MOVIMIENTO DE TIERRA PARA BADEN L=15.00m
REHABILITACIN DE LA CARRETERA Y PUENTES DEL TRAMO HUAYLLAMPI - LINCHA, DE LOS DISTRITOS DE HONGOS, CACRA Y LINCHA, PROVIN
OBRA : DISTRITO : CACRA - HONGOS - LINCHA, PROV. : YAUYOS, DPTO : LIMA
FECHA : ABRIL 2013
BADEN (L=15.00m)
VOLUMEN RELLENO
PROG REA CORT AREA EMBOQUILLADO AREA RELLENO VOL OL. ACUM. VOL . VOL. ACUM.
02+365 1.35 1.23 0.68 0.00 0.00 0.00 0.00
02+370 1.35 1.23 3.29 6.75 6.75 9.91 9.91
02+375 1.35 1.23 3.96 6.75 13.50 18.12 28.03
02+380 1.35 1.23 2.82 6.75 20.25 16.96 44.99
Total 20.25 Total 44.99
(LOSA)
7/23/2019 BADEN 1 (L=15m)
2/2
CIA DE YAUYOS - LIMA
REVISADO : A.P.C.
HECHO : A.E.L.S
VOLUMEN EMBOQUILLADO
VOL . VOL. ACUM.
0.00 0.00
6.14 6.14
6.14 12.27
6.14 18.41
Total !.4