannpcilcoin

XI RELIANCE ADA39 Shri Pavan K Sharma AVP 9325119773 pavansharmarelianceadacom

XII APMLAPL40 Shri Manoj Taunk GM 9099005517 manojtaunkadanicom41 Shri Rakesh Bhalerao AM 7045953823 rakeshbhaleraoadanicom42 Shri Nilesh Wankhede AM 8291118849 nileshwankhedeadanicom

XIII TATA POWER43 Shri Avinash Kumar GM -Opn 8866058628 avinashkumartatapowercom44 Shri Rajendra V Saraf Head GOpn 9969334420 vvsaraftatapowercom

XIV STERLITE POWER45 Shri Nithin A Skaria Eng 9673007426 nithinskariasterlitecom

XV MB POWER46 Shri Prateek Dubey Sr Eng 7773011366 prateekdubeyhppplin

XVI VEDANTA47 Shri Sangeet Ku Sahu Mgr 9893592588 sangeetsahuvedantacoin

XVII RATTAN INDIA48 Shri Anil Kumar Mishra GM 9665070111 anil-mrattanindiacom

XVIII TORRENT POWER LTD49 Shri Ronak Naik Mgr 9227410210 ronaknaiktorrentpowercom

XIX JINDAL POWER LTD50 Shri Ajeet Kumar 9329444989 ajeetjindalpowercom

XX KSK51 Shri Ramakant Upadhyay Dy Mgr 7869916080 ramakantukskcoin

XXI JHABUA POWER Ltd52 Shri Dileep Singh Mgr 9713063449 dileepsinghavanthapowercom

XXII RKM POWER53 Shri T Rajesh Kumar Mgr 8435000779 trajeshkumarrkmpowergenin

XXIII ESSAR POWER54 Shri Ashwin Ande 9909993594 ashwinandeessarpowercom

Anaulagnak 21

maah ma[- 2018

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5010 Hz BETWEEN 0400 Hrs amp 0500 Hrs Hrs ON 03052018

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4977 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 26052018

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5020 Hz AT 040310 Hrs ON 03052018

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4957 Hz AT 194910 hrs Hrs ON 26052018

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS MAY 2018 APRIL 2018 MARCH 2018

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2252 1280 1299

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7006 7957 7929

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 742 763 772

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING MAY 2018

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

मई 2018 Voltage Profile during the month of May18

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 400 423 411 413 401 420 409 418 405 417 404 410 390 422 416 425 4202 413 396 420 407 412 397 421 407 417 399 417 399 415 400 421 414 424 4113 415 396 422 407 414 396 425 406 418 401 417 400 417 391 422 415 426 4184 411 396 420 407 410 396 418 404 415 402 415 401 407 393 420 413 423 4165 411 398 421 408 410 397 418 403 417 401 415 401 410 393 419 414 424 4166 416 399 424 412 416 400 422 404 420 405 419 404 408 390 419 414 422 4177 411 399 422 412 410 400 418 406 418 405 415 405 406 392 418 413 423 4168 411 398 421 410 411 399 419 405 417 402 416 402 409 392 418 412 421 4169 411 399 419 409 409 398 418 404 416 402 414 401 410 395 418 412 422 41510 412 398 422 408 410 398 418 404 419 402 417 401 414 395 417 411 419 41611 411 399 422 410 410 399 417 404 417 404 415 403 407 391 418 413 419 41412 416 400 425 413 414 401 424 406 419 407 418 405 411 393 421 414 419 41413 415 400 423 412 414 400 419 402 418 406 417 404 415 394 419 414 422 41614 411 398 421 409 410 397 416 400 417 402 416 401 410 392 422 412 422 41515 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 415

Annexure 23

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खडवा इटारसी दमोह नागदा इदौर

Raipur Raigarh400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

15 414 397 422 409 411 397 424 406 417 402 416 401 413 398 421 415 420 41516 414 398 421 409 412 399 424 408 417 404 415 402 418 391 423 414 422 41317 413 399 421 410 411 399 421 406 418 405 416 404 411 391 420 414 421 41418 414 398 421 408 412 398 420 409 417 404 416 402 415 397 420 412 422 41319 414 402 422 411 412 403 422 408 420 406 418 406 416 394 420 411 420 41320 414 397 422 411 414 400 422 408 419 407 418 405 411 392 421 417 421 41721 414 397 422 406 413 398 421 406 420 401 418 400 412 391 420 413 421 41422 411 398 421 406 410 397 420 405 417 399 416 400 413 398 418 413 418 41223 415 401 421 409 413 401 424 409 419 401 417 402 414 393 420 415 421 41524 413 395 421 406 412 398 422 410 417 401 416 399 416 398 419 413 420 41425 414 400 421 407 412 399 421 407 419 402 417 400 411 396 420 413 420 41326 412 399 421 407 412 399 420 408 419 403 418 401 410 393 420 413 420 41327 415 399 422 412 414 402 423 411 419 408 418 407 414 396 421 417 421 41628 413 400 421 408 412 400 421 408 417 402 415 402 411 396 420 413 420 41429 412 398 422 410 411 398 421 409 418 406 417 405 412 396 420 414 421 41430 413 396 420 408 411 397 422 406 418 402 415 401 412 395 421 414 422 41531 414 396 422 406 413 396 422 407 417 398 415 398 411 395 421 415 424 417

416 395 425 406 416 396 425 400 420 398 419 398 418 390 423 411 426 411

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 412 425 418 434 414 424 406 420 410 429 415 426 413 414 400 422 4072 417 410 423 416 429 412 422 405 421 400 428 402 423 403 413 397 421 4053 419 410 424 414 433 411 424 401 417 396 425 399 422 404 414 395 418 4064 417 408 424 416 431 411 420 399 415 400 422 400 421 400 413 397 421 4065 415 409 422 416 430 410 419 399 414 396 421 399 423 400 412 397 420 4056 416 410 422 418 432 415 422 399 416 402 424 406 422 404 415 401 422 4097 415 409 424 418 430 416 420 401 417 399 422 398 422 406 415 400 422 4078 415 407 423 417 430 411 422 399 416 396 423 398 423 406 414 399 422 4069 415 408 424 417 430 412 419 401 415 397 421 396 422 405 413 396 421 406

10 414 407 424 417 431 410 422 400 418 396 425 398 426 404 415 397 424 40511 414 409 421 415 433 412 420 400 417 404 420 401 424 406 413 400 425 40912 418 411 420 413 431 416 423 402 420 403 426 403 425 409 416 402 423 40913 416 411 418 412 430 412 421 401 416 400 424 402 424 406 414 401 420 40914 418 409 420 412 429 392 421 400 415 396 421 395 421 406 413 398 421 40515 417 411 422 414 429 411 422 402 414 393 421 394 420 407 413 397 420 40516 419 411 421 412 429 411 422 401 411 392 418 391 422 402 412 399 420 40617 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 400

धल बोईसर कलवा कराड़ असोज दहगामKarad Asoj Dehgam

400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

17 416 411 420 412 429 409 421 405 414 396 421 396 424 401 412 399 421 40018 417 409 419 412 430 410 422 399 413 395 421 395 421 406 413 397 419 40519 419 412 418 410 433 412 421 403 416 395 423 396 421 405 415 400 422 40620 418 413 418 414 432 415 421 403 415 404 422 407 421 407 415 404 422 41121 417 409 417 409 433 380 419 398 415 391 422 392 422 404 413 397 420 40522 414 408 422 412 433 400 419 395 414 392 420 393 420 406 413 396 421 40323 417 412 420 413 432 412 420 400 414 393 422 392 421 402 414 397 422 40424 416 409 418 410 430 408 418 396 415 394 422 396 421 405 413 397 420 40525 416 409 418 410 433 412 419 395 414 399 422 400 422 402 413 396 422 40426 416 409 422 411 430 412 419 396 412 396 419 394 423 402 412 398 419 40527 418 414 422 414 432 411 421 404 412 399 419 398 420 405 413 401 420 40628 417 409 421 413 433 389 423 400 411 394 417 392 420 400 412 397 421 39529 417 411 420 412 432 411 421 397 411 394 418 394 424 410 413 399 422 40030 418 411 420 411 431 409 419 400 414 392 419 390 420 402 413 396 420 39731 417 410 424 415 433 410 423 401 410 393 417 393 419 398 412 394 418 400

419 407 425 409 434 380 424 395 421 391 429 390 426 398 416 394 425 395

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 408 414 404 418 408 420 409 417 400 419 407 422 412 419 405 785 763 781 757

2 417 405 416 404 419 407 422 402 420 383 419 399 425 401 420 398 788 756 785 745

3 418 407 417 403 419 406 418 398 421 398 416 396 419 400 419 397 795 755 786 751

4 418 407 415 403 418 406 417 400 421 400 415 398 418 402 418 400 779 754 780 749

5 418 408 416 404 417 408 417 397 420 400 415 396 418 400 417 400 783 755 782 752

6 418 407 417 403 420 408 416 400 424 400 415 400 420 405 419 401 793 762 790 756

7 419 407 415 404 419 408 419 399 424 402 417 399 420 404 420 400 787 766 783 757

8 418 408 417 406 420 408 418 399 424 399 415 396 420 399 421 401 787 763 779 753

9 417 407 416 405 420 409 417 399 427 399 414 396 419 401 419 405 782 763 780 756

10 419 406 416 404 420 408 420 397 433 405 417 395 421 400 420 401 787 763 788 758

11 419 409 415 403 419 407 417 403 427 403 415 401 420 408 418 402 783 762 783 763

12 419 409 416 405 420 410 420 403 424 408 418 401 424 406 419 399 791 764 790 759

13 417 408 418 406 421 409 418 403 426 404 416 401 418 400 416 400 794 765 787 757

14 417 408 418 406 421 410 417 397 423 402 415 397 418 400 418 395 786 754 786 756

15 418 408 416 405 420 410 414 397 423 395 412 396 415 397 415 398 786 761 785 754

16 417 408 417 407 420 410 413 396 425 392 410 394 415 394 416 397 794 755 780 754

17 419 410 417 406 422 411 416 399 424 399 413 397 417 401 415 399 782 762 786 755

18 417 407 416 405 420 411 415 397 424 406 413 395 416 399 416 396 787 760 787 759

19 419 409 417 403 423 409 417 398 422 399 414 396 416 400 416 401 787 762 790 767

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

कासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीराKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीना इदौर

765Kv 765Kv

Indore

20 419 410 417 407 421 410 417 403 423 406 414 401 416 406 414 395 788 760 787 755

21 412 408 415 405 420 410 416 394 425 401 414 392 416 395 415 395 786 756 788 754

22 417 406 414 402 419 408 414 393 424 399 413 392 415 395 416 393 782 763 786 756

23 419 407 415 404 421 408 415 398 421 396 414 397 415 397 417 399 789 764 787 759

24 418 407 415 403 420 407 415 394 421 397 413 391 415 397 415 394 788 766 783 760

25 417 405 414 404 418 407 415 397 420 395 412 393 416 399 417 394 789 765 786 756

26 418 408 414 403 418 405 414 398 421 399 413 397 414 401 416 402 785 763 786 756

27 417 406 411 402 416 406 413 399 422 403 412 397 414 401 416 401 789 765 789 759

28 417 407 413 402 418 408 415 397 420 398 414 396 414 398 417 395 783 761 784 758

29 417 407 412 402 417 406 413 396 424 408 411 395 413 399 418 398 788 765 784 755

30 417 404 413 402 417 408 416 395 420 394 416 394 415 395 415 396 789 765 785 751

419 403 418 402 423 405 422 393 433 383 419 391 425 394 421 393 796 754 790 745

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 777 758 784 752 803 792 804 793 789 763 808 790 791 756 773 762 790 771 804 780

2 774 760 782 754 801 790 801 790 785 753 804 790 795 762 769 761 784 767 798 7813 785 755 791 748 806 790 806 789 786 752 809 787 799 752 771 760 786 765 803 7734 765 756 764 750 800 786 800 785 785 757 805 786 781 752 766 757 782 761 802 7745 768 757 773 750 804 787 805 787 783 757 808 788 783 752 766 758 783 764 799 7756 777 759 786 758 800 788 800 788 789 765 802 791 794 760 770 760 786 769 794 7807 774 761 777 758 800 789 800 788 790 765 804 791 788 763 768 761 786 770 800 7838 773 761 777 760 796 787 796 786 787 759 801 790 795 764 769 761 785 768 799 7789 769 761 775 759 797 775 797 785 784 755 803 790 789 765 767 760 783 768 800 781

10 772 762 780 763 795 787 795 786 791 758 801 789 795 762 767 760 784 768 801 78111 771 761 778 759 793 785 792 784 788 762 798 786 783 758 769 760 784 768 798 78012 779 761 786 763 794 785 794 785 793 765 798 786 793 761 774 762 792 775 795 77813 777 761 786 763 801 785 801 785 787 763 804 785 801 756 767 761 791 773 793 77614 770 752 778 749 797 784 798 784 787 758 801 783 792 752 764 757 788 765 794 77315 766 756 777 756 792 785 792 783 787 756 797 785 791 763 768 760 788 771 800 761

16 774 756 789 755 799 783 799 778 784 760 804 779 803 744 772 757 793 766 797 771

17 769 760 775 759 796 784 797 782 787 761 800 780 784 756 768 759 785 769 793 77318 770 760 778 760 798 781 798 779 789 757 798 775 793 759 769 759 787 767 792 769

19 771 761 779 761 794 781 793 780 794 766 798 777 795 758 769 761 788 773 791 772

20 772 759 780 756 798 789 797 780 792 771 801 790 792 757 770 762 789 775 795 782

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

सासन सतना तमनार कोटरा वडोदराSasan Satna Tamnar Kotra Vadodara

765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765KvDurg Gwalior Sipat Seoni Wardha

21 767 757 773 752 795 782 796 781 790 756 802 777 787 753 768 756 786 765 793 766

22 768 760 773 757 791 780 790 778 790 755 795 774 790 763 766 757 785 765 793 769

23 771 761 776 759 794 787 795 787 791 759 800 789 792 757 771 762 791 776 799 77924 771 761 777 759 795 784 794 783 788 756 798 783 793 768 770 760 789 769 793 76825 773 760 779 759 794 783 795 783 789 756 798 781 794 765 768 759 787 767 792 76926 769 761 775 758 792 783 793 782 789 759 798 781 793 752 767 756 789 764 798 767

27 770 760 775 758 795 788 795 788 790 767 801 791 795 762 771 762 791 776 797 780

28 769 759 773 756 794 785 794 784 787 759 799 785 789 757 769 761 789 771 800 777

29 773 762 780 760 797 784 797 780 790 764 802 785 792 760 772 761 792 772 800 77630 774 761 781 757 797 784 798 784 789 758 802 783 795 763 773 759 792 773 798 774

785 752 791 748 806 775 806 778 794 750 809 774 803 744 774 756 796 761 805 761

Annexure-25Power CutRestrictions in Western Region for the month of May-2018

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum ofpower cut

(MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa-kTaOtI TotalEnergy Cut(MUs day

Remark

From TotalEnergy Cut(MUs day

(a) PowerRestrictions(Evening peakHour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

All industries areallowed to run theirunits on all days ofweek amp if they want toavail staggered holidaythen they will have tostagger on notified dayonly amp cannot avail asper their choice Allindustries are requiredto keep their recesstimings staggered

(c) Anya jaanakarI Otherinformation

1Weekly Off2Staggering of powersupply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three phase supply 01052018 31052018 800 800 800

22 Single Phase supply 01052018 31052018 1600 1600 1600Remarks08 Hrs power supply in staggered form in rotation of day amp night is given to AG During21072017 to 28072017 -- 10 hours AG supply given to Lunavada area for paddy crops 10Hrs power supply in staggered form in rotation of day amp night is given to AG from 17082017to 31082017 In PGVCL area 10 Hrs AG Supply given from 17092017 to 1102017 In allGujarat 10 Hrs AG Supply given from 05102017 to 19102017 and further from 24102017to 20112017 In all Gujarat 10 Hrs AG Supply given from 02122017 to 31122017 InDGVCL area 10 Hrs AG supply given to 118 feeders for paddy crops from 20012018 to28022018 Single Phase supply given during rest of 16 Hrs by providing LSTC

3 Anya jaanakarI3 Any other information

1 Jayotigram Yojana-24 hours2 There is no load shedding in Urban areas

K maQya p`doSa Madhya Pradesh1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 2333 2210 2315

22 Three-PhaseSupply(DLF) 01052018 31052018 2337 2339 2323

23 Three-PhaseSupply(Irrigation) 01052018 31052018 0949 0924 0944

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2354 2318 234432 District Head Qtrs 01052018 31052018 2355 2330 234633 Tehsil Head Qtrs 01052018 31052018 2350 2317 2340

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the stateetcDetails Quantum

of powercut (MW)

Restriction Timing

Total Energy Cut(MUs day

From To(a) Power Restrictions(Evening peak Hour) on

non continuousprocess HTLT IndustriesM(b) Load Shedding

NIL

(c)Other information1Weekly Off2Staggering of power supply

NIL

2 Power supply to Agricultural Sector -Details From

DateTo

DateSupplyHoursperday

Max(Hrs)

Min(Hrs)

Average (Hrs)

21 Three-PhaseSupply(DLF) 01052018 31052018 Not Applicable

22 Three-PhaseSupply(Irrigation) 01052018 31052018

10 8 9

23 Three-PhaseSupply(Mixed) 01052018 31052018

24 24 24

3 Scheduled Power cuts in Urban Areas

Details FromDate

ToDate

AverageSupplyHoursperday

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 NIL NIL NIL

32 District Head Qtrs 01052018 31052018 NIL NIL NIL

33 Tehsil Head Qtrs 01052018 31052018 NIL NIL NIL

4 Any other information

Load Shhedding due to Less availability of Generationin real time

0-7 MW 0000 2400 0003MusDay

Ga CtIsagaZ Chhattisgarh

]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day)sao From tk To(a)Power Restrictions(Eveningpeak Hour) on continuousprocess HTLT IndustriesM

(b) Baar inayamana Load Shedding

1 394MW

2 66 MW

SaUnya Nil

260518(1930)

300518(1830)

SaUnya Nil

260518(2400)

300518(2020)

SaUnya Nil

018

015

SaUnya Nil(c) Anya jaanakarI Other information

1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk To idnaaMkDate

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(Mixed) 01052018 31052018 - - -

22 Three-PhaseSupply(DLF) 01052018 31052018 - - -

23 Three-PhaseSupply(Irrigation) 01052018 31052018 1800 1800 1800

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat pitidna Average SupplyAapUit- GaMTo Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01052018 31052018 2400 2400 240032 District Head Qtrs 01052018 31052018 2400 2400 240033 Tehsil Head Qtrs 01052018 31052018 2400 2250 2305

Annex-26

मई2018Details of forced unit outages during the month ofMay2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1GIPCL STG 2

GSECL 165 0000 01-03-2018 Still out Still out No schedule

2 बीईसीएल BECL 1 GSECL 250 1721 02-04-2018 0934 11-05-2018 Drum level high

3 डीजीबीपी DGBP 2 GSECL 112 1244 16-04-2018 0624 22-05-2018 RSD

4 डीजीबीपी DGBP 3 GSECL 375 1832 18-04-2018 2350 10-05-2018 RSD

5 बीईसीएलBECL 2 GSECL 250 0000 22-04-2018 Still out Still out

OEM BHEL pending workunit is out due to ligniteshortage and also watershortage as intimated byGujarat on 29-05-2018

6 STPS 4 GSECL 250 0950 04-05-2018 0650 09-05-2018 Air pre-heater problem

7 जीपक GPEC 1 GSECL 218 1651 04-05-2018 2215 09-05-2018 RSD

8 जीपक GPEC 3 GSECL 218 1748 04-05-2018 2155 08-05-2018 RSD

9UTRAN STG II 1

GSECL 375 1848 04-05-2018 1920 10-05-2018 RSD

10 जीसग GSEG STAGE II 1 GSECL 351 1903 05-05-2018 0405 11-05-2018 RSD

11 एसएलपीपी SLPP 1 GSECL 125 0000 07-05-2018 0439 11-05-2018 BTL

12 Wanakbori 5 GSECL 210 1832 07-05-2018 2000 10-05-2018 Oil leakage in air pre-heater

13 जीपक GPEC 3 GSECL 218 0011 09-05-2018 2033 16-05-2018 RSD

14 जीपक GPEC 2 GSECL 218 0044 09-05-2018 0619 12-05-2018 RSD

15 जीपक GPEC 1 GSECL 218 0048 10-05-2018 1806 16-05-2018 RSD

16UTRAN STG II 1

GSECL 375 1750 11-05-2018 1144 15-05-2018 RSD

17 जीपीपीसी GPPC 1 GSECL 351 0135 13-05-2018 1943 18-05-2018 RSD

18 STPS 3 GSECL 250 0944 18-05-2018 1303 26-05-2018 APH problem

19 जीसग GSEG 1 GSECL 351 1544 21-05-2018 0000 29-05-2018 RSD

20 डीजीबीपी DGBP 1 GSECL 107 2054 21-05-2018 0100 29-05-2018 RSD

21 जीपक GPEC 2 GSECL 218 1521 22-05-2018 2205 27-05-2018 RSD

22 बीईसीएल BECL 1 GSECL 250 1050 23-05-2018 Still out Still out Water shortage

23 जीपीपीसी GPPC 1 GSECL 218 1945 23-05-2018 2330 31-05-2018 Nonavailability of gas

24 डीजीबीपी DGBP 3 GSECL 375 1600 24-05-2018 0145 29-05-2018 RSD

25 एसएलपीपी SLPP 3 GSECL 125 0100 25-05-2018 1523 28-05-2018 BTL

26 जीसग GSEG STAGE II 1 GSECL 351 0000 29-05-2018 0000 02-06-2018 Non-availability of gas

27 Wanakbori 6 GSECL 210 0031 29-05-2018 Still out Still out Turbine bearing inspection

28 डीजीबीपी DGBP 1 GSECL 107 0100 29-05-2018 0000 03-06-2018 Non-availability of gas

29 डीजीबीपी DGBP 3 GSECL 375 0145 29-05-2018 0000 03-06-2018 Non-availability of gas

30 जीपीपीसी GPPC 2 GSECL 351 1931 29-05-2018 Still out Still out non-availability of gas

31 उकई Ukai 6 GSECL 500 1140 31-05-2018 Still out Still out Electrical fault

32 जीपक GPEC 3 GSECL 218 1900 31-05-2018 1205 04-05-2018 RSD costly gas

33 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

34 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

35 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

36 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out RSD

37 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still out RSD

38 पायोनीरPIONEER(262+126) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out RSD

39 Chandrapur 3 MAHAGENCO 210 0135 03-12-2017 Still out Still out Water shortage

40 Chandrapur 4 MAHAGENCO 210 1417 03-12-2017 Still out Still out Water shortage

41 Chandrapur 6 MAHAGENCO 500 1330 04-01-2018 Still out Still out Water shortage

42 कोराडीKoradi 7 MAHAGENCO 210 1700 07-01-2018 0513 29-05-2018 Poor coal receipt

43 उरणUran 8 MAHAGENCO 108 0625 25-03-2018 Still out Still out Thrust bearing tripped

44 वीआईपीएलVIPL MAHAGENCO 300 0026 01-04-2018 2216 28-05-2018 Coal Shortage

45 Nasik 3 MAHAGENCO 210 0958 10-04-2018 1423 25-05-2018 BTL

46 घाटघरGhatghar 1 MAHAGENCO 125 2345 14-04-2018 Still out Still out Stator earth fault

47 उरणUranBO-1 MAHAGENCO 120 1916 12-05-2018 Still out Still outDue to outage of unit-7 andunit-8

48 उरणUran7 MAHAGENCO 108 1930 12-05-2018 Still out Still out Gas shortage

49 भसावलBhusawal 4 MAHAGENCO 500 2311 17-05-2018 0408 21-05-2018 BTL

50 भसावलBhusawal 3 MAHAGENCO 210 1846 21-05-2018 Still out Still outTaken out to save coal asIEPL -1 synchronized

51 Nasik 5 MAHAGENCO 210 1600 25-05-2018 2028 01-06-2018 Boiler validity certification

52 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 1942 26-05-2018 1848 29-05-2018 BTL

53 Parli 8 MAHAGENCO 250 1108 29-05-2018 2251 02-06-2018 BTL

54 सातपराSatpura III 9 MPPGCL 210 1003 02-05-2018 1448 05-05-2018 GT earth fault

55 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 Still out Still out Coal Shortage

56 सातपराSatpura II 7 MPPGCL 210 1600 05-05-2018 2134 18-05-2018 Coal Shortage

57 सातपराSatpura II 6 MPPGCL 200 1900 10-05-2018 1703 14-05-2018 Coal Shortage

58 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

59 SGTPS 2 MPPGCL 210 1130 14-05-2018 2137 23-05-2018 Turbine vibration high

60 SGTPS 5 MPPGCL 500 0000 12-05-2018 Still out Still out Turbine vibrations

61 सातपरा Satpura II 6 MPPGCL 200 0001 21-05-2018 Still out Still out ETL Coal shortage WEF2000Hrs23-05-2018

62 Singaji 1 MPPGCL 600 2145 21-05-2018 0350 01-06-2018Water wall tubeleakagedeclared out on

coalshortage since 0000hrsof 25-05-2018

63 सातपरा Satpura II 7 MPPGCL 210 1000 26-05-2018 1224 31-05-2018 Coal shortage

64 सातपराSatpura III 8 MPPGCL 210 1239 27-05-2018 Still out Still out Coal shortage

65 सातपराSatpura III 9 MPPGCL 210 2014 30-05-2018 1918 04-06-2018 BTL

66 Korba(E) 6 CSPGCL 120 1430 11-05-2018 1310 14-05-2018 Coal mill out

67Korba(W) -2

CSPGCL 210 0054 30-05-2018 Still out Still out ESP Renovation work

68 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out Economic shutdown

69 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

70 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

71आरजीपीपीएलRGPPL-2B

RGPPL 230 1941 31-03-2018 1132 11-05-2018Unit change over less gasavailability

72आरजीपीपीएलRGPPL-2A

RGPPL 230 1304 18-04-2018 Still out Still outUnit revived earlier fortesting purpose taken out onless gas availability

