Bagian I Studi Rencana Induk Tabel-Tabel

Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

  • Upload
    others

  • View
    23

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

Bagian I Studi Rencana Induk

Tabel-Tabel

Page 2: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-1

Tabel 1.5.2 Daftar Anggota Komisi Penasehat

Posisi Nama Lembaga

Chairman Josuke KASHIWAI

Ketua Kelompok Insinyur Peneliti Hidrolika Bendungan, Kelompok Insinyur Peneliti Hidrolika, Incorporated Administrative Agency, Institut Penelitian Pekerjaan Umum di bawah Departemen Pertanahan, Infrastruktur dan Transportasi

Anggotar Takashi HOSODA Profesor Insinyur Sistem Sungai, Departemen Menejemen Perkotaan, Fakultas Teknik, Universitas Kyoto

Anggota Hitoshi NOGUCHI

Kepala Divisi Mekanika Fluida, Departemen Sistem Pembangunan dan Pengawasan, Institut Penelitian Pelabuhan dan Bandara di bawah Departemen Pertanahan, Infrastruktur dan Transportasi

Anggota Junji YOKOKURA Penasehat Teknik Senior untuk Kegiatan Antarnegara, Departemen Kegiatan Antarnegara, Lembaga Sumber Daya Hijau Jepang

Sumber: Tim Studi JICA

Tabel 1.5.3 Komposisi Tim Studi

No. Posisi Nama

1 Ketua Tim/Sedimentasi Waduk/Perencana Pengoperasian Waduk Minoru OUCHI 2 Wakil Ketua Tim/Pengelolaan DAS/Ahli Erosi Tanah Kenjiro ONAKA 3 Ahli Hidrologi Naoki YAMASHITA 4 Insinyur Sipil/Sistem Pembuangan Sedimen Hidetoshi KANAMURA 5 Ahli Hidrolika Sedimen Tadahiro FUKUDA 6 Ahli Analisis Perhitungan Hidrolika Haisheng JIN 7 Ahli Survei Topografi Yutaka NAKADA 8 Ahli GIS Masahiko TANIGUCHI 9 Ahli Geologi Yasushi MOMOSE 10 Ahli Penyelidikan Sosial/Pemberdayaan Masyarakat Tetsunari GEJO 11 Ahli Lingkungan Hitoshi SAKAI 12 Insinyur Sipil/Waduk dan Fasilitas Lainnya Tamotsu SHINGU 13 Ahli Pertanian/Tanah Takashi SHIRAKI 14 Perencana Biaya/Perencana Pembangunan Masaru TOKUNO / Kozo YAMADA 15 Ahli Kelembagaan/Hukum dan Peraturan John A.L. CHETTOE 16 Ahli Sosial Ekonomi Magdalena LUKOWSKA 17 Koordinator/Ahli kualitas Air Hikaru SUGIMOTO

Sumber: Tim Studi JICA

Page 3: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-2

Tabel 1.5.4 Daftar Personel Pendamping

No. Nama Posisi Lembaga Ke-1Ke-21 Ir. Tri Rohadi, Dipl HE Ketua Pendamping 1/Sedimentasi Waduk IPKPWSBS O O2 Ir. Hetomo, Dipl HE Ketua Pendamping 2/Sedimentasi Waduk IPKPWSBS – O3 Ir. Erwin Budoyo, M.Eng Perencana Pengoperasian Waduk PJT I B.Solo O O4 Ir. Widihardjo, Sp Pengelolaan DAS/Ahli Erosi Tanah IPKPWSBS O O5 Drs. Setyo Susilo Ahli Pengelolaan DAS Dinas LHKP Kab Wonogiri O O6 Rejodadi Ahli Erosi Tanah Dinas LHKP Kab Wonogiri – O7 Suparno Ahli Hidrologi IPKPWSBS O O8 Ir. Mulyana, Sp.1 Insiynur Sipil/Sistem Pembuangan Sedimen PJT I B.Solo – O9 Ir. Lilik Retno C, MA Ahli Hidrolika Sedimen IPKPWSBS O O

10 Ir. Sriyanto Hidrolika Sedimen PJT I B.Solo O –11 Ir. Daryanto Survei Sedimen IPKPWSBS O –12 Ir. Wisman Hari Ismoyo Survei Topografi IPKPWSBS O –13 Pardjo, BE Survei Topografi IPKPWSBS O –14 Ir. Raden Dody Prakoso Ahli GIS BP2TPDAS IBB O O15 A. Supriyanto, SP Ahli GIS BPDAS Solo O O16 Sudarmadji, SST Ahli Geologi IPKPWSBS O O17 Hernowo Edy Yuliasto Ahli Geologi IPKPWSBS O –

18 Ir. Edi Djoko Dwiono Penyelidikan Sosial/ Ahli Pemberdayaan Masyarakat

Bappeda Kab. Wonogiri O O

19 T. Sarwono, BE Penyelidikan Sosial/ Ahli Pemberdayaan Masyarakat

IPKPWSBS O –

20 Ruwiyo Sudjatmiko, S Sos Ahli Teknik Lingkungan IPKPWSBS O O21 Ir. S.B. Ekoyanto Insinyur Sipil/Sistem Pembuangan Sedimen IPKPWSBS O –22 Ir. Wuryanto A Sidik, Sp.1 Insinyur Sipil/Waduk dan Fasilitas Lainnya IPKPWSBS – O23 Ir. Muljana, SP Insinyur Sipil/Waduk dan Fasilitas Lainnya PJT I B.Solo O –24 Ir. Sri Widowati Ahli Pertanian dan Tanah Dipertanbun Kab. Wonogiri O O25 Ir. Saksono Ahli Pertanian dan Tanah IPKPWSBS O –26 Gemala Suzanti, SP. MMA Ahli Pertanian dan Tanah IPKPWSBS – O27 Joko Inti, ST. MT Perencana Biaya/Perencana Pembangunan SKS PPSABS – O28 Ir. Suyatmo Perencana Biaya IPKPWSBS O –29 Bsimo Sustyo, SST Perencana Pembangunan PJT I B.Solo O –30 Supriyanto, ST Ahli Kelembagaan/Hukum dan Peraturan SKS PPSABS – O31 Wiyanto, SH Ahli Kelembagaan/Hukum dan Peraturan Bag.Hukum Setkab Wonogiri – O32 Ir. Tugiyo Ahli Sosial Ekonomi Bappeda Kab. Wonogiri O O33 Dwi Sularjanto, BE Ahli Kualitas Air IPKPWSBS O O34 Drs. Djoko Widodo, MT Ahli Kualitas Air O –Catatan: PekerjaanTahap I : Agustus 2004 – Februari 2005 Pekerjaan Tahap II : Mei 2005 – Maret 2006 Sumber: Tim Studi JICA

Page 4: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-3

Ta

ble

2.1.

1 So

cio-

Econ

omic

Indi

cato

rs o

f the

Stu

dy A

rea

1999

2002

1999

2002

1999

2002

1999

2002

1999

2002

1999

2002

1999

2002

Life

Exp

ecta

ncy

66.2

66.2

68.3

68.8

71.1

71.6

70.1

71.8

69.1

69.3

69.1

69.8

70.8

71.5

Adu

lt Li

tera

cy R

ate

88.4

89.5

84.8

85.7

76.4

77.4

78.3

78.9

84.0

82.2

81.1

82.8

71.6

75.3

Mea

n Y

ear o

f Sch

oolin

g6.

77.

16.

06.

55.

65.

96.

17.

07.

47.

96.

77.

35.

36.

0A

djus

ted

Real

per

cap

ita E

xpen

ditu

re [R

p. 0

00]

578.

859

1.2

583.

859

4.2

584.

260

7.6

587.

661

7.1

591.

860

7.0

589.

060

7.3

581.

359

2.7

HD

I64

.365

.864

.666

.364

.066

.564

.568

.566

.567

.765

.167

.862

.364

.9

Popu

latio

n w

ith N

o A

cces

s to

Fres

h W

ater

[%]

51.9

44.8

47.8

39.8

41.3

38.0

58.3

31.4

64.8

40.0

54.7

49.5

40.9

39.6

Popu

latio

n w

ith N

o A

cces

s to

Hea

lth F

acili

ties [

%]

21.6

23.1

17.1

20.9

25.9

16.8

17.1

23.9

17.1

14.0

17.1

13.9

51.3

36.0

HH

with

No

Acc

ess t

o Sa

nita

tion

[%]

25.0

30.9

31.1

7.1

10.3

35.0

29.0

25.4

17.1

36.2

37.2

24.7

23.1

Ope

n U

nem

ploy

men

t [%

]10

.68.

15.

45.

36.

97.

09.

6Em

ploy

men

t in

Info

rmal

Sec

tor [

%]

64.1

66.6

78.2

63.9

57.4

63.2

69.0

GRD

P Re

al p

er c

apita

200

0 [R

p. 0

00]

with

oil

& g

as1,

340

788

1,54

21,

480

1,06

980

7 w

ithou

t oil

& g

as1,

201

788

1,54

21,

480

1,06

980

7A

nnua

l Gro

wth

in R

eal G

RDP

per c

apita

199

9/20

00 A

nnua

l Gro

wth

/ with

oil

& g

as1.

12.

91.

43.

01.

73.

30.

02.

20.

03.

51.

42.

2 1

999/

2000

Ann

ual G

row

th/ w

ithou

t oil

& g

as0.

92.

51.

43.

01.

73.

30.

02.

20.

03.

51.

42.

2

Ave

rage

Non

-Agr

icul

ture

Wag

e [R

p. 0

00]

Ave

rage

Non

-Agr

icul

ture

Wag

e Fe

mal

e [R

p. 0

00]

461.

818

6.7

313.

121

7.9

336.

015

0.7

342.

121

4.0

349.

519

1.1

289.

916

9.1

279.

3A

vera

ge N

on-A

gric

ultu

re W

age

Mal

e [R

p. 0

00]

680.

729

4.7

500.

029

7.1

484.

327

0.1

590.

129

4.7

529.

627

3.4

432.

327

4.0

476.

8

Per C

apita

Exp

endi

ture

[Rp.

000]

206.

315

6.0

149.

018

1.0

183.

016

1.0

142.

0Fo

od [%

of t

otal

exp

endi

ture

]58

.561

.062

.757

.256

.560

.763

.8

Pove

rty L

ine

[Rp.

/cap

ita/m

onth

]10

9,00

010

6,43

810

2,93

210

7,58

310

5,07

110

4,34

795

,302

Num

ber o

f Poo

r Peo

ple

[thou

sand

]38

,394

7,30

824

613

413

528

724

5Po

verty

Rat

e [%

]18

.223

.125

.217

.016

.924

.528

.6H

PI25

.222

.723

.221

.023

.020

.926

.019

.424

.319

.724

.120

.931

.124

.8So

urce

: Sus

enas

200

2; B

PS; I

ndon

esia

: Hum

an D

evel

opm

ent R

epor

t 200

4 fo

r HD

I; W

onog

iri in

Fig

ures

200

4, C

entra

l Jav

a in

Fig

ures

200

4

Indo

nesi

aC

entra

l Jav

a Pr

ov.

Won

ogiri

wat

ersh

ed a

rea

Won

ogiri

irrig

ated

are

a

kab.

Won

ogiri

kab.

Kar

anga

nyar

kab.

