Upload
jeslyn
View
48
Download
0
Embed Size (px)
DESCRIPTION
ARES Upgrade for Super KEKB. KAGEYAMA Tatsuya for the KEKB RF ARES cavity group Introduction Fundamental mode issues HOM load issues Input Coupler R&D Summary. 2CA-2: T. Kageyama et al., “The Growth Potential of the ARES Cavity System toward Super-KEKB”, SAST’03 - PowerPoint PPT Presentation
Citation preview
ARES Upgrade for Super KEKBARES Upgrade for Super KEKB
KAGEYAMA Tatsuya
for the KEKB RF ARES cavity group
• Introduction • Fundamental mode issues• HOM load issues• Input Coupler R&D• Summary
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
2CA-2: T. Kageyama et al., “The Growth Potential of the ARES Cavity System toward Super-KEKB”, SAST’03
1P-071: 阿部哲郎、他『高周波入力結合器におけるマルチパクタリングの研究』、 SAST’03
1P-074: 竹内保直、他『炭化珪素セラミックスの誘電特性と HOM 減衰器設計への応用』、 SAST’03
Accelerator Resonantly coupled with Energy Storage
ARES3-cavity system stabilized with the π/2-mode operation
Accelerator Resonantly coupled with Energy Storage
ARES3-cavity system stabilized with the π/2-mode operationQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Pumping Port
SC CC AC
GBP
HWG
Eight SiC tiles per Groove
Two SiC bullets per Waveguide
Tuner Port
Tuner Port
HCCCF
Input Coupler Port
Mode Shifting Groove
HWG
Two SiC bullets per Waveguide
GBP
CF
SS
C damper
AC: Accelerating Cavity (HOM-damped)
SC: Storage Cavity (TE013)
CC: Coupling Cavity damped with an antenna-type coupler (C damper)
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Fundamentals of the ARES cavity systemFundamentals of the ARES cavity systemQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
The longitudinal CBI (Coupled-Bunch Instability, µ = -1, -2, • • • ) driven by the accelerating mode, which is to be detuned downward from the fRF by ∆fa where |dfa| would amount to ~2Xfrev . cf. frev = 99kHz for KEKB
€
Δfa ∝ beamPacc. modeU
€
Δfa = −Isinφs2Vc
×R
Q× fRF = −
Pb tanφs4πU
Operation of a conventional copper cavity under the heavy beam loading (2.6A for KEKB LER) would bring on
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Fundamentals of the ARES cavity systemcont’d
Fundamentals of the ARES cavity systemcont’dQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
A flywheel is a device for storing energy or momentum in a rotating mass, used to minimize variations in angular velocity and revolutions per minute, as in a machine subject to fluctuation in drive and load.
S-cav functions as a kind of EM flywheel.
How to couple A-cav with S-cav is the most important issue.
C-cav engaged to stabilize the coupled cavity system with the π/2-mode operation and also suppress CBI due to the parasitic modes.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Fundamentals of the ARES cavity systemcont’d
Fundamentals of the ARES cavity systemcont’dQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
ks kaUs
damper
Ua
S-cav A-cavC-cav
π/2
π
0
mode
0.0001
0.001
0.01
0.1
495 500 505 510 515 520
π/2 mode
0 modeQL≈100
π modeQL≈100
frequency [MHz]
S21 response
QC-cav ≈ 50
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
€
UsUa
=ka
2
ks2 for /2 mode
Fundamentals of the ARES cavity systemcont’d
Fundamentals of the ARES cavity systemcont’d
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
• The stored-energy ratio of the π/2 mode:
• The EM field distribution of the π/2 mode is stable against detuning of A-cav (= ∆fa) loaded with the beam.
• The amount of detuning of A-cav can be reduced as:
• The parasitic 0 and π modes can be selectively damped (QL ≈ 100) with an antenna-type coupler attached to C-cav.
• Furthermore, the damped 0 and π modes are located almost symmetrically with respect to the π/2 mode. Therefore, their impedance contributions to CBI can be counterbalanced.