73 आरजीपीपीएलRGPPL 3B

RGPPL 230 1740 11-05-2018 Still out Still outUnit change over less gasavailability

74 एपीएल मदराAPL Mundra 6

Adani Power Ltd 660 2020 20-10-2017 Still out Still out Coal shortage

75 एपीएल मदराAPL Mundra 5

Adani Power Ltd 660 2343 01-11-2017 Still out Still out Coal shortage

76 एपीएल मदराAPL Mundra 4

Adani Power Ltd 330 0843 14-12-2017 Still out Still out Coal shortage

77 एपीएल मदराAPL Mundra 1

Adani Power Ltd 330 0646 07-01-2018 Still out Still out Coal shortage

78APML Tiroda 2

Adani Power Ltd 660 1526 02-01-2018 0210 12-05-2018 HPBP Bonnet leakage

79 एपीएल मदराAPL Mundra 2

Adani Power Ltd 330 2230 20-01-2018 Still out Still out Coal shortage

80 एपीएल मदराAPL Mundra 9

Adani Power Ltd 660 0915 24-01-2018 0713 02-06-2018 Coal shortage

81 एपीएल मदराAPL Mundra 7

Adani Power Ltd 660 2310 28-02-2018 1816 28-05-2018 Coal shortage

82 एपीएल मदराAPL Mundra 8

Adani Power Ltd 660 1928 10-03-2018 0846 22-05-2018 Coal shortage

83APML Tiroda 5

Adani Power Ltd 660 0853 24-04-2018 Still out Still out Bottom ash hopper leakage

84 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 0555 25-05-2018 Still out Still outLow bunker level coalshortage

85AMR

AVATITPP(INDIABULL)-4

Rattan PowerIndia Ltd

270 2050 17-04-2018 2232 20-05-2018 Coal shortage

86AMR

AVATI

TPP(INDIABULL)-1Rattan Power

India Ltd270 0000 01-05-2018 Still out Still out Coal shortage

87AMR

AVATI

TPP(INDIABULL)-2Rattan Power

India Ltd270 1800 06-05-2018 Still out Still out Coal shortage

88 जपीएल JPL Stg-I- 3 JPL 250 2144 17-11-2017 1419 11-05-2018 Coal shortage

89 JPL Stg-II 4 JPL 600 2118 05-01-2018 Still out Still out RSD

90 JPL Stg-I- 2 JPL 250 0000 11-02-2018 Still out Still out Coal shortage

91 JPL Stg-I 4 JPL 250 0000 02-03-2018 2347 10-05-2018 Coal shortage

92 JPL Stg-II 2 JPL 600 0855 02-05-2018 2117 14-05-2018 BTL

93 जपीए JPL Stg-I 4 JPL 250 1749 11-05-2018 1508 16-05-2018MS line Strainer(LHS) steamleakage

94 JPL Stg-II 3 JPL 600 0030 15-05-2018 0443 22-05-2018ESP ASH evacuationproblem

95 JPL Stg-I 3 JPL 250 1431 16-05-2018 2220 24-05-2018Gear box problem in APHCoal shortage wef0000hrs19-05-2018

96 JPL Stg-II 1 JPL 600 1236 19-05-2018 Still out Still outDue to Boiler Drum safetyvalve simmering problem

97 ईपीजीएलEPGL 2 ESSAR 600 2025 24-10-2017 Still out Still out Coal shortage

98 ईपीजीएल EPGL 1 ESSAR 600 1851 23-01-2018 Still out Still out Coal shortage

99 उनोसजनUNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

100 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out RSD

101 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 1939 21-05-2018 RSD

102 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out RSD

103 डीजीईएनDGEN-51 TPGL 400 2130 21-05-2018 Still out Still outNot able to run in combinedcycle

104 पीसीएलKWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator Earth fault protectionoperatedmaintenance

105KSK Mahanadi 4

KMPCL 600 1833 27-04-2018 0717 29-05-2018

Tripping of KSK-Champa-3line resulted the tripping ofUnit-4 further lighted up at2000hrs2704 but boxed up at0100hrs2804 due to Boiler auxiliaryproblem

106KSK Mahanadi 2

KMPCL 600 1725 29-05-2018 Still out Still outAsh evacuation problem inash plant

107 आरकएमपावरRKM Power 2

RKMPPL 360 1950 21-11-2017 0931 10-05-2018 Coal Shortage

108 आरकएमपावरRKM Power 1

RKMPPL 360 2048 09-05-2018 2227 14-05-2018 BTL

109 आरकएमपावरRKM Power 2

RKMPPL 360 1215 14-05-2018 0000 18-05-2018 Boiler tube leakage

110 आरकएमपावरRKM Power 2

RKMPPL 360 0000 18-05-2018 Still out Still out Coal shortage

111 आईईपीएलIEPL I IEPL 270 2358 30-12-2017 0047 21-05-2018 RSD

112 एसकएसपावरSKS Power 1

SKS 300 2116 17-04-2018 1717 12-05-2018Due to heavy steam leakagefrom turbine control valvelead pipe

113 एसकएसपावरSKS Power 2

SKS 300 0103 13-05-2018 2211 18-05-2018 BFP problem

114 एसकएसपावरSKS Power 1

SKS 300 0624 17-05-2018 2119 31-05-2018Problem in the Dustevacuation system in BottomAsh System

115 सीजीपीएल CGPL 4 CGPL 830 0000 08-05-2018 1314 17-05-2018 Condenser vacuum problem

116 एमसीसीपीएल MCCPL1 ACBIL 300 1143 06-05-2018 1623 11-05-2018 Ash handling problem

117 ACBIL 300 1042 23-04-2018 0101 20-05-2018Due to DC earth fault at KotraSS and from 240418 unit

TRN Energy 2 outage due to coal shortage

118 एमसीसीपीएल MCCPL 1 ACBIL 300 0944 28-05-2018 2007 31-05-2018 ID Fan Vibration Problem

119 JP Bina 2 JAYPEE 250 0006 16-05-2018 1914 27-05-2018 Coal Shortage

120 झाबआ पावरJhabua Power 1

JHABUAP 660 0000 16-05-2018 0203 21-05-2018 Boiler license renewal

121 झाबआ पावरJhabua Power 1

JHABUA 600 1536 26-05-2018 0825 31-05-2018 GT earth fault

122 Lanco 1 LANCO 300 0545 30-05-2018 0512 02-06-2018 BTL

123 ससान Sasan 4 SASAN 660 2158 28-05-2018 0231 01-06-2018 BTL

124 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

125 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

126 TAPS 3 NPCIL 540 2001 02-05-2018 0331 27-05-2018

Unit withdrawn due toproblem in reactorconverted into Biennial shutdown for maintenance

127 गाधारGandhar GT ST 3 NTPC 219 1322 23-04-2018 0430 19-05-2018 RSD

128 कावासKawas GT 2B NTPC 106 0638 06-05-2018 0656 16-05-2018 RSD changeover of GTs

129 कावासKawas ST 2C NTPC 106 0710 06-05-2018 1203 16-05-2018 RSD

130 कावासKawas GT 2A NTPC 106 0728 06-05-2018 1805 18-05-2018 RSD

131VSTPS 2

NTPC 210 2156 11-05-2018 0156 13-05-2018Generator Earth fault Class-Aprotection

132 गाधारGandhar GT ST 3 NTPC 219 0430 19-05-2018 1815 25-05-2018 Non availability of gas

133 कावासKawas GT 2B NTPC 106 0000 22-05-2018 0856 25-05-2018 Non-availability of gas

134Solapur STPS 1

NTPC 660 0227 31-05-2018 0231 05-06-2018For attending ID Fan-1A oilleakage

Note Units out for more than 72 hrs are only included

Annex-27

मई2018Details of planned unit outages during the month of May2018

अन

SlNo

Unitसघटक

ConstituentIPP

मतामगावॉटCapMW

सoFrom

तकTo

कारणReason

Time Date Time Date

1BANASAGAR TONS 1

MPPGCL 105 1030 02-04-2018 Still out Still out AOH

2 एसएलपीपी SLPP 4 GSECL 125 1210 06-05-2018 Still out Still out AOH

3 VSTPS 1 NTPC 210 0018 15-04-2018 1236 19-05-2018 AOH

4 मौदाMouda 2 NTPC 500 0000 21-05-2018 Still out Still out AOH

Commissioning of New Elements-May 2018 Annexure-29a)Generating Units

Sl No Owner Location(Const) Station Name Capacity (MW) Unit No Date ofSynchronization Date of COD

b)Transmission Lines

Sl No Owner Location(Const) Line Name Ckt No KV Date ofSynchronization

Added Line Length (inKm)

1 CWRTLAdaniMP Gwalior(PG)-Morena I 400 532018 482 CWRTLAdaniMP Gwalior(PG)-Morena II 400 532018 483 DNHISTS Vapi-Bhilosa-I 220 5720184 DNHISTS Bhilosa-Kharadpada-I 220 5920185 PWTLMaharashtra Wardha-Warora-I 400 5920186 PWTLMaharashtra Warora(PS)-Parli(PG)-I 400 51320187 PWTLMaharashtra Wardha-Warora-II 400 5920188 PWTLMaharashtra Warora(PS)-Parli(PG)-II 400 51420189 GETCOGujarat Wanakbori AIS-Wanakbori GIS I 400 5172018 1

Total 296

c)ICTs

Sl No Owner Location(Const) Station Name ICT No KV Ratio Capacity(MVA) Date

1 PGCILMaharashtra Boisar 4 400220 500 5320182 CWRTLAdaniMP Morena 1 400220 315 5320183 CWRTLAdaniMP Morena 2 400220 315 5420184 PWTLMaharashtra Warora(PS) 2 765400 1500 5920185 PWTLMaharashtra Warora(PS) 1 765400 1500 51020186 PGCILMP Khandwa(PG) 3 400220 500 51920187 PGCILGujarat Dehgham(PG) 3 400220 500 5282018

d)Line Reactor

Sl No Owner Location(Const) Station Name Line Name KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-I 400 80 5920182 PWTLMaharashtra Warora(PS) Warora(PS)-Parli-II 400 80 5920183 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-I 765 330 51820184 PWTLMaharashtra Warora(PS) Warora(PS)-New Parli-II 765 330 51820185 PPTLMaharashtra New Parli Warora(PS)-New Parli-I 765 330 52120186 PPTLMaharashtra New Parli Warora(PS)-New Parli-II 765 330 5212018

e)Bus Reactor

Sl No Owner Location(Const) Station Name BR No KV Capacity(MVAR) Date

1 PWTLMaharashtra Warora(PS) I 765 330 51020182 NPCILGujarat KAPS 3amp4 I 400 125 5142018

f) Spare Elemenets ChargedSl No Owner Location(Const) Station Name Element KV Capacity

(MVAMVAR) Date

NIL

NIL

LILO of 220kV Vapi-KharadpadaCkt-2 at Bhilosa

LILO of Wardha-Parli Dc atWarora PS

98

98

3

ANNEXURE 31

(MW) From To

1 GUJARAT

11 Wanakbori 5 5 210 28-Jun-18 24-Jul-18 AOH

12 Ukai 3 3 200 5-Jul-18 25-Jul-18 AOH

13 Gandhinagar TPS 4 210 25-Jun-18 14-Aug-18 AOH

14 Sikka TPS 3 250 20-Jun-18 11-Jul-18 AOH

15 WTPS 7 7 210 22-Jul-18 20-Aug-18 AOH

16 WTPS 4 4 210 30-Jul-18 19-Aug-18 AOH

17 Dhuvaran Gas Stage-I 107 10-Jul-18 17-Jul-18 AOH

18 GT 22243

19 STG 129

2 MADHYAPRADESH

21 AMARKANTAK 5 210 01-Jul-18 25-Jul-18 AOH

22 SATPURA 7 210 01-Jul-18 25-Jul-18 AOH

23 SATPURA 10 250 01-Jul-18 30-Jul-18 AOH

24 Sanjay Gandhi 4 210 01-Jul-18 30-Jul-18 AOH

25 SATPURA 10 250 15-Jun-18 20-Jul-18 COH

26 Indira Sagar Project Station(ISPS) 6 125 16-Jun-18 30-Jun-18 AOH

27 Jhabua Power 1 600 22-Jul-18 13-Aug-18 AOH

3 CHHATTISHGARH

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING JUNE 2018 AND JULY 2018

ReasonS No Unit No Capacity

10-Jul-18 17-Jul-18 Statutory Hydro testGSEG - II

Outage Plan

NIL

4

41 Koradi Unit 6 210MW 1-Jul-15 30-Nov-17 RampM

42 Bhusawal Unit 4 500MW 25-Jul-18 5-Sep-18 COH

43 Khaparkheda Unit 5 500MW 18-Jun-18 10-Jul-18 AOH

44 Parli Unit 6 250MW 1-Jul-18 20-Jul-18 AOH

45 TATA Unit 7 180MW 22-Jul-18 2-Aug-18 RampM

46 JSW Unit 2 300MW 1-Aug-18 30-Aug-18 COH

5 Central Sector andIPPs

51 KORBA ( KSTPS ) 4 500 5-Jul-18 8-Aug-18 AOH

52 VINDHYACHAL 12 500 27-Jul-18 20-Aug-18 AOH

53 VINDHYACHAL 8 500 19-Jun-18 23-Jul-18 AOH

54 SIPAT 2 660 16-Jun-18 26-Jul-18 BOILER + IPT + LPT

55 JHANOR GT-3 1443 23‐Jul‐18 25‐Jul‐18 Licence Renewal

56 JAYPEE NIGRE 2 660 1-Jul-18 31-Jul-18 RAPH modification Coal Burnerinspection amp repair Boiler

57 Sasan Power Ltd 4 660 2-Jul-18 31-Jul-18 AOH

58 Sasan Power Ltd 1 660 16-Jun-18 15-Jul-18 AOH

59 JPL EXT 2 600 1-Jul-18 25-Jul-18 AOH

510 BALCO 2 300 1-Jul-18 20-Jul-18 Overhaul

511 MOUDA 1 500 17-Jul-18 10-Aug-18 AOH

512 Solapur 1 660 31-Jul-18 20-Aug-18 PG test preparation

513 TAPS 2 2 160 15-Jul-18 15-Nov-18

to carry out unit2 refuellingoutage and mandatory checksand inspection of the reactorvessel

MAHARASHTRA

Line Element From Type

DateTime Date Time Annexure

321 765_RAICHUR_Sholapur I 17Jun18 800 17Jun18 1800 Daily transposition tower works SRPC POWERGRID SR12 400KV RANCHI SIPAT CKT-2 LR 19Jun18 800 19Jun18 1700 ODB LR AMP ERPC POWERGRID3 765kV Dharamjaigarh-Ranchi-1 19Jun18 800 19Jun18 1800 Daily STATCOM construction work ERPC POWERGRID4 765kV Gwalior-Phagi-1 20Jun18 800 21Jun18 1800 Daily Excess jumper length modification at Trasposition tower NRPC POWERGRID5 765_Raichur_Solapur II 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places SRPC Raichur sholapur Transmission company Private Ltd6 765kV Dharamjaigarh-Ranchi-2 25Jun18 800 25Jun18 1800 Daily STATCOM construction work ERPC POWERGRID

7 400 315 MVA ICT-I at Kala 01Jul18 800 01Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

8 400 J P NIGRIE-SATNA-1 01Jul18 800 01Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

9 400 Aurangabad-Boisar 2 Outage ampAurangabad-Boisar Ckt 1 into NA mode 01Jul18

90001Jul18

1800 Daily Installation of pilot string at one location POWERGRID WR-II R

10 400 KV PADGHE - KALWA 1 01Jul18 0900 01Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --

11 400 400kV DC Vindhyachal-Mahan and Mahan-Korba TL (Essar) 01Jul18 700 02Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOT

LINE METHOD) AR DISABLEMENT REQUIREDESSAR WR-II C

12 765 765KV Bus-I at Pooling stationjabalpur 01Jul18 1000 02Jul18 1800 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

13 220 Busbar I and Busbar-II at Betul

01Jul18

800

05Jul18

2000 Cont

Contact resistance rectification work of bus side earthswitches(Bus side earth switches of each bay has contact problemfor which earth switch contacts needs rectification This needboth busbar outage to avoid induction on working section

POWERGRID WR-II R

14 220 Waidhan-Singrauli VSTPP 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

MPPTCL WR-II C

15 400 Mundra-Jetpur Ckt-I 01Jul18 900 31Jul18 1800 Daily For OPGW stringing under live line condition( AR TO BE KEPTINTO NA MODE ONLY)

POWERGRID WR-II C

16 400 KV PARLI-SOLAPUR (LAMBOTI) 01Jul18 1000 31Jul18 1800 Daily For PID Work MSETCL MSETCL Line will be in service only AR in Non Auto mode17 400 KV Sundargarh-Raigarh - I (One) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH18 400 KV Sundargarh - Raigarh - II (Two) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

19 400 KV Sundargarh - Raigarh - III (Three) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

20 400 KV Sundargarh - Raigarh - IV (Four) 01Jul18 800 31Jul18 1700 ODB For PID Testing of Porcelin Insulator AR OFF only ERPC ER-IIODISHASUNDERGARH

21 PHAGI (765KV)-GWALIOR-WR (765KV)1

01Jul18

0800

02Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-2 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated23062018 amp 24062018sd avail date from 230618 to240618

NRPC POWERGRID

22 765 765kV DC Jharsuguda-Dharamjaygarh ckt3amp 4 02Jul18 800 04Jun18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-Sundergarh

LinePGCIL OGPTL(sterlite) C

23 400 Kansari-Kankroli line at GETCO Kansari SS 02Jul18 800 02Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

24 400 400kV Bhadravati 1_MAIN_BAY_407 at Parli 02Jul18 800 02Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

25 400 Mundra Hadala Line 02Jul18 800 02Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO26 400 J P NIGRIE-SATNA-2 02Jul18 800 02Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

27 400 Itarsi-Indore2 Line02Jul18

90002Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

28 765 ICT2_765400kv_SOLAPUR 02Jul18 900 02Jul18 1400 DAILY IR MEASURMENTS OF ICT LA WRTS-I WRTS-I R

29 400 400kV BHACHAU-RANCHODPURA1 02Jul18 900 02Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

30 220 220KV SGAR -400KV PGCIL DAMOH 1 02Jul18 900 02Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

31 400 Bay No 417 Tie bay of 400kv Boisar-Magarwada-I amp Future Bay at Boisar 02Jul18 900 02Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

32 400 400kV Akola-1 LR atAurangabad02Jul18

90002Jul18

1800 Daily For AMP works line will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

33 765 765 kV_BUS_2_KOTRA PS 02Jul18 900 02Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C34 400 400kV RAIPUR-SIPAT III 02Jul18 930 02Jul18 1730 Daily CVT replacement WRTS-I WRTS-I R

ReasonSrNo

To

BasisKV System Agency

35 400 423Bina-4 amp ICT-1 tie bay at Bina 02Jul18 930 02Jul18 1800 Daily For AMP work POWERGRID WR-II R36 765 701 Sasan1 Main Bay at Vindhyachal 02Jul18 1000 02Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R37 400 413BAY ( KAPP 1 MAIN BAY) AT VAPI 02Jul18 1000 02Jul18 1100 Daily NTAMC Signal Testing POWERGRID WR-II R38 765 702 Sasan1 Tie Bay at Vindhyachal 02Jul18 1100 02Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R39 765 703 ICT1 Main Bay at Vindhyachal 02Jul18 1400 02Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R40 400 400kV BHACHAU-RANCHODPURA1 02Jul18 1500 02Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

41 400 KV KHADKA - BABLESHWAR 02Jul18 0900 02Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1amp2 will be in service

42 400 Asoj - Chorania line No 2 02Jul18 800 05Jul18 1800 Daily Damper spacers replacement work GETCO GETCO Auto reclose of Chorania - Amreli line will remain out

43 400 kV DGEN GT 52 (Bay 407) 02Jul18 800 05Jul18 1900 ContinuousAnnual PM of 52BAT Generator Transformer AuxiliaryTransformer Excitation Transformer amp 400kV Breaker

TPL - DGEN TPL - DGEN R

44 400 KAPP-3amp4-Navsari-2 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-13) CB Isolator(DS-14) amp Line isolator(DS-15)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

45 400 KAPP-3amp4-Navsari-1 line

02Jul18

000

05Jul18

000 Continuous

Shield wire down jumpering for earthing at Navsari line tower inKAPP-3amp4 Swithyard

Main Bay CB Auxiliary Switch replacement and Bus isolator(DS-21) CB Isolator(DS-22) amp Line isolator(DS-23)) Limit switchrepalcement

PGCIL NPCIL KAPP-3amp4

46 400 Kansari-Kankroli line reactor at GETCOKansari SS 02Jul18

81506Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

47 400Bay 405 ( Tie Bay for 400 kV Indore -Pithampur 2 ) at Indore ss

02Jul18

1000

07Jul18

1800 Cont

For shifting PU Relay from bay 405 to bay 406 to make bay 406 asmain bay of New 400 220 kV ICT 2 and Bay 405 as tie bay for400 kV Indore - Pithampur 2 and New 400 220 kV ICT 2under WRSS 14

POWERGRID WR-II R

48 220 KV DEOLI(PGCIL)-BADNERA 02Jul18 0800 07Jul18 1700 Daily For PID work Shifting of auto reclose MSETCL MSETCL -

49 400 50MVAR Bina Ckt-I Switchable LineReactor at Shujalpur 02Jul18

100009Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

50 400 Indore2 line reactor at Itarsi 02Jul18 900 13Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

51 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 02Jul18 0800 13Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

52 220 KV PUSAD - WARDHA (PG) 02Jul18 1000 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL --

53 400 Korba - Bhatapara line03Jul18

73003Jul18

830 ContinuousReplacement of energy meter PGCIL owned Line Shutdown isrequired Outage in eveing period for 30 min for taking SEM intoservice

NTPC NTPC

54 765 765 KV ICT-3 Main bay (709) at Wardha 03Jul18 900 03Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

55 400 J P NIGRIE-SATNA-1 03Jul18 800 03Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE56 400 Soja - Dehgam Line 03Jul18 800 03Jul18 1800 Daily PMM Work GETCO GETCO57 400 SSNL - Dhule - 1 03Jul18 800 03Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 2 will remain out58 400 Varsana - Hadala Line 03Jul18 800 03Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO For information Excluded from important element list

59 400 400kV BHACHAU-RANCHODPURA1 03Jul18 900 03Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

60 400KV Dhariwal Station Transformer-203Jul18

90003Jul18

1500 continuousTo attend hotspot at R amp B phase of CT Terminal connector andPreventive maintenance of Station Transformer-2 and associatedbay equipments

Dhariwal Dhariwal Infrastructure LtdPlanned

61 220 220KV SGAR -400KV PGCIL DAMOH 2 03Jul18 900 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

62 400 Bay No 418 Main Bay of 400kv Boisar-Magarwada-I at Boisar 03Jul18 900 03Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

63 400 400kV Akola-2 LR atAurangabad03Jul18

90003Jul18

1800 Daily for AMP worksline will charge with out LR during this period Line outage required for LR take out amp take in to service

WRTS-I WRTS-I R

64 400kv400kV Bhadrawati-Raipur-2 LR atBhadrawati

03Jul18

900

03Jul18

1800 dailyFor AMP work amp Tan delta of Reactor bushing on variablefrequencyLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

65 765 ICT1_765400kv_DJAIGARH 03Jul18 900 03Jul18 1800 Daily AMP WORKS OF ICT WRTS-I WRTS-I R

66 765 765kV AURANGABAD-1_MAIN_BAY_707 atSoalapur 03Jul18 900 03Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

67 765 765 kV_BUS_2_KOTRA PS 03Jul18 900 03Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C68 400 416Satna-2 Main bay at Bina 03Jul18 930 03Jul18 1800 Daily For AMP work POWERGRID WR-II R

69 400 400KV Indore(PGCIL Hanuniya)-Pithampur-1 03Jul18 1000 03Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

70 400 400kV KOLHAPUR(MSETCL)-I ampFUTURETIE BAY (408) at Kolhapur 03Jul18 1000 03Jul18 1800 DAILY BAY AMP WORKS amp Control circuitry check WRTS-I WRTS-I R

71 400 400kV ICT1 at Gwalior 03Jul18 1000 03Jul18 1800 Daily For replacement of Aircell POWERGRID WR-II R72 765 706 ICT2 Main Bay at Vindhyachal 03Jul18 1100 03Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R73 400 400kV BHACHAU-RANCHODPURA1 03Jul18 1500 03Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R74 400 KV CHANDRAPUR-PARLI CKT-3 03Jul18 0700 03Jul18 1900 Daily For Replacement Missing of Earth wire MSETCL MSETCL --

75 400 Korba - Bhilai Line-103Jul18

73004Jul18

830 ContinuousReplacement of energy meter amp bay PM PGCIL owned LineShutdown is required Eveninf 30 Mins for taking SEM intoservice

NTPC NTPC

76 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

77 765 765KV Bus-II at Pooling stationjabalpur 03Jul18 1000 04Jul18 1730 Daily For Vindhyachal Bay Extension work at Pooling stationJabalpur POWERGRID WR-II C

78 400 500MVA ICT1 at Rewa 03Jul18 1000 04Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

79 400 Magarwada-Boisar 2 04Jul18 930 04Jul18 1800 Daily AMP works of Bay 403 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

80 400 J P NIGRIE-SATNA-2 04Jul18 800 04Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE81 400 Soja - Dehgam Line 04Jul18 800 04Jul18 1800 Daily PMM Work GETCO GETCO82 400 SSNL - Dhule - 2 04Jul18 800 04Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Dhule - 1 will remain out83 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R84 220 220KV Bhanpura-Kota 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

85 400 Rewa-Jabalpur 1 line at Jabalpur

04Jul18

900

04Jul18

1000 Daily

SD on R-J 1 to take LR out of service at Jbp end foroverhauling work on Dt 040718 from 0900 to 1000 HrsThereafter R-J 1 line will be taken in service WO LR at Jbpend