Suk

ohar

joka

b. K

late

nka

b. S

rage

n

Tabe

l 2

.1.1

K

ondi

si S

osia

l-Eko

nom

i DA

S W

onog

iri,

DI W

onog

iri,

Prop

insi

Jaw

a Te

ngah

, dan

Inod

ones

ia T

ahun

199

9 da

n 20

02

Page 5: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-4

Sub-

DA

Sha

%ha

%ha

%%

Ha

%

Ked

uang

17,7

8942

9,48

723

14,8

6135

42,1

3710

0

Tirto

moy

o6,

951

339,

052

435,

085

2421

,088

100

Tem

on3,

639

582,

631

426,

270

100

Upp

er S

olo

14,1

6172

2,67

514

2,87

815

19,7

1410

0

Ala

ng6,

150

365,

666

335,

152

3016

,968

100

Wur

yant

ro98

014

1,93

827

4,26

259

7,18

010

0

Ngu

ngga

han

2,66

332

2,25

227

3,34

941

8,26

410

0

Res

idua

l Bas

in12

84

2,73

496

2,86

210

0

Land

Are

a To

tal

52,4

6142

31,0

7025

26,0

9121

14,8

6112

124,

483

100

Wat

er S

urfa

ce8,

767

Tota

l52

,461

-31

,070

-26

,091

-14

,861

-13

3,25

0-

Mar

ent M

ater

ials

Phy

siogr

aphy

Vol

cani

c slo

pe V

olca

nic

slope

Fla

t or f

old

Vol

cani

c slo

pe V

olca

nic

pied

mon

t F

old

& u

plift

Vol

cani

c slo

peSo

urce

: Soi

l map

s pre

pare

d by

Sub

Bal

ai R

ehab

ilita

si L

ahan

dan

Kon

serv

asi T

anah

, Sol

o, 1

985;

bas

ed o

n a

map

pre

pare

d by

Soi

l Res

earc

h In

stitu

te, B

ogor

, 197

3

Vol

cani

c tu

ff V

olca

nic

tuff

Tabl

e 2.

4.1

Soi

l Dist

ribut

ion

in W

onog

iri C

atch

men

t Are

a

Soil

Type

Tota

lM

edite

ran

(Alfi

sols)

Lito

sol (

Ince

ptiso

ls)G

rum

sol (

Ver

tisol

s)La

toso

l (A

lfiso

ls)

Vol

cani

c tu

ff L

imes

tone

Cla

y de

posit

Vol

cani

c tu

ff

Tabe

l 2.4

.1

Dis

trib

usi J

enis

Tan

ah d

i DA

S W

onog

iri

Page 6: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-5

Feat

ure

Faci

lity

Plan

Cos

tEv

alua

tion

1) Mod

ifica

tion

of in

take

◆In

take

tow

er w

ith se

lect

ive

inta

ke g

ate

is to

be

cons

truct

ed o

n th

e ex

istin

g in

take

to ra

ise

foun

datio

n he

ight

of I

nlet

.◆

This

met

hod

aim

s at a

void

ing

the

inta

ke fr

ombe

ing

burie

d by

sedi

men

tatio

n an

d to

pre

vent

garb

age

from

ent

erin

g th

e in

let.

i) In

take

Tow

er

Hei

ght

H=2

6.0

m

Gat

es

H5.

0m x

B12

.6m

x 2

nos.

E

leva

tion

of b

otto

m o

f inl

et

EL.

127.

0 m

i) C

onst

ruct

ion

Cos

t

$

3,16

0,00

0ii)

O&

M C

ost

$53

,000

/yea

r

◆ W

ater

supp

ly sh

ould

be

susp

ende

d du

ring

cons

truct

ion.

◆St

rong

load

bear

ing

capa

city

offo

unda

tion

shal

lbe

need

ed to

supp

ort t

he su

pers

truct

ure.

◆Se

dim

enta

tion

wou

ldbe

acce

lera

ted

due

tohe

ight

enin

gof

inle

t fou

ndat

ion

from

EL.

116.

0 m

to 1

27.0

m.

2) R

eloc

atio

nof

inta

ke◆

Relo

catio

n of

the

exis

ting

inta

ke to

300

mup

stre

am o

n th

e le

ft ba

nk w

here

less

sedi

men

tatio

nis

exp

ecte

d◆

Inta

ke to

wer

with

sele

ctiv

e in

take

with

gat

es is

tobe

con

stru

cted

.◆

Wat

erw

ay tu

nnel

is c

onst

ruct

ed to

con

nect

the

exis

ting

cond

uit t

o th

e po

wer

stat

ion.

i) In

take

Tow

er

Hei

ght

H=2

6.0

m

Gat

es

H5.

0m x

B12

.6m

x 2

nos.

E

leva

tion

of b

otto

m o

f inl

et

EL.

127.

0 m

ii) T

rans

mis

sion

Tun

nel

D

iam

eter

D=5

.5 m

L

engt

h

L

=570

m

i) C

onst

ruct

ion

Cos

t

$

8,80

0,00

0ii)

O&

M C

ost

$14

0,00

0/ye

ar

◆C

onst

ruct

ion

cost

is th

e hi

ghes

t◆

Sedi

men

tatio

nha

sal

read

ybe

enoc

curr

edar

ound

the

prop

osed

site

.So

effe

ctiv

enes

san

dre

liabi

lity

agai

nst

sedi

men

tatio

n is

ver

y lo

w.

◆W

ater

supp

lysh

ould

besu

spen

ded

durin

gco

nnec

tion

wor

k w

ith th

e ex

istin

g co

ndui

t.

3) Gar

bage

trapp

ing

stru

ctur

e at

inta

ke

◆O

verf

low

wei

r is t

o be

con

stru

cted

aro

und

the

exis

ting

inta

ke.

◆Tr

ash

rack

s are

to b

e in

stal

led

on th

e ov

erflo

ww

eir t

o bl

ock

garb

age

ente

ring

into

the

inta

ke.

◆A

ppro

achi

ng d

eck

is to

be

inst

alle

d ov

er th

etra

sh ra

cks t

o co

nnec

t th

e da

m c

rest

and

this

stru

ctur

e. T

hese

dec

k an

d tra

sh ra

ck a

re d

esig

ned

to b

e su

bmer

gibl

e to

min

imiz

e co

nstru

ctio

n co

st.

◆G

arba

ge o

n tra

sh ra

ck sh

all b

e re

mov

ed b

y ba

ckho

e to

min

imiz

e m

aint

enan

ce w

orks

.

i) D

oubl

e Sc

reen

H

26.0

m x

L11

1.2m

A

rea

A

=890

m2

ii) A

ppro

ach

Dec

k

Len

gth

L=1

06 m

W

idth

B

=7.0

m

Are

a

A=7

40 m

2

iii) S

teel

Pile

Φ

1,00

0 m

m x

H9.

0 m

x 3

4 no

s.

i) C

onst

ruct

ion

Cos

t

$

3,67

0,00

0ii)

O&

M C

ost

$65

,000

/yea

r

◆G

arba

ge re

mov

al w

ork

beco

me

easy

by

this

met

hod.

◆W

ater

supp

ly sh

ould

be

susp

ende

d du

ring

cons

truct

ion.

◆ C

erta

inty

and

effe

ctiv

enes

s are

ver

y hi

gh a

mon

gco

unte

rmea

sure

s.

4) Dre

dgin

g by

Hyd

ro-

suct

ion

met

hod

◆H

ydro

-suc

tion

syst

em is

to b

e in

stal

led

to re

mov

eth

e se

dim

ent a

nd g

arba

ge a

t int

ake.

i) H

ydro

-suc

tion

syst

emi)

Con

stru

ctio

n C

ost

$2,

875,

000

ii) O

&M

Cos

t

$

99,0

00/y

ear

◆Th

is m

etho

d is

con

side

red

to re

duce

ope

ratio

nal c

ost

with

nor

mal

hyd

raul

ic d

redg

ing.

◆C

erta

inty

of t

his m

etho

d is

a li

ttle

infe

rior t

o hy

drau

licdr

edgi

ng, h

owev

er e

ffect

iven

ess o

f thi

s met

hod

for b

oth

sedi

men

t and

gar

bage

wer

e co

nfirm

ed.

◆Th

ere

are

oper

atio

nal c

onst

rain

ts d

epen

ding

on

the

rese

rvoi

r wat

er le

vels

.

5) Hyd

raul

icdr

edgi

ng

◆Re

mov

e th

e se

dim

ent a

nd g

arba

ge a

t int

ake

bypu

mp

dred

ger.

i) D

redg

er

Suc

tion

dred

ger,

600P

S x

1uni

ti)

Con

stru

ctio

n C

ost

$4,

456,

700

ii) O

&M

Cos

t

$

320,

200/

year

◆Th

is m

etho

d is

com

mon

cou

nter

mea

sure

aga

inst

rese

rvoi

r sed

imen

tatio

n.◆

Relia

bilit

y of

sedi

men

t rem

ovin

g pe

rfor

man

ce is

hig

hest

amon

g th

e al

tern

ativ

e co

unte

rmea

sure

s.◆

Runn

ing

cost

is h

ighe

st. A

nd sp

oil b

ank

is re

quire

d.

6) Gar

bage

trapp

ing

stru

ctur

e in

the

Ked

uang

Riv

er

◆O

verf

low

wei

r with

stee

l pip

es is

to b

eco

nstru

cted

on

the

Ked

uang

Riv

er b

efor

e en

terin

gth

e re

serv

oir.

◆Sa

bo d

am w

ith st

eel-p

ipe

type

trap

ping

stru

ctur

eis

com

mon

in Ja

pan

to tr

ap a

nd re

mov

e ga

rbag

e.◆

Gar

bage

rem

oval

wor

ks w

ill b

e ca

rrie

d ou

tpe

riodi

cally

.

i) C

oncr

ete

Wei

r

Dam

wid

th

W=5

6.3

m

Dam

hei

ght

H

= 9.

3 m

D

esig

n di

scha

rge

Q=

1,3

70 m

3 /s

Cre

st w

idth

Bc

= 70

m

Ove

rflo

w d

epth

H

w=4

.9m

ii) S

teel

mat

eria

l

Wid

th

B=2

5.0

m

Hei

ght

H=4

.0 m

i) C

onst

ruct

ion

Cos

t

$

1,37

0,00

0ii)

O&

M C

ost

$21

,000

/yea

r

◆Th

is m

etho

d is

to re

duce

gar

bage

ent

erin

g in

to th

ere

serv

oir.

◆Pe

riodi

cal g

arba

ge re

mov

al w

orks

are

nee

ded.

Alte

rnat

ives

Tab

le 8

.6.1

Eva

luat

ion

of A

ltern

ativ

es fo

r C

ount

erm

easu

res f

or S

edim

ent D

epos

its a

nd G

arba

ge a

t Int

ake

Cocr

ete

for p

lug

EL.1

22.5

m

EL.1

16 m

EL.1

28 m

EL.1

40 m

Scre

en

Exis

ting

stru

ctur

es

Inta

ke to

wer

1,0m

10.0

m5.