• C-cav functions as a filter to isolate S-cav from A-cav’s HOMs.
€
UsUa
=ka
2
ks2
€
Δfπ 2 =Δfa
1+Us /Ua
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
ARES Operation Status in KEKBARES Operation Status in KEKBQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
LER (e+): 20 ARES cavities Total Vc = 8 MV (0.4MV/cav) Beam current (max.): ~1.8A Input RF power/cav: ~300kW HOM power/cav: ~5kW Trip rate: ~1/cav/3months According to stats for Apr.~Jun., 2003
HER (e-): 12 ARESs and 8 SCCsTotal Vc = 15 MV = 3.84MV(ARES) + 11.16 (SCC)Beam current (max.): ~1.1A
ARES cavities in the LER RF section Fuji D7
RF Parameters of the π/2 mode: Us / Ua = 9 R / Q = 15 Ω Q0 = 1.1 x 105 Pc = 150 kW / cav Vc = 0.5 MV /cav
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
ARES Upgrade for Super-KEKBARES Upgrade for Super-KEKB
LER: 2.6 A by 20 ARESsHER: 1.1 A by 12 ARESs + 8 SCCs
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
LER: 9.4 A by 28 ARESs
HER: 4.1 A by 16 ARESs + 12 SCCs
We are planning to remodel the accelerating cavity part and the HOM loads for Super-KEKB LER.
Coupling SlotWidth: 120 mmHeight: 160 mm
WG HOM Load
GBP HOM Load
1000 mm
Half-Cell CC
Grooved Beam Pipe
CC
AC
HOM WG
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
€
UsUa
=ka
2
ks2
ARES Upgrade for Super-KEKBFundamental mode issues
ARES Upgrade for Super-KEKBFundamental mode issues
2.6 A by 20 ARESs for LER∆fa = -200 kHz
9.4 A by 28 ARESs for LER∆fa = -710 kHz
CBI driven by the π/2 accelerating mode: We need to increase the stored-energy ratio Us / Ua. ∆fπ/2 = 71 kHz if Us / Ua = 9 unchanged. (cf. frev= 99 kHz)
CBI due to the parasitic 0 and π modes: We have investigated the impedance imbalance caused by larger detuning of A-cav.
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
CBI due to the π/2 modeCBI due to the π/2 mode
Table 1: RF parameters of ARES cavity for Super KEKB LER.
Us /Ua 9 15 18Coupling Slot 120 160120 175 120 182 W mm2
I 9.4 (2.6) A # of Cavities 28 (20) fRF 508.887 MHz h 5120 Vc 0.5 MV Q0 1.11 1.27 1.32
R/Q input Pc kW Δ f kHz
Numbers in ( ) for KEKB LER
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
CBI due to the π/2 mode (cont’d)CBI due to the π/2 mode (cont’d)QuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
100
101
102
103
104
9 12 15 18
Us/Ua
μ = −
μ = −
μ = −
Growth rates of the CBIs (µ = -1, -2, -3) due to the π/2 mode, plotted as a function of Us / Ua .
By increasing Us / Ua from 9 to 15, the growth rate of the severest CBI (µ = -1) can be reduced by one order of magnitude and down to = 1.5 ms, where some RF feedback system could manage to damp it.
Coupling Impedance of the π/2 mode loaded with 9.4 A for Us / Ua = 9, 15, 18.
S. Yoshimoto et al., “The -1 mode damping system for KEKB”, in this conferenceKAGEYAMA, T. Super-KEKB WSNov. 28, 2003
CBI due to the 0 and π modesCBI due to the 0 and π modesQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
The damped 0 and π modes (Ua:Uc = 1:1 when Δfa = 0 kHz) are located almost symmetrically with respect to the π/2 mode ( ≈ fRF ).
For KEKB (Δfa = -200 kHz), Re[Z //] has a small asymmetry with respect to fRF.
|R+ - R-|max ~500 Ω/ARES → ~46 ms
cf. rad ~23 ms (KEKB)
0.0001
0.001
0.01
0.1
495 500 505 510 515 520
π/2 mode
0 modeQL≈100
π modeQL≈100
frequency [MHz]
S21 response
The EM field distributions (Ua:Uc) of the 0 and π modes aresubject to the perturbation of order of Δfa / (fπ - f0).