POWERGRID WR-II R

86 400 400kV BHACHAU-RANCHODPURA2 04Jul18 900 04Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

87 220 220KV Pandhurna Kalmeahwar 04Jul18 900 04Jul18 1600 Daily DPR relay testing and Maintenance of Equipment MPPTCL MPPTCL R88 220 220KV Mehgaon-Adani feeder 04Jul18 900 04Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

89 400 Bay No 419 Main Bay of 400kv Boisar-Magarwada-II at Boisar 04Jul18 900 04Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

90 400 400KV Damoh-Katni 04Jul18 900 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R91 765 765kV Wardha - Aurangabad (PG) III 04Jul18 900 04Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

92 765 765kV AURANGABAD-1 ampPUNE_TIE_BAY_711 at Solapur 04Jul18 900 04Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

93 765 SWITCHABLE LR_765kV_NIZAMABAD2_WARDHA 04Jul18 900 04Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

94 765 765 kV_BUS_2_KOTRA PS 04Jul18 900 04Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C95 400 400kV RAIPUR-DURG II 04Jul18 930 04Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R96 400 410Satna-4 Main bay at Bina 04Jul18 930 04Jul18 1800 Daily For AMP work POWERGRID WR-II R97 400 400kV Bus-2 at Gwalior 04Jul18 1000 04Jul18 1800 Daily For alignment of Isolator connected to Bus-2 POWERGRID WR-II R

98 765 710 Bus Reactor1 Main Bay atVindhyachal 04Jul18 1100 04Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

99 765 711 Bus Reactor1 Tie Bay at Vindhyachal 04Jul18 1200 04Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

100 765 713 Sasan2 Main Bay at Vindhyachal 04Jul18 1400 04Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R101 400 400kV BHACHAU-RANCHODPURA2 04Jul18 1500 04Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

102 400 KV PARLI - KUMBHARGAON (NANDED) CKT -1 04Jul18 0900 04Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

103 220 KV KALMESHWAR-PANDHURNA 04Jul18 0900 04Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --104 400 KV BUS COUPLER KARAD 04Jul18 1000 04Jul18 1700 Daily Quarterly Maint Work MSETCL MSETCL Load manage on BUS Iamp II105 220 KV DEOLI(PGCIL)-BADNERA 04Jul18 1000 04Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

106 765 Bay 705 ( Tie Bay of 765 kV Bina - Indoreline and ICT 2 at Indore ss 04Jul18 1000 05Jul18 1800 daily Damaged Operating Lever in R phase Circuit Breaker to be

replacedPOWERGRID WR-II R

107 765 765kV Bus 1 at Pune-GIS 04Jul18 900 06Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 1connection

WRTS-I WRTS-I C

108 400 Rewa-Jabalpur 1 line reactor at Jabalpur 04Jul18 900 12Jul18 1800 Cont LR out of service at Jbp end for overhauling work POWERGRID WR-II R

109 400 400KV Nagda-Rajgarh -I 04Jul18 800 04Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

110 765 Vindhyachal Pool- Satna 105Jul18

90005Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

111 400 400kV SC Itarsi-Indore ckt-1 05Jul18 800 06Jul18 1800 continuousOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite) C

112 765 701 Bay (Jaipur2 main bay) 05Jul18 1000 05Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

113 765 710 bay ( 765kV Agra2 Main bay) atGwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

114 765 702 Bay (Jaipur 2 Tie bay) 05Jul18 1200 05Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R115 765 703 Bay (765kV BR- main Bay) 05Jul18 1430 05Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R116 765 704 Bay (Jaipur1 Main Bay) 05Jul18 1630 05Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

117 400 400KV Main Bus I at 400KV Ss Indore 05Jul18 900 07Jul18 1800 Continue For 400 KV Main bus -I PG Isolator of Buscoupler replacementwork

MPPTCL MPPTCL R

118 400 BUS REACTOR_400kV_50MVAR_WARDHA 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

119 765 705 Satna1 Tie Bay at Vindhyachal 05Jul18 800 05Jul18 900 Daily For NTAMCRTAMC work POWERGRID WR-II R120 400 125 MVAR BR 2 at Dehgam 05Jul18 900 05Jul18 1800 Cont Internal Inspection of BR under BHEL Supervision POWERGRID WR-II R

121 765 765kV SEONI-BINA 05Jul18 900 05Jul18 1800 Daily For Guy wire arrangement at Seoni end to avoid swing of jumperduring wind storm

WRTS-I WRTS-I C

122 400 Rajgarh -Kasor2 line05Jul18

110005Jul18

1700 DailyTo replace droper of Y Phase Wave trap amp B ph isolator dropperconductor (Conductor strands are broken near the connectors atRajgarh

ADANI WR-II R

123 400KV 400KV BUS-1 PHASE-4SWITCHYARDMUNDRA 05Jul18 730 05Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

124 400 400kV Bhadravati 1 amp Sholapur1_TIE_BAY_408 at Parli 05Jul18 800 05Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

125 400 400KV ISP-Nagda 05Jul18 800 05Jul18 1800 Daily For Relay Testing work NHDC NHDC R126 400 400 kV Bus-I at Bilaspur PS 05Jul18 800 05Jul18 1800 Daily AMP works 2018-19 WRTS-I WRTS-I R

127 400 400kV BHACHAU-RANCHODPURA2 05Jul18 900 05Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

128 220 220KV Gwalior(PGCIL)-Malanpur-I 05Jul18 900 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

129 400 Bay No 420 Tie bay of 400kv Boisar-Magarwada-II amp Future Bay at Boisar 05Jul18 900 05Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

130 765 765KV Bus Reactor Main Bay (703) atChampa PS 05Jul18 900 05Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

131 765 SWITCHABLELR_JHARSUGUDA3_DJAIGARH 05Jul18 900 05Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

132 400 400kV SEONI KHANDWA1 LINE REACTORat Seoni 05Jul18

90005Jul18

1800 DailyFor carrying out repeat Tan-delta measurement of Y-phaseBushing of Kh1 LR on account of increasing trend of tan delta ofbushing(as per AM review meeting)

WRTS-I WRTS-I R

133 765 765 KV ICT-1 Main Bay (703) at Wardha 05Jul18 900 05Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

134 765 765 kV_BUS_1_KOTRA PS 05Jul18 900 05Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C135 765 714 Sasan2 Tis Bay at Vindhyachal 05Jul18 1000 05Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

136 400 400KV Indore(PGCIL Hanuniya)-Pithampur-2 05Jul18 1000 05Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

137 400 Indore-Asoj Ckt II

05Jul18

1000

05Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Asoj cktII linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

138 400 400kv TRN-1 Main Bay(403) at Tamnar PS 05Jul18 1000 05Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

139 400 400kV ICT3 at Gwalior 05Jul18 1000 05Jul18 1800 Daily AMP WORKS POWERGRID WR-II R140 400 401 Sasan1 Main Bay at Vindhyachal 05Jul18 1100 05Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R141 400 402 Sasan1 Tie Bay at Vindhyachal 05Jul18 1200 05Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R142 400 403 ICT1 Main Bay at Vindhaychal 05Jul18 1400 05Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R143 400 400kV BHACHAU-RANCHODPURA2 05Jul18 1500 05Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

144 400 KV CHANDRAPUR 2- KUMBHARGAON(NANDED) CKT - 1 05Jul18 0800 05Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

145 400 KV LONIKAND 1 -JEJURI 05Jul18 0900 05Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Koyna Stage IV line

146 765 765kv AURANGABAD-1_MAIN_BAY_710 atSolapur 05Jul18 900 06Jul18 1800 CONTINUOUSCB SF6 LEAKAGE ARRESTING WORKS WRTS-I WRTS-I R

147 400 500MVA ICT2 at Rewa 05Jul18 1000 06Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

148 400 KV DGEN ICT 1 energisation testing 05Jul18 1100 06Jul18 1900 continuousICT routine energisation testing during RSG and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

149 400 Kasor -GPEC 05Jul18 800 07Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Exluded from Important element list For information

150 765 KV SNG-DHARAMJAYGARH - I amp II

05Jul18

800

06Jul18

1700 ODB

1 SD related works like C C Ring tighteningcotter pin inclusionJumper tightening checking etc in old portion of line2 Replacement of Pocelin insulator at power line crossing by CLRpolymer insulator near Dead tower in Sunstation

ERPC ER-IIODISHASUNDERGARH

151 400 Kala-Kudus 2 06Jul18 900 25Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R

152 765 Vindhyachal Pool- Satna 206Jul18

90006Jul18

1600 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

153 400 416 BAY( KAPP 2 MAIN BAY) AT VAPI 06Jul18 800 06Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R154 400 400kV Bus Coupler Bay (402) at Kala 06Jul18 900 06Jul18 1300 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R155 765 705 Bay (Jaipur1 Tie Bay) at Gwalior 06Jul18 1000 06Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R156 400 Ukai-Navsari 06Jul18 1000 06Jul18 1800 Daily AMP works at Navsari GIS POWERGRID WR-II R

157 400 Rajgarh-Khandwa2 Line 06Jul18 1030 06Jul18 1430 Daily To replace Dropper conductor of B phase wave trap (conductorstrands broken) at Rajgarh

POWERGRID WR-II R

158 765 707 Satna2 Main Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

159 765 706 Bay (765kV ICT-1 main Bay) at Gwalior 06Jul18 1200 06Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

160 765 708 Satna2 Tie Bay at Vindhyachal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R161 765 707 Bay (Agra1 Main bay) 06Jul18 1430 06Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R162 765 708 Bay ( Agra1 Tie Bay) 06Jul18 1630 06Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

163 400 KV TIE BAY (428) OF WARORA WARDHA(PG) 06Jul18 0900 10Jul18 1700 ContinuousRoutine Maintenance amp Dignostic testing work and replacement of

R-ph pole complete wiringMSETCL MSETCL --

164 220 220KV Bus 2 with 202 bay at Bhachau ICT1 will be in TBC 06Jul18 800 06Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

165 220 220kV Bus Coupler Bay(205) at Kala 06Jul18 1300 06Jul18 1800 Daily AMP WORKS- Timing CRMDCRM of CB etc POWERGRID WR-II R

166 220 220KV Bus 2 with 203 bay at Bhachau ICT2 will be in TBC 06Jul18 1400 06Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

167 400 Magarwada-Boisar 1 06Jul18 930 06Jul18 1800 Daily AMP works of Bay 408 at Magarwada (Line SD is required as DMscheme)

POWERGRID WR-II R

168 400 KV MAIN BUS - 2 KUMBHARGAON(NANDED) 06Jul18 0800 06Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

169 400 Chorania-Asoj -1 line 06Jul18 600 06Jul18 1800 Daily For PMM work of Line GETCO GETCO

170 400 Kansari-Kankroli line at GETCO Kansari SS06Jul18

80006Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

171 220 220KV Bina-Bina PGCIL 06Jul18 800 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R172 400 Wanakbori - Dehgam line 06Jul18 800 06Jul18 1800 Daily PMM Work GETCO GETCO173 400 Amreli Hadala Line 06Jul18 800 06Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

174 400 410 Bay 400KV Satna-Bina Line2 MainBay at Satna 06Jul18 900 06Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

175 220 220KV Gwalior(PGCIL)-Malanpur-II 06Jul18 900 06Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R176 765 709 ICT 3 Main Bay at V-CHAL PS 06Jul18 900 06Jul18 1800 Daily For AMP workFor NTAMC work POWERGRID WR-II R177 400 400KV Seoni-Bhilai 06Jul18 900 06Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R178 765 765kV Wardha - Aurangabad (PG) IV 06Jul18 900 06Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

179 765 SWITCHABLELR_JHARSUGUDA4_DJAIGARH 06Jul18 900 06Jul18 1800 Daily AMP WORKS OF Reactor WRTS-I WRTS-I R

180 765 765 kV_BUS_1_KOTRA PS 06Jul18 900 06Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C

181 220 220KV Urla Main bay (204) at Raipur SS 06Jul18 930 06Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

182 400 407 Bus Reactor1 Main Bay atVindhyachal 06Jul18 1000 06Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

183 400 400kv TRN-1 Tie Bay (402) at Tamnar PS 06Jul18 1000 06Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

184 400 413 Bay 400KV Satna-Bina Line1 MainBay at Satna 06Jul18 1100 06Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

185 400 405Sasan2 Tie Bay at Vindhyachal 06Jul18 1200 06Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R186 400 406 ICT2 Main Bay at Vindhaychal 06Jul18 1400 06Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R187 400 KV KALWA - KHARGHAR 06Jul18 0800 06Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL -

188 400 KV MAIN BUS - 1 AKOLA06Jul18

080006Jul18

1800 DailyIsolator Maintenance work of 418 bay (89) Isolator and routinebus maintenance amp testing work will be carried out inoppurtunity

MSETCL MSETCL --

189 400 400 kV Tie Bay CB of KAPP-3amp4 -Vapi-1 ampKAPP-3amp4 -Navsari-1 line at KAPP-3amp4 06Jul18

00007Jul18

000 ContinuousCircuit Breaker tie Bay CB (CB-8) Auxiliary Switch replacementand CB isolators (DS-2024) Limit switch repalcement

PGCIL NPCIL KAPP-3amp4

190 400 ICT1 Main Bay (413) at Itarsi 06Jul18 900 12Jul18 1800 Cont For retrofitting of bus side isolator (under add cap) POWERGRID WR-II R

191 765 765 kV V-Chal PS-satna 2 Line 06Jul18 900 06Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

192 400 400 kV INDORE-ITARSI2 Line

07Jul18

1000

10Jul18

1800 ContEQUIPMENT SHIFTING FOR MAKING LINE REACTORSWITCHABLE AT INDORE(MP) ON DATE 03072018 LINESHALL BE TAKEN INTO SERVICE WITHOUT LINE REACTOR

POWERGRID WR-II C

193 400 401 kV INDORE-ITARSI2 Line Reactor atIndore(MP) 07Jul18 1000 02Aug18 1800 Cont FOR MAKING LR AS SWITCHABLE POWERGRID WR-II C

194 765 709 Bay (765kV ICT-2 Main Bay) 07Jul18 1000 07Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R195 765 710 Bay (Agra2 Main bay) 07Jul18 1200 07Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R196 765 711 Bay (Agra2 Tie bay) 07Jul18 1430 07Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R197 765 712 Bay (Main bay of Bina1 Line) 07Jul18 1630 07Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

198 400 KV EKTUNI - BABLESHWAR CKT 1 07Jul18 0900 07Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

199 400VINDH - Tie Line-2 ( Between Stage-III ampStage -V) (BAY NO 34) ((STAGE-III) withMain Bus-VI at NTPC Vindhyachal 07Jul18

90008Jul18

1900 ContinuousANNUAL BAY MAINTENANCE amp ATTENDING HOTSPOTBUS-6SD WILL BE TAKEN FOR 1 DAY IE ON 070718

NTPC NTPC

200 220 220KV Bus 2 with 206 bay at BhachauLalpar Line will be in TBC 07Jul18 800 07Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

201 400 SSP - Rajgarh - 1 07Jul18 800 07Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 2 will remain out

202 400 Rewa-Jabalpur 1 line at Jabalpur 07Jul18 900 07Jul18 2000 Daily Line outage for lifting of bushings for OH work due to chargedoverhead conductor

POWERGRID WR-II R

203 220 220KV Bus 2 with 207 bay at BhachauCharadova 2 Line will be in TBC 07Jul18

140007Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

204 400 KV BUS COUPLER PARLI 07Jul18 0900 07Jul18 1700 Daily CT and Breaker testing work MSETCL MSETCL --205 400 ICT1_400220kv_SEONI 07Jul18 900 07Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

206 765 765 KV Nizamabad-2 Main Bay (704) atWardha 07Jul18 900 07Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

207 765 712 switchable LR Bay (765kV Bina1Line Reactor) at Gwalior 07Jul18 1000 07Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

208 400 Chorania-Asoj -1 line 07Jul18 600 07Jul18 1800 Daily For PMM work of Line GETCO GETCO

209 400 Kansari-Bhinmal line at GETCO Kansari SS 07Jul18 800 07Jul18 815 Daily Taking out line reactor from line for NIFP work POWERGRID WR-II C

210 220 220KV Bhanpura-Modak 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

211 400 Bay No-402 Tie Bay of 400kv Aurangabad-Boisar Line-I amp Furture Bay at Boisar 07Jul18

90007Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

212 765 Sasan-Vindhyachal Pooling-1 07Jul18 900 07Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C213 220 220kV Damoh(PGCIL)-Tikamgarh -I 07Jul18 900 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R214 765 400kV Parli-2 Main bay 416 at Solapur 07Jul18 900 07Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R215 765 765 kV_BUS_1_KOTRA PS 07Jul18 900 07Jul18 1800 Daily Integration of new bays at Kotra WRTS-I WRTS-I C216 400 400kV RAIPUR-RAIGARH III 07Jul18 930 07Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R217 400 408 ICT3 Tie Bay at Vindhyachal 07Jul18 1000 07Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R218 400 409 ICT3 Main Bay at Vindhyachal 07Jul18 1100 07Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R219 400 414 Rihand1 Tie Bay at Vindhyachal 07Jul18 1200 07Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R

220 400 415 Rihand1 Main Bay at Vindhyachal 07Jul18 1400 07Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

221 400 KV 400 KV Bus-1 and Bus-2 Bus barprotscheme 400 KV Khadka ss 07Jul18 0800 07Jul18 1700 Daily 400 KV Bus Bar testing work amp integration of 400 KV 50 MVAr

new reactor bay cabling workMSETCL MSETCL Outage on 400 KV Bus-1 and Bus-2 Bus bar protscheme 400 KV Khadka ss

222 765 765 kV Sasan ndash satna I 07Jul18 700 08Jul18 1800 Cont stringing of 765 kV Dc Vindhyachal pooling-jabalpur TL( HOTLINE METHOD) AR DISABLEMENT REQUIRED

POWERGRID WR-II C

223 400 400KV Jabalpur-MB2 Main Bay(419 bay)at Pooling stationjabalpur 07Jul18 1000 08Jul18 1800 Cont For replacement of Damaged CB Pole POWERGRID WR-II R

224 765 765kV Bus 2 at Pune-GIS 07Jul18 900 09Jul18 1800 Contihellip For Bay extension works- Existing and extension Bus 2connection

WRTS-I WRTS-I C

225 400 Itarsi-indore 2 07Jul18 900 10Jul18 1800 Daily DISMANTLING OF TOWER ERECTION OF NEW TOWER POWERGRID WR-II R

226 400 Kansari-Bhinmal line reactor at GETCOKansari SS 07Jul18

81511Jul18

1800 Cont Outage of Line Reactor for Erection amp Commissioning of newNIFS system in powergrid Line Reactor at Kansari GETCO SS

POWERGRID WR-II C

227 400 400KV Rajgarh-SSP-1 07Jul18 800 07Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

228 765 765kV DC Kotra -Tamnar line 08Jul18 700 17Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite) C

229 400 315 MVA ICT-II at Kala 08Jul18 800 08Jul18 1700 Daily AMP WORKS- Bushing Tan delta tightening of connectorsjumpers CRMDCRM etc

POWERGRID WR-II R

230 765 765KV Durg-1 Main Bay (701) at ChampaPS 08Jul18 900 08Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

231 765 765kV SEONI-WARDHA I 08Jul18 900 08Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

232 400 400KV Main Bus I at 400KV Ss Indore 08Jul18 900 10Jul18 1800 Continue For 400 KV PG Isolator of Nagda amp main bus-I replacementwork

MPPTCL MPPTCL R

233 220 220KV Bus 1 with 202 bay at Bhachau ICT1 will be in TBC 08Jul18 800 08Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

234 400 SSP - Rajgarh - 2 08Jul18 800 08Jul18 1800 Daily PMM work NCA GETCO Auto reclose of Rajgadh - 1 will remain out

235 400 Bay No-401 Main Bay of 400kvAugrangabad-Boisar-I Line at Boisar 08Jul18 900 08Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

236 765 765 Kv Bus-1 at Durg PS 08Jul18 900 08Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

237 220 220KV Bus 1 with 203 bay at Bhachau ICT2 will be in TBC 08Jul18 1400 08Jul18 1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

238 400 400315MVA ICT at Bina 08Jul18 900 08Jul18 1800 Daily AMP Work POWERGRID WR-II R239 220kV TALANDGE - CHIKODI 08Jul18 0900 08Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL240 400 400KV Rajgarh-SSP-2 08Jul18 800 08Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

241 765 765kV Kotra -2 Main bay (713) at Durg PS 09Jul18 900 09Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

242 765 765 kV Bus-I at V-CHAL PS 09Jul18 900 09Jul18 1800 Daily Extension of 765 kV Bus-I for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

243 765 765kV SEONI-WARDHA II 09Jul18 900 09Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

244 400 404 Sasan2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

245 220 220KV Bus 1 with 206 bay at BhachauLalpar Line will be in TBC 09Jul18 800 09Jul18 1200 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

246 400 406 Bay (400kV ICT-1 Main bay) 09Jul18 1000 09Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R247 400 407 Bay (400kV ICT-2 Mai Bay) 09Jul18 1200 09Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

248 220 220KV Bus 1 with 207 bay at BhachauCharadova 2 Line will be in TBC 09Jul18

140009Jul18

1800 Daily RTV coating of Bus ISOLATOR POWERGRID WR-II R

249 400 408 Bay (400kV ICT-2 Tie Bay) 09Jul18 1430 09Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R250 400 409 Bay (400kVBR-2 Main bay) 09Jul18 1630 09Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R251 400 Kasor - SSP and SSP-Asoj AR off 09Jul18 800 11Jul18 1800 ContinuousPMM work amp relay replacement work at Kasor end GETCO GETCO Auto reclose of Asoj - SSP will remain out252 400 Choraniya Hadala Line 09Jul18 800 09Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

253 400 401 Bay 400KV Satna-Nigri Line1 MainBay at Satna 09Jul18 900 09Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

254 400 400kV Dehgam Pirana1 09Jul18 900 09Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

255 400 Bay No-404 Main Bay of 500 MVA ICT-3 atBoisar 09Jul18 900 09Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

256 400 400kV Damoh-Bhopal line1 09Jul18 900 09Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R257 220 220KV Seoni-Seoni PGCIL-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R258 220 220KV Chhegaon-Khandwa (PGCIL)-I 09Jul18 900 09Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

259 765 765kv RAICHUR-2_TIE BAY_714 at Solapur 09Jul18 900 09Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

260 400 400KV Wardha-1 amp NSPCL-II Tie bay (435)at Raipur SS 09Jul18 930 09Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

261 400 417 Rihand2 Tie Bay at Vindhyachal 09Jul18 1000 09Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

262 765 765kV DJAIGARH-BILASPUR 09Jul18 1000 09Jul18 1400 Daily For Guy wire arrangement at Dgarh end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

263 400 400kV TRN-2 Main Bay (406) at Tamnar PS 09Jul18 1000 09Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

264 400 418 Rihand2 Main Bay at Vindhyachal 09Jul18 1100 09Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

265 400 402 Bay 400KV Satna-Nigri Line1 Tie Bayat Satna 09Jul18 1100 09Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

266 400 421 Vchal1 Main Bay at Vindhyachal 09Jul18 1200 09Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R267 400 424 Vchal2 Main Bay at Vindhyachal 09Jul18 1400 09Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

268 400 403 Bay 400KV Side Main Bay of 765KVICT1 at Satna 09Jul18 1400 09Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

269 400 400kV Nicol (2) Pirana 09Jul18 1500 09Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

270 400 404 Bay 400KV Satna-Nigri Line2 MainBay at Satna 09Jul18 1600 09Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

271 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 09Jul18 0900 09Jul18 1700 Daily hardwareEarth wire clamp nb tightening Work Loc No

878881MSETCL MSETCL --

272 400 KV Akola II (Yelwan) - Akola I CKT - 1 09Jul18 0900 09Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --273 400 125MVAR BUS REACTOR at Rewa 09Jul18 1000 10Jul18 1800 DAILY COMMISSIONING OF CSD POWERGRID WR-II C

274 400 400 kV Bus Reactor isolation DS-07 atKAPS 09Jul18 900 10Jul18 1800 ContinuousHot spot rectification in Y Phase of Bus Reactor isolator (DS-07)

and alignment of LS of the same DSPGCIL NPCIL KAPP-3amp4

275 400 400 kV Bus-II isolator (DS-05) and BusReactor main bay CB at KAPS

09Jul18

900

10Jul18

1800 Continuous

400kV Bus-II Shutdown required for replacement of Corona ringbolt in Y phase of bus isolator (DS-05) also LS replacement of thesame isolator

CB Auxiliary Switch replacement and LS replacement of CBisolator (DS-06)

PGCIL NPCIL KAPP-3amp4

276 400 Korba Transfer Bus coupler-2 09Jul18 730 11Jul18 1900 ContinuousBay PM amp replacement of LBB relay NTPC NTPC

277 400KV 400KV 315MVA ICT- 1Phase-2switchyardMUNDRA 09Jul18 1000 11Jul18 1000 ContinuousAnnual ICT-1 amp bay Maintenance with oil filtartion ATIL ATIL R

278 220 KV DEOLI(PGCIL)-BADNERA 09Jul18 0800 14Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

279 765 765KV Durg-1 Tie Bay (702) at Champa PS 10Jul18 900 10Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

280 400 400kV RAIPUR-DURG I 10Jul18 930 10Jul18 1730 Daily Auto-reclose and relay testing works at Raipur SS WRTS-I WRTS-I R

281 765 765 kV Bus-I at V-CHAL PS 10Jul18 900 10Jul18 1800 Daily Stability test of Bus-I for bays of 765 kV DC Vchal - JabalpurLine

POWERGRID WR-II C

282 765 713 Bay (Main bay of satna1 Line) 10Jul18 1000 10Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R283 765 714 Bay (Satna1 Tie Bay) 10Jul18 1200 10Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R284 765 715 Bay (Bina2 Line main Bay) 10Jul18 1430 10Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R285 765 716 Bay (main bay of Satna2 Line) 10Jul18 1630 10Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R286 400 400KV Nagda-Rajgarh -2 10Jul18 800 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

287 400 KV BABHALESHWAR - PADGHE 1 10Jul18 0900 10Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kV Babhaleshwar-Padghe-Ckt-2 will be in service