0 m

15,7

m

EL.1

38 m

EL.1

29 m

Sect

ion

of c

onst

ruct

ion

ofne

w in

take

stru

ctur

e/w

ater

way

5.5

m

EL.1

40 m

Con

nect

ing

Poin

t

Surg

e ta

nk

EL.1

42.5

m

EL.1

07.6

m

Gat

e sh

aft

Spill

way

Sect

ion

of e

xist

ing

wat

erw

ay

ΔH

ΔH

EL.1

16.0

m

EL.1

28.0

m

EL.1

36.0

m EL.1

36.0

m

EL.1

16.0

m

EL.1

28.0

m

EL.1

36.0

m EL.1

36.0

m

Tabe

l 8.6

.1

Eva

luas

i Alte

rnat

if Pe

nang

anan

End

apan

Sed

imen

dan

Sam

pah

di In

take

Page 7: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-6

Feat

ure

and

Sedi

men

t Bal

ance

Faci

lity

Plan

Cos

t E

valu

atio

n1)

Ked

uang

Riv

erSe

dim

ent

bypa

ss

◆Th

is m

etho

d is

redu

ce th

e se

dim

ent i

nflo

w fr

omth

e K

edua

ng R

iver

into

the

rese

rvoi

r by

dive

rting

the

sedi

men

t inf

low

with

hig

h co

ncen

tratio

n in

toth

e by

pass

tunn

el to

the

dow

nstre

am ri

ver.

◆Ta

rget

sedi

men

t is t

he w

ash

load

s bec

ause

tract

ive

forc

e is

smal

l due

to g

entle

byp

ass t

unne

l(c

hann

el) g

radi

ent o

f 1/1

,000

.◆

This

met

hod

is u

sual

ly e

ffect

ive

in c

ase

that

itw

ould

be

diffi

cult

to lo

wer

the

wat

er le

vel f

orse

dim

ent f

lush

ing

and

the

rese

rvoi

r is r

elat

ivel

ysm

all.

◆Ef

ficie

ncy

of S

edim

ent R

emov

al   

Vol

ume

7

57,0

00 m

3 (wet

yea

r)

C

once

ntra

tion

2,

789

ppm

(wet

yea

r)

* w

et y

ear 1

998-

1999

i) B

ypas

s tun

nel

L

= 6

,435

m, I

= 1

/1,0

00

Hor

sesh

oe se

ctio

n 2r

= 5

.0 m

D

esig

n di

scha

rge

Q =

50

m3/

sii)

Riv

er im

prov

emen

t

L=2

,395

m, I

=1/2

00

Cro

ss se

ctio

n

B1

0.0

m x

H3.

0 m

(s

ide

slop

e 1:

0.5)

D

esig

n di

scha

rge

Q =

65

m3 /s

iii) D

iver

ting

Wei

r

W=1

37.9

m, H

= 9.

3 m

,

Des

ign

disc

harg

e Q

= 1

,370

m3 /s

C

rest

wid

th

Bc =

70

m

Ove

rflo

w d

epth

H

w =

4.9

m

Gat

es

H6.

7m x

B5.

0m x

2no

s.

i) C

onst

ruct

ion

Cos

t

$

82,9

40,0

00ii)

O&

M C

ost

$1,

597,

000/

year

iii) U

nit c

ost

$10

.7/m

3

◆C

onst

ruct

ion

cost

and

O&

M c

ost w

ill b

e hi

ghes

tam

ong

the

alte

rnat

ive

coun

term

easu

res.

◆V

olum

e of

sedi

men

t rel

ease

d is

alm

ost t

he sa

me

with

oth

er a

ltern

ativ

es, h

owev

er re

liabi

lity

and

effe

ctiv

enes

s of s

edim

ent r

elea

sing

is h

igh.

◆Le

ngth

of b

ypas

s cha

nnel

is v

ery

long

. And

com

pens

atio

n fo

r lan

d ac

quis

ition

will

be

nece

ssar

y.

2) S

edim

ent

sluic

ing

byne

w g

ates

◆Th

is m

etho

d is

to p

ath

thro

ugh

inco

min

g flo

odin

flow

from

the

Ked

uang

Riv

er w

ith h

igh

turb

idity

to th

e do

wns

tream

reac

hes t

hrou

gh n

ew g

ate

befo

rede

posi

tion

in th

e re

serv

oir.

◆N

ew sl

uici

ng g

ate

is to

be

inst

alle

d on

the

right

abut

men

t of t

he d

am to

mak

e th

e K

edua

ng fl

ood

inflo

w sm

ooth

ly fl

owin

g in

to sl

uice

gat

e.

◆Ef

ficie

ncy

of S

edim

ent R

emov

al   

Vol

ume

843

,000

m3

(wet

yea

r)

C

once

ntra

tion

2,

712

ppm

(wet

yea

r)

* w

et y

ear 1

998-

1999

i) S

edim

ent g

ate

H

12.6

m x

B5.

0 m

x 4

nos.

ii) S

pillw

ay c

hann

el

L =

723

m, B

= 2

0 m

iii) F

ore

bay

exca

vatio

n

Lev

el o

f exc

avat

ion

EL.1

27.0

m

Vol

ume

183,

000

m3

i) C

onst

ruct

ion

Cos

t

$

35,6

30,0

00ii)

O&

M C

ost

$67

2,00

0/ye

ariii

) Uni

t cos

t

$

4.7/

m3

◆Fa

cilit

ies r

equi

red

are

only

slui

cing

gat

e an

dch

ute

way

whi

ch c

an b

e co

nstru

cted

with

in th

e da

mar

ea, s

o no

nee

d fo

r lan

d ac

quis

ition

.◆

Con

stru

ctio

n co

st is

che

apes

t am

ong

the

alte

rnat

ives

, it i

s aro

und

1/2

of th

e se

dim

ent

bypa

ssin

g.◆

Effe

ctiv

enes

s of s

edim

ent r

elea

se is

alm

ost t

hesa

me

as th

e se

dim

ent b

ypas

sing

.◆

Sedi

men

t slu

icin

g is

onl

y ef

fect

ive

whe

n th

ere

serv

oir w

ater

leve

l is l

ow m

ainl

y in

the

begi

nnin

gof

the

wet

seas

on. W

hen

the

rese

rvoi

r wat

er le

vel i

shi

gh, e

ffici

ency

on

sedi

men

t rel

easi

ng b

ecom

essm

all.

3) S

edim

ent

stor

age

rese

rvoi

rw

ith n

ewga

tes i

nre

serv

oir

◆Th

is m

etho

d is

to c

reat

e a

smal

l sed

imen

tst

orag

e re

serv

oir f

or th

e se

dim

ent i

nflo

w fr

om th

eK

edua

ng R

iver

insi

de th

e re

serv

oir.

◆Th

e sm

all s

edim

ent s

tora

ge re

serv

oir i

s cre

ated

by in

stal

latio

n of

clo

sure

dik

e.◆

New

gat

e is

to b

e in

stal

led

for s

edim

ent r

elea

sing

on th

e sa

me

loca

tion

of th

e se

dim

ent s

luic

ing

alte

rnat

ive.

◆Be

caus

e of

smal

l cap

acity

of s

edim

ent s

tora

gere

serv

oir,

the

rese

rvoi

r wat

er le

vel r

ises

rapi

dly

due

to in

flow

from

the

Ked

uang

Riv

er. T

he st

ored

wat

er in

the

stor

age

rese

rvoi

r is d

iver

ted

into

the

mai

n re

serv

oir t

hrou

gh th

e ne

w o

verf

low

wei

r.

◆Ef

ficie

ncy

of S

edim

ent R

emov

al   

Vol

ume

1,38

0,00

0 m

3 (wet

yea

r)

i) C

losu

re d

ike

: dou

ble

shee

t pile

L

= 6

50 m

, H =

15

m, B

= 1

0 m

ii) S

edim

ent g

ate

H

12.6

m x

B7.

5 m

x 4

nos.

iii)

Spill

way

cha

nnel

L

= 7

23 m

, B =

20

miv

) For

e ba

y ex

cava

tion

L

evel

of e

xcav

atio

n EL

.127

.0 m

V

olum

e 18

3,00

0m3

v) O

verf

low

wei

r

L =

150

m, B

= 1

0 m

i) C

onst

ruct

ion

Cos

t

$

47,0

90,0

00ii)

O&

M C

ost

$90

8,00

0/ye

ariii

) Uni

t cos

t

$

3.8/

m3

◆Se

dim

ent s

tora

ge re

serv

oir c

an b

e op

erat

edse

para

tely

from

the

mai

n W

onog

iri re

serv

oir.

◆ S

edim

ent f

lush

ing

can

be o

pera

ted

with

out

low

erin

g m

ain

rese

rvoi

r wat

er le

vel.

◆A

ll fa

cilit

ies c

an b

e co

nstru

cted

with

in d

am si

tear

ea w

ithou

t lan

d ac

quis

ition

.◆

Gar

bage

issu

es a

t int

ake

will

be

solv

ed b

ecau

seal

mos

t all

of th

e ga

rbag

e fr

om th

e K

edua

ng R

iver

is re

tain

ed in

the

stor

age

rese

rvoi

r.◆

Sedi

men

t flu

shin

g ca

n be

mad

e af

ter s

torin

gw

ater

up

to N

HW

L in

the

mai

n re

serv

oir.

◆A

s wel

l as s

edim

ent f

lush

ing,

sedi

men

t slu

icin

gca

n be

mad

e in

the

begi

nnin

g of

the

wet

seas

on.

◆Su

stai

nabi

lity,

relia

bilit

y an

d ef

fect

iven

ess o

fse

dim

ent r

elea

sing

are

hig

hest

am

ong

the

alte

rnat

ive

coun

term

easu

res.

Alte

rnat

ivesTab

le 8

.6.2

E

valu

atio

n of

Alte

rnat

ives

for

Cou

nter

mea

sure

s for

Sed

imen

t Inf

low

from

Ked

uang

Riv

er

Bypa

ss T

unne

lL=

6,44

0m2R

=5.0

m

Div

ertin

g W

eir

Ked

uang

Riv

er

Won

ogir

iDam

Riv

er im

prov

emen

tL=

2,40

0mB

=10m

,h=3

.0m

Bypa

ss T

unne

lL=

6,44

0m2R

=5.0

m

Div

ertin

g W

eir

Ked

uang

Riv

er

Won

ogir

iDam

Riv

er im

prov

emen

tL=

2,40

0mB

=10m

,h=3

.0m

Ked

uang

Riv

er

Won

ogir

iD

amSe

dim

ent S

luic

ing

Gat

e

Pres

umed

se

dim

ent f

low

Exi

stin

g Sp

illw

ay

Solo

Riv

er

Ked

uang

Riv

er

Won

ogir

iD

amSe

dim

ent S

luic

ing

Gat

e

Pres

umed

se

dim

ent f

low

Exi

stin

g Sp

illw

ay

Solo

Riv

er

Won

ogir

iD

am

Bypa

ss w

ayL=

720

m

Ove

rflo

w W

eir

L=15

0 m

Sedi

men

t Sto

rage

R

eser

voir

Won

ogir

iD

am

Bypa

ss w

ayL=

720

m

Ove

rflo

w W

eir

L=15

0 m

Sedi

men

t Sto

rage

R

eser

voir

Tabe

l 8.6

.2

Eva

luas

i Alte

rnat

if Pe

nang

anan

Alir

an S

edim

en d

ari S

unga

i Ked

uang

Page 8: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-7

Feat

ure

Faci

lity

Plan

Cos

tEv

alua

tion

1) S

edim

ent

stor

age

dam

for s

edim

ent

rem

oval

(Che

ck d

am,

Sabo

dam

)

◆ S

edim

ent s

tora

ge d

ams a

re c

onst

ruct

ed o

n th

e riv

er c

hann

el o

fm

ajor

trib

utar

ies t

o tra

p an

d st

ore

sedi

men

ts, a

nd to

rem

ove

byex

cava

tion.