Δfa = -200 kHz (KEKB) → -710 kHz (Super-KEKB)
The delicate counterbalancing may be deteriorated in Super-KEKB.KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
CBI due to the 0 and π modes (cont’d)CBI due to the 0 and π modes (cont’d)QuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
The CBI due to the 0 and π modes:
= 3.3 ms for Us / Ua = 9 (9.4 A) cf. = 46 ms for Us / Ua = 9 (2.6 A KEKB)
= 4.0 ms for Us / Ua = 15 (9.4 A) to be damped by longitudinal FB kickers
the first order term Δfa / (fπ - f0) where fπ - f0 ∝ ka (∝ Us / Ua)1/2
Top: Re[Z//] of the 0 and π modes
Bottom:Re[Z//] imbalance R+ - R- with respect to fRF.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
ARES upgrade for Super-KEKBHOM load issues
ARES upgrade for Super-KEKBHOM load issues
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
HOM WG: Monopole & Dipole(V) HOMs
GBP: Dipole(H) HOMs
HOM-damped structure for ARESBased on the conceptual demonstrator ARES96Carefully designed to be smoothly embedded into the whole ARES schemeConsists of 4 HOM WGs and 2 GBPs (Grooved Beam Pipe)
1000 mm
Half-Cell CCCC
AC
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
WG HOM load (KEKB)WG HOM load (KEKB)QuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
WG HOM load: Two bullet-shape SiC absorbers at the end of the HOM WG. Each absorber directly water-cooled. Power capability tested up to 3.3 kW / bullet (26 kW / cavity).
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
GBP HOM load (KEKB)GBP HOM load (KEKB)QuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
GBP HOM load: 8 SiC tiles per groove, brazed to a water-cooled OFC plate. Power capability tested up to 0.5 kW / groove (2 kW / cavity).
SiC TileOFC SUS
Cooling Circuit
OFC
OFC Compliant Layer
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
HOM load status in KEKBHOM load status in KEKBQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
0
1
2
3
4
5
0 200 400 600 800 1000 1200 1400
Total HOM PowerWG HOM PowerGBP HOM PowerPrediction from Cavity Loss FactorPrediction from GBP Loss Factor
LER Beam Current (mA)
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
2 4 6 8 10
AC + 2 x GBP2 x GBPAC + 2 x CBP
Bunch Length (mm)
k (fundamental) = 0.12 V/pC
WG and GBP HOM powers per cavity measured in the KEKB LER, compared with theoretical predictions (z = 7 mm).
Loss factors computed for the whole damped structure (3D) and the GBPs (3D), together with those for a simplified axially symmetric structure (2D) with circular beam pipes (CBPs).KAGEYAMA, T.
Super-KEKB WSNov. 28, 2003
Prospect of HOM power for Super-KEKBProspect of HOM power for Super-KEKBQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Super-KEKB LER:9.4 A, ~5000 bunches, z = 3mm.
Extrapolation
HOM data taken in KEKB LER: 1224 bunches, z = 7mm.
cf. KEKB LER design:2.6 A, ~5000 bunches, z = 4mm
0.1
1
10
100
0.1 1 10
2 x GBP (Nb=1224, BL=7mm)2 x GBP (Nb=4896, BL=4mm)2 x GBP (Nb=4896, BL=3mm)4 x HOM WG (Nb=1224, BL=7mm)4 x HOM WG (Nb=4896, BL=4mm)4 x HOM WG (Nb=4896 BL=3mm)
Beam Current (A)
WG HOM: ~80 kW / cavity
GBP HOM: ~20 kW / cavity
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Upgrading WG HOM load for Super-KEKBUpgrading WG HOM load for Super-KEKBQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
WG HOM load for Super-KEKB LER: ~80 kW / cavity
HPT’d up to 26 kW/cavity (3.3 kW/bullet) for KEKB: The limit due to the maximum RF power stably supplied by the current L-band klystron.