288 220 220KV Bus 2 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

80010Jul18

1200 Daily RTV coating of Bus Isolator POWERGRID WR-II R

289 220 220KV Bus 1 with 208 bay at BhachauCharadova 1 Line will be in TBC 10Jul18

140010Jul18

1800 Daily RTV coating of Bus Isolator POWERGRID WR-II R

290 400 Main Bay of Bus Reactor 1 (401) atDehgam 10Jul18 900 10Jul18 1800 Daily For AMP work POWERGRID WR-II R

291 400 ICT2_MAIN_BAY_406 at Seoni 10Jul18 900 10Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

292 400 400 KV TIE BAY_KOTRA-LARA_2_KOTRAPS 10Jul18 900 10Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

293 400 400kV SHOLAPUR1_MAIN_BAY_409 at Parli 10Jul18 800 10Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

294 400 Soja - Wanakbori line 10Jul18 800 10Jul18 1800 Daily PMM Work GETCO GETCO295 400 Vadinar Hadala Line - 2 10Jul18 800 10Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO

296 400 405 Bay 400KV Satna-Nigri Line2 Tie Bayat Satna 10Jul18 900 10Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

297 400 400kV Vadodara Pirana1 10Jul18 900 10Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

298 400 Bay No-405 Tie Bay of 400kv Aurangabad-Boisar Line-II amp Furture Bay at Boisar 10Jul18

90010Jul18

1730 Daily For Bay AMP POWERGRID WR-II R

299 400 Jabalpur 4 Main Bay (407) at Itarsi 10Jul18 900 10Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

300 220 220kV Damoh(PGCIL)-Sagar -I 10Jul18 900 10Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

301 765 765 KV Durg -I Non Switchable LR atWardha 10Jul18 900 10Jul18 1800 Daily Changeover of newly Erected B phase reactor of Durg1 WITH

SPARE ReactorWRTS-I WRTS-I C

302 400 400KV Tamnar-II Main bay (442)at Raipurss 10Jul18 930 10Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

303 400 423 Vchal2 Tie Bay at Vindhyachal 10Jul18 1000 10Jul18 1100 Daily For NTAMCRTAMC work POWERGRID WR-II R

304 765 765KV Jabalpur-DMJY3 Line along withLine reactor at pooling stationjabalpur 10Jul18

100010Jul18

1800 Daily For testing of autoreclose at Jabalpur PS POWERGRID WR-II R

305 220 Kakrapar-Haldarwa-1 10Jul18 1000 10Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

306 400 400kV TRN-2 Tie Bay (405) at Tamnar PS 10Jul18 1000 10Jul18 1800 Daily For AMP Works WRTS-I WRTS-I R

307 400 425 Vchal4 Main Bay at Vindhyachal 10Jul18 1100 10Jul18 1200 Daily For NTAMCRTAMC work POWERGRID WR-II R

308 400 406 Bay 400KV ICT2 Main Bay at Satna 10Jul18 1100 10Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

309 400 426 Vchal4 Tie Bay at Vindhyachal 10Jul18 1200 10Jul18 1300 Daily For NTAMCRTAMC work POWERGRID WR-II R310 400 428 Vchal4 Main Bay at Vindhyachal 10Jul18 1400 10Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

311 400 407 Bay 400KV 50MVAR Bus Reactor1Main Bay at Satna 10Jul18 1400 10Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

312 400 400kV Vadodara Pirana2 10Jul18 1500 10Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

313 400 408 Bay 400KV 50MVAR Bus Reactor1 TieBay at Satna 10Jul18 1600 10Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

314 400 KV CHANDRAPUR 2 - WARORA CKT-1 10Jul18 0800 10Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

315 765 Bay 707 ( Main Bay of 765 kV BR 1 ) atIndore ss 10Jul18 1000 11Jul18 1800 daily To carry out Joint verification of DCRM signatures of Circuit

Breaker with OEMPOWERGRID WR-II R

316 400 KV KORADI-KHADKA 10Jul18 0800 11Jul18 1800 Daily Restringing between location 111-112 MSETCL MSETCL --

317 400 50MVAR Bina Ckt-II Switchable LineReactor at Shujalpur 10Jul18

100016Jul18

1800 ContCommissioning of Reactor Switching 145KV NGR Bypass CircuitBreaker at Shujalpur Line will be in service without LineReactor at Shujalpur

POWERGRID WR-II C

318 400KV RANCHI SIPAT CKT-2 10Jul18 1100 10Jul18 1700 ODB CHANGING OF FLASH OVER INSULATOR ERPC POWERGRID

319 765 KV SNG-DHARAMJAYGARH - III amp IV10Jul18

80014Jul18

1700 ODB Maintenance works and coonection with new portion of balanceline after swapping arrangement (Under Antitheft Charging)

ERPC ER-IIODISHASUNDERGARH

320 400 KV Sundargarh - Raigarh - II amp IV10Jul18

80011Jul18

1700 ODB For tree Bamboo cutting at Loc No 426 AND SD related worksfor various compliance of cross patrolling team of AM BBSR

ERPC ER-IIODISHASUNDERGARH

321 400 400KV ISP-Sarni 11Jul18 800 11Jul18 1800 Daily For Relay Testing work NHDC NHDC R322 765 717 Bay (Satna2 Tie bay) 11Jul18 1000 11Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R323 765 718 Bay (main Bay of Bina3 line) 11Jul18 1200 11Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R324 400 404 Bay (400kV BR-1 Mai Bay) 11Jul18 1430 11Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R325 400 405 Bay (400kV ICT-1 Tie Bay) 11Jul18 1630 11Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

326 400 400kv Mundra-Bhachau line-1 along withMain and Tie breaker at both ends 11Jul18 900 11Jul18 2000 Daily Line terminal equipment maintenance and terminal tightness of

bay equipmentPGCIL CGPL

327 400 KV CHANDRAPUR 2 - WARORA CKT-2 11Jul18 0800 11Jul18 1700 Daily Tightening of conductor Earthwire Hardware MSETCL MSETCL --

328 400 400kV DEHGAM-GANDHAR-I 11Jul18 900 11Jul18 1300 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

329 765 765KV Durg-2 Main Bay (704) at ChampaPS 11Jul18 900 11Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

330 765 765kV ICT-2 amp Future Tie bay (705) atDurg PS 11Jul18 900 11Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

331 400 400 kV Bus 2 at Indore ss 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406

POWERGRID WR-II R

332 400 400 kV Indore - Pithampur 2 Line 11Jul18 1000 11Jul18 1800 daily For testing of BUS BAR Relay after shifting BU relay from Bay405 to Bay 406 at Indore

MPPTCL WR-II R

333 400 400kV DEHGAM-GANDHAR-I 11Jul18 1500 11Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

334 400 400kV PADGHE (PG)-KUDUS (MSETCL)-I 11Jul18 800 11Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

335 765 765kV PUNE(GIS)-SOLAPUR 11Jul18 900 11Jul18 1300 DAILY For Guy wire arrangement at Solapur Pune end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

336 765 765 KV Nizamabad-2 Tie Bay (705) atWardha 11Jul18 900 11Jul18 1900 Daily AMP work at Wardha end WRTS-I WRTS-I R

337 400 Asoj-Indore 2 at Asoj11Jul18

80011Jul18

1000 DailyFor attending oil leakage amp Installation of NIFS System at asojend Line Reactor will be out of serviceLine will be chargedwithout reactor

POWERGRID WR-II C

338 765 765kV SEONI-BILASPUR I 11Jul18 1000 11Jul18 1400 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

339 765 765kV SEONI-BILASPUR II 11Jul18 1500 11Jul18 1800 Daily For Guy wire arrangement at Seoni Bilaspur end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

340 400 KV WARORA - Wardha(PG) 11Jul18 0900 11Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

341 765 765kV DJAIGARH- JHARSUGUDA I 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

342 765 765kV DJAIGARH- JHARSUGUDA II 11Jul18 900 16Jul18 1800 CONTI Swapping of Ckt 1 and 2 with under construction Dgarh-Jharsuguda Ckt 3 and 4

WRTS-I WRTS-I C

343 400 LR of Asoj-Indore 2 at Asoj 11Jul18 1000 20Jul18 1800 Cont Installation of NIFS System at asoj end POWERGRID WR-II C

344 400 Kansari-Bhinmal line at GETCO Kansari SS11Jul18

80011Jul18

1700 DailyOutage of Line for Testing of new NIFP system along withprotection relays After work completion Line Reactor shall betaken into service

POWERGRID WR-II C

345 400 Vadinar Hadala Line - 1 11Jul18 800 11Jul18 1800 Daily Feeder Bay Water washing Work GETCO GETCO346 400 Soja- Wanakbori line 11Jul18 800 11Jul18 1800 Daily PMM Work GETCO GETCO Exluded from Important element list For information

347 400 409 Bay 400KV ICT1 Main Bay at Satna 11Jul18 900 11Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

348 400 220kV Pirana Bhat1 11Jul18 900 11Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

349 400 Bay No-406 Main Bay of 400kvAugrangabad-Boisar-II Line at Boisar 11Jul18 900 11Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

350 765 JABALPUR-ORAI 1 11Jul18 900 11Jul18 1800 Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C

351 765 765 kV Bus-II at V-CHAL PS 11Jul18 900 11Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

352 400 400kV Damoh-Bhopal line2 11Jul18 900 11Jul18 1800 Daily AMP work of terminal equipments POWERGRID WR-II R

353 400 Jabalpur 4 Tie Bay (408) at Itarsi 11Jul18 900 11Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

354 400 400kV ICT 1 Main Bay 401 at Aurangabad 11Jul18 900 11Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

355 220 Kakrapar-Haldarwa-2 11Jul18 1000 11Jul18 1800 Daily AMP works at GETCO Haldarwa POWERGRID WR-II R

356 765 711 bay ( 765kV Agra2 Tie bay) at Gwalior 11Jul18 1000 11Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

357 400 KV NTPC-PGCIL SOLAPUR- 4 11Jul18 1000 11Jul18 1800 Cont Bay Preventive maintenance PGCIL NTPC Line

358 400 416 Bay 400KV Satna-Bina Line4 MainBay at Satna 11Jul18 1100 11Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

359 400 429 Vchal4 Tie Bay at Vindhyachal 11Jul18 1400 11Jul18 1500 Daily For NTAMCRTAMC work POWERGRID WR-II R

360 400 416 Bay 400KV Satna-Bina Line4 Tie Bayat Satna 11Jul18 1400 11Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

361 400 220kV Pirana Bhat2 11Jul18 1500 11Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

362 400 418 Bay 400KV Vchal-Satna Line4 MainBay at Satna 11Jul18 1600 11Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

363 400 KV 80 MVAr Bus reactor Talandge 11Jul18 0900 11Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --364 220 KV DEOLI(PGCIL)-BADNERA 11Jul18 1000 11Jul18 1800 Daily Suspension clamp and nut bolt tightening MSETCL MSETCL --

365 400 VINDH -Charging of Transfer Bus-III atNTPC Vindhyachal 11Jul18 730 12Jul18 1900 ContinuousPID Testing of String Insulator NTPC NTPC

366 400Bay 402 ( Tie Bay for 400 kV Indore -Pithampur 1 ) at Indore ss

11Jul18

1000

15Jul18

1800 Cont

For shifting PU Relay from bay 402 to bay 403 to make bay 403 asmain bay of New 400 220 kV ICT 1 and Bay 405 as tie bay for400 kV Indore - Pithampur 1 and New 400 220 kV ICT 1WRSS 14

POWERGRID WR-II R

367 400 Indore-Itarsi Ckt I

12Jul18

1000

12Jul18

1800 dailyonline code required for PLCC channel 2 in Indore-Itarsi cktI linefor retrofitting of new DTPC at 400kV MPPTCL Indore SS Lineshall remain in service with channel-I PLCC

POWERGRID WR-II R

368 400 KV LONIKAND 1 - TALEGAON (PGCIL) 12Jul18 0800 12Jul18 1800 Daily Line Maintenance amp Routine Dignostic testing work MSETCL MSETCL --

369 400 410 Bay (400kV Side of 765400kV ICT-1main bay) 12Jul18 1000 12Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

370 400 411 Bay( Tie bay of 400kv BR-3) 12Jul18 1200 12Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R371 400 412 Bay(Main bay of 400kv BR-3) 12Jul18 1430 12Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R372 400 413 Bay (400kV ICT-3 Main bay) 12Jul18 1630 12Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

373 765 Bina-Seoni Line 12Jul18 930 12Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

374 400 400KV Main Bus I at 400KV Ss Indore 12Jul18 900 14Jul18 1800 Continue For 400 KV ISP-I PG Isolator of main bus-I replacement work MPPTCL MPPTCL R

375 400 400kV DEHGAM-GANDHAR-I 12Jul18 900 12Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

376 765 765KV Durg-2 Tie Bay (705) at Champa PS 12Jul18 900 12Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

377 765 765 kV Bus-II at V-CHAL PS 12Jul18 900 12Jul18 1800 Daily Extension of 765 kV Bus-II for bay extention work for Vchal -Jabalpur Line

POWERGRID WR-II C

378 400 400kV DEHGAM-GANDHAR-I 12Jul18 1500 12Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

379 400 765KV SOLAPUR -RAICHUR 2 12Jul18 900 12Jul18 1300 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

380 765 765kV ICT-2 Main bay (706) at Durg PS 12Jul18 900 12Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

381 765 765kV BILASPUR-SIPAT I 12Jul18 1000 12Jul18 1400 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

382 765 765kV BILASPUR-SIPAT II 12Jul18 1500 12Jul18 1800 Daily For Guy wire arrangement at Bilaspur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

383 400 KV BABHALESHWAR - PADGHE 2 12Jul18 0900 12Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400kv Babhaleshwar-Padghe-Ckt-1 will be in service

384 400 400kV PADGHE (PG)-KUDUS (MSETCL)-II 12Jul18 800 13Jul18 1800 Daily For Taking Breaker CRM (for Main and TIE Bay) is to be taken byRemoving IPS and cleaning the Breker PAD

WRTS-I WRTS-I R

385 400 Asoj - Chorania No 1 12Jul18 800 12Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

386 400 419 Bay 400KV Satna-Bina Line3 MainBay at Satna 12Jul18 900 12Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

387 400 220kV Pirana Barjedi1 12Jul18 900 12Jul18 1300 Daily Main 2 Relay Replacement POWERGRID WR-II R

388 765 765KV SOLAPUR -RAICHUR 1 12Jul18 1300 12Jul18 1800 DAILY For Guy wire arrangement at Solapur end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

389 400 Rewa-Jabalpur 1 line at Jabalpur 12Jul18 900 12Jul18 1700 Daily Line outage to take LR in service after OH INCLUDINGTESTING WORK ALSO

POWERGRID WR-II R

390 220 220KV Gwalior(PGCIL)-Mahalgaon-I 12Jul18 900 12Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

391 220 Bay No 209 Main Bay of ICT-III at Boisar 12Jul18 900 12Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

392 400 400kV Wardha 2 amp Aurangabad (PG)1 TieBay 411 at Aurangabad 12Jul18 900 12Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

393 765 SWITCHABLE LR_765kV_ABAD1_WARDHA 12Jul18 900 12Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

394 220 220KV Raipur-Khedamara line 12Jul18 930 12Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R395 765 702Seoni amp ICT-1 Tie bay at Bina 12Jul18 930 12Jul18 1800 Daily For AMP work POWERGRID WR-II R396 400 402 Mundra-2 Tie bay at Bhachau 12Jul18 1000 12Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

397 765 765KV1500MVA ICT1 at poolingstationjabalpur 12Jul18 1000 12Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

398 400 400kV KUDGI-I MAIN BAY (401) atKolhapur 12Jul18 1000 12Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

399 400 420 Bay 400KV Satna-Bina Line3 Tie Bayat Satna 12Jul18 1100 12Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

400 400 KV DGEN Unit 51 generator transformerenergisation charging 12Jul18 1100 12Jul18 1800 continuousUnit 51 generator transformer remains energized during RSD for

healthiness checkingTPL - DGEN TPL - DGEN R

401 400 KV DGEN Unit 53 generator transformer de-energisation discharging 12Jul18 1100 12Jul18 1800 continuousUnit 53 generator transformer routine de energisation during RSD

and shutdown for energy conservationTPL - DGEN TPL - DGEN R

402 400 KC

400kv Navsari-DGEN line bays 1 and 2400kv Waghodia - DGEN line bays 1 and 2400kv Transfer bay - bus isolator operationtesting and change-over 12Jul18

1100

12Jul18

1800 continuousmonthly routine testing of isolators operation TPL - DGEN TPL - DGEN R

403 400 404 Mundra -1Main bay at Bhachau 12Jul18 1200 12Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R404 400 405 Mundra-1 Tie bay at Bhachau 12Jul18 1400 12Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

405 400 421 Bay 400KV Vchal-Satna Line3 MainBay at Satna 12Jul18 1400 12Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

406 400 220kV Pirana Barjedi2 12Jul18 1500 12Jul18 1900 Daily Main 2 Relay Replacement POWERGRID WR-II R

407 400 406 Main bay at BhachauICT-2 will becharged through Tie bay 12Jul18 1600 12Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

408 400 422 Bay 400KV 63MVAr Bus Reactor2Main Bay at Satna 12Jul18 1600 12Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

409 400 KV MAIN BUS - 1 KUMBHARGAON(NANDED) 12Jul18 0800 12Jul18 1700 Daily Annual Maintenance and Testing work MSETCL MSETCL --

410 400 KV JEJURI- KOYNA STAGE-IV BY Pune zone 12Jul18 0800 12Jul18 1800 Daily Line Maintenance MSETCL MSETCL

411 400 KV DGEN ICT 2 energisation testing 12Jul18 1100 13Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

412 400 KV AKOLA - KHADKA (BHUSAWAL) 12Jul18 1200 14Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

413 KOTA(220KV)-BAROD (220KV) 12Jul18 0800 12Jul18 1800 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan

414 400 KVLONIKAND2-LONIKAND1(INTERCONNECTOR -1)

13Jul180900

13Jul181800 Daily Routine Maintenance amp Diagnostic testing work MSETCL MSETCL Load will be manage on 400kV Interconnector II at 400kV Lonikand II substation

415 400 Jabalpur 3 Main Bay (406) at Itarsi 13Jul18 900 13Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

416 400 400KV Vchal-Satna Line1 amp 2 13Jul18 1600 18Jul18 1800 Cont Line diversion due to National Highway (Rewa-Alhababd NH 7) POWERGRID WR-II C

417 765 765kV DURG PS -WARDHA_4 13Jul18 900 13Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I D

418 400 414 Bay (Tie Bay of 400kV ICT-3) 13Jul18 1000 13Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

419 400 415 Bay (400kv side of 765400kV ICT-2Mai Bay) 13Jul18 1200 13Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

420 220 201 Bay (220kv side of 400220kv ICT1 bay) 13Jul18 1430 13Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

421 220 202 Bay (Malanpur1 Line Bay) 13Jul18 1630 13Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

422 400 400kV DEHGAM-GANDHAR-II 13Jul18 900 13Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

423 400 400KV Bus-4 at Raipur SS 13Jul18 930 13Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R424 400 400kV DEHGAM-GANDHAR-II 13Jul18 1500 13Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R425 400 401 Mundra-2 Main bay at Bhachau 13Jul18 700 13Jul18 900 Daily NTAMC Signal Testing POWERGRID WR-II R

426 400 400KV ICT-1 Tie Bay (420) at Champa PS 13Jul18 900 13Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

427 400 400kV REWA-SASAN 13Jul18 1000 14Jul18 1800 DAILY REPLACEMENT OF GLASS DISC INSULATOR POWERGRID WR-II R428 765 765400 kV ICT 2 at V-CHAL PS 13Jul18 700 13Jul18 1500 Daily ICT 2 AMP work amp RTCC commissioning work POWERGRID WR-II C429 400 Asoj - Chorania No 2 13Jul18 800 13Jul18 1800 Daily PMM work GETCO GETCO

430 400 423 Bay 400KV 63MVAr Bus Reactor2 TieBay at Satna 13Jul18 900 13Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

431 220 220KV Gwalior(PGCIL)-Mahalgaon-II 13Jul18 900 13Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R432 220 Bay No 210 Future Bay at Boisar 13Jul18 900 13Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

433 220 220kV Damoh-Damoh line1 Bay (204 Bay)at Damoh SS 13Jul18 900 13Jul18 1800 Daily Bay Amp(Line will be in service through TBC) POWERGRID WR-II R

434 220 220KV Chhegaon-Khandwa (PGCIL)-II 13Jul18 900 13Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

435 400 400kV Aurangabad (PG)-1 Main Bay 412 atAurangabad 13Jul18 900 13Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

436 765 765kV ICT-1_MAIN_BAY_712 at Seoni 13Jul18 900 13Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

437 400 400kV Kolhapur Main bay 418 at SOLAPUR 13Jul18 900 13Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

438 400 400 KV MAIN BAY_KOTRA-LARA_1_KOTRAPS 13Jul18 900 13Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

439 400 400kV Mindra-Bhachau line-2 13Jul18 900 13Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

440 765 765KV1500MVA ICT2 at poolingstationjabalpur 13Jul18 1000 13Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

441 765 716 Bay (main bay of Satna2 Line) atGwalior 13Jul18 1000 13Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

442 400 424 Bay 400KV Side Main Bay of 765KVICT2 at Satna 13Jul18 1100 13Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

443 400 425 Bay Future Bay of 400KV ICT3 atSatna 13Jul18 1400 13Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

444 400 426 Bay 400KV ICT3 Tie Bay at Satna 13Jul18 1600 13Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

445 400 Itarsi-Indore2 Line 13Jul18 1700 13Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

446 400 Indore1 Tie Bay at Itarsi 13Jul18 900 19Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R447 400 125MVAR Bus Reactor1 at Itarsi 14Jul18 900 18Jul18 1800 Cont For retrofitting of reactor isolator (under add cap) POWERGRID WR-II R448 765 765 Bus-1 at Aurangabad 14Jul18 800 14Jul18 1800 Daily for AMP works WRTS-I WRTS-I R449 220 203 Bay (Mahalgaon1 Line Bay) 14Jul18 1000 14Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R450 220 204 bay (Transfer Bus bay) 14Jul18 1200 14Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

451 220 205 bay (220kv side of 400220kV ICT-2bay) 14Jul18 1430 14Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

452 220 206 Bay (Malanpur2 Line Bay) 14Jul18 1630 14Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

453 400 400kV DEHGAM-GANDHAR-II 14Jul18 900 14Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

454 400 400kV DEHGAM-GANDHAR-II 14Jul18 1500 14Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

455 765 765kV Champa-1 amp Wardha-2 Tie bay (717)at Durg PS 14Jul18 900 14Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

456 220 220KV Malanpur - Auraiya 14Jul18 900 14Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R457 220 220kV Damoh(PGCIL)-Sagar-II 14Jul18 900 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

458 400 400KV Durg-I Main Bay (445) at Raipur SS 14Jul18 930 14Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

459 400 KV BABLESHWAR- AURANGABAD (WALUJ) 14Jul18 0900 14Jul18 2100 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV BhusawalDhule-Ckt-1amp2 Ektuni-ckt-2 will be in service

460 400 412 Main bay at BhachauBus Reactor-1will be charged through Tie bay 14Jul18 800 14Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

461 400 400kV SHOLAPUR2_MAIN_BAY_412 at Parli 14Jul18 800 14Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R

462 400 Main bus - 1 at Hadala 14Jul18 800 14Jul18 1800 Daily Water washing Work GETCO GETCO463 400 400KV Nagda-ISP 14Jul18 800 14Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

464 220 Bay No 211 Main Bay of 220kv Boisar-Boisar-II Line at Boisar 14Jul18 900 14Jul18 1730 Daily For Bay AMP POWERGRID WR-II R

465 400 413 Varsana-1 Main bay at Bhachau 14Jul18 1000 14Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

466 400 400KV Bus Reactor1 at poolingstationJabalpur 14Jul18 1000 14Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

467 400 414 varsana-1 Tie bay at Bhachau 14Jul18 1200 14Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R468 400 415 essar-1 Main bay at Bhachau 14Jul18 1400 14Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R469 400 416 varsana-2 Main bay at Bhachau 14Jul18 1600 14Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R470 220kV NASHIK - NAVSARI CKT - 1 14Jul18 0800 14Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

471 400 400kV DCDS Raipur -Tamnar line 14Jul18 700 25Jul18 1800 Daily AR OFF To carry out Overhead Hotline stringing of UC 765kVDC Rapur-Sundergarh Line

JPL OGPTL(sterlite) C

472 400 400KV Khandwa-Rajgarh ckt-115Jul18

90015Jul18

1800 DailyFor terminal equipment amp line maint work (Auto reclosure of400KV Khandwa-Rajgarh ckt-2 to be kept in non auto mode) atKhandwa

POWERGRID WR-II R

473 400 400KV Bus-1 at Raipur SS 15Jul18 930 15Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R474 400 Bus Coupler(405) at Vadodara 15Jul18 1000 15Jul18 1800 Daily For interlock checking with LampT bay extension work POWERGRID WR-II C

475 400 400kV Bus1 at Itarsi 15Jul18 900 15Jul18 1800 Daily For removing of bus jumpers for retrofitting of bus isolator (413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

476 765 Bay 715 ( Main Bay of 765 kV Indore -Vadodara Line ) at Indore ss 15Jul18 1000 16Jul18 1800 daily To attend faculty Trip Coil 2 Latch in B phase Circuit Breaker POWERGRID WR-II R

477 500 KV CHANDRAPUR - PADGHE HVDC POLE 1 15Jul18 0600 15Jul18 1700 Daily Broken Disc insulator replacement amp hardware tightening work MSETCL MSETCL --

478 400 Asoj-Indore 1 at Asoj 15Jul18 700 15Jul18 1000 Daily For Over Voltage Testing POWERGRID WR-II R

479 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

480 400 400kV Bus-2 at CGPL 15Jul18 800 15Jul18 2000 Daily Bus-2 CVT Testing amp Isolaotr maintenance CGPL CGPL

481 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

482 400 Asoj - SSP 15Jul18 800 15Jul18 1800 Daily PMM work GETCO GETCO Auto reclose of Kasor - SSP will remain out

483 400 400KV ISP-Indore-II 15Jul18 1000 15Jul18 1700 Daily For Providing spacers vibration damper etc and linemaintenance work