◆Re

mov

al w

orks

of s

edim

ent d

epos

its is

car

ried

out i

n th

e dr

yse

ason

◆Tr

appe

d se

dim

ents

shal

l be

perio

dica

lly re

mov

ed b

y ex

cava

tion

by b

ack

hoe

and

conv

eyed

to sp

oil b

anks

by

truck

s.◆

Rela

tivel

y co

arse

sedi

men

ts a

re d

epos

ited

in th

e st

orag

e da

m a

ndfin

er se

dim

ents

flow

into

the

rese

rvoi

r

i) Se

dim

ent S

tora

ge D

am x

83un

its

Dam

wid

th

W =

116

m

Dam

hei

ght

H

= 9

.3 m

S

tora

ge C

apac

ity

V

= 2

4,00

0 m

3

C

rest

wid

th

Bc

= 70

m

Ove

rflo

w d

epth

H

w =

5.0

m

i) C

onst

ruct

ion

Cos

t

$

225,

460,

000

ii) O

&M

Cos

t

$3,1

89,0

00/y

ear

iii) U

nit c

ost

$12

.8/m

3

◆T

his m

etho

d is

com

mon

to

trap

sedi

men

ts in

rive

r .M

any

chec

k da

ms h

ave

been

alre

ady

cons

truct

ed.

How

ever

thes

e da

ms h

ave

been

alre

ady

fille

d w

ithse

dim

ents

with

out e

xcav

atio

n.◆

As t

he ta

rget

sedi

men

t is w

ash

load

s, se

dim

ent

trapp

ing

ratio

will

be

very

smal

l.◆

Furth

er, t

rapp

ing

capa

city

of s

tora

ge d

am is

ver

y sm

all

com

parin

g th

e se

dim

ent i

nflo

w, s

o m

any

stor

age

dam

ssh

all b

e co

nstru

cted

to c

ope

with

sedi

men

t inf

low

.◆

Due

to li

mita

tion

of lo

catio

ns o

f sto

rage

dam

, tra

pped

sedi

men

ts in

the

stor

age

dam

shal

l be

rem

oved

by

exca

vatio

n. T

hus h

uge

spoi

l ban

k ar

eas s

hall

be re

quire

d.

2) H

ydra

ulic

dred

ging

inre

serv

oir

◆Th

is m

etho

d is

to re

mov

e th

e de

posi

ted

sedi

men

t in

the

rese

rvoi

rby

hyd

raul

ic d

redg

ing.

◆D

redg

ed se

dim

ents

shal

l be

conv

eyed

to sp

oil b

anks

.

i) D

redg

erSu

ctio

ndr

edge

r,60

0PS

x10

units

i) C

onst

ruct

ion

Cos

t

$

44,5

67,0

00ii)

O&

M C

ost

$

3,20

2,00

0/ye

ariii

) Uni

t cos

t

$

4.3/

m3

◆ H

uge

spoi

l ban

k ar

eas s

hall

be re

quire

d.◆

Run

ning

cos

t is v

ery

expe

nsiv

e.◆

Rel

iabi

lity

of se

dim

ent r

emov

al is

hig

h.

3) D

ryex

cava

tion

inre

serv

oir

◆D

ry e

xcav

atio

n in

the

rese

rvoi

r sha

ll be

car

ried

out b

y ba

ck h

oeor

cra

wle

r-m

ount

ed b

ulld

ozer

for s

wam

p in

the

dry

seas

on w

hen

depo

site

d se

dim

ents

app

ear o

n th

e gr

ound

nea

r the

rive

r mou

ths o

fm

ajor

trib

utar

ies i

n th

e re

serv

oir.

◆Ex

cava

ted

sedi

men

ts sh

all b

e co

nvey

ed to

spoi

l ban

ks b

y tru

cks.

i)Bu

lldoz

er4t

,sw

amp

x2,

960

units

ii)C

raw

ler

load

er,

2.3

m3

x40

unit

iii)

Dum

ptru

ck,

20to

nx

165

units

i) C

onst

ruct

ion

Cos

t

$

287,

990,

000

ii) O

&M

Cos

t

$7,7

54,0

00/y

ear

iii) U

nit c

ost

$19

.0/m

3

◆Re

liabi

lity

of th

is m

etho

d is

hig

h.◆

This

met

hod

is a

pply

for s

edim

ent r

emov

al in

sedi

men

t sto

rage

dam

, how

ever

, to

cope

with

all

sedi

men

ts d

epos

ited

in th

e re

serv

oir (

arou

nd 2

0,00

0m

3/da

y) b

y so

le d

ry e

xcav

atio

n, m

any

syst

ems a

rere

quire

d, c

onse

quen

tly c

ost m

ust b

e ve

ry h

igh.

◆ H

uge

spoi

l ban

k ar

eas s

hall

be re

quire

d.

4) M

anag

ing

ofse

dim

ents

with

in re

serv

oir

by w

ater

rele

asin

g fro

mth

e in

take

◆Th

is m

etho

d ai

ms a

t mov

ing

the

prev

ious

ly d

epos

ited

sedi

men

tsto

war

d th

e de

ad z

one

of th

e re

serv

oir,

ther

eby

mai

ntai

ning

or

incr

easi

ng th

e ef

fect

ive

capa

city

of t

he re

serv

oir.

◆A

t the

beg

inni

ng o

f wet

seas

on, t

he m

axim

um in

take

dis

char

ge(7

0 m

3/s)

shal

l be

rele

ased

con

tinuo

usly

for l

ong

dura

tion,

say

2m

onth

s.◆

This

met

hod

is c

ateg

oriz

ed a

s sed

imen

t slu

icin

g by

use

of t

heex

istin

g in

take

.

No

new

faci

litie

s mig

ht b

ene

cess

ary.

Mai

nten

ance

of t

he e

xist

ing

inta

ke sh

all b

e ne

cess

ary.

i) C

onst

ruct

ion

Cos

t

$

0ii)

O&

M C

ost

$0/

year

iii) U

nit c

ost

$ 0

/m3

◆ R

elia

bilit

y of

this

met

hod

is v

ery

low

with

out

coun

term

easu

re fo

r blo

ckin

g of

inta

ke d

ue to

gar

bage

.G

arba

ge re

mov

al sy

stem

is st

the

inta

ke w

ill b

ein

disp

ensa

ble.

◆ T

his m

etho

d ha

s bee

n fu

nctio

ned

at n

orm

al o

pera

tion,

how

ever

it c

an n

ot b

e a

solu

tion

to c

ope

with

mas

sive

sedi

men

t inf

low

into

dam

rese

rvoi

r.◆

Sign

ifica

nt a

mou

nt o

f wat

er sh

all b

e re

leas

ed a

nd th

usth

ere

is a

risk

that

the

rese

rvoi

r wat

er le

vel c

an n

ot re

ach

NH

WL.

Alte

rnat

ivesT

able

8.6

.3 E

valu

atio

n of

Alte

rnat

ives

for

Cou

nter

mea

sure

s for

Sed

imen

t Inf

low

from

Oth

er T

ribu

tari

es

Hollo

w jet

Powe

r

HWL.1

36.

Guar

dco

nduit

EL.11

6.0m,

1310

Solo

Sluici

ng12

70

Exist

ing Sp

illwayTa

bel 8

.6.3

E

valu

asi A

ltern

atif

Pena

ngan

an A

liran

Sed

imen

dar

i Sun

gai L

ainn

ya

Page 9: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-8

Tabel 9.1.1 Pelajaran dari Pengalaman Sebelumnya Pada Proyek-proyek Konservasi DAS Wonogiri

- Well integrated & coordinated physical and vegetative or civil and agricultural measures are-

-

-

- Not blue print approaches, but area specific & flexible prescriptions by watershed conditions are-

-

- Crop Selection & Cropping Pattern- Need of crops tolerant to dry climate & with adequate economic value- Introduction of area specific superior crops/commodity andalan for dry land- Further adaptation of multiple cropping system with legumes should be aimed for improvement of- Development of commodities suitable for conservation purposes is to be envisaged.- Selection of agricultural commodities should be based on market potential followed by technical &- One alternative is to combine perennial crops with seasonal crops in home compound & dry farm

- Project failed because of top-down management & use of inflexible prescriptions poorly adapted to loc-

-

-

-

- Monitoring of performances of the programs implemented seldom practiced in the past. -

-

- Legal or official procedures will be necessary for controlling cropping pattern in dry farm land.

-

--- Multi-stakeholders dialog at district & watershed levels are to be maintained.-

-

-

1/: Lessons learned was extracted based on the review on the following reports & interview with the agencies concerne-

-

As farmers are becoming more interested in income earned in non-agricultural activities, they areincreasingly reluctant to invest in their own farm especially when it concerns maintenance of their

Introduction of measures which are accepted & practiced by farmers/farmers groups andsustainable; not sophisticated, low cost, use of available materials.

High priority to be given to sub-watersheds which are main contributors to the acute sedimentationproblems in the Wonogiri Reservoir.

Government support is still required & essential for supporting farming activities. The level ofincentives should be sufficiently high to induce farmers participation in soil conservation programs.

Precondition for success: strong & motivated extension services involving PPL & PKL will form thekey in implementing & sustaining conservation efforts.

1. Technical Issues

Grant aid in terrace rehabilitation has resulted in a detrimental change in social behavior in selfreliant activities for soil conservation and terrace rehabilitation.

Report on the Evaluation of Wonogiri Watershed Management, Watershed Management Technology Center(BP2TP DAS), Surakarta, 1995

Depending solely on conservation measures would mean implementing remedial measures withouttackling, preventing and solving the real causes.

2. Project Management Issues

Land is often left by the family head working on a seasonal basis in the cities. Recommendedagricultural measures are to be in line with this reality.

To achieve a balance between the farmers aspiration & the project objectives, an integrated planningwhich involves the bottom-up and bottom-down approaches is needed.Peoples behavior depends on their local culture. So, whatever programs must be formulatedaccordingly and not given as a uniform package for all locations, but must be arranged together withtheir leaders and then given to the people by various methods of extension and communications.Traditional values must be taken into account to ensure participation of communities.

3. Social & Institutional Issues

Technical collaboration team & technical working team at kabupaten level and integratedinstitutions at kecamatan & village levels are to be established.

Institutionalization of integrated & synergetic efforts & activities toward watershed management inthe Wonogiri catchment area is to be envisaged.

Consulting Services for the Upper Solo (Wonogiri) Watershed Protection Project, Monitoring & EvaluationFinal Report, July 1991, BCEOM

Planning is to be based on prospects for sustainable income flow, farmers traditional customs ofcultivation, off-farm income, availability of credits & markets, existing social priorities.

Reasons not following integrated approaches; project expenditures are to be spread as much aspossible among villages and communities in the project area.

Combined package of conservation measures and improved agricultural practices must provideadequate and immediate & long term financial gains to farmers for ensuring positive participation of

Agro-forestry approaches: Past projects were too much forestry oriented; to employ integratedforestry & agronomic approaches.