Perform HPT over 3.3 kW/bullet: Resume HOM load test bench, hopefully with a new klystron supplying more than 10 kW.
Increase # of absorbers per WG.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Upgrading GBP HOM load for Super-KEKBUpgrading GBP HOM load for Super-KEKBQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
GBP HOM load for Super-KEKB LER: ~20 kW / cavity
HPT’d up to 2 kW/cavity (0.5 kW/groove) for KEKB.
Need to upgrade the power capability by one order of magnitude.
?A new design with directly water-cooled SiC absorbers.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
GBP evolves into Winged ChamberGBP evolves into Winged ChamberQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Winged chamber loaded with directly water-cooled SiC bullets:
Developed under collaboration between the KEKB vacuum and ARES cavity groups.
Used in the movable mask sections in KEKB since 2002.
Perform HPT over 5 kW / bullet.
SiC
Slot
Beam Chamber
Y.Suetsugu et al., “Development of Winged HOM Damper for Movable Mask in KEKB”, Proc. PAC2003.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Input Coupler UpgradeInput Coupler UpgradeQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Over- and under-cut structure for impedance matching
Door-knob transformer from rectangular WG to coaxial line
Coaxial line WX77Dmultipactoring discharge problem
Coupling loop
Ceramic RF window
Monitor port for arc detectionCapacitive iris
ICF-203 flange
Monitor port for arc detection
RF power ( = Pc + Pbeam ) ~400kW for KEKB~800kW for Super-KEKB
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Input Coupler Upgrade (cont’d)Input Coupler Upgrade (cont’d)QuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
RF power
Dummy load
S-cav (TE013 mode)Multipactoring-free
/2-mode terminator
RF power
HPT setup (old)RF power < 1 MW
HPT setup (new)RF power < 500 kWKAGEYAMA, T.
Super-KEKB WSNov. 28, 2003
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
HPT setupKAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Input Coupler Upgrade (cont’d)Input Coupler Upgrade (cont’d)
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
SAST’03 1P-071: 阿部哲郎『高周波入力結合器におけるマルチパクタリングの研究』KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Input Coupler Upgrade (cont’d)Input Coupler Upgrade (cont’d)
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Single-surface MP @ the WX77D outer conductorRF input power: 160~180kW
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
TV camera
Input Coupler Upgrade (cont’d)Input Coupler Upgrade (cont’d)
SAST’03 1P-071: 阿部哲郎『高周波入力結合器におけるマルチパクタリングの研究』
ΔT of the cooling waterfor the outer conductor
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
Dummy loadRF power
HPT setup (future)RF power up to ~1 MW
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
Input Coupler Upgrade (cont’d)Input Coupler Upgrade (cont’d)
SummarySummaryQuickTime˛ Ç∆
TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
By increasing Us/Ua from 9 to 15, the severest CBI (µ = -1) due to the π/2 accelerating mode can be eased by one order of magnitude and down to = 1.5 ms (Super-KEKB LER) where some RF feedback system could manage to damp it.
The growth time of the CBI due to the impedance imbalance between the 0 and π modes has been estimated as = 4 ms (Super-KEKB LER). Some longitudinal FB kicker system will be needed.
For Super-KEKB LER, we need to upgrade the power capabilities of the WG and GBP HOM loads to ~80kW and ~20kW per cavity, respectively. The GBP with indirectly water-cooled SiC tiles may evolve into a winged chamber loaded with directly water-cooled SiC bullets.
R&D of the input coupler for Super KEKB is being carried out with a new HPT setup using an S-cav. First, single-surface MP discharge on the outer conductor of the coaxial line section (WX77D) should be suppressed.
We should first resume HPT for the HOM loads, hopefully with an L-band klystron supplying more than 10kW.
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003
QuickTime˛ Ç∆TIFFÅià≥èkǻǵÅj êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB
And that’s all?And that’s all?
KAGEYAMA, T. Super-KEKB WSNov. 28, 2003