MPPTCL MPPTCL R

484 220 207 Bay (Mahalgaon2 Line Bay) 15Jul18 1000 15Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R485 220 208 Bay (Bus Coupler Bay) 15Jul18 1200 15Jul18 1330 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

486 220 209 bay (220kV side of 400220kv ICT-3Bay) 15Jul18 1430 15Jul18 1600 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

487 220 210 bay (not charged ) 15Jul18 1630 15Jul18 1800 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R

488 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- I 15Jul18

080015Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - II will be in service

489 400 KV PARLI(MS) - PARLI (PG) CKT -1 15Jul18 0900 15Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

490 765 765 kV Bus-1 + 711 Tie bay Sipat 2simultaneously at Bilaspur PS 15Jul18 800 16Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction bays

Rajnandgaon lineWRTS-I WRTS-I C

491 400 400kV PIRANA-DEHGAM1 15Jul18 900 15Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

492 400 400kV PIRANA-DEHGAM1 15Jul18 1500 15Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

493 400 400kV ICT 2 -amp Future - Tie Bay 405 atAurangabad 15Jul18 900 15Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

494 400 400kV PARLI-1amp ALKUD Tie bay 414 atSolapur 15Jul18 900 15Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

495 400 63 MVAR Bus Reactor 1 at Jabalpur 15Jul18 900 22Jul18 2000 Cont OVERHAULING WORK POWERGRID WR-II R

496 400 Itarsi-Jabalpur1 Line15Jul18

90015Jul18

915 DailyLine to be HT for taking Indore-2 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

497 220 220kV Satna(PGCIL)-Chhatarpur-I 15Jul18 900 15Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

498 400 400KV Bus Reactor2 at poolingstationJabalpur 15Jul18 1000 15Jul18 1800 Daily For replacement of multiple small stoll from 336KV OBLUM make

LA by single stoolPOWERGRID WR-II C

499 220kV MUDSHINGI - CHIKODI 15Jul18 0900 15Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL500 400 Itarsi-Jabalpur1 line reactor at Itarsi 15Jul18 900 24Jul18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R501 400 Navsari-Magarwada 15Jul18 900 30Jul18 1800 Daily Online PID work AR DISABLEMENT REQUIRED POWERGRID WR-II R502 400 400kV Bus-2 at CGPL 16Jul18 800 16Jul18 2000 Daily Bus-2 isolator maintenance CGPL CGPL

503 400 Bina-Shujalpur ckt-2 at Bina 16Jul18 930 16Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

504 400 400kV Bus1 at Itarsi 16Jul18 900 16Jul18 1800 Daily For connecting of bus jumpers after retrofitting of bus isolator(413-89) of ICT-1 Main Bay (under add cap)

POWERGRID WR-II R

505 400 KV PARLI - LONIKAND 2 CKT 1 16Jul18 1000 16Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-10711295154170

MSETCL MSETCL --

506 220 211 bay (Sithouli2 line Bay) 16Jul18 1000 16Jul18 1130 Daily Remote operation check from RTAMC at Gwalior POWERGRID WR-II R507 400 417 varsana-2 Tie bay at Bhachau 16Jul18 800 16Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R508 400 765KV SOLAPUR-PARLI 1 16Jul18 900 16Jul18 1100 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

509 400 BUS REACTOR_400kV_80MVAR_KOTRA PS 16Jul18 900 16Jul18 1300 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

510 400 400kV RAJGARH-KASOR1 16Jul18 900 16Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

511 220 220KV Malanpur - Auraiya 16Jul18 900 16Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

512 400 400KV ICT-3 Main Bay (422) at Champa PS 16Jul18 900 16Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

513 400 400kV Boisar 2 Main Bay 427 atAurangabad 16Jul18 900 16Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

514 765 765 KV Nizamabad-1 Tie Bay (702) atwardha 16Jul18 900 16Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

515 765 Bina- Gwalior-3 Line reactor at Bina(switchable) 16Jul18 930 16Jul18 1800 Daily AMP of switchable reactor at Bina

Line will be remained in service without ReactorPOWERGRID WR-II R

516 400 418 essar-2 Main bay at Bhachau 16Jul18 1000 16Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R517 400 765KV SOLAPUR-PARLI 2 16Jul18 1100 16Jul18 1300 DAILY FOR COMMISSIONING OF PLCC DTPC WRTS-I WRTS-I C

518 400 419 Main bay at BhachauBus Reactor-2will be charged through Tie bay 16Jul18 1200 16Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

519 400 420 BR-2 Tie bay at Bhachau 16Jul18 1400 16Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R520 400 400kV RAJGARH-KASOR1 16Jul18 1500 16Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R521 400 425 Mundra-3 Main bay at Bhachau 16Jul18 1600 16Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R522 400 KV NEW KOYNA - DABHOL - II 16Jul18 0800 16Jul18 1700 Daily Routine Maintenance amp Relay testing work MSETCL MSETCL -

523 400 KV BUS COUPLER KOLHAPUR-III(TALANDGE)-400 KV 16Jul18 0900 16Jul18 1800 Daily Quarterly MaintWork MSETCL MSETCL --

524 400 KV Akola II (Yelwan) - Akola I CKT - 2 16Jul18 0900 16Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

525 400kv 400132 KV Mouda ICT2 and bay number410 16Jul18 930 18Jul18 1830 cont Annual maintenance of Transformer and bay NTPC NTPC AMC

526 220 220kv Khanpur - Dehgam (PG) line no1 16Jul18 800 20Jul18 1800 ContineousFor 220 KV Class breaker Replacement work GETCO GETCO

527 220 KV DEOLI(PGCIL)-BADNERA 16Jul18 0800 21Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL --

528 400 KV CHANDRAPUR-PARLI CKT-3 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

529 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 16Jul18 0800 31Jul18 1700 Daily For PID WorkShifting of auto reclose switch to non auto mode MSETCL MSETCL Chandrapur II- Nanded Ckt-II amp Chandrapur GCR- Parli Ckt- III lines are on DC tower so both lines require on same day AR out

530 400 Tie Bay of ICT 1 amp Nagda 2 (405) atDehgam 17Jul18 900 17Jul18 1800 Daily For AMP work POWERGRID WR-II R

531 400 400kV Mindra-Jetpur line-1 17Jul18 900 17Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL

532 765 765 kV Bus-II at Bilaspur PS 17Jul18 800 18Jul18 1800 Daily Erection of equipments amp Stringing of Bus in construction baysRajnandgaon line

WRTS-I WRTS-I C

533 400 400 kV Bus 2 at Indore ss 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403

POWERGRID WR-II R

534 400 400 kV Indore - Pithampur 1 Line 17Jul18 1000 18Jul18 1800 Cont For testing of BUS BAR Relay after shifting BU relay from Bay402 to Bay 403 at Indore

MPPTCL WR-II R

535 400KV 400KV BUS-1 PHASE-3SWITCHYARDMUNDRA 17Jul18 730 17Jul18 1830 ContinuousAnnual Routine Bus Maintenance ATIL ATIL R

536 400 426 mundra-3 Tie bay at Bhachau 17Jul18 800 17Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R537 400 Asoj - Wanakbori 17Jul18 800 17Jul18 1800 Daily PMM work GETCO GETCO

538 220 205 Bay 220KV Side Tie Bay of 400KVICT1 at Satna 17Jul18 900 17Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

539 400 400kV RAJGARH-KASOR1 17Jul18 900 17Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

540 400 400KV ICT-4 Main Bay (427) at Champa PS 17Jul18 900 17Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

541 220 220KV Seoni-Seoni PGCIL-II 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R542 220 220kV Damoh (PGCIL)-Damoh-I 17Jul18 900 17Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

543 765 765kV Wardha 2 amp Padghe 1 Tie Bay 711 atAurangabad 17Jul18 900 17Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

544 765 BUS REACTOR_765kV_240MVAR_WARDHA 17Jul18 900 17Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R

545 765 710Bus reactor Main bay at Bina 17Jul18 930 17Jul18 1800 Daily For AMP work POWERGRID WR-II R546 400 427 Mansar Main bay at Bhachau 17Jul18 1000 17Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R547 400 400KV Shujalpur-RAPP Ckt-I 17Jul18 1000 17Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

548 400 500MVA ICT 2 at Vadodara 17Jul18 1000 17Jul18 1800 Daily For senstivity test with LampT Bay extension work of DGENTPS(Extn Bays)

POWERGRID WR-II C

549 220 206 Bay 220KV Satna-Satna Line2 MainBay at Satna 17Jul18 1100 17Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

550 400 428 Mundra-4 Main bay at Bhachau 17Jul18 1200 17Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R551 400 429 mundra-4 Tie bay at Bhachau 17Jul18 1400 17Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

552 220 207 Bay 220KV Satna-Maihar Line MainBay at Satna 17Jul18 1400 17Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

553 400 400kV RAJGARH-KASOR1 17Jul18 1500 17Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R554 400 430 chorania Main bay at Bhachau 17Jul18 1600 17Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

555 220 208 Bay 220KV Satna-Maihar Line Tie Bayat Satna 17Jul18 1600 17Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

556 400 KV MAIN BAY (420) OF WARDHA (PG) CKT WARORA 17Jul18 0800 17Jul18 1700 Daily Bay 420 CB DCRM CRMTiming and IR Values Testing works

isolater maintainance work MSETCL MSETCL 400KV PGCIL Line will be charged through Tie CB 421

557 400 KV EKTUNI - BABLESHWAR CKT 2 17Jul18 0900 17Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL 400 kV Bhusawal Auranagabad Dhule-Ckt-1amp2 Ektuni-ckt-1 will be in service

558 765 Gwalior-Phagi 117Jul18

80018Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

559 400 SOLAPUR_ STATCOM_COUPLINGTRANSFORMER 17Jul18

90018Jul18

1800 CONTINUOUSSTATCOM ALONG WITH COUPLING XMER SHALL BE OUT OFSERVCE TO TAKE SPARE UNIT IN SERVICE AND TO KEEPSPARE UNIT 24HRS IDEAL CHARGING

WRTS-I WRTS-I C

560 765 704 Bay (765kV Jaipur1 Main bay) atGwalior 17Jul18 1000 18Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

561 765 ICT3_765400kv_TAMNAR PS 18Jul18 900 18Jul18 1700 Daily For AT Bank 03 B Ph HV Bushing replacement work WRTS-I WRTS-I R562 400 Main Bay of ICT 2 (407) at Dehgam 18Jul18 900 18Jul18 1800 Daily For AMP work POWERGRID WR-II R563 400 Main bus - 2 at Hadala 18Jul18 800 18Jul18 1800 Daily Water washing Work GETCO GETCO564 400 400kV Mindra-Jetpur line-2 18Jul18 900 18Jul18 2000 Daily Line terminal equipment maintenance PGCIL CGPL565 220 201 bay(Bus coupler bay) at Bhachau 18Jul18 800 18Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R566 400 Asoj - Kosamba 18Jul18 800 18Jul18 1800 Daily PMM work GETCO GETCO

567 220 209 Bay 220KV Satna-Satna Line3 MainBay at Satna 18Jul18 900 18Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

568 400 400kV RAJGARH-KASOR2 18Jul18 900 18Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

569 220 220KV Malanpur-Auraiya 18Jul18 900 18Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

570 765 Switchable LR_765kV_Solapur1_Aurangabad 18Jul18 900 18Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

571 765 400kV NTPC-1 amp FUTURE Tie bay (420)atSolapur 18Jul18 900 18Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

572 400 220KV Raipur-Doma-I Line 18Jul18 930 18Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R

573 400 Bina-Bina ckt-2 at Bina 18Jul18 930 18Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

574 220 202 bay at Bhachau ICT 1 will be in TBC 18Jul18 1000 18Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

575 400 400KV Shujalpur-RAPP Ckt-II 18Jul18 1000 18Jul18 1800 Daily Line auto recloser checking work at Shujalpur RELIANCE WR-II R

576 220 210 Bay 220KV side Main Bay of 400KVICT3 at Satna 18Jul18 1100 18Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

577 220 203 bay at Bhachau ICT 2 will be in TBC 18Jul18 1200 18Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

578 220 205 bay at Bhachau Morbi Line will be inTBC 18Jul18 1400 18Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R

579 220 211 Bay 220KV side Tie Bay of 400KVICT3 at Satna 18Jul18 1400 18Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

580 400 400KV Vapi-Boisar at Boisar 18Jul18 1400 18Jul18 1700 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

581 400 400kV RAJGARH-KASOR2 18Jul18 1500 18Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R

582 220 206 bay at Bhachau Lalpar Line will be inTBC 18Jul18 1600 18Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

583 220 212 Bay 220KV Satna-Satna Line4 MainBay at Satna 18Jul18 1600 18Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

584 400 KVi) 404 -Main Bay of 400 KV Switching ckt-2and ii) 406 -Main Bay of 400KV Nanded ckt-1 400KV Chandrapur-II ss 18Jul18

0700

18Jul18

1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

585 400 400kV BUS 1 SECTIONALISER at Kotra 19Jul18 900 19Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

586 765 765kV WARDHA - NIZAMABAD I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

587 400 Tie Bay of ICT 2 (408) at Dehgam 19Jul18 900 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

588 400 KV MAIN BUS - A CHAKAN WITH BUSCOUPLER 19Jul18 0800 19Jul18 1700 Daily Yearly maintenance and testing activities MSETCL MSETCL

589 220kV BOISAR (M) - BOISAR (PG) CKT - 1 19Jul18 0900 19Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

590 400 VINDH -HVDC 2 (BAY No 01 ) with MainBus-I at Vindhyachal 19Jul18

73031Jul18

1900 ContinuousANNUAL BAY MAINTENANCECT REPACEMENT WITHSTRUCTURE BUS-1 SD WILL BE TAKEN FOR 1 DAY IE ON210718

NTPC NTPC

591 220 400kV RAIPUR-SIPAT I 19Jul18 930 19Jul18 1700 Daily AMP of Line equipments WRTS-I WRTS-I R592 765 ICT3_765400kv_BILASPUR 19Jul18 800 19Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

593 765 765kV WARDHA - AURANGABAD(PG) I 19Jul18 900 19Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

594 765 765 Kv Bus-2 at Durg PS 19Jul18 900 19Jul18 1800 Daily For constrution of Adani bay Extn work at Durg WRTS-I WRTS-I C

595 220 207 bay at Bhachau Charadova 2 Line willbe in TBC 19Jul18 800 19Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

596 220 213 Bay Future Bay of Satna-ChattarpurLine at Satna 19Jul18 900 19Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

597 400 400kV RAJGARH-KASOR2 19Jul18 900 19Jul18 1500 Daily For replacement of BPL PLCC Ch-2 amp Protection Coupler at boththe ends without Line Outage

ADANI WR-II R

598 220 220KV Mahegaon-Auraiya 19Jul18 900 19Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R

599 400 400KV ICT-4 Tie Bay (428) at Champa PS 19Jul18 900 19Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

600 220 220kV Solapur (MSETCL) Bay 211 atSolapur 19Jul18 900 19Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

601 765 714NHPTL 7 Gwalior2 Tie bay at Bina 19Jul18 930 19Jul18 1800 Daily For AMP work POWERGRID WR-II R

602 220 208 bay at Bhachau Charadova 1 Line willbe in TBC 19Jul18 1000 19Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

603 220 213 Bay 220KV Satna-Chattarpur Line TieBay at Satna 19Jul18 1100 19Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

604 220 209 bay(TBC bay) at Bhachau 19Jul18 1200 19Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

605 220 213 Bay 220KV Satna-Chattarpur LineMain Bay at Satna 19Jul18 1400 19Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

606 400 400KV Vapi-Boisar at Boisar 19Jul18 1400 19Jul18 1700 Daily For tripping and AR Trials of Main-I relay (Line will be in servicethrough M-2)

POWERGRID WR-II R

607 400 400kV RAJGARH-KASOR2 19Jul18 1500 19Jul18 1700 Daily For end to end to code checking with Line Outage ADANI WR-II R608 400 KV JEJURI- KOYNA STAGE-IV 19Jul18 0900 19Jul18 1700 Daily Annual maintenance work amp testing work MSETCL MSETCL Load will be fed from 400KV Lonikand Line609 400 400KV Raipur-Main Bay at Bhilai SS 19Jul18 930 20Jul18 1730 ContinuousAMP and MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

610 400 KV DGEN ICT 3 energisation testing 19Jul18 1100 20Jul18 1800 continuousICT routine energisation testing during rsd and shutdown forenergy conservation

TPL - DGEN TPL - DGEN R

611 400 400KV Main Bus I at 400KV Ss Indore 19Jul18 900 21Jul18 1800 Continue for 400 KV ISP-I PG Isolator of main bus-I Replacement MPPTCL MPPTCL R

612 400 KV RPL(AMT) NANDGAON PETH - AKOLA I 19Jul18 1200 21Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL 400 kV Koradi- Bhusawal 400 kV Akola-Bhusawal amp 400 kV Koradi-Nandgaonpeth are in service

613 400 400kV DC Khandwa-Indore 1 amp 2 19Jul18 900 24Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

614 400 400KV Bus2 at Satna SS 20Jul18 900 20Jul18 1800 Daily AMP Work POWERGRID WR-II R

615 400 Tie Bay of SOJA amp Rpura 2 (414) atDehgam 20Jul18 900 20Jul18 1800 Daily For AMP work POWERGRID WR-II R

616 400 Bus Reactor 2 Main Bay (426) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

617 400 Bus Reactor 2 Tie Bay (427) at Itarsi 20Jul18 900 20Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

618 400 KV KORADI 2-WARDHA PGCIL 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

619 765 765kv BILASPUR1 amp ICT1_TIE_BAY_711 atSeoni 20Jul18 900 21Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

620 765 765kV KOTRA PS-DURG PS I 20Jul18 900 20Jul18 1400 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

621 765 Switchable LR_765kV_Solapur2_Aurangabad 20Jul18 900 20Jul18 1800 Daily for AMP works of LR CB line remains in charged condition with

out LRWRTS-I WRTS-I R

622 400 KV PARLI(MS) - PARLI (PG) CKT -2 20Jul18 0900 20Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --623 400 KV SOLAPUR PG - ALKUD 20Jul18 0930 20Jul18 1730 Daily Routine Maintenance Work MSETCL MSETCL -

624 765 765 kV V-chal PS-Satna 2 Line Reactor Bay(Switchable) at V-Chal PS 20Jul18 700 20Jul18 1800 Daily Reactor Bay AMP work POWERGRID WR-II R

625 400 Mansar - Choraniya Line 20Jul18 800 20Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat626 400 Kansari - Bhinmal 20Jul18 800 20Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

627 765 ICT1_765400kv_BILASPUR 20Jul18 800 20Jul18 1800 Daily Erection of BPI amp For tertiary loading of ICT WRTS-I WRTS-I C

628 400 400Kv Boisar-Padghe at Boisar 20Jul18 900 20Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

629 765 765kV KOTRA PS-DURG PS II 20Jul18 1400 20Jul18 2200 Daily For Guy wire arrangement at kotradurg end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

630 220 220KV Malanpur - Adani 20Jul18 900 20Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R631 400 400kV Parli-1 main bay at Bvt 20Jul18 900 20Jul18 1800 daily For AMP works WRTS-I WRTS-I R632 400 400kV Bus Reactor at CGPL 20Jul18 900 20Jul18 2000 Daily Reactor PM and testing CGPL CGPL633 765 716Jabalpur-2 Main bay at Bina 20Jul18 930 20Jul18 1800 Daily For AMP work POWERGRID WR-II R634 220 220KV Khandwa (PGCIL)-Nepanagar 20Jul18 1000 20Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

635 400 400kV MAPUSA CKT-I MAIN BAY (406) atKolhapur 20Jul18 1000 20Jul18 1800 DAILY BAY AMP WORKS WRTS-I WRTS-I R

636 765 701switchable LR Bay (765kV Jaipur2Line Reactor) at Gwalior 20Jul18 1000 20Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

637 400 KV MAIN BAY (413) OF KORADI 2 LINE WARDHA (PG) 20Jul18 0900 20Jul18 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

638 765 Bay 712 ( Main Bay of 765 kV BR 2 ) atIndore ss 20Jul18 1000 21Jul18 1800 DAILY amp testing POWERGRID WR-II R

639 400 Jabalpur2 Main Bay at Itarsi 20Jul18 900 27Jul18 1800 Cont Retrofitting of existing BHEL CB with CGL CB POWERGRID WR-II R640 400 400KV Bus1 at Satna SS 21Jul18 900 21Jul18 1800 Daily AMP Work POWERGRID WR-II R641 765 765 Bus-2 at Aurangabad 21Jul18 800 21Jul18 1800 Daily for AMP works WRTS-I WRTS-I R642 400 400 KV TIE BAY_ICT_4_KOTRA PS 21Jul18 900 21Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

643 220 201 Bay 220KV Side Main Bay of 400KVICT2 at Satna 21Jul18 900 16Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

644 220 202 Bay 220KV Side Tie Bay of 400KVICT2 at Satna 21Jul18 1100 21Jul18 1300 Daily FOR NTAMC Work POWERGRID WR-II R

645 220 203 Bay 220KV Satna-Satna Line1 MainBay at Satna 21Jul18 1400 21Jul18 1600 Daily FOR NTAMC Work POWERGRID WR-II R

646 220 204 Bay 220KV Side Main Bay of 400KVICT1 at Satna 21Jul18 1600 21Jul18 1800 Daily FOR NTAMC Work POWERGRID WR-II R

647 400 KV PARLI - LONIKAND 2 CKT 2 21Jul18 0900 21Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

648 400 KV BUS COUPLER BABHALESHWAR 21Jul18 0900 21Jul18 1700 Daily Quarterly Maintenance work amp Servicing and allignment of PGisolators work

MSETCL MSETCL Bus will be seperated

649 400 Bhachau-Varsana 1 21Jul18 900 21Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

650 765 765kV Raichur-1 Main bay (716) at Solapur 21Jul18 900 21Jul18 1800 DAILY CB timing mismatch rectification works WRTS-I WRTS-I R

651 400 KV AKOLA - WARDHA(PG) CKT - 2 21Jul18 0900 21Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

652 765 Gwalior-Phagi 221Jul18

80022Jul18

1900 DailyAttending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc

POWERGRID WR-II R

653 220 220kV Damoh (PGCIL)-Damoh-II 21Jul18 900 21Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R654 400 400kV Bus Reactor at CGPL 21Jul18 900 21Jul18 2000 Daily Reactor PM and testing CGPL CGPL

655 400 400Kv Boisar-Padghe at Boisar 21Jul18 1400 21Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

656 220kV NASHIK - NAVSARI CKT - 2 21Jul18 0800 21Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL657 400 400KV Main Bus I at 400KV Ss ISP 22Jul18 800 22Jul18 1800 Daily For Annual maintenance work NHDC NHDC R658 220 220KV Bus1 at Satna SS 22Jul18 900 22Jul18 1800 Daily AMP Work POWERGRID WR-II R

659 400 KV KALWA - TALEGAON (PGCIL) BY Pune zone 22Jul18 0800 22Jul18 1800 Daily Line Maintenance MSETCL MSETCL Outage proposed by 400kV Lonikand (Line maint)

660 400 400 KV Bus -1 at Wardha 22Jul18 900 22Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

661 765 765kV BILASPUR1_MAIN_BAY_710 ay Seoni 22Jul18 900 23Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

662 765 765kV TAMNAR PS-KOTRA PS II 22Jul18 900 22Jul18 1400 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

663 765 765 kV V-Chal PS-Sasan 1 Line 22Jul18 900 22Jul18 1800 Daily For changing jumper from quard to twin at V-Chal PS POWERGRID WR-II R

664 765 765kV TAMNAR PS-KOTRA PS I 22Jul18 1400 22Jul18 2200 Daily For Guy wire arrangement at tamnar kotra end to avoid swingof jumper during wind storm

WRTS-I WRTS-I C

665 400 KV Bus-I and Bus-II Bus bar protection scheme KORADI 2 22Jul18 1000 22Jul18 1700 Daily On line testing of 400KV BusBar Protection Scheme MSETCL MSETCL 400KV Bus-1 amp Bus-II will remain in service bus bar protection will be out

666 400 Mansar - Bhachau Line 22Jul18 800 22Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

667 400 Bhachau-Varsana 2 22Jul18 900 22Jul18 1800 Daily For Relay testingCB scheme checkingisolator mechanicalinterlock checkingAuto reclose scheme checking

POWERGRID WR-II R

668 765 SWITCHABLELR_765kV_PUNE(GIS)_SOLAPUR 22Jul18 900 22Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

669 765 Bina-Indore line 22Jul18 1000 22Jul18 1800 Daily AMP OF LINE REACTOR amp TERMINAL EQUIPMENTS POWERGRID WR-II R670 765 Sasan-Satna Ckt-I 23Jul18 900 23Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C671 220 220KV Bus2 at Satna SS 23Jul18 900 23Jul18 1800 Daily AMP Work POWERGRID WR-II R

672 400 40022033KV 315MVA ICT -2 outage atBhachau 23Jul18

80023Jul18

1800 DailyFor RTV coating of Tertiary elementsRelay testing and checking ofCB scheme amp Isolator mechanical interlock and installation of GEback up impedance relay

POWERGRID WR-II R

673 400 Aurangabad-Aurangabad-1 along with MainBus-1 at Msetcl Waluj SS 23Jul18 800 23Jul18 1800 Daily for repairing of damaged strands of Bus conductors amp CT drop

jumpers replacementWRTS-I WRTS-I R

674 400 420 NTPC- Vchal 1 amp Future Tie Bay Bayat V-Chal PS 23Jul18 700 23Jul18 1500 Daily For AMP work For NTAMC work POWERGRID WR-II R

675 400 BUS - A Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO MS Siemens Gujarat676 400 BUS Coupler Mansar 23Jul18 800 23Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO MS Siemens Gujarat

677 400 40kv Tarapur-Boisar-I at Boisar 23Jul18 900 23Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

678 765 765kV CHAMPA- KOTRA PS 23Jul18 900 23Jul18 1400 Daily For Guy wire arrangement at champakotra end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

679 220 220KV Malanpur - Adani 23Jul18 900 23Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R

680 765 765 kV INDORE VADODARA LINEREACTOR( Switchable) at Indore ss 23Jul18

90023Jul18

1800 Daily INTEGRATION OF vadodara line reactors with SPAREREACTOR DURING REACTOR SHUTDOWN LINE will REMAININ SERVICE WITHOUT LR