Page 10: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-9

Veg

etat

ion

1/1.

Terr

ace

Benc

h (c

ultiv

ated

are

a)(1

)A

gro-

fore

stry

& L

and

Use

Mod

ifica

tion

Prov

ision

of:

1)Sl

ope

Cla

ss: 0

- 8

%A

nnua

l Cro

ps +

Tre

e C

rops

/Tre

e-

Agr

o-fo

rest

ry D

evel

opm

ent

Ann

ual c

rops

90%

+ T

ree

crop

s/tr

ees 1

0%・

Tree

cro

p/tre

e se

edlin

g2)

Slop

e C

lass

: 0 -

15 %

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

・Fe

rtiliz

er/c

ompo

stA

nnua

l cro

ps 2

5% +

Tre

e cr

ops/

tree

s 25%

・La

bor c

ost (

ince

ntiv

es)

3)Sl

ope

Cla

ss: >

15 -

25 %

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

Ann

ual c

rops

50%

+ T

ree

crop

s/tr

ees 5

0%(+

med

ical

cro

ps)

Exte

nsio

n Se

rvic

es:

4)Sl

ope

Cla

ss: >

25 -

40 %

Tree

Cro

ps/T

rees

+ A

nnua

l Cro

ps・

Lan

d us

e co

nver

sion

to o

rcha

rd(+

med

ical

cro

ps)

Tre

e cr

ops/

tree

s 75%

+ A

nnua

l cro

ps 2

5%

・Tr

aini

ng p

rogr

am5)

Slop

e C

lass

: >40

%Tr

ee C

rops

/Tre

es・

Fiel

d pr

ogra

ms

Lan

d us

e co

nver

sion

to o

rcha

rd/fo

rest

(+ m

edic

al c

rops

+ C

over

Cro

p/G

rass

es)

・Li

vest

ock

supp

ort p

rogr

amT

ree

crop

s/tr

ees 1

00%

1-1.

Terr

ace

Lip

Impr

ovem

ent

1.Te

rrac

e Li

pPr

ovisi

on o

f:(1

)Te

rrac

e Li

p Im

prov

emen

t(1

)Te

rrac

e Li

p St

abili

zatio

nG

rass

es-

Agr

o-fo

rest

ry D

evel

opm

ent

-1)

-Ele

phan

t gra

ss・

Tree

cro

p/tre

e se

edlin

g-R

. Kol

onjo

no・

Ferti

lizer

/com

post

-Bra

chya

ria

briz

anth

a・

Labo

r cos

t (in

cent

ives

)2)

Prev

entin

g pl

antin

g of

cas

sava

on

lipSh

rubs

1-2.

Terr

ace

Ris

er Im

prov

emen

t-L

euca

ena

leuc

ocep

hala

(lam

toro

)-

Farm

ing

supp

ort

(1)

Terr

ace

Rise

r Im

prov

emen

t2.

Terr

ace

Rise

r-G

lyri

cide

ae・

Soil

amel

iora

nt-

(1)

Terr

ace

Rise

r Sta

biliz

atio

n・

Farm

inpu

ts1)

Veg

etat

ing

riser

with

gra

sses

of c

reep

ing

natu

reG

rass

es (C

reep

ing/

runn

er ty

pe g

rass

es p

refe

rabl

e)-

-Bra

chya

ria

briz

anth

a (B

B)Ex

tens

ion

Serv

ices

:2)

Prev

entin

g pl

antin

g of

cas

sava

on

riser

-Bra

chia

ria

decu

mbe

ns (B

D)

-Loc

al g

rass

(eba

lan

rum

put)

3.Te

rrac

e Be

nch

(cul

tivat

ed a

rea)

・Tr

aini

ng p

rogr

am1-

3.Te

rrac

e Be

nch

Impr

ovem

ent

(1)

Agr

o-fo

rest

ry &

Lan

d U

se M

odifi

catio

n・

Fiel

d pr

ogra

ms

(1)

Terr

ace

Benc

h R

efor

mat

ion

1)Sl

ope

Cla

ss: 0

- 8

%・

Live

stoc

k su

ppor

t pro

gram

1)A

nnua

l cro

ps 9

0% +

Tre

e cr

ops/

tree

s 10%

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

2)Sl

ope

Cla

ss: 0

- 15

%-

Ann

ual c

rops

25%

+ T

ree

crop

s/tr

ees 2

5%A

nnua

l Cro

ps +

Tre

e C

rops

/Tre

e3)

Slop

e C

lass

: >15

- 25

%A

nnua

l cro

ps 5

0% +

Tre

e cr

ops/

tree

s 50%

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

4)Sl

ope

Cla

ss: >

25 -

40 %

(+ m

edic

al c

rops

)L

and

use

conv

ersi

on to

orc

hard

Tree

Cro

ps/T

rees

+ A

nnua

l Cro

ps1-

4.W

ater

way

& D

rop

Stru

ctur

e Im

prov

emen

tT

ree

crop

s/tr

ees 7

5% +

Ann

ual c

rops

25%

(+

med

ical

cro

ps)

1)5)

Slop

e C

lass

: >40

%L

and

use

conv

ersi

on to

orc

hard

/fore

stTr

ee C

rops

/Tre

esT

ree

crop

s/tr

ees 1

00%

(+ m

edic

al c

rops

+ C

over

Cro

p/G

rass

es)

U S 1 ~ 4 T 1 U S 1 ~ 5 T 2 ~ 3

Back

war

dslo

ppin

gof

terr

ace

benc

h;co

nstri

ctio

nof

terr

ace

drai

nan

dex

cava

tion

ofdu

gout

forw

ater

& se

dim

ent d

epos

ition

Form

ing

orre

shap

ing

&st

reng

then

ing

ofte

rrac

elip

like

ridge

of p

addy

fiel

d

Form

ing

or re

shap

ing

of te

rrac

eris

er

Impr

ovem

ent o

f wat

erw

ay &

dro

pst

ruct

ure

All Classes

Upland Field with Bench Terrace

Veg

etat

ive

Mea

sure

s/A

gro-

fore

stry

Targ

et P

lace

/Veg

etat

ive

Mea

sure

s/A

gro-

fore

stry

No

cons

erva

tion

wor

ks p

lann

edPh

ysic

al M

easu

res

Supp

ort P

rogr

ams

Req

uire

d

Tab

le 9

.3.8  

Bas

ic C

ount

erm

easu

rs fo

r W

ater

shed

Con

serv

atio

n in

the

Won

ogir

i Cat

chm

ent A

rea

(1/2

)

Medium & Fair to Poor Quality Bench Terrace

Subject Area

Slope Class

Good Quality Bench TerraceTerrace Type& Condition

Land Unit

Soil

& W

ater

Con

serv

atio

n M

easu

res

Form

atio

n/em

pow

erm

ent o

ffa

rmer

gro

ups

Form

atio

n/em

pow

erm

ent o

ffa

rmer

gro

ups

1. B

ench

Ter

race

Impr

ovem

ent W

orks

Veg

etat

ing

lipw

ithgr

asse

sor

shru

bsw

ithec

onom

ic u

se (f

odde

r, fu

el)

Benc

h im

prov

emen

t & c

onst

ruct

ion

of te

rrac

e dr

ain

Prev

entin

gre

shap

ing

orcl

earin

gpr

actic

esof

riser

&pr

eser

ving

vege

tatio

n

Tabe

l 9.3

.8

Pena

ngan

an D

asar

Kon

serv

asi D

AS

di D

TA W

aduk

Won

ogir

i (1/

2)

Page 11: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-10

Veg

etat

ion

1/

2-1.

Con

stru

ctio

n of

ben

ch te

rrac

e1.

Terr

ace

Lip

Prov

ision

of:

1)(1

)Te

rrac

e Li

p St

abili

zatio

nG

rass

es-

Agr

o-fo

rest

ry D

evel

opm

ent

1)-E

leph

ant g

rass

・Tr

ee c

rop/

tree

seed

ling

-R. K

olon

jono

・Fe

rtiliz

er/c

ompo

st-B

rach

yari

a br

izan

tha

・La

bor c

ost (

ince

ntiv

es)

2)Pr

even

ting

plan

ting

of c

assa

va o

n lip

Shru

bs2-

2.W

ater

way

& D

rop

Stru

ctur

e C

onst

ruct

ion

-Leu

caen

a le

ucoc

epha

la (l

amto

ro)

-Fa

rmin

g su

ppor

t1)

-Gly

rici

deae

・So

il am

elio

rant

2.Te

rrac

e R

iser

・Fa

rm in

puts

(1)

Terr

ace

Rise

r Sta

biliz

atio

nG

rass

es (C

reep

ing/

runn

er ty

pe g

rass

es p

refe

rabl

e)1)

Veg

etat

ing

riser

with

gra

sses

of c

reep

ing

natu

re-B

rach

yari

a br

izan

tha

(BB)

Exte

nsio

n Se

rvic

es:

-Bra

chia

ria

decu

mbe

ns (B

D)

2)Pr

even

ting

plan

ting

of c

assa

va o

n ris

er-L

ocal

gra

ss (e

bala

n ru

mpu

t)・

Trai

ning

pro

gram

3.Te

rrac

e Be

nch

(cul

tivat

ed a

rea)

・Fi

eld

prog

ram

s(1

)A

gro-

fore

stry

& L

and

Use

Mod

ifica

tion

・Li

vest

ock

supp

ort p

rogr

am1)

Slop

e C

lass

: 0 -

8 %

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

Ann

ual c

rops

90%

+ T

ree

crop

s/tr

ees 1

0%2)

Slop

e C

lass

: 0 -

15 %

Ann

ual C

rops

+ T

ree

Cro

ps/T

ree

Ann

ual c

rops

25%

+ T

ree

crop

s/tr

ees 2

5%3)

Slop

e C

lass

: >15

- 25

%A

nnua

l Cro

ps +

Tre

e C

rops

/Tre

eA

nnua

l cro

ps 5

0% +

Tre

e cr

ops/

tree

s 50%

(+ m

edic

al c

rops

)4)

Slop

e C

lass

: >25

- 40

%Tr

ee C

rops

/Tre

es +

Ann

ual C

rops

Lan

d us

e co

nver

sion

to o

rcha

rd(+

med

ical

cro

ps)

Tre

e cr

ops/

tree

s 75%

+ A

nnua

l cro

ps 2

5%

5)Sl

ope

Cla

ss: >

40 %

Tree

Cro

ps/T

rees

Lan

d us

e co

nver

sion

to o

rcha

rd/fo

rest

(+ m

edic

al c

rops

+ C

over

Cro

p/G

rass

es)

Tre

e cr

ops/

tree

s 100

%1.

Frin

ge o

f Hou

sing

Yar

d1)

Eros

ion

Miti

gatio

n in

Hou

sing

Yar

dSh

rubs

Prov

ision

of:

-Ser

enga

n ja

ntan

・Tr

ee se

edlin

g(F

lem

ingi

a co

nges

ta R

oxb)

・La

bor c

ost (

ince

ntiv

es)

1/: K

inds

of t

ree

crop

s/tre

es: t

o be

sele

cted

by

bene

ficia

ries o

n ne

ed b

asis

2/

: Hou

sing

yar

d

Land Unit

Soil

& W

ater

Con

serv

atio

n M

easu

res

Veg

etat

ive

Mea

sure

s/A

gro-

fore

stry

Supp

ort P

rogr

ams

Phys

ical

Mea

sure

sTa

rget

Pla

ce/V

eget

ativ

e M

easu

res/

Agr

o-fo

rest

ryR

equi

red

Esta

blish

emen

t of h

edge

row

s aro

und

hous

ing

yard

Housing 2/

> 8%

H S 2 ~ S 5

No

phys

ical

mea

sure

s pla

nned

P S 1 ~ S 5 T 42.

