B2 -Atlantic Yards
Brooklyn – New York
Rob FrancisDirector, Innovation & Improvement
Assembly not Construction – Lean Construction in practice
B2 -Atlantic Yards
50/50 J.V.
3
BARCLAY’S ARENA
MODULAR Atlantic Yard Master Plan
B2 footprint
MODULAR – Full Development
B2
6
• Residential building at Atlantic Yards
• Modular construction
• 348,000-square foot
• 32-story building
• Approximately 363 rental apartments
•Contract Value: $116 million
•Preconstruction: Start Date December 2012
•Modular Pre - Production: Start Date July 2013
• Modular program: 32 weeks
•Completion Date: Summer 2014
•LEED Certification: Goal of LEED Silver
First Modular Residential Building: B2
Conventional building, using conventional materials, assembled in an innovative way
PHASE 1 -MANUFACTURED
MODULAR STEEL FRAME
PHASE 3 – MEP INSTALLATION IN
FACTORY
PHASE 2 – INTEGRATION OF SUBASSEMBLIES
PHASE 5 – ERECTION & MATELINE CONNECTIONS
PHASE 4 – MODULE INTERIOR & EXTERIOR
FINISHES
MODULAR – The Process
PROJECT $ VALUE
On-Site 20%
EXCAVATION FOUNDATION UTILITIES
FIRST FLOOR STEEL ERECTIONMODULE
ERECTION
MODULE MATELINE CONNECTIONS
Factory 80%
MODULAR – Union Field Work
9
MODULAR – B2 Floor Plan
10
MODULAR – B2 Floor Plan
11
MODULAR – Foundations
13
Basement and Foundation
Plinth
Building MassingTypical Modules
Dean Street Transfer
N-S Braced Frames
E-W Braced Frames
Building Setbacks
Hat Truss
MODULAR – Structural Scheme
14
MODULAR – Structural Scheme
PROTOTYPE - Interior Design
PROTOTYPE - Interiors
What did we do in 9 months?• Fit out of the factory infrastructure
• Implemented new Company procedures (ie purchasing, finance, accounts, HR)
• Designed a new organization structure with new job roles and job descriptions
• Designed a manufacturing layout (in a very restricted building)
• New modular processes (de-skill)
• 3D CAD Bills of Material process
• Multi-skilled new modular trade union agreement
• Quality Assurance certification
Innovation• Multi – skilled trade union
• Collaborative partnership
• On site assembly – B2, Brooklyn
• Manufacturing processes
• Factory layout by B2 floor level
• Assembly fixtures
• Mateline design
• Structural methodology
• Method of de-latch process
• Façade seal and DFMA
Leadership:
• Collaborative Partnership Contract
• Innovative Developer
• Design for Manufacture & Assembly
• Repeatable Design