POWERGRID WR-II R

681 400 Bina-JP Line at Bina 23Jul18 930 23Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

JP WR-II R

682 765 765kV Bus reactor at Gwalior 23Jul18 1000 23Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

683 400 KV CHANDRAPUR-PARLI CKT-3 23Jul18 0900 23Jul18 1700 Daily Outage For hardwareEarth wire clamp nb tightening Work Loc No 890891 and Distance relay testing work

MSETCL MSETCL --

684 400 400KV Main Bus II at 400KV Ss Indore 23Jul18 900 25Jul18 1800 Continue For 400KV Main bus -II PG Isolator of ICT I replacement work MPPTCL MPPTCL R

685 220 KV DEOLI(PGCIL)-BADNERA 23Jul18 0800 28Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

686 400 400 KV Jhabua- jabalpur Line 2 main409 amp Tie Bay 408 23Jul18 900 29Jul18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

687 400 400 KV Jhabua GT main 401 amp Tie Bay402 23Jul18 900 29Jul18 1800 Isolator Alligment amp breaker inspection work Jhabua Power Jhabua Power annual shut dowmn

688 KURUKSHETRA-CHAMPA POLE-1800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

689 KUREKSHETRA -CHAMPA POLE -II800 23Jul18 0900 24Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Kurukshetra end shutdown of bothPoles are required

NRPC POWERGRID

690 765 Sasan-Satna Ckt-II 24Jul18 900 24Jul18 1800 Daily PMU integration work at Sasan under URTDSM project POWERGRID WR-II C

691 400 40022033KV 315MVA ICT -1 outage atBhachau 24Jul18 800 24Jul18 1800 Daily Replacement of HV amp IV OC and EF Relay and installation of

GE back up impedance relayPOWERGRID WR-II R

692 400 400kV BUS 2 SECTIONALISER at Kotra 24Jul18 900 24Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

693 765 765kV WARDHA1_MAIN_BAY_721 at Seoni 24Jul18 900 25Jul18 1800 ContinuousFOR AMP WORK WRTS-I WRTS-I R

694 765 765kV Seoni-1 main bay 704 at Bilaspur PS 24Jul18 800 24Jul18 1800 Daily AMP works (CT tan delta CB Timings and CRM measDew point) WRTS-I WRTS-I R

695 400 400KV ICT-5 Tie Bay (429) at Champa PS 24Jul18 900 24Jul18 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R

696 400 BUS-B Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly testing And Bus Maintnenance work GETCO GETCO697 400 BUS Coupler Mansar 24Jul18 800 24Jul18 1800 Daily Half Yearly Testing And Bay Maintenance work GETCO GETCO698 400 400kV Dhariwal Main Bay (410) at Parli 24Jul18 800 24Jul18 1700 Daily For AMP works at Parli WRTS-I WRTS-I R699 400 Kansari-Kankroli 24Jul18 800 24Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

700 400 400kV Aurangabad (PG)-Aurangabad(MSETCL) II 24Jul18 800 24Jul18 1800 Daily Line AMP works amp CT drop jumper replacement at Msetcl waluj

SsWRTS-I WRTS-I R

701 220 220KV Malanpur - Adani 24Jul18 900 24Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R702 220 220kV Damoh (PGCIL)-Damoh-III 24Jul18 900 24Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R703 400 ICT1_400220kv_WARDHA 24Jul18 900 24Jul18 1800 Daily AMP work at Wardha end WRTS-I WRTS-I R704 765 Bus reactor-2 Main bay at Bina 24Jul18 930 24Jul18 1800 Daily For AMP work and Bus reactor-2 wiil be also out of service POWERGRID WR-II R

705 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

706 400 Itarsi-Jabalpur1 Line 24Jul18 1700 24Jul18 1715 Daily Line to be HT for taking Line Reactor into service afteroverhauling works at Itarsi end

POWERGRID WR-II R

707 400 KV CHANDRAPUR GCR - CHANDRAPUR HVDC- II 24Jul18

080024Jul18

1800 DailyPMU commissioning work under URTDSM project work (makingprovision for panel cable entry work and CT PT and DI statuswiring work and testing work)

MSETCL MSETCL 400 KV GCR- HVDC ckt No - I will be in service

708 400 400KV Bhatapara Main bay at Bhilai SS 24Jul18 930 25Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

709 400 400 KV Shujalpur-Nagda Ckt- I 24Jul18 1000 25Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

710 220 220kV Korba-Budhipadar circuit 3 24Jul18 700 26Jul18 1800 continuousOverhead stringing works of UC 765kV DC Rapur-SundergarhLine

PGCIL OGPTL(sterlite) C

711 400 Rewa -Jabalpur 2 Tie bay 408 (8CTB) atJabalpur 24Jul18 900 26Jul18 2000 Cont Replacement of 04 No WSI CT with CGL CT POWERGRID WR-II R

712 765 SATNA-ORAI 25Jul18 900 25Jul18 1800 Daily Commissioning of CSD at 765KV Orai GIS SS POWERGRID NR-III C713 400 407 Vadavi-1 Main bay at Bhachau 25Jul18 800 25Jul18 1000 Daily NTAMC Signal Testing POWERGRID WR-II R

714 400 408 Vadavi-1 Tie bay at Bhachau 25Jul18 1000 25Jul18 1200 Daily NTAMC Signal Testing POWERGRID WR-II R

715 400 409 Main bay at BhachauICT-1 will becharged through Tie bay 25Jul18 1200 25Jul18 1400 Daily NTAMC Signal Testing POWERGRID WR-II R

716 400 410 vadavi-2 Main bay at Bhachau 25Jul18 1400 25Jul18 1600 Daily NTAMC Signal Testing POWERGRID WR-II R717 400 411 vadavi-2 Tie bay at Bhachau 25Jul18 1600 25Jul18 1800 Daily NTAMC Signal Testing POWERGRID WR-II R

718 400 400 KV MAIN BAY_KOTRA-LARA_2_KOTRAPS 25Jul18 900 25Jul18 1800 Daily AMP 2018 - 2019 WRTS-I WRTS-I R

719 400 Itarsi-Khandwa 1 at Itarsi25Jul18

90025Jul18

1800 DailyOnline retrofitting of exisitng BPL PLCC amp Protection coupler withPuncom make Analog PLCC amp Protection coupler at both ends(CH-1 PLCC at both ends)

POWERGRID WR-II R

720 400 400kV KHANDWA-RAJGARH-I 25Jul18 900 25Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

721 400 400kV KHANDWA-RAJGARH-I 25Jul18 1500 25Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

722 765 765kV Wardha-3 Main Bay 718 atAurangabad 25Jul18 900 25Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

723 220 Chardva- Bhimasar line No 1 25Jul18 800 25Jul18 1800 Daily Routine bay mainteance work GETCO GETCO724 400 Kansari - Veloda 25Jul18 800 25Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

725 400 765400kV ICT-1 Main bay 401(400kV side)at Bilaspur 25Jul18 800 25Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

726 400 Itarsi-Indore1 Line25Jul18

90025Jul18

915 DailyLine to be HT for taking Indore-1 line reactor out of service atItarsi end for overhauling works of reactor Line will be chargedwithout line reactor

POWERGRID WR-II R

727 400 40kv Tarapur-Boisar-II at Boisar 25Jul18 900 25Jul18 1300 Daily code for Online Main-I relay replacement(Line will be in servicethrough M-2)

POWERGRID WR-II R

728 220 220KV Seoni PGCIL-Chhindwara-I 25Jul18 900 25Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

729 400 400kV PARLI-1 Main bay (413) at Solapur 25Jul18 900 25Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

730 765 765kV WARDHA - NIZAMABAD II 25Jul18 900 25Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

731 400 400kV GMR-1 amp Future Tie bay (420) atDurg PS 25Jul18 900 25Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

732 400 Bina-Bina ckt-1 at Bina 25Jul18 930 25Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

733 220 220kV Bus-1 at Gwalior 25Jul18 1000 25Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

734 400 KV TIE BAY (405) OF SWICHING SS CKT - 2 ampNANDED - 1 CHANDRAPUR 2 25Jul18 0700 25Jul18 1500 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL --

735 400 KV MAIN BUS - 1 LAMBOTI ( 401-52 CB amp404-52 CB Will be made off ) 25Jul18 0800 25Jul18 1300 Daily Bus Bar Testing MSETCL MSETCL 401-52 CB amp 404-52 CB Will be made off

736 400 KV AKOLA - KHADKA (BHUSAWAL) 25Jul18 0900 25Jul18 1800 Daily Routine Maintenance amp testing work MSETCL MSETCL --

737 400 KV MAIN BUS - 2 LAMBOTI ( 403-52 CB amp406-52 CB Will be made off ) 25Jul18 1300 25Jul18 1800 Daily Bus Bar Testing MSETCL MSETCL 403-52 CB amp 406-52 CB Will be made off

738 400 Indore1 line reactor at Itarsi 25Jul18 900 05Aug18 1800 Cont For overhauling of line reactor at Itarsi SS POWERGRID WR-II R

739 KURUKSHETRA-CHAMPA POLE-1800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

740 KUREKSHETRA -CHAMPA POLE -II800 25Jul18 0900 26Jul18 1730 DAILY For OCT amp OLT of Pole-3 at Champa end shutdown of both Polesare required

NRPC POWERGRID

741 PHAGI (765KV)-GWALIOR-WR (765KV)2

25Jul18

0800

26Jul18

1800 DAILY

Replacement of defetive Y Phase CVT of line as the oil leakage hasbeen observed from bottom capacitorThere will no inerruptionduring shut-down period as the 765KV Phagi-Gwalior-1 line willbe remained energized to exportimport the powerThe defectiveCVT is under guarantee period and Ms CGL has supplied theCVT for replacement The new CVT has already been received atsite for replacement The shutdown of the line has already beenapproved by OCC on the request of Ms PGCIL Gwalior for dated25062018 amp 26062018sd avail date from 250618 to260618

NRPC POWERGRID

742 400 400KV Main Bus II at 400KV Ss ISP 26Jul18 800 26Jul18 1800 Daily For Annual maintenance work NHDC NHDC R743 400 J P NIGRIE-SATNA-1 26Jul18 800 26Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE744 400 Satna-Bina ckt 3 at Bina 26Jul18 930 26Jul18 1800 Daily For rectification of damaged conductor in line POWERGRID WR-II R

745 765 Bay 709 ( Main Bay of ICT 1 ) at Indore ss 26Jul18 1000 27Jul18 1800 DAILY amp testing POWERGRID WR-II R

746 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -1 26Jul18 0800 26Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

747 220kV BOISAR (M) - BOISAR (PG) CKT - 2 26Jul18 0900 26Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL748 400 400KV Seoni-Sarni 26Jul18 900 26Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

749 400 400kV KHANDWA-RAJGARH-II 26Jul18 900 26Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

750 400 400kV KHANDWA-RAJGARH-II 26Jul18 1500 26Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

751 400 Main Busbar-1 at Vadodara 26Jul18 1000 28Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

752 400 KV PARLI-SOLAPUR (LAMBOTI) 26Jul18 0900 26Jul18 1700 Daily Testing and maintenance work of line MSETCL MSETCL --

753 765 BUS REACTOR_765kV_330MVAR_WARDHA26Jul18

90028Jul18

1800 ContinousFor connection of newly 765 KV Auxilliary bus and 145v kvneutral bus of spare bus reactor to existing 765 kv auxilliary end145 kv neutral bus

WRTS-I WRTS-I C

754 765 765kV Wardha-3 Tie Bay 717 atAurangabad 26Jul18 900 26Jul18 1800 Daily for AMP works WRTS-I WRTS-I R

755 220 Chardva- Bhimasar line No 2 26Jul18 800 26Jul18 1800 Daily Routine bay mainteance work GETCO GETCO756 400 Kansari-Vadavi 26Jul18 800 26Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

757 400 400kV Lanco-2 Main bay 422 at Bilaspur 26Jul18 800 26Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

758 765 SWITCHABLE LR_765kV_RAICHUR1_SOLAPUR 26Jul18 900 26Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

759 400 400 KV Akola -aurangabad-2 Line reactor atAkola 26Jul18

90026Jul18

1800 Daily For AMP work at Akola endLine outage required for 1 hr LR take out amp take into service

WRTS-I WRTS-I R

760 765 Bina-Gwalior 1 26Jul18 930 26Jul18 1800 Daily For RTV coating on Trench make HV bushingsLine alongwith Reactor will be out of service at Bina

POWERGRID WR-II R

761 765 BUS REACTOR_765kV_240MVAR_KOTRAPS 26Jul18

100026Jul18

1300 Daily ATTENDING SIR POINTS WRTS-I WRTS-I R

762 220 220kv Annupur-Kotmikala-I 26Jul18 1000 26Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R763 400 400 KV Shujalpur-Nagda Ckt- II 26Jul18 1000 26Jul18 1800 Cont CSD Relay Retrofitting Work at Nagda POWERGRID WR-II C

764 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Line will be in servicethrough M-2)

POWERGRID WR-II R

765 400 400KV Korba-II Main bay at Bhilai SS 26Jul18 930 27Jul18 1730 ContinuousFor MOM Box Retrofiltting works at Bhilai SS WRTS-I WRTS-I R

766 400 KV KORADI-KHADKA 26Jul18 1200 28Jul18 1800 Daily PID testing of insulator strings by PID Uint of OampM Circle AkolaAR shall be kept in non auto mode

MSETCL MSETCL Outage proposed by Akola lines division 400 kV Akola- Bhusawal 400 kV Akola-Nandgaonpeth amp 400 kV Koradi-Nandgaonpeth are in service

767 400 400kV DC Khandwa-Rajgarh 1 amp 2 26Jul18 900 31Jul18 1800 Cont Line Diversion for laying of Railway track for NTPC Khargon POWERGRID WR-II C

768 MORAK (220KV)-BAROD (220KV) 26Jul18 0930 26Jul18 1630 DAILY QUARTERLY MAINTENANCE WORK NRPC Rajasthan769 400 J P NIGRIE-SATNA-2 27Jul18 800 27Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

770 400 Aurangabad-Aurangabad-1 along with MainBus-2 at Msetcl Waluj SS 27Jul18 800 27Jul18 1800 Daily line AMP works and for repairing of damaged strands of Bus

conductors amp CT drop jumpers replacementWRTS-I WRTS-I R

771 765 765 Bus -I at Dharamjaygarh 27Jul18 900 28Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

772 765 765kV Satna-Gwalior 2 Line

27Jul18

1000

27Jul18

1800 Daily

Attending SD Nature defects such as re-fixing of CCGradingring tightning of jumper bolts fixing of quarter pin fixing of CUbond etc Also Interconnection of Line Terminal equipment withIPS Tube and AMP WORKS of Line Reactor at Gwalior

POWERGRID WR-II C

773 400 400KV Main Bus II at 400KV Ss ISP 27Jul18 800 27Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R774 765 ICT2_765400kv_WARDHA 27Jul18 900 27Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C

775 220 KV TALEGAON (AMBI) - TALEGAON (PG) CKT -2 27Jul18 0800 27Jul18 1700 Daily Quarterly Maintenance work MSETCL MSETCL

776 400 KV PARLI - KUMBHARGAON(NANDED) CKT -2 27Jul18 0900 27Jul18 1700 Daily Distance relay testing work MSETCL MSETCL --

777 400 Kansari-Adani Line No4[Mundra ] 27Jul18 800 27Jul18 1800 Daily CT Tan-dBkrCRM-Timing amp Bay Maint GETCO GETCO

778 400 400kV Lanco-2 amp Future Tie bay 423 atBilaspur 27Jul18 800 27Jul18 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R

779 220 220KV Malanpur - Adani 27Jul18 900 27Jul18 1700 Daily 220 KV Isolator replacement work under PSDF Scheme MPPTCL MPPTCL R780 220 220KV Bina(PGCIL)-Shivpuri 27Jul18 900 27Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R781 220 220KV Seoni PGCIL-Chhindwara-II 27Jul18 900 27Jul18 1800 Daily For Line maintenance work MPPTCL MPPTCL R

782 400 400kV SATPURA amp BHILAI_TIE_BAY_414 atSeoni 27Jul18 900 27Jul18 1800 Daily FOR AMP WORK WRTS-I WRTS-I R

783 400 ICT3_400220kv_SOLAPUR 27Jul18 900 27Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

784 400 Bina-Shujalpur ckt-1 at Bina 27Jul18 930 27Jul18 1800 Daily For correction in wiring for line protection scheme and AMP of lineamp Reactor terminal equipment

POWERGRID WR-II R

785 400 DEHGAM-NAGDA 1 LINE27Jul18

100027Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

786 400 Nagda-Dehgam Ckt-I 50MVAR Non-Switchable Line Reator at Nagda 27Jul18 1000 27Jul18 1800 Daily AMP work POWERGRID WR-II R

787 220 220kV Bus-1 at Gwalior 27Jul18 1000 27Jul18 1800 Daily AMP WORKS POWERGRID WR-II R788 400 DEHGAM-NAGDA 1 LINE 27Jul18 1800 27Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

789 400 KV MAIN BUS - 2 WARORA27Jul18

080027Jul18

1700 Daily Routine maintainance and diagonastic testing such as CTtandeltaCRMIR valuesisolater maintainance work and DCRM

MSETCL MSETCL 400KV MAIN BUS-1 WILL BE IN SERVICE

790 220kV BOISAR (M) - BOISAR (PG) CKT - 3 27Jul18 0900 27Jul18 1800 Daily Quarterly Maintenance work MSETCL MSETCL

791 765 Satna-Bina 2 Line 28Jul18 930 28Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

792 400 J P NIGRIE-SATNA-1 28Jul18 800 28Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE

793 `` Khandwa 2 Main Bay (423) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

794 400 Khandwa 1 Main Bay (422) at Itarsi 28Jul18 900 28Jul18 1800 Daily For retrofitting of existing ER auxilary relays with Alstom auxiliaryrelays in relay panel at Itarsi SS

POWERGRID WR-II R

795 765 716 Bay 765KV Vchal-Satna Line 2 MainBay at Satna 28Jul18 900 28Jul18 1800 Daily AMP Work POWERGRID WR-II R

796 400 400KV Main Bus I at 400KV Ss ISP 28Jul18 800 28Jul18 1800 Daily For Extension of Bus up to Shunt Reactor Bay NHDC NHDC R

797 400 KV PARLI - LONIKAND 2 CKT 2 28Jul18 1000 28Jul18 1800 Daily Hardware Tightening amp Fitting Work At Loc No-9495137149157

MSETCL MSETCL --

798 765 ICT3_765400kv_WARDHA 28Jul18 900 28Jul18 1800 Daily For Retuning of ABB make CSD WRTS-I WRTS-I C799 220 220kV Gwalior-Sithouli Line2 28Jul18 1000 28Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R

800 220 220 KV Raigarh-Budhipadar Line at 220 KVSs Raigarh 28Jul18 800 28Jul18 1700 Daily Annual Maintenance Programme CSPTCL

801 400 400kV BINA-SHUJALPUR1 28Jul18 900 28Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

802 400 400kV Solapur NTPC-2 Main bay 424 atSolapur 28Jul18 900 28Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

803 400 DEHGAM-NAGDA 2 LINE28Jul18

100028Jul18

1030 DailyHT TO ISOLATE LR AT NAGDA END FOR AMP work AFTERISOLATING LR LINE WILL BE CHARGED WITHOUT LR ATNAGDA END

POWERGRID WR-II R

804 400 Nagda- Dehgam Ckt-II 50MVAR Non-Switchable Line Reator at Nagda 28Jul18 1000 28Jul18 1800 Daily AMP work POWERGRID WR-II R

805 400 400kV BINA-SHUJALPUR1 28Jul18 1500 28Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R806 400 DEHGAM-NAGDA 2 LINE 28Jul18 1800 28Jul18 1830 Daily Line outage for taking LR into service after AMP works POWERGRID WR-II R

807 400 400 KV Rewa-Jabalpur 2 Main bay 407 atJabalpur 28Jul18 900 29Jul18 1800 Cont Replacement of 03 No WSI CT with CGL CT (Line outage required

from 280718 to 290718)POWERGRID WR-II R

808 765 Satna-Bina 1 Line 29Jul18 930 29Jul18 1800 Daily For RTV coating on Trench make HV bushings of LR Linealongwith Reactor will be out of service at Bina

POWERGRID WR-II R

809 400 J P NIGRIE-SATNA-2 29Jul18 800 29Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE810 400 400 KV Bus -2 at wardha 29Jul18 900 29Jul18 1800 Daily Aligment of newly erected bus isolator WRTS-I WRTS-I R

811 765 765 Bus -II at Dharamjaygarh 29Jul18 900 30Jul18 1800 ContinousFor Equipment erection work under 765KV Bus for Bus-Sectionalizing work by Ms Techno at Korba PS

WRTS-I WRTS-I C

812 400 400 kV INDORE-ITARSI2 Line29Jul18

100029Jul18

1800 DailyTESTING OF SWITCHABLE SCHEME PROTECTIONSWITCHABLE LR WILL BE TAKEN INTO SERVICE AT INDOREMPPTCL END

POWERGRID WR-II C

813 765 765kV WARDHA - AURANGABAD(PG) II 29Jul18 900 29Jul18 1800 Daily For Guy wire arrangement at wardha end to avoid swing ofjumper during wind storm

WRTS-I WRTS-I C

814 400 Main Busbar-2 at Vadodara 29Jul18 1000 31Jul18 1800 Daily For coupling of GIS Bus Duct of Extn Bays associated with DGENTPS(Extn Bays)

POWERGRID WR-II C

815 400 BUS 2 at Shujalpur 29Jul18 1000 29Jul18 1800 Daily BUS BAR Testing work POWERGRID WR-II R816 400 KV PADGHE - KALWA 2 29Jul18 0900 29Jul18 1800 Daily Maintenance amp testing work MSETCL MSETCL --817 400 J P NIGRIE-SATNA-1 30Jul18 800 30Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE818 765 765400 KV ICT 3 at V-CHAL PS 30Jul18 900 30Jul18 1800 Daily CSD commissioning (Make-CGL) in main bay of ICT-3 POWERGRID WR-II C

819 765 714 Bay 765KV Vchal-Satna Line 1 TieBay at Satna 30Jul18 900 30Jul18 1800 Daily AMP Work POWERGRID WR-II R

820 400 400kV BINA-SHUJALPUR2 30Jul18 900 30Jul18 1500 Daily For replacement of BPL PLCC Ch-1 amp Protection Coupler at boththe ends without Line Outage

POWERGRID WR-II R

821 765 400kV Solapur NTPC-1 Main bay 421 atSolapur 30Jul18 900 30Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

822 765 765 Seoni-Wardha-2 Line reactor at Wardha 30Jul18 900 30Jul18 1800 Daily For Replacement of Sukrut make PRD Line outage required for 1hr LR take out amp take into service

WRTS-I WRTS-I R

823 400 400kV Raipur -1 amp Future Tie bay (417) atDurg PS 30Jul18 900 30Jul18 1800 Daily For AMP works WRTS-I WRTS-I R

824 220 220kV Transfer Bus at Raipur SS 30Jul18 930 30Jul18 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R825 220 220kV Annupur-Kotmikala-II 30Jul18 1000 30Jul18 1700 Daily For Line maintenance work MPPTCL MPPTCL R826 220 220kV Gwalior-Sithouli Line1 30Jul18 1000 30Jul18 1800 Daily AMP of Line terminal Equipments POWERGRID WR-II R827 400 400kV BINA-SHUJALPUR2 30Jul18 1500 30Jul18 1700 Daily For end to end to code checking with Line Outage POWERGRID WR-II R

828 400 KV MAIN BUS - 2 KHADKA 30Jul18 0800 30Jul18 1700 Daily BUS 2 CVT R Ph tan delta monitoring and replacement ifrequired

MSETCL MSETCL --

829 220 KV DEOLI(PGCIL)-BADNERA 30Jul18 0800 31Jul18 1700 Daily For PID work Shifting of auto reclose switch to non auto mode MSETCL MSETCL -

830 400 400 KV Jhabua ST main 401 amp Tie Bay402 30Jul18 900 01Aug18 1800 Bus Reactor tightness amp PM work of bay Jhabua Power Jhabua Power annual shut dowmn

831 400 400 KV Jhabua - Jabalpur Line 1 main403 amp Tie Bay 402 30Jul18 900 05Aug18 1800 daily line maintenance and bay equipment maintenance at JPL and

NPS endJhabua Power Jhabua Power annual shut dowmn

832 765kV Bus-II at Raichur SS 30Jul18 800 30Jul18 2000 Daily Construction works Bus Stability testing works under bay extnworks for Bus-Reactor

SRPC POWERGRIDSR-I

833 400 427 Bay 400KV ICT3 Main Bay at Satna 31Jul18 900 31Jul18 1100 Daily FOR NTAMC Work POWERGRID WR-II R

834 400 J P NIGRIE-SATNA-2 31Jul18 800 31Jul18 1800 Daily Attending shutdown nature of work JP NIGRIE JP NIGRIE835 765 704 Satna 1 Main Bay at V-Chal PS 31Jul18 700 31Jul18 1800 Daily For AMP work For NTAMC work POWERGRID WR-II R

836 765 718 Bay 765KV Bus Reactor2 Main Bay atSatna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

837 400 418Bay 400KV Vchal-Satna Line4 MainBay at Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

838 400 420Bay 400KV Satna-Bina Line3 Tie Bayat Satna 31Jul18 900 31Jul18 1800 Daily AMP Work POWERGRID WR-II R

839 765 765kV AURANGABAD-1_TIE_BAY_708 atSolapur 31Jul18 900 31Jul18 1800 DAILY AMP WORKS WRTS-I WRTS-I R

840 400 400 KV Jabalpur-Itarsi 2 Main bay 415 atJabalpur 31Jul18 900 31Jul18 2000 Daily Replacement of Main bay(415) R Phase TELK CT at Jabalpur SS

(Line outage required on 310718)POWERGRID WR-II R

841 765 765kV Gwalior-Orai Line Reactor(Switchable) at Gwalior 31Jul18 1000 31Jul18 1800 Daily AMP WORKS POWERGRID WR-II R