Ter

race

For

mat

ion/

Upg

radi

ng W

orks

Con

stru

ctio

n of

wat

erw

ay &

dro

pst

ruct

ure

All Classes

Composite

Subject Area

Slope Class

Terrace Type& Condition

Form

atio

n/em

pow

erm

ent o

ffa

rmer

gro

ups

Upland Field without Bench Terrace, Traditional Terrace & Settlement Area under uplandField Condition

Upg

radi

ng c

urre

nt te

rrac

es in

toim

prov

ed b

ench

terr

ace

orfo

rmat

ion

of im

prov

ed b

ench

terr

ace

Veg

etat

ing

lipw

ithgr

asse

sor

shru

bsw

ithec

onom

ic u

se (f

odde

r, fu

el)

Tabe

l 9.3

.8

Pena

ngan

an D

asar

Kon

serv

asi D

AS

di D

TA W

aduk

Won

ogir

i (2/

2)

Page 12: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-11

1. L

and

Man

agem

ent f

or S

oil &

Wat

er C

onse

rvat

ion

1-1.

Farm

Lan

d Im

prov

emen

t-

Diss

emin

atio

n of

ben

efits

of s

oil &

wat

er c

onse

rvat

ion

-

-Te

rrac

e m

anag

emen

t-

Terr

ace

impr

ovem

ent w

ith a

dequ

ate

vege

tativ

e m

easu

res;

soil

& w

ater

con

serv

atio

n m

easu

res

-So

il m

anag

emen

t/im

prov

emen

t-

Impr

ovem

ent o

f soi

l che

mic

al &

phy

sical

pro

perti

es &

soil

prod

uctiv

ity th

roug

h;・

App

licat

ion

of o

rgan

ic fe

rtiliz

er o

r mat

ter;

diss

emin

atio

n of

qua

lity

com

post

mak

ing

・In

trodu

ctio

n of

cov

er/fo

dder

cro

ps in

MT

II to

app

ly o

rgan

ic m

atte

r & p

rovi

de v

eget

ativ

e co

ver

・Pl

antin

g of

seas

onal

gra

sses

or l

egum

es fo

r soi

l im

prov

emen

t & li

vest

ock

deve

lopm

ent

-So

il su

rfac

e co

ver m

anag

emen

t/im

prov

emen

t-

Impr

ovem

ent s

oil s

urfa

ce c

over

thro

ugh;

・M

ulch

ing

usin

g cr

op re

sidue

s, es

peci

ally

in M

T II

・In

trodu

ctio

n of

cov

er/fo

dder

cro

ps in

MT

II to

pro

vide

veg

etat

ive

cove

r & a

pply

org

anic

mat

ter

・ ・

1-2.

Land

Use

Mod

ifica

tion/

Con

vers

ion

- -Es

tabl

ishin

g so

il co

nser

vatio

n or

ient

ed la

nd u

se b

y pr

omot

ing

agro

-fore

stry

mea

sure

s-

2. A

gro-

fore

stry

Pro

mot

ion

2-1.

Prom

otio

n of

Agr

o-fo

rest

ry- -

3. Im

prov

emen

t of P

ekar

anga

n U

se3-

1.Im

prov

emen

t of V

eget

ativ

e C

over

& P

rodu

ctiv

ity-

Esta

blish

men

t of w

ell m

anag

ed p

ekar

anga

n w

ith su

ffici

ent t

ree

crop

s & im

prov

ed la

nd fo

rms

-M

odifi

catio

n of

land

use

in p

ekar

anga

n to

war

d so

il &

wat

er c

onse

rvat

ion

orie

nted

use

Tab

le 9

.3.9

L

and

Man

agem

ent &

Agr

icul

tura

l Pro

mot

ion

Mea

sure

s in

Dry

Far

m L

and

(1/2

)

Des

crip

tion/

Obj

ectiv

esSu

bjec

t/Mea

sure

s

Intro

duct

ion

ofril

eycr

oppi

ngby

mul

tiple

crop

ping

ofpa

law

ijaof

diffe

rent

grow

thdu

ratio

n;ex

.mai

ze11

0da

ys+

soyb

eans

90da

ys

Diss

emin

atio

nof

bene

fits

ofso

il&

wat

erco

nser

vatio

nth

roug

hm

ass

guid

ance

&ot

her

exte

nsio

nac

tiviti

esin

tegr

ated

with

impl

emen

tatio

n of

soi

l & w

ater

con

serv

atio

n m

easu

res

Col

labo

rativ

e &

inte

grat

ed m

easu

res o

f agr

icul

tura

l (es

tate

& fr

uit c

rops

) & fo

rest

ry m

easu

res i

n pr

omot

ion

of a

gro-

fore

stry

Cul

tivat

ion

ofle

gum

inou

scr

ops

offa

vora

ble

surf

ace

cove

rin

the

edge

ofte

rrac

e;ex

.mai

zein

cent

erof

benc

hw

ithgr

ound

nuti

nth

e ed

ge

Land

use

conv

ersio

nof

farm

land

toor

char

d/fo

rest

incr

itica

llan

dsof

slope

clas

s>

40%

; aim

ing

atla

ndpr

oduc

tivity

impr

ovem

ent

& so

il co

nser

vatio

n

Prom

otio

nof

plan

ting

pere

nnia

lcro

psto

redu

cela

bor

requ

irem

ents

infa

rmin

g;ne

xtge

nera

tion

appe

ars

toha

vele

ssin

tere

sted

infa

rmin

g &

labo

r sho

rtage

pro

blem

s sla

ted

Prom

otio

nof

agro

-fore

stry

asa

mea

sure

for

agric

ultu

ralp

rom

otio

nas

wel

las

soil

&w

ater

cons

erva

tion

base

don

land

suita

bilit

y,m

arke

tabi

lity

&pa

ying

due

cons

ider

atio

nto

annu

al&

long

term

prod

uctiv

ity&

econ

omic

valu

e;se

lect

ion

ofpl

ants

shou

ldbe

base

don

ben

efic

iarie

s pre

fere

nce

Tabe

l 9.3

.9

Peng

elol

aan

Lah

an d

an P

enan

gana

n Pr

omos

i Per

tani

an d

i Lah

an P

erta

nian

Ker

ing

(1/2

)

Page 13: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-12

4. C

rop

Sub-

sect

or M

easu

res

4-1.

Impr

ovem

ent o

f Cro

ppin

g Sy

stem

1)Im

prov

emen

t of C

ropp

ing

Patte

rnIm

prov

emen

t of C

ropp

ing

Patte

rn &

Sys

tem

-Si

ngle

Cro

ppin

g in

MT

1・

Mai

ze/C

assa

va -

Fallo

w-

Impr

ovem

ent o

f pro

duct

ivity

& in

clus

ion

of b

eans

in M

T 1

(ex.

row

s of b

eans

in th

e lo

wer

edg

e of

terr

ace

benc

h)-

Incl

usio

n of

bea

ns/d

roug

ht to

lera

nt c

rops

in M

T II;

inc

lusio

n of

legu

min

ous c

over

cro

ps in

MT

II-

Prev

entin

g ca

ssav

a pl

antin

g on

terr

ace

lip &

rise

r

・M

ultip

le C

rops

with

Bea

ns/C

assa

va -

Fallo

w-

Incl

usio

n of

bea

ns/d

roug

ht to

lera

nt c

rops

in M

T II;

inc

lusio

n of

legu

min

ous c

over

cro

ps/s

orgh

um in

MT

II

・M

ultip

le C

rops

with

out B

eans

/Cas

sava

- Fa

llow

-In

clus

ion

of b

eans

/dro

ught

tole

rant

cro

ps in

MT

II; i

nclu

sion

of le

gum

inou

s cov

er c

rops

/sor

ghum

in M

T II

-Im

prov

emen

t of p

rodu

ctiv

ity &

incl

usio

n of

bea

ns in

MT

1 (e

x. ro

ws o

f bea

ns in

the

low

er e

dge

of te

rrac

e be

nch)

-Pr

even

ting

cass

ava

plan

ting

on te

rrac

e lip

& ri

ser

-D

oubl

e C

ropp

ing

in M

T 1

& M

T 2

・M

aize

/Cas

sava

- M

aize

-Im

prov

emen

t of p

rodu

ctiv

ity &

incl

usio

n of

bea

ns in

MT

1 (e

x. ro

ws o

f bea

ns in

the

low

er e

dge

of te

rrac

e be

nch)

-In

clus

ion

of b

eans

or l

egum

inou

s cov

er c

rops

in M

T II

-Pr

even

ting

cass

ava

plan

ting

on te

rrac

e lip

& ri

ser

・M

ultip

le C

rops

with

bea

ns/C

assa

va -

Bean

s-

Impr

ovem

ent o

f pro

duct

ivity

of b

eans

in M

T I

-Pr

even

ting

cass

ava

plan

ting

on te

rrac

e lip

& ri

ser

・M

ultip

le C

rops

with

out b

eans

/Cas

sava

- Be

ans

-Im

prov

emen

t of p

rodu

ctiv

ity &

incl

usio

n of

bea

ns in

MT

1 (e

x. ro

ws o

f bea

ns in

the

low

er e

dge

of te

rrac

e be

nch)

-Pr

even

ting

cass

ava

plan

ting

on te

rrac

e lip

& ri

ser

2)Im

prov

emen

t of F

arm

ing

Prac

tices

-A

ppro

pria

te fe

rtiliz

atio

n in

clud

ing

orga

nic

ferti

lizer

; te

chni

cal t

rain

ing

on q

ualit

y co

mpo

st p

repa

ratio

n-

Use

of q

ualit

y se

eds,

espe

cial

ly in

MT

I-

Intro

duct

ion

of m

ulch

ing

& st

able

mul

ch;

min

imum

tilla

ge in

MT

II

4-2.

Tech

nolo

gy D

evel

opm

ent

-A

dapt

abili

ty te

st o

f pro

misi

ng b

ean

varie

ties

-R

iley

crop

ping

to e

nsur

e ve

geta

tive

cove

r in

criti

cal p

erio

d fo

r ero

sion

from

Janu

ary

to M

arch

-A

dapt

abili

ty te

st o

f sha

de to

lera

nt c

rops

, dro

ught

tole

rant

cro

ps &

oth

er p

rom

ising

cro

ps-

Tech

nolo

gy d

evel

opm

ent o

n tre

e cr

ops p

rodu

ctio

n on

long

term

bas

is

4-3.