842 400 KV KORADI 2-WARDHA PGCIL 31Jul18 0800 31Jul18 1800 Daily Refixing of missing and tightening of loose jumper NB onconductor hardware at various locations

MSETCL MSETCL --

FromDate Time Date Time

AD1 400 40kv Tarapur-Boisar-I at Boisar 24Jul18 1400 24Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD2 400 40kv Tarapur-Boisar-II at Boisar 26Jul18 1400 26Jul18 1700 Daily For tripping and AR Trials of Main-I relay(Linewill be in service through M-2)

POWERGRID WR II

AD3 400 400kV SC Itarsi-Indore ckt-1 01Jul18 800 02Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD4 400 400kV DC twin Khandwa-Indore 03Jul18 800 04Jul18 1800 continuous Overhead stringing works of UC 765kV DChexa Khandwa-Indore Line

POWERGRID KTL(Sterlite)

AD5 765 765KV ICT1 at Satna 11Jul18 1600 11Jul18 1800 Daily For taking out spare unit amp taking B-Ph intoservice

POWERGRID WR-II

AD6 765 765KV ICT2 at Satna 12Jul18 900 12Jul18 1100 Daily For attending leakage in ICT2 B-Ph Spare shallbe taken into service inplace of B-Ph

POWERGRID WR-II

AD7 400 400kV Nagda Dehgam Ckt I17Jul18

90017Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD8 400 400kV Nagda Dehgam Ckt II18Jul18

90018Jul18

1800 Daily Fixing of fabricated bird Guard at Loc 630 toavoid tripping due to sitting of peacock on tower POWERGRID WR-II

AD9 400 400 KV BUS 1 at Jabalpur 400kV 09Jul18 900 10Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

AD10 400 400 KV BUS 2 at Jabalpur 400kV 11Jul18 900 12Jul18 1700 Daily Bus bar relay retrofitting POWERGRID WR II

ReasonSr No KV Line Element To Basis System Agency

Date Time Date Time

POST OCC 400 400kV SC Itarsi-Indore ckt-1 20Jun18 800 21Jun18 1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 765 765kV DC Kotra -Tamnar line20Jun18

70030Jun18

1800 DailyAR OFF To carry out Overhead Hotline stringing of UC765kV DC Rapur-Sundergarh Line

PGCIL OGPTL(sterlite)

POST OCC 220KV Kawas-Icchapore line2 21Jun18 800 21Jun18 1800 Cont Relay testing amp annual bay maintenance GETCO NTPC

POST OCC 765 Raichur-Solapur ckt 2 23Jun18 700 24Jun18 1800 Daily Spacers hot spot repair sleeves opened at many places RSTCPL RSTCPL

POST OCC 220KV Kawas-Dastan line225Jun18

80025Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 400 400kV DC TWIN Khandwa-Indore Line25Jun18

80026Jun18

1800 DailyOverhead stringing works of UC 765kV DC hexa Khandwa-Indore Line

PGCIL KTL(Sterlite)

POST OCC 220KV Kawas-Vav line227Jun18

80027Jun18

1800 Cont Relay testing amp annual bay maintenance PGCIL NTPC

POST OCC 765kV Durg-wardha-3amp417-06-18

80018-06-18

2000 Cont Diamong crossing PGCIL WR1

POST OCC 765kV Durg-Kotra-120-06-18

80022-06-18

1800 dailyWork of Durg-jharsuguda(at DURG END)_Reason updated inG-sheet-Construction related works (Fire wall)

PGCIL WR1

POST OCC 765400kV warora ICT-118-06-18

80020-06-18

2000 Cont First time commissioning of spare ICT 1 PGCIL WR1

POST OCC 765 SEONI - WARDHA 1

250618

700

250618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 3

POWERGRID WR-II

POST OCC 765 SEONI - WARDHA 2

260618

700

260618

1800 dailyFOR PEAK STRENGTHNING OF EXISTING LINE amp DIAMONDCROSSING OF EW FOR 765Kv GADARWADA-WARORA LINEPART 4

POWERGRID WR-II

POST OCC 400BAY -405( TIE BAY PITHAMPUR 2) ATINDORE PS

220618

1000

270618

1800 Cont

FOR SHIFTING ONE BAY UNIT RELAY FROM BAY-405 TO BAY-406 TO MAKE 406 AS MAIN BAY OF NEW ICT 2 amp BAY-405AS TIE BAY FOR 400KV INDORE-PITHAMPUR 2 amp NEW ICT 2 400KV

POWERGRID WR-II

POST OCC 400 BUS 2 AT INDORE PS290618

1000290618

1800 DailyFOR TESTING OF BB RELAY AFTER SHIFTING BU RELAY FROMBAY-405 TO BAY-406

POWERGRID WR-II

POST OCC 400400kV Korba(West)-Khedamara and400kV Korba(W)-Marwa 250618

600260618

1800 Daily line crossing works of EPTCL 400kV mahan-SIPAT line CSPTCL EPTCL

POST OCC 400 KAPP-3amp4 Vapi Line-125062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400 KAPP-3amp4 Vapi Line-225062018

00028062018

1800 ContinuousShield Wire down jumpering for earthing at wVapi lines towerin KAPP switchyard Circuit breaker auxiliary switch ad DSLimit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400400kV Tie bay of Vapi-II and Future line atKAPP-amp4 29062018

00030062018

1800 ContinuousCircuit Breaker (CB-11) Auxiliary Switch and its isolator (DS-28amp 32 Limit switch replacement

PGCIL NPCIL KAPP-3amp4

POST OCC 400KV 400 KV Kalwa Padgha ckt-2 22-Jun-18 800 01-Jul-18 1700 Conti1) Dismantling of conductor at Loc No1103 to 11062) Tower erection at loc No 1104 and 11053) Dismantling of Tower existing 1104

MSETCL MSETCL

POST OCC 400 Chorania - Vadavi DC 150618 700 150618 1800 Daily For 400 KV Mansar - Vadavi line crossing work ATL GETCO

POST OCC 400 Soja - Dehgam line 190618 800 190618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Dehgam line 200618 800 200618 1800 Daily PMM Work GETCO GETCO

POST OCC 220 Kawas - Ichhapore line No 1 200618 900 200618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

Sr No kV Line Element From To

Basis Reason System Agency

ANNEXURE-32

POST OCC 220 Kawas - Ichhapore line No 2 210618 900 210618 1400 DailyYard flyover gentry insulator replacement work atIchhapore end

GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 1 220618 700 220618 1900 Daily Line impedance and signature test after LILO GETCO GETCO

POST OCC 400 400 KV Kosamba - Chorania line No 2 220618 1000 220618 1700 DailyLine require to be made off for Line impedance andsignature test of Line No 1

GETCO GETCO

POST OCC 400 Soja - Wanakbori line 220618 800 220618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Soja - Wanakbori line 230618 800 230618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Wanakbori - Dehgam line 250618 800 250618 1800 Daily PMM Work GETCO GETCO

POST OCC 400 Vadavi-Veluda line 250618 800 250618 1200 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Kansari line 250618 1300 250618 1700 DailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Chorania - Amreli 260618 800 270618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Chorania - Amreli 290618 800 300618 1800 Daily Damper spacers replacement work GETCO GETCO

POST OCC 400 Vadavi-Chorania line 1 290618 800 290618 1200 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 400 Vadavi-Chorania line 2 290618 1300 290618 1700 dailyOnly line require to be shifted on TBC for online TBCchangeover operation work

GETCO GETCO

POST OCC 220220KV ICT (315 MVA) NO1AT 220 KV SSSUKHA

21-Jun-2018 900 23-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220Kv ICT (315MVA) no2 at 220KVsubstation Sukha

25-Jun-18 900 27-Jun-2018 1700 CONTINUOUSFOR REPLACEMENT WORK OF SF6 CB MPPTCL MPPTCL

POST OCC 220220KV malanpur-auraiya line at malanpurend

25-Jun-18 900 25-Jun-18 1700 daily for replacement of isolator under psdf scheme MPPTCL MPPTCL

POST OCC

765kV TIRORA-KORADI 1 23-Jun-2018 700 23-Jun-2018 1800 DAILYFor peak strengthning of existing line amp diamond crossing ofEW for 765kV Gadarwara-Warora line Part 2

Earlier written as Ckt 2(which is already under

breakdown) ADDITIONALOUTAGE

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 2 21-Jun-2018 800 21-Jun-2018 2000 Daily1) Beam Erection GB-42) LBPI Structure amp BPI Erection = 3 Nos

Bay extension work at CGPLMundra for Bhuj pulling

station(PG) DC lineADDITIONAL AGENDA

ADDITIONALOUTAGE

CONSENTED BYWRPC IN MEETING

POST OCC

CGPL 400kV main Bus 1 25-Jun-2018 800 25-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 1 26-Jun-2018 800 26-Jun-2018 2000 Daily

1) Stringing from GB-2 to GB- 3 (1)2) Bus IPS tube modification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 29-Jun-2018 800 29-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 400kV main Bus 2 30-Jun-2018 800 30-Jun-2018 2000 Daily

1) Stringing from GB-3(1) to GB- 3 2) Bus IPS tubemodification amp welding work3) HBPI shifting =1 Nos4) IPS tube Measurement

POST OCC

CGPL 408 52 breaker Can be combined with any shutdown of 25 to 26 or 29 to 30 JuneDaily1) CB Pole Erection amp Interrupter2) Isolator Erection

Anaulagnak 33

jaUna 2018 AaOr jaulaa[- 2018 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2018 AND JULY 2018

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)jaUna 2018 jaulaa[- 2018 jaUna 2018 jaulaa[- 2018

JUNE 2018 JULY 2018 JUNE 2018 JULY 2018

1 gaujarat

saIimat 16500 15500 10040 8740

AsaIimat 16525 15525 10050 8750

2 maQya p`doSa

saIimat 8100 7750 5200 5060

AsaIimat 8100 7750 5200 5060

3 CltaIsagaZ

saIimat 3604 3614 1996 2189

AsaIimat 3604 3614 1996 2189

4 maharaYT

saIimat 22800 23100 14800 14900

AsaIimat 22850 23500 14850 14950

5 gaaovaa

saIimat 600 600 385 375

AsaIimat 604 604 390 380

6 dmana dIva

saIimat 340 340 225 225

AsaIimat 343 343 225 225

7 DI ena eca

saIimat 860 860 540 535

AsaIimat 860 860 545 540

8 piScama xao~

saIimat 51000 51000 32100 32500

AsaIimat 51200 51200 32200 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah ma[- 2018

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2257 76

]k[- Ukai - 2 301 75]k[- Ukai - 3 1039 76]k[- Ukai - 4 019 75]k[- Ukai (Total) 3616 302 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 015 1]k[- ela baI saI eca Ukai LBCH - 2 001 1]k[- ela baI saI eca Ukai LBCH (Total) 015 2 0000

3 kDanaa Kadana - 1 236 54 0000kDanaa Kadana - 2 094 56 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 052 54 0019kDanaa Kadana (Total) 383 164 0019

4 pnama PANAM amp Madhuban Dam 1 amp 2 376 9 0025 6 kula jalaIya TOTAL(H) 4391 225 0373

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00662 TaoronT pavar ilaimaToD yauinaT DI 8296 117 70463 TaoronT pavar ilaimaToD yauinaT [- 8787 123 70704 TaoronT pavar ilaimaToD yauinaT ef 8876 123 73055 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0443

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113511 Qauvarna tapIya Dhuvaran - GT 2 000 0 459612 Qauvarna tapIya Dhuvaran - STG 8882 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 14440 203 1398616 ]ka[- yauinaT 4 Ukai -4 14557 204 1290717 ]ka[- yauinaT 5 Ukai -5 15196 212 1375818 ]ka[- yauinaT 6 Ukai -6 28004 506 1749619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 13967 215 1430922 gaaMQaInagar 4 Gandhinagar - 4 13962 215 1500023 gaaMQaInagar 5 Gandhinagar - 5 15118 218 1406024 vaNakbaaorI 1 Wanakbori - 1 14505 214 000025 vaaNakbaaOrI 2 Wanakbori - 2 14334 21326 vaaNakbaaOrI 3 Wanakbori - 3 15212 21627 vaaNakbaaOrI 4 Wanakbori - 4 14855 21428 vaaNakbaaOrI 5 Wanakbori - 5 13080 21429 vaaNakbaaOrI 6 Wanakbori - 6 12994 21530 vaaNakbaaOrI 7 Wanakbori - 7 14828 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 3590 229 224535 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 2459 140 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 000 0 1019938 isaka Sikka - 2 22402 465 122058

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR MAY 2018Actual vaastivak

Anaulagnak 41

39 kcC ilagnaa[-T Kutch Lignite - 1 2417 67 1076140 kcC ilagnaa[-T Kutch Lignite - 2 2000 5841 kcC ilagnaa[-T Kutch Lignite - 3 3115 7342 kcC ilagnaa[-T Kutch Lignite - 4 4146 62 801443 saUrt ilagnaa[-T Surat Lignite - 1 7501 125 763844 saUrt ilagnaa[-T Surat Lignite - 2 8859 125 908345 saUrt ilagnaa[-T Surat Lignite - 3 7803 127 841846 saUrt ilagnaa[-T Surat Lignite - 4 1380 109 174347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6963 110 1076148 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5891 11049 jaI Aa[- pI saI ela GIPCL GT - 1 457 29 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1887 3151 jaI Aa[- pI saI ela GIPCL GT - 3 1511 3052 jaI Aa[- pI saI ela GIPCL ST - 1 2196 3253 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 086456 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 1508 148 057660 jaI pI [- saI GPEC GT - 2 1134 150 014261 jaI pI [- saI GPEC GT - 3 1511 146 046662 jaI pI [- saI GPEC STG 1106 22363 jaI esa [- jaI GSEG GT - 1 068 46 025164 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 028 2166 Sugen (GT 1 + GT 2) 21685 377 1263567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 97074 1084

kula tapIya Total (T) 503911 11285 479051kula jalaIya+tapIya Total (H+T) 508302 12393 479424ivaMD [najaI- Wind Energy 139071kula jalaIya+tapIya+hvaa Total (H+T+Wind) 647373 14533ivainamaya Exchanges 452527saIimat jaa- maaMga Restricted Energy Req 1099900

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 066 81

11 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 027 129 003013 javaahr sagar Jawahar Sagar 104 33 0030

2 ponca Pench 1035 150 00603 baargaI Bargi 2641 83 00904 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 2530 208 02006 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 339 16 00108 banasaagar Bansagar-4 (Zinaha) 270 10 00309 maoDIKoDa Medikheda 000 0

10 ibarisaMGapur Birsingpur 000 0 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 013013 Omkareshwar 3272 252 034614 [Midra saagar Indira Sagar 7072 675 0526

kula jalaIya TOTAL(H) MPPGCL 16190 1331 1011

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 126802 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15812 221 04 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 4221 165 201406 satpura II Satpura-II Unit 7 4167 1657 satpura II Satpura-II Unit 8 9686 180 10200

Actual vaastivak

8 satpura II Satpura-II Unit 9 7778 1699 satpura III Satpura-III Unit 10 15321 261 28040

10 satpura III Satpura-III Unit 11 13228 194 2174011 esajaITIpIesa 1 SGTPS Unit - 1 13228 194 2174012 esajaITIpIesa 2 SGTPS Unit - 2 8620 19013 esajaITIpIesa 3 SGTPS Unit - 3 12253 178 2454014 esajaITIpIesa 4 SGTPS Unit - 4 12449 19215 esajaITIpIesa 5 SGTPS Unit - 5 9252 36516 SSTPS 42882 1061 33120

kula tapIya Total (T) 192080 3558 169050kula jalaIya+tapIya Total (H+T) 222556 5160 170061Injection from WIND 83625 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 306181 5160ivainamaya Exchanges 311449saIimat jaa- maaMga Rest En Req 617630

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 875 120 00902 Gangrel 053 10 00203 Mini Micro KWB 000 0

kula jalaIya TOTAL(H) CSEB 928 130 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 0 68302 kaorbaa (pU) Korba (E) Unit-2 2764 03 kaorbaa (pU) Korba (E) Unit-3 2764 424 kaorbaa (pU) Korba (E) Unit-4 2784 445 kaorbaa (pU) Korba (E) Unit -5 3685 120 131606 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 21460

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 17368 254 1352012 KORBA(EB) Extn - 2 (DSPM 2 16484 253 13270

kula tapIya Total (T) 195931 3045 14595013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 195931 3045kula jalaIya+tapIya Total (H+T) 196859 3175 146060ivainamaya Exchanges 31850 0saIimat jaa- maaMga Rest En Req 228709 3175

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 18612 580 52902 kaoyanaa III Koyna III 11434 3203 kaoyanaa IV Koyna IV 32423 10054 kaoyanaa DIpIeca Koyna DPH 1973 355 TaTa jalaIya TATA Hydro 16270 459 24886 vaOtrNaa Vaitarna 060 07 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 1093 33

10 itlaarI Tillari 343 6311 BaIra Tola rosa Bhira Tail Race 892 8012 GaTGar Ghatghar 839 12513 Anya CaoTo jalaIya Small Hydro (others) 815 0

kula jalaIya TOTAL(H) 89058 459 7778

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 2835 1994 naaisak 4 Nasik Unit -4 13564 2015 naaisak 5 Nasik Unit -5 10483 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 33716 4908 Tambao 6 Trombay Unit -6 000 0

Actual vaastivak

9 Tambao 8 Trombay Unit -8 17471 24410 Tambao 7A gaOsa Trombay -7A (Gas) 4584 118 296211 Tambao 7ba Trombay -7B (WHR) 3443 6712 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 25614 51015 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 7904 20017 Bausaavala 4 Bhusawal Unit -4 28878 49518 Bausaavala 4 Bhusawal Unit -5 31729 50019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 14858 25023 parlaI 7 Parli Unit -7 13030 24624 KaprKoDa 1 Khaperkheda Unit -1 11156 17525 KaprKoDa 2 Khaperkheda Unit -2 11265 19526 KaprKoDa 3 Khaperkheda Unit -3 12017 20527 KaprKoDa 4 Khaperkheda Unit -4 11823 20628 KaprKoDa 5 Khaperkheda Unit -5 29026 50530 parsa Paras-3 17716 25631 parsa Paras-4 16561 25532 ]rna Uran (Gas) 22641 45433 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 036 caMd`pur 3 Chandrapur Unit -3 000 037 caMd`pur 4 Chandrapur Unit - 4 000 46338 caMd`pur 5 Chandrapur Unit -5 26928 48539 caMd`pur 6 Chandrapur Unit -6 30562 47540 caMd`pur 7 Chandrapur Unit -7 30654 041 DhaNaU 1 Dahanu Unit-1 18228 250 1733042 DhaNaU 2 Dahanu Unit-2 18155 250 1733043 CPP 356921 49572444 RGPPL Share 000 0

kula tapIya Total (T) 921892 10585 387100MAH Wind + Solar Generation 85660 0kula jalaIya+tapIya Total (H+T+Wind) 1096610 12472 438092

TOTAL (H+T)ivainamaya Exchanges 468220saIimat jaa- maaMga Rest En Req 1564830

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1502 29ivainamaya Exchanges 37140saIimat jaa- maaMga Rest En Req 39033 531

C (F) dmana AaOr dIva DAMAN amp DIU 23165 367ja (G) dadra nagar hvaolaI DNH 54788 795

kula DD ampDNH (T) 77953 1162

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 11909 160 1104312 tara`pur 2 TAPS Unit -2 9888 16013 tara`pur 3 TAPS Unit -3 8174 549 5097014 tara`pur 4 TAPS Unit -4 40126 54615 kakrapr 1 KAPS Unit -1 000 549 312716 kakrapr 2 KAPS Unit -2 000 546

kula ena pI saI NPC Total 70097 25112 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14225 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 12837 214 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 13786 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 29334 51325 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35224 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 34759 51527 kaorbaa esaTIpIesa 7 KSTPS Unit-7 34348 513

kula kaorbaa KSTPS Total 174513 2697 116780

Actual vaastivak

27 ivanQa esaTIpIesa 1 VSTPS Unit-1 5986 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 14021 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 14860 211210 ivanQa esaTIpIesa 4 VSTPS Unit-4 15559 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 13599 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14346 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 36870 513214 ivanQa esaTIpIesa 8 VSTPS Unit-8 36667 515215 ivanQa esaTIpIesa 9 VSTPS Unit-9 34746 514216 ivanQa esaTIpIesa 10 VSTPS Unit-10 37039 513217 ivanQa esaTIpIesa 11 VSTPS Unit-11 37132 513

kula ivanQayaacala VSTPS Total 334525 REF 21297 31 saIpt -1 -SIPAT-1 47020 67000 32 saIpt -2 -SIPAT-2 42200 68000 33 saIpt -3 -SIPAT-3 46340 66500 34 saIpt -4 -SIPAT-4 36930 51500 35 saIpt -5 SIPAT-5 37020 52000

kula saIpt -SIPAT TOTAL 209510 305000 1156041 kvaasa gaOsa 1e Kawas GT-1A 6227 10542 kvaasa gaOsa 1baI Kawas GT-1B 4979 10643 kvaasa esaTI 1saI Kawas ST-1C 6322 12044 kvaasa gaOsa 2e Kawas GT-2A 2490 10545 kvaasa gaOsa 2baI Kawas GT-2B 2917 10746 kvaasa esaTI 2saI Kawas ST-2C 2925 125

kula kvaasa KGPS Total 25860 668 650051 gaMQaar gaOsa 1 Gandhar GT-1 6537 14352 gaMQaar gaOsa 2 Gandhar GT-2 7145 14453 gaMQaar gaOsa 3 Gandhar GT-3 112 12054 gaMQaar esaTI 4 Gandhar ST-4 7012 200

kula gaMQaar GGPS Total 20806 607 584061 maaOda 1 Mauda -1 35526 660 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 35526 660 2368061 RGPPL Block I 000 062 RGPPL Block II 12731 27063 RGPPL Block III 26367 560

RGPPL TOTAL 39098 830 1094771 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 000 075 esa esa pI SSP RBPH - 5 000 076 esa esa pI SSP RBPH - 6 000 077 esa esa pI SSP CHPH - 1 000 078 esa esa pI SSP CHPH - 2 000 079 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 000 0711 esa esa pI SSP CHPH - 5 000 0

kula esa esa pI SSP Total 000 0 000081 kula poMca Pench Total 1035 150 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGION

ga`aosa ]padna Gross generation 3122352(J) ]plabQata Availability REF

naoT ivainamaya Net Exchanges -630845]plabQa jaa- Energy Availability REF

maah ma[- 2018 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2018 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 16811 - - - 16811 28052018 1500 4985

saIimat Restricted 16500

AsaIimat Unrestricted 16525 15959 109175 10610 0 17157 31052018 1500 4981

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13027 13027 06052018 1900 5002

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 9058 - - - 9058 29052018 2300 4993

saIimat Restricted 8100

AsaIimat Unrestricted 8100 9058 0 1868 0 9077 29052018 2300 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5816 5816 03052018 0400

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3879 3879 07052018 2300 4992

saIimat Restricted 3604

AsaIimat Unrestricted 3604 3879 0 1086 0 3890 07052018 2300 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2221 2221 07052018 0715 5007

maharaYT MAHARASHTRA

pMjaIkRt Registered 23755 - - - 23755 30052018 160000 4988

saIimat Restricted 19600

AsaIimat Unrestricted 19650 23749 0 14131 0 23890 31052018 160000 4983

nyaUnatma pMjaIkRt maaMga Min Registered Demand 17372 17372 01052018 1900 5003

gaaovaa GOA

pMjaIkRt Registered 600 531 - - 531 07052018 2300 4992

AsaIimat Unrestricted 600 530 0 223 - 532 05052018 2200 4988

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 838 - - 838 21052018 2200 4993

AsaIimat Unrestricted 838 0 0 - 838 21052018 2200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 350 - - 350 23052018 1600 4993

AsaIimat Unrestricted 350 0 0 - 350 23052018 1600 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 782 - - 782 24052018 1800 5002

AsaIimat Unrestricted 782 0 - - 782 24052018 1800 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 54534 - - - 54534 30052018 1500 4984

saIimat Restricted 51000

AsaIimat Unrestricted 51200 54534 0 305 0 54839 30052018 1500 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 43251 43251 01052018 1900 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 43

अन समातर PARALLEL RADIAL OPERATION Total Operating Hours(HHMMSS)

1 1 HVDC back-to back link Vindhyachal-Pole 1 7141600

2 2 HVDC back-to back link Vindhyachal-Pole 2 00000

3 एचवीडीसी मदरा ट महनदरगढ़ पोल 1 HVDC Mundra-Mahendergarh Pole 1 7440000

4 एचवीडीसी मदरा ट महनदरगढ़ पोल 2 HVDC Mundra-Mahendergarh Pole 2 7424300

5 1 HVDC Champa-Kurukshetra Pole-1 7135900

6 2 HVDC Champa-Kurukshetra Pole-2 7233200

7 1 HVDC back-to back link Bhadrawti Pole-1 7440000

8 2 HVDC back-to back link Bhadrawti Pole-2 7440000

1 765 कवी सोलापर स रायचर -I 765kV solapur to Raichur I 7440000

2 765 कवी सोलापर स रायचर -II 765kV solapur to Raichur II 7440000

3 765 -I 765kV Wardha to Nizamabad I 7393800

4 765 -II 765kV Wardha to Nizamabad II 7440000

5 765 -I 765kV Gwalior to Phagi I 7424300

6 765 -I 765kV Gwalior to Phagi II 7411700

7 765 -I 765kV Gwalior to Agra I 701100

8 765 -II 765kV Gwalior to Agra II 68954

9 765 -I 765kV Dgarh to New Ranchi I 7334800

10 765 -II 765kV Dgarh to New Ranchi II 7345700

11 765 कवी धरमजयगड स झारसगड़ा-I 765kV Dgarh to Jharsuguda I 7440000

12 765 कवी धरमजयगड स झारसगड़ा-II 765kV Dgarh to Jharsuguda II 7440000

13 400 I 400kV Kolhapur-Narendra I 7432700

14 400 II 400kV Kolhapur-Narendra II 7440000

15 400 400kV Kansari- Bhinmal 7440000

16 400 400kV Kansari- Kankroli 7440000

17 400 कवी रप स सजलपर-I 400 kV RAPP-Sujalur I 7440000

18 400 कवी रप स सजलपर-II 400kV RAPP-Sujalur II 7440000

19 400 I 400kV Sipat-Ranchi I 7440000

20 400 II 400kV Sipat-Ranchi II 7440000

21 400 कवी रायगढ़ स झरसगड़ा I 400kV Raigarh to Jharsuguda I 7440000

22 400 कवी रायगढ़ स झरसगड़ा II 400kV Raigarh to Jharsuguda II 7440000

23 400 कवी रायगढ़ स झरसगड़ा III 400kV Raigarh to Jharsuguda III 7440000

24 400 कवी रायगढ़ स झरसगड़ा IV 400kV Raigarh to Jharsuguda IV 7440000

25 400 220kV Raigarh-Budhipadar 7430400

26 220 -II 220kV K(E) to Budhipadar-II 2022200

27 220 -III 220kV K(E) to Budhipadar-III 7413300

28 220 कवी बदोड़ स साकतपर 220kV Badod to Sakatpur 7440000

29 220 कवी भनपर स मोडक 220kV Bhanpur to Modak 7284400

30 220 कवी महगाओ स औरया 220kV Mehgaon to Auraiya 7433600

List of Inter-stateInter-Regional Lines- Parallel Radial Operation

Inter-Regional Lines

HVDC Lines

माह मई 2018 May 2018

भार WRLDC Mumbai

31 220 कवी मालनपर स औरया 220kV Malanpur to Auraiya 7425900

1 765 -I 765kV Seoni to Wardha-I 7440000

2 765 -II 765kV Seoni to Wardha-II 7440000

3 765 -I 765kV Durg to Wardha I 4770200

4 765 -II 765kV Durg to Wardha II 6043900

5 765 -III 765kV Durg to Wardha III 5590400

6 765 -IV 765kV Durg to Wardha IV 5173600

7 765 कवी धल स वडोदरा-I 765kV Dhule to Vadodara I 6330500

8 765 कवी इदौर स वडोदरा-I 765kV Indore(PG) to Vadodara I 7440000

9 765 कवी धरमजयगड स जबलपर-I 765kV Dgarh to Jabalpur I 4881000

10 765 कवी धरमजयगड स जबलपर-II 765kV Dgarh to Jabalpur II 7431500

11 765 कवी धरमजयगड स जबलपर-III 765kV Dgarh to Jabalpur III 7272800

12 765 कवी धरमजयगड स जबलपर-IV 765kV Dgarh to Jabalpur IV 2972400

13 765 -I 765kV Seoni to Bilaspur-I 7440000

14 765 -II 765kV Seoni to Bilaspur-II 7440000

15 400 400kV Bhilai to Koradi 7242100

16 400 400kV Bhilai to Bhadravati 7231600

17 400 400kV Bhilai to Seoni 7440000

18 400 -I 400kV Raipur to Bhadravati-I 7361000

19 400 ndashII 400kV Raipur to Bhadravati-II 7440000

20 400 ndashIII 400kV Raipur to Bhadravati-III 7425300

21 400 ndashI 400kV Raipur to Wardha-I 7050300

22 400 ndashII 400kV Raipur to Wardha-II 7083200

23 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7440000

24 400 (GIS) स मापसा-I 400kV Kolhapur(GIS)-Mapusa-I 7311500

25 400 (GIS) स मापसा-II 400kV Kolhapur(GIS)-Mapusa-II 6972800

26 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

27 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

28 400 कवी एसएसपी स धल-I 400kV SSP-Dhule-I 4964600

29 400 कवी एसएसपी स धल-II 400kV SSP-Dhule-II 5113900

30 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

31 400 कवी एसएसपी स राजगढ़-I 400kV SSP- Rajgarh -I 7440000

32 400 कवी एसएसपी स राजगढ़-II 400kV SSP- Rajgarh -II 7440000

33 400 कवी कासोर स राजगढ़-I 400kV Kasor- Rajgarh -I 7424400

34 400 कवी कासोर स राजगढ़-II 400kV Kasore- Rajgarh -II 7421400

35 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7315000

36 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7281700

37 400 I 400kV Korba-Birsigpur I 7144600

38 400 II 400kV Korba-Birsigpur II 7440000

39 400 400kV Korba-Essar Mahan 7043300

40 400 400kV Korba-Vindhyachal 7393900

41 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam I 7440000

42 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam II 7431500

Inter-State Lines

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah ma[- 2018 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2018

8817

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39480 62618

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

38703

]ka[- Ukai

63258

9491

24925

24964

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

Outage Duration

Date Time Date Time Time

1 WR

Tripping of1220132 kV 160 MVA Urla ICT 12220132 kV 160 MVA Urla ICT 23220132 kV 160 MVA Urla ICT 34All 132 kV lines at Urla

CSPTCL 512018 1628 512018 1655 027 132 kV Bus bar protection operated at 220 kV Urla substation resulted in tripping ofall the elements connected to the 132 kV Bus

Nil 395 GI-1 017775

2 WR

Tripping of1400 kV Khaparkeda-Koradi DC2400 kV Khaparkeda-Chandrapur3400220 kV 500 MVA Khaparkeda ICT 1amp24500 MW Khaparkeda Unit 5

MSEGCL 512018 2021 512018 2225 204 400 kV side CT of ICT 2 blasted resulting in tripping of all the 400 kV elementsconnected in both 400 kV Buses 1 and 2

350 Nil GI-2 Nil

3 WR

Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 522018 848 522018 1022 134 While opening 400 kV Marwa-Raita 1 on planned outage LBB operated at Marwasubstation and all the elements connected to the 400 kV Bus 2 tripped

450 Nil GI-2 Nil

4 WRTripping of1220132 kV 160 MVA Barwaha ICT 12220132 kV 160 MVA Barwaha ICT 2

MPPTCL 532018 1721 532018 1735 014B-phase CT blast at 132kV Burawaha SS on 132kV Burwaha-Sanawat resulting intripping of both 220132kV ICTs at Burwaha Nil 42 GI-1 00098

5 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 552018 1315 552018 1628 313 Champa Kurukshetra Bipole tripped due to auxiliary supply failure at Champa end Nil Nil GI-2 Nil

6 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 572018 422 572018 447 025 Champa Kurukshetra Bipole tripped on Metallic return Line Differential Protectionoperation

Nil Nil GI-2 Nil

7 WRTripping of1220132 kV 100 MVA Dondaicha ICT 1amp22All 132 kV lines at Dondaicha Ss

MSETCL 5102018 1451 5102018 1521 030At 132 KV Nandurbar substation 33 kV Nadurbar Feeder Y Ph Jumper of line isolator broke but feeder breaker did not trip At 220 kV Dondaicha SS all 132 KV lines and220132 kV 100 MVA ICT-I amp II LVs tripped on LBB operation

Nil 67 GI-1 00335

ANNEXURE -5

Western Region-Event Report for May 2018

SNo

Outage Revival

Region Name of Elements OwnerAgency EventGeneration Loss

(MW) Load Loss (MW)Category as per CEA

standardsEnergy Unserved

(MU)

8 WR

Tripping of1220132 kV 160 MVA Sidhi ICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

MPPTCL 5122018 1236 5122018 1314 038 220kV Rewa-Sidhi and Amarkantak -Sidhi tripped on fault Since the incomingfeeders tripped at 220 kV sidhi substation the substation got blacked out

Nil 187 GD-1 0118433333

9 WR

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 5132018 2109 5132018 2205 056JP Bina 250 MW units 1amp2 tripped due to loss of evacuation lines Heavy rain andstorm were reported in that area At the same time due to fire at Bina(MP) 400 kVBhopal 2 and 220 kV Gwalior(MP) 1 also tripped

309 Nil GD-1 Nil

10 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5182018 638 5182018 743 105 Champa Kurukshetra Bipole tripped due to filter block control alarm at Champa end Nil Nil GI-2 Nil

11 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5192018 2145 5192018 2222 037Champa Kurukshetra Bipole tripped on Converter differential protection in Lane-1at Kurukshetra end Nil Nil GI-2 Nil

12 WR

Tripping of1220132 kV 100 MVA Belwandi ICT 12132 kV Bus sectionalizer3132 kV Belwandi-Shrigonda

MSETCL 5212018 2134 5212018 2220 046

132 Kv Bus Section -I side Y ph PT Burst and caught fire at 220 kV Belwandisubstation 132 KV Bus Bar protection DC supply failed amp Bus bar protection did notoperate Therefore 220132 kV 100 MVA ICT -1 amp Bus sectionliser tripped onbackup protection

Nil NIl GI-1 NIl

13 WR

Tripping of1 220132KV 200 MVA Satana ICT-12 220132KV 150 MVA Satana ICT-23132KV Satana-Taharabad DC4132KV Satana-Bhendi (Kalwan)513233 kV 50 MVA Satana ICT 1amp2613233 kV 25 MVA Satana ICT 3

MSETCL 5242018 052 5242018 130 038 B-ph CT of 132kV Satana-Taharabad-2 burst and caught fire132kV BB ProtectionOperated at 220 kV Satana substation

Nil 397 GI-1 00251

14 WRTripping of1800 kV HVDC Champa-Khurukshetra Pole 12800 kV HVDC Champa-Khurukshetra Pole 2

PGCIL 5242018 1719 5242018 1805 046Champa Kurukshetra Bipole tripped due to DC Line fault in Pole-2 and pole -1blocked on MRLD protection in DMR2 Nil Nil GI-2 Nil

15 WR

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 5262018 1749 5262018 1823 034 All the 220 kV lines at Omkareshwar Power station tripped due to LBB operation 174 Nil GD-1 Nil

16 WR

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP) DC

PGCIL 5312018 1505 5312018 1611 106400 kV 125 MVAR Itarsi BR 1amp2 were opened on Voltage regulation at 1505 HrsAt the same time all the 220 kV elements tripped along with the 400 kV Itarsi-Bhopal 2

Nil Nil GI-2 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-6Status of healthiness of SERsDRs

SlNo

Name of Constituent Date ofReceipt

1 PGCILWRTS-I 070620182 PGCILWRTS-II 040620183 MPPTCL 150620184 NTPC 050620185 CSPTCL 050620186 GETCO 150620187 MSETCL 090620188 DDDNH 210320189 GOA 0106201810 NPCIL11 NCASSP 0504201812 NHDC 0406201813 Jindal PL 1705201814 CGPL 0806201815 DB POWER 0705201816 KWPCL 0506201817 ACBILTRN ENERGY 0406201818 KSK 1404201819 GMR CHHATTISHGARH 2103201820 JNSTPS 0306201821 MB POWER 0905201822 SASAN UMPP 2205201823 NSPCL 2205201824 RGPPL25 SUGENDGEN 02062018

26 RKM POWER 0504201827 ESSAR POWER 0903201828 BDTCLJTCLRTCL 0806201829 RELIANCE TRANSMISSION 0206201830 ADANI POWER 0206201831 JHABUA POWER 0406201832 EPTCL 0306201833 TPGL 02062018

Annexure-71Status of Reactors

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL September ndash 2018

2 Kolhapur 125 MSETCL September ndash 2018

3 Akola 125 MSETCL August ndash 2018

4 ISP 125 NHDC Sept ndash 2018 expected

(Tendering done)

5 Satpura-ISPLine Rx(atSatpura end)

50 MPPGCL Dec-2018

6 Bus Reactor atNew Parli(PG)

330 PGCIL Commissioned on 24042018

7 Bus Reactor atDhariwal

80 DIL Commissioned on 23052018

8Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

9Warora(PS) 80 PWTLMaharashtra Commissioned on 09-05-2018

10Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

11Warora(PS) 330 PWTLMaharashtra Commissioned on 18-05-2018

12New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

13New Parli 330 PPTLMaharashtra Commissioned on 21-05-2018

14Warora(PS) 330 PWTLMaharashtra Commissioned on 10-05-2018

15KAPS 3amp4 125 NPCILGujarat Commissioned on 14-05-2018

Annexure 72

Status of Transmission schemes 765400 kV and aboveThe updated status on various ongoing transmission schemes for the year

2018-19 as per the current information available is as follows -SlNo

Name of the Line Ckt km TargetCompletionDate

Remarks

Powergrid1 LILO of Lonikhand-Kalwa at Navi

Mumbai GIS-JSLLS Cable16 Sept 18

2 Parli(PG)-New Parli(PG) ckt I amp II 18 Commissionedon 21042018

3 765kV Vindhyachal - JabalpurDC

749 June 2018

4 765kV DC Gadarwara STPP -Warora

4536 June 2018

5 800 kV Raigarh-Pugalur HVDCBipole

3676 March-19 Work underprogress

6 400kV DC Banaskantha -Sankheri (GETCO)

434 Oct 18

7 765kV DC Banaskantha -Chittorgarh

2933 Oct 18

8 400kV DC Banaskantha(Radhanesda) - Banaskantha (PG)

132 March 2019

9 765kV Bhuj-Banaskamta DC 583 Oct 18

10 400 kV Mundra UMPP ndash Bhuj DC 190 Oct 18

11 400 kV Dc Wardha-Aurangabad(Upgradable to 1200kV)

347 February 19 Work is inprogress

12 765 kV DC Jharsuguda-Dharamjaigarh line 2

149 June 18 Work is inprogress

13 765Kv DC Gadarwara ndash Warora 626 June 18 Work is inprogress

14 LILo of 400Kv DC Wardha ndash Parli 196 June 18 Work is in

at Warora progress

15 765Kv DC Warora - Parli 698 June 18 Work is inprogress

16 765Kv DC Parli - Solapur 236 June 18 Work is inprogress

17 400Kv DC Parli - Parli 37 June 18 Work is inprogress

Chhattishgarh1 LILO of 400kV Raita-Jagdalpur at

Dhamtari2 August 19 Oder placed on

210218

2 LILO of 220 kV Raigarh-Budipadarat 400 kV PGCIL Ss Raigarh Idlecharged on 1182015 for anti theftreason

July -18

3 220 kV Barsoor-Jagdalpur 175 June 2018

4 2nd circuiting of 220 KV Korba-Bishrampur line(DCSS)

155 June 2018

Gujarat1 400 kV DC Vadinar-Amreli line 11685 June 18

2 400kV APL-Hadala LILO to Halvad 8940 Dec 18

3 400 kV DC Amreli-Kasor line 47055 March 19

4 400kV DC Vadavi - Halvad Line 291 March 19

5 400 kV Varsana-Halvad 237 March 19

6 400 kV Wanakbori-Soja DC 21317 May 18

7 400 kV Soja-Zerda DC 26892 Nov 18

8 400 kV Hadala-Shapar Dc 12434 Mar 19

9 400 kV Bhogat- Kalawad DC 26057 Mar 20

10 400 kV Bhachuunda-Varsana Dc 27616 June 20

11 LILO of both ckt of 400kV DCMundra - Zerda line at 400kVCharanka Ss

2576 July 2018

Madhya Pradesh

1 400 KV DCDS (Quad moose)line from Shri Singa Ji TPS

282 Sept 2018

(Stage-II) to Pithampur

2 400 KV DCDS (Quad moose)line from Pithampur toBadnawar

140 Sept 2018

3 LILO of both circuit of 400KVNagda-Rajgarh line at 400KVSubstation Badnawar

163 December2018

Maharashtra (STU)1 400 kV Bableshwar-Kudus DC

(Quad)150 December -18 Forest

clearanceawaited severeROW problem

2 New Parli(PG)-Solapur ckt-I amp II 118 December -18 Commissionedon 24042018

3 400 KV DC Jejuri-HinjewadiLine(Jejuri-Wainjhar) Package-I

101December -18

4 400 KV DC Jejuri-Hinjewadi Line(Wainjhar- Hinjewadi) Package-II

9267December -18

5 400 KV DCQ BBLR-Kudus line(upto Naneghat)

30646December -18

Other ISTS lines1 Raigarh (Kotra) - Champa (Pool) 765

KV SC 96 June 2018

2 Champa (Pool) - Dharamjaygarh765 KV SC 51 June 2018

3 LILO of one ckt of Aurangabad -Padghe 765 KV DC line at Pune 130 Nov18

4 Rajnandgaon - Warora 765 KV DC 532 Oct 18

5 Sipat STPS - Bilaspur 765 KV SC 23 June 2018

6 400kV DC Mahan Sipattransmission line

674 June 2018

7 Jharsuguda ndash Raipur 765 kV DC(hexa) line (Sterlite) 610

June 2018

8 765KV DC Khandwa Pool (KTL)-Indore (PGCIL) Line(Sterlite) 180 July 2018

9 765KV DC Khandwa Pool (KTL)-Dhule (BDTCL) Line(Sterlite) 379 July 2018

10 LILO of one CKT of 400KV DCKhandwa-Rajgarh at NTPCKhargone (Sterlite)

14 June 2018

11 400KV DC Khargone TPPSwitchyard (NTPC)-Khandwa Pool(KTL) Line(Sterlite)

49 July 2019

12400 kV Gwalior(PG)-Morena -I 48 CWRTLAdani

MP03-05-2018

13400 kV Gwalior(PG)-Morena -II 48 CWRTLAdani

MP03-05-2018

14400 kV Wardha-Warora-I 98 PWTLMahara

shtra09-05-2018

15400 kV Warora(PS)-Parli(PG)-I 98 PWTLMahara

shtra13-05-2018

16400 kV Wardha-Warora-II 98 PWTLMahara

shtra09-05-2018

17400 kV Warora(PS)-Parli(PG)-II 98 PWTLMahara

shtra14-05-2018

The WR utilities may intimate the current status on above

Annexure 73Status of Generating Units in WR

The status regarding Generating units commissioned expected to becommissioned during the current year 2018-19 is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

Gujarat

NIL

Chhattisgarh

NIL

Maharashtra

NIL

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on 03082017

Central sectorIPP

RKM UNIT 4 300 Sep-18

SHINGAJI UNIT 3 660 Jul-18

NTPC LARA UNIT 1 800 Sep-18

NTPC GADARWADA UNIT 1 800 Dec-18

NTPC SHOLAPUR UNIT 2 660 Mar-19

KSK UNIT 5 600 Dec-18

ANNEXURE-81 REPORT ON MOCK DRILL FOR CRISIS

MANAGEMENT PLAN IN POWER SECTOR for the quarter ending helliphelliphelliphelliphelliphellip

1 Name of Power Utility Generating Station

2 Date Time of Mock-drill

3 Location site of Mock-drill

4 Observers (Indicate names of Team designated Leader Members to handle crisis situation)

5 Scenario of mock emergent situation

6 Objective

7 Chronological order of events logged

Time Events Response Time

8 Observations on effectiveness of Mock Drill

9 Recommendations Suggestions on the observations (S No 8)

Signature of Designated Signature of (Safety Security Officer) (Head O amp M of Plant) Datedhelliphelliphelliphelliphelliphelliphelliphellip Datedhelliphelliphelliphelliphelliphelliphelliphellip

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Acer
Typewritten text
ANNEXURE 83
Acer
Typewritten text
ANNEXURE 851
Acer
Typewritten text
ANNEXURE 852

Annexure 97The details of DREL submission is as on 05-06-2018

SN Name of Elements OwnerAgency

Outage

Event

CategoryasperCEAstandard

s

DREL

submitted

Preliminar

yrepor

tsubmitted

Detailed

report

submitted

Date Time

1

Tripping of1220132 kV 160 MVA UrlaICT 12220132 kV 160 MVA UrlaICT 23220132 kV 160 MVA UrlaICT 34All 132 kV lines at Urla

CSPTCL 01-05-2018 1628

Bus bar protection operatedat 220132 kV Urlasubstation resulted in trippingof all the elements connectedto the 132 kV Bus

GI-1 NO No No

2Tripping of1400 kV Marwa-Bhilai2400 kV Marwa-Korba(W)3500 MW Marwa Unit 2

CSPTCL 02-05-2018 0848

While opening 400 kV Marwa-Raita 1 on planned outageLBB operated at Marwasubstation and all theelements connected to the 400kV Bus 2 tripped

GI-2 NO No No

3

Tripping of1220132 kV 160 MVABarwaha ICT 12220132 kV 160 MVABarwaha ICT 2

MPPTCL 03-05-2018 1721

B-phase CT blast at 132kVBurawaha SS on 132kVBurwaha-Sanawat resultingin tripping of both 220132kVICTs at Burwaha

GI-1 No NO NO

4

Tripping of1220132 kV 160 MVA SidhiICT 1amp22220 kV Sidhi-Amarkantak3220 kV Sidhi-Rewa4132KV Sidhi-Sidhi DC5132KV Sidhi-Mauganj6132KV Sidhi-Deosar DC

MPPTCL 12-05-2018 1236

220kV Rewa-Sidhi andAmarkantak -Sidhi tripped onfault Since the incomingfeeders tripped at 220 kVsidhi substation thesubstation got blacked out

GD-1 No Yes No

7132KV Sidhi-Pahadiya8220KV Rewa-SGTPS9220KV Rewa-TONS

5

Tripping of1400 kV JP Bina-Bina(PG)2400 kV JP Bina-Bina(MP)3250 MW JP Bina Unit 14250 MW JP Bina Unit 25400 kV Bina(MP)-Bhopal 26220 kV Bina(MP)-Gwalior(MP) 1

MPPTCLPGCIL 13-05-2018 2109

JP Bina 250 MW units 1amp2tripped due to loss ofevacuation lines Heavy rainand storm were reported inthat area At the same timedue to fire at Bina(MP) 400kV Bhopal 2 and 220 kVGwalior(MP) 1 also tripped

GD-1 No No No

6

Tripping of1OSP-Nirmani tap Barwaha2OSP-Barwaha3OSP-Juluwaniya4OSP-Khandwa5OSP-Chhagaon

NHDCMPPTCL 26-05-2018 1749

All the 220 kV lines atOmkareshwar Power stationtripped due to LBB operation

GD-1 No Yes No

7

Tripping of1400220 kV 315 MVA ICT 12400220 kV 500 MVA ICT 23400 kV Itarsi-Bhopal 24220 kV Itarsi-Hosangabad 25220 kV Itarsi-Itarsi(MP)DC

PGCIL 31-05-2018 1505

400 kV 125 MVAR Itarsi BR1amp2 were opened on Voltageregulation at 1505 Hrs Atthe same time all the 220 kVelements tripped along withthe 400 kV Itarsi-Bhopal 2

GI-2 No No No

8

Tripping of1765 kV Durg-Champa 22220kV Churi-kotmikala 13132 kV Bango-Manendargarh4132 kV Simgha-Chakarbhata5500 MW Marwa Unit 26Some of the 33 kV feedersat Chattisgarh system

CSPTCL 01-04-2018 1609

Due to inclement weathercondition at chattisgarh statemultiple tripping occurred atchattisgarh system and theload crash happened ismainly due to the tripping of33 kV feeders at chattisgarh500 MW Marwa unit 2 alsotripped on generatorprotection operation

GI-2 No No No

9Tripping of1210 MW VSTPS Unit 42500 MW VSTPS Unit 133 20 MVA Waidhan(MP) ICT

NTPCMPPTCL 10-04-2018 1944

Due to the Earth quake atVindhyachal nearVindhayachal and Satna areaVindhyachal Unit 4 and 13tripped on Turbine protectionoperation At the same time20 MVA ICT at Waidhan alsotripped

GI-2 No No No

10

Tripping of1220 kV Pedambe-Adlabs2220 kV Pedambe-Nerule3Pedambe Units 9 and 124400220 kV 315 MVANewKoyna ICT 1and 25400132 kV Bhusawal ICT1amp26400 kV Parli-Solapur(MS)7220 kV Karad-Malharpeth8220 kV Padghe-Nallasoppara9220 kV Talangade-Tilwani

MSETCL 17-04-2018 1549

Due to the heavy rain nearNew Koyna Ss multiple 220kV lines tripped on distanceprotection operation alongwith ICTs due to NDRoperation and fault at 132 kVside

GI-2 No Yes No

11Tripping of1400 kV Bus 1 at KWPCL2400 kV 80 MVAR Kotra BR3RKM Power 360 MW Unit 1

KWPCL 16-04-2018 1323

Due to the failure of Bus postinsulator at KWPCL station

400 kV Bus 1 tripped and dueto the heavy jerk in the grid400 kV BR 2 at Kotra andRKM unit 1 also tripped

GI-2 No No Yes

  • COV LETTpdf
  • listpdf
  • textpdf
  • Apdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 29pdf
  • 31pdf
  • 321pdf
  • 322pdf
  • 323pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 6pdf
  • 71pdf
  • 72pdf
  • 73pdf
  • 81pdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 82C3pdf
  • 82C4pdf
  • 83pdf
  • 851pdf
  • 852pdf
  • 97pdf
Page 9: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 10: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 11: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 12: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 13: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 14: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 15: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 16: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 17: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 18: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 19: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 20: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 21: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 22: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 23: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 24: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 25: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 26: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 27: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 28: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 29: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 30: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 31: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 32: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 33: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 34: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 35: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 36: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 37: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 38: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 39: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 40: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 41: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 42: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 43: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 44: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 45: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 46: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 47: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 48: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 49: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 50: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 51: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 52: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 53: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 54: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 55: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 56: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 57: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 58: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 59: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 60: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 61: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 62: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 63: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 64: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 65: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 66: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 67: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 68: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 69: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 70: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 71: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 72: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 73: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 74: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 75: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 76: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 77: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 78: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 79: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 80: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 81: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 82: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 83: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 84: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 85: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 86: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 87: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 88: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 89: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 90: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 91: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 92: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 93: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 94: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 95: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 96: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 97: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 98: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 99: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 100: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 101: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 102: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 103: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 104: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 105: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 106: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 107: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 108: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 109: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 110: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 111: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 112: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350
Page 113: Annexure-I List of OCC Members · 2018. 7. 4. · GUJ MP CG MAH GOA DD DNH ESIL WR REQUIREMENT 17016 8764 3663 23395 532 350 778 838 53817 AVAILABILITY 15818 8745 3652 23254 530 350