Pala

wija

See

d Pr

oduc

tion

-A

ctiv

atio

n of

See

d Fa

rm th

roug

h re

nova

tion

& c

apac

ity b

uild

ing

-D

evel

opm

ent o

f soy

bean

s & g

roun

dnut

seed

pro

duct

ion

tech

nolo

gy b

y th

e Se

ed F

arm

-Fo

rmat

ion

of p

alaw

ija se

ed g

row

ers f

arm

er g

roup

s & p

rodu

ctio

n/su

pply

of s

eeds

in a

dist

rict

5. L

ives

tock

Sub

-sec

tor

Mea

sure

s5-

1.Li

vest

ock

Prom

otio

n-

Impl

emen

tatio

nof

lives

tock

prom

otio

npr

ogra

ms

(suc

has

intro

duct

ion

ofqu

ality

bree

ds&

impr

oved

offe

edin

gpr

actic

es a

nd st

reng

then

ing

of v

eter

inar

y &

ext

ensio

n se

rvic

es) i

nteg

rate

d w

ith so

il co

nser

vatio

n ve

geta

tive

mea

sure

s

Subj

ect/M

easu

res

Des

crip

tion/

Obj

ectiv

es

Tabe

l 9.3

.9

Peng

elol

aan

Lah

an d

an P

enan

gana

n Pr

omos

i Per

tani

an d

i Lah

an P

erta

nian

Ker

ing

(2/2

)

Page 14: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-13

Topography and Geology

Soil erosion

Waste (Dredged/excavated material)

Groundwater (well water use)

Water quality (Bengawan Solo river)

Water quality (Wonogiri reservoir)

Air quality (emission gas, dust.)

Noise and vibration

Terrestrial flora and fauna

Aquatic flora and fauna

Protected species and areas

Land acquisition and Resettlement

People's unrest and conflict/opposition

Change of income / livelihood

Impacts on agriculture, fishery, forestry

Impacts on downstream area

Traffic and transportation

Mod

ifica

tion

of th

e in

take

--

--

+-

-R

eloc

atio

n of

the

inta

ke-

-1-

-1-2

--

+1-

-1G

arba

ge tr

appi

ng s

truct

ure

at in

take

--

--

-+

--

Gar

bage

trap

ping

stru

ctur

e at

Ked

uang

rive

r-1

+-

--

-+

--

Hyd

ro-s

uctio

n se

dim

ent r

emov

al sy

stem

-1+

--

-1+

-H

ydra

ulic

dre

dgin

g-1

+-

-+

Ked

uang

rive

r sed

imen

t byp

ass

-1-2

-2-2

+1-1

-2-2

-1-2

+2-1

--1

Sedi

men

t slu

cing

by

new

gat

es-2

-2+1

-1-1

-2-1

-+1

-1-

-1C

ompa

rtmen

ted

rese

rvoi

r with

new

flus

hing

gat

es-2

-2+1

-1-1

-2-1

-+1

-1-

-1Se

dim

ent s

tora

ge d

am fr

o se

dim

ent r

emov

al-1

+-

--

-+

--

Hyd

raul

ic d

redg

ing

in re

serv

oir

-1+

--

-+

-D

ry e

xcav

atio

n in

rese

rvoi

r-1

-2-

+-2

-2-

-1-1

+2-1

-1M

anag

ing

of s

edim

ents

with

in re

serv

oir b

y w

ater

rele

asin

g fr

om th

e in

take

+-1

Re-

allo

catio

n of

rese

rvoi

r sto

rage

cap

acity

-1-1

-1-3

-3+1

-1-1

d. W

ater

shed

Con

serv

atio

nC

omm

unity

-bas

ed so

il co

nser

vatio

n+2

++1

+1-

+1+1

-

e. N

o A

ctio

nD

o no

thin

g fo

r sed

imen

tatio

n pr

oble

m-3

-1-

--2

--2

-1-2

-2-

Not

e)

"

-": N

eglig

ible

neg

ativ

e im

pact

, "

-1":

Min

or n

egat

ive

impa

ct,

"-2

": M

ediu

m n

egat

ive

impa

ct,

"-3

": S

igni

fican

t neg

ativ

e im

pact

.

"+":

Neg

ligib

le p

ositi

ve im

pact

, "

+1":

Min

or p

ositi

ve im

pact

, "

+2":

Med

ium

pos

itive

impa

ct,

"+3

": S

igni

fican

t pos

itive

impa

ct.

b. C

ount

erm

easu

res

for S

edim

ent I

nflo

wfr

om K

edua

ng ri

ver

c. C

ount

erm

easu

res

for S

edim

ent I

nflo

wfr

om O

ther

Trib

utar

ies

a. C

ount

erm

easu

res

for S

edim

ent

Dep

osits

and

Gar

bage

at I

ntak

e

E

nvir

onm

enta

l Ele

men

ts

Can

dida

te P

roje

ct C

ompo

nent

s

Phys

ical

Env

iron

men

tN

atur

alE

nvir

onm

ent

Soci

o-ec

onom

ic E

nvir

onm

ent

Tabe

l 10.

6.1

Mat

rik

Dam

pak

Kom

pone

n C

alon

Pro

yek

dala

m M

aste

r Pla

n

Page 15: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-14

(1) Countermeasures for Sediment Deposits and Garbage at IntakePositive Impact

Pre-construction

Construction Operation All Stages

Modification of the intake -1 +1 ○

Relocation of the intake - -2 +1 △

Garbage trapping structure at intake -1 - + ○

Garbage trapping structure at Keduang river - -1 - +1 ○

Hydro-suction sediment removal system -1 -1 +1 ○

Hydraulic dredging - -1 +1 ○

(2) Countermeasures for Sediment Inflow from Keduang RiverPositive Impact

Pre-construction

Construction Operation All Stages

Keduang river sediment bypass -2 -2 -2 +2 ×

Sediment sluicing by new gates -1 -1 -2 +2 △

Compartmented reservoir with new flushinggates -1 -2 -2 +2 △

(3) Countermeasures for Sediment Inflow from Other TributariesPositive Impact

Pre-construction

Construction Operation All Stages

Sediment storage dam for sediment removal - -1 -1 + ○

Hydraulic dredging in reservoir - -2 + ○

Dry excavation in reservoir -2 -2 +1 △

Managing of sediments within reservoir bywater releasing from the intake -1 +1 ○

Re-allocation of reservoir storage capacity -3 -2 -1 +1 ×

(4) Countermeasues for Watershed ConservationPositive Impact

Pre-construction

Construction Operation All stages

Community-based soil conservation - - +2 ○

-: Negligible negative impact, -1: Minor negative impact, -2: Medium negative impact, -3: Significant negative impact +: Negligible positive impact, +1: Minor positive impact, +2: Medium positive impact, +3: Significant positive impact○:Good, △:Fair, ×:Not Recommended

Table 10.6.2 Evaluation of Candidate Project Components

Evaluation

Evaluation

Evaluation

Candidate Project Components

Candidate Project Components

Candidate Project Components

Negative Impact

Negative Impact

Negative Impact

Candidate Project ComponentsNegative Impact

Evaluation

Tabel 10.6.2 Evaluasi Komponen Calon Proyek

Page 16: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-15

Unit Cost Cost(US$) (US$, thousand)

I Diect costA Spillway

/1 Excavation m3 502,580 3 1,510/2 Backfill m3 46,470 4 190/3 Concrete m3 35,110 113 3,970/4 Reinforcing bar t 1,756 813 1,430/5 Gate, radial t 170 18,600 3,160/6 Excavation, fore bay m3 183,000 5 920

Sub Total A 11,180B Closure dike

/1 Filling, for dike m3 47,320 6 280/2 Steel sheet pile t 4,452 1,200 5,340/3 Concrete, capping m3 3,300 13 40/4 Reinforcing bar t 165 813 130

Sub Total B 5,790C Overflow dike

/1 Excavation m3 20,000 3 60/2 Concrete m3 5,000 113 570

Sub Total C 630D Sub total, A to C 17,600E Other works (35% of D) 6,160F Sub total, D to E 23,760G Temporary works (10% of F) 2,380H Direct construction cost 26,140

( Total F and G)

II Government administration and Engineering service cost 3,920(15% of H)

III Pysical contingency 6,010(20% of I and II)

Grand Total 36,070Source: JICA Study Team

Unit Cost Cost(US$) (US$, thousand)

I Diect costA Equipment

/1 Cutter-suction dredger, 600PS nr. 1 2,969,200 2,970B Other equipments (15% of A) 446C Direct construction cost 3,416

( Total A and B)II Pysical contingency 170

(5% of I )

Grand Total 3,586Source: JICA Study Team

Table 11.4.3 Project Cost of Sediment Storage Reservoir with New Gates

Unit QuantityDescriptionNo.

Table 11.4.4 Procurement Cost of Dredger

No. Description Unit Quantity

Tabel 11.4.3 Biaya Konstruksi Waduk Penampung Sedimen Dengan Pintu-pintu Baru

Tabel 11.4.4 Biaya Pengadaan Mesin Pengeruk

Page 17: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-16

Tab

le 1

1.4.

5 P

roje

ct C

ost b

y W

ater

shed

Con

serv

atio

n

Uni

tE

ntir

e ba

sinK

udua

ngT

irto

moy

oT

emon

Upp

er S

olo

Ala

ngN

gung

gaha

nW

urya

ntor

oR

emna

ntC

ost

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

Q'ty

Am

ount

($)

($, t

hous

.)($

, tho

us.)

($, t

hous

.)($

, tho

us.)

($, t

hous

.)($

, tho

us.)

($, t

hous

.)($

, tho

us.)

($, t

hous

.)I.

Con

stru

ctio

n co

st1.

Land

pre

para

tion

1)Te

rrac

ing

(1)

Cut

ting

and

fillin

gm

30.

6922

,224

,000

15,3

355,

269,

000

3,63

64,

675,

000

3,22

61,

073,

000

740

5,58

8,00

03,

856

2,52

1,00

01,

739

1,51

2,00

01,

043

936,

000

646

650,

000

449

2)W

ater

way

and

dro

p(1

)St

one

mat

eria

lm

38.

4816

4,00

01,

391

45,0

0038

239

,000

331

8,00

068

38,0

0032

215

,000

127

9,00

076

6,00

051

4,00

034

(2)

Exca

vatio

nm

30.

5819

1,00

011

162

,000

3636

,000

2110

,000

637

,000

2119

,000

119,

000

511

,000

67,

000

4(3

)M

ason

ry w

ork

m3

10.6

414

9,00

01,

585

41,0

0043

636

,000

383

7,00

074

34,0

0036

213

,000

138

8,00

085

6,00

064

4,00

043

3)Li

p an

d riz

er, p

lant

ing

(1)

Seed

ling,

gra

ss, f

or li

pnr

.0.

0130

4,73

1,00

03,

047

86,1

07,0

0086

170

,106

,000

701

15,3

97,0

0015

468

,341

,000

683

28,0

70,0

0028

116

,178

,000

162

12,2

13,0

0012

28,

319,

000

83(2

)Se

edlin

g, sh

rub,

for l

ipnr

.0.

0718

,284

,000

1,28

05,

166,

000

362

4,20

6,00

029

492

4,00

065

4,10

1,00

028

71,

684,

000

118

971,

000

6873

3,00

051

499,

000

35(3

)Se

edlin

g, g

rass

, for

rise

rnr

.0.

0015

432,

330,

000

648

119,

414,

000

179

103,

112,

000

155

21,3

34,0

0032

98,9

13,0

0014

838

,625

,000

5822

,905

,000

3416

,181

,000

2411

,846

,000

18(4

)Pl

antin

g w

ork,

for l

ipm

0.01

91,4

20,0

0091

425

,833

,000

258

21,0

32,0

0021

04,

619,

000

4620

,502

,000

205

8,42

1,00

084

4,85

3,00

049

3,66

4,00

037

2,49

6,00

025

(5)

Plan

ting

wor

k, fo

r ris

erm

20.

0286

,466

,000

1,72

923

,883

,000

478

20,6

22,0

0041

24,

267,

000

8519

,783

,000

396

7,72

5,00

015

54,

581,

000

923,

236,

000

652,

369,

000

472.

Side

ditc

hes (

hous

ing

yard

)1)

Side

ditc

h(1

)St

one

mat

eria

lm

38.

4837

,000

314

20,0

0017

07,

000

591,

000

85,

000

421,

000

81,

000

81,

000

81,

000

8(2

)Ex

cava

tion

m3

0.58

53,0

0031

28,0

0016

11,0

006

2,00

01

7,00

04

2,00

01

1,00

01

1,00

01

1,00

01

(3)

Mas

onry

wor

km

310

.64

33,0

0035

118

,000

192

7,00

074

1,00

011

4,00

043

1,00

011

1,00

011

1,00

011

--

2)H

edge

row

(1)

Shru

b, fo

r hed

ge ro

wnr

.0.

078,

346,

000

584

4,44

2,00

031

11,

690,

000

118

282,

000

201,

130,

000

7930

4,00

021

221,

000

1518

9,00

013

90,0

006

(2)

Plan

ting

wor

k, h

edge

row

m2

0.02

1,04

3,00

021

555,

000

1121

1,00

04

35,0

001

141,

000

338

,000

128

,000

124

,000

-11

,000

-3.

Agr

o-fo

rest

ry a

nd a

nnua

l cro

p1)

Agr

o-fo

rest

ry a

nd a

nnua

l cro

pL.

S10

,093

3,12

52,

033

538

2,08

599

252

152

727

24.

Supp

ort p

rogr

am1)

Supp

ort p

rogr

amL.

S2,

974

981

595

149

595

268

149

149

90

Sub-

tota

l for

I.40

,408

11,4

348,

622

1,99

89,

131

4,01

32,

320

1,77

51,

115

II.

Gov

ernm

ent a

dmin

istra

tion

and

engi

neer

ing

serv

ice

cost

10%

4,04

11,

143

862

200

913

401

232

178

112

(10%

of I

.)

III.

Phys

ical

con

tinge

ncy

10%

4,44

51,

258

948

220

1,00

444

125

519

512

3(1

0% o

f tot

al o

f I. a

nd II

.)

Proj

ect C

ost (

tota

l of I

., II

. and

III

.)48

,894

13,8

3510

,433

2,41

811

,049

4,85

62,

807

2,14

81,

349

Sour

ce:

JIC

A S

tudy

Tea

m

Uni

tIt

em

Tabe

l 11.

4.5

Bia

ya K

onst

ruks

i Pro

yek

Kon

serv

asi D

AS

Page 18: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-17

Project Name: Construction of Sediment Storage Reservoir with New Gates in the Wonogiri ReservoTarget Area: In/around the Wonogiri Reservoir Project Period: 4 years

Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions

Overall Goal

Project Purpose

Outputs

Activities Inputs

Pre-conditions

Source: JICA Study Team

Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.

1)Decreasing ration of theeffective storage volume in thereservoir

2) Water supply to the Wonogiriirrigation area

Reservoirsedimentationsurvey andmonitoring ofwater supply

There will be no drastic change inreservoir management policy ofGovernment of Indonesia

1) The existing intake structurewill be completely reloevedfrom the sediment and garbageinflow from the Keduang River.

2) Majority of sediment andgarbage from the KeduangRiver will released from thenew gates to the vdownstreamreach from the dam.

1) Sediment deposition level atthe intake (every 2 month)

2) Frequency of interruption ofpower generation and watersupply

3) Volume of released sedimentfrom the new gates

1) Echo soundingsurvey at theintake

2) Operationrecord of powergeneration andwater supply

1) PJT I Bengawan Solo will operate thesediment storage reservoir according tothe new operation rule.

2) PJT I Bengawan Solo will conductsedimentation survey at the intakeperiodically.

Janapnese side:Funding assistance for construction of the sedimentstorage reservoir with new gates

Indonesian side:Government administrationAllocation of proper O&M cost by PJT I BengawanSolo

Sediment storage reservoir withnew gates will be constructed inthe Wonogiri reservoir.

Construction of:1) Sediment stodrage reservoirwith new gates in the Wonogirireservoir,2) Closure and overflow dikes

Socialization of downstreamresidents (stakeholders) for theconstruction

1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.3) Water quality of the downstreamreach is not drastically deteriorated.

Construction cost does not increasedrastically.

Visible confirmation Surver recordProgress report,completion reportand evaluationreport of theconstruction stage

1) The sediment storage reservoir willbe operated according to the reservoiroperation rule and maintained properly.

2) Maintenance dredging at the intakewill be conducted periodically.

Tabel 11.5.4 PDM Penanganan Mendesak (1/2)

Page 19: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-18

Project Name: Watershed Conservation in Keduang River CatchmentTarget Area: Keduang River Watershed Project Period: 3 years

Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions

Overall Goal

Project Purpose

Outputs

Activities Inputs

Pre-conditions

Source: JICA Study Team

Janapnese side:Funding assistance for implementation of watershedconservation

Indonesian side:Government administrationTechnical and financial support program for landmanagement and agricultural promotion

In the watershed of Keduangriver,1) K2TAs will be established inthe selected area.2) Farmers understandings onthe importance of land andwater conservation will bedeepened in the selected areas.3) Demonstration plots will beprepared and managed by thekey farmers.4) 11,260 ha of upland fieldwill be rehabilitated throughparticipation of farmers.5) Agro-forestry will bedeveloped and applied in theselected area.

1) Formulation of K2TA2) Farmer training on: -Land & water conservation -Terrace formation,improvement and rehabilitation -Agro-forestry development3) Making demonstration plot4) Farm input supply5) Labor cost subsidy6) Field staff training on soil &water conservation

1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.

1) Cost of the farm input and thematerials for terrace rehabilitation donot change dramatically.2) Needs of upland farmer is notchanged.

1) Estbalishment of committeeanf farmer groups2) Progress of project works andsupporting program3) Record of demonstration plots4) Number of participants forthe works and supportingprogram5) Change of land use, croppingpattern, terrace improvement,framing practices, etc.6) Change of income ofvillage/groups7) No. of request and discussionwith the executing agency8) Change of the project plan

1) Surver report

2) Record ofweekly andmonthly meeting(monitoring onmembers

3) Monitoringsurver

1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.

2) Cooperation of line agenciesconcerned does not chgane drastically.

1) Annual sediment inflow fromthe Keduang River will bereduced from 1.22 million m3to 0.80 million m3.

2) Agricultural productivity willbe increased with provision ofnext generation of farmers withresources of anotheragricultural income.

1) Sediment deposition in thereservoir (every 3 year)

2) Increase of agriculturalproductivity

3) Balance of cash flow offarmers

1) Echo soundingsurvey in thereservoir

2) Operationrecord of powergeneration andwater supply

1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.

2) Cooperation efforts of line agenciesconcerned does not chgane drastically.

3) Aspiration of local farmers tomaintain the rehabilitated terrace doesnot change drastically.

Table 11.5.4 PDM of Urgent Countermeasures (2/2)

Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.

1)Decreasing ration of theeffective storage volume in thereservoir2) Water supply to the Wonogiriirrigation area

Reservoirsedimentationsurvey andmonitoring ofwater supply

There will be no drastic change inreservoir management policy ofGovernment of Indonesia

Tabel 11.5.4 PDM Penanganan Mendesak (2/2)

Page 20: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-19

Project Name: Watershed Conservation in Other River catchmentsTarget Area: Watershed of Other Rivers Project Period: 6 years

Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions

Overall Goal

Project Purpose

Outputs

Activities Inputs

Pre-conditions

Source: JICA Study Team

Janapnese side:Funding assistance for implementation of watershedconservation

Indonesian side:Government administrationTechnical and financial support program for landmanagement and agricultural promotion

In the watershed of othertributaries,1) K2TAs will be established inthe selected area.2) Farmers understandings onthe importance of land andwater conservation will bedeepened in the selected areas.3) Demonstration plots will beprepared and managed by thekey farmers.4) 23,120 ha of upland fieldwill be rehabilitated throughparticipation of farmers.5) Agro-forestry will bedeveloped and applied in theselected area.

1) Formulation of K2TA2) Farmer training on: -Land & water conservation -Terrace formation,improvement and rehabilitation -Agro-forestry development3) Making demonstration plot4) Farm input supply5) Labor cost subsidy6) Field staff training on soil &water conservation

1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.

1) Cost of the farm input and thematerials for terrace rehabilitation donot change dramatically.2) Needs of upland farmer is notchanged.

1) Estbalishment of committeeanf farmer groups2) Progress of project works andsupporting program3) Record of demonstration plots4) Number of participants forthe works and supportingprogram5) Change of land use, croppingpattern, terrace improvement,framing practices, etc.6) Change of income ofvillage/groups7) No. of request and discussionwith the executing agency8) Change of the project plan

1) Surver report

2) Record ofweekly andmonthly meeting(monitoring onmembers

3) Monitoringsurver

1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.

2) Cooperation of line agenciesconcerned does not chgane drastically.

1) Annual sediment inflow fromother tributaries will be reducedfrom 1.96 million m3 to 1.04million m3.

2) Agricultural productivity willbe increased with provision ofnext generation of farmers withresources of anotheragricultural income.

1) Sediment deposition in thereservoir (every 3 year)

2) Increase of agriculturalproductivity

3) Balance of cash flow offarmers

1) Echo soundingsurvey in thereservoir

2) Operationrecord of powergeneration andwater supply

1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.

2) Cooperation efforts of line agenciesconcerned does not chgane drastically.

3) Aspiration of local farmers tomaintain the rehabilitated terrace doesnot change drastically.

Table 11.5.5 PDM of Mid Term Countermeasures

Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.

1)Decreasing ration of theeffective storage volume in thereservoir2) Water supply to the Wonogiriirrigation area

Reservoirsedimentationsurvey andmonitoring ofwater supply

There will be no drastic change inreservoir management policy ofGovernment of Indonesia

Tabel 11.5.5 PDM Penanganan Jangka Menengah

Page 21: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-20

(Unit:US$ thousand)

Countermeasures Total Cost /Financial

Total Cost /Economic Conversion Factor

1. Urgent Countermeasures for Garbage and SedimentInflow from Keduang River

a. Sediment Storage Reservoir with New Gates 36,070 25,610 0.71

b. Watershed Conservation in Keduang Catchment 13,835 12,778 (Total works both by government andbeneficiary) x CF

c. Procurement of One Dredger 3,586 3,586 1.00

Sub-total 53,491 41,974

2.Mid Term Countermeasures for Sediment Inflowfrom Other Tributaries

d. Watershed Conservation in Ohter Basins 35,060 36,134 (Total works both by government andbeneficiary) x CF

Grand Total 88,551 78,108

(Unit:US$ thousand)

O&M Total OM Cost/Financial

Total OM Cost /Economic Conversion Factor

a. Sediment Storage Reservoir with New Gates 14 11 0.8

b. Watershed Conservation in Keduang Catchment 5 4 0.8

c. Procurement of One Dredger 59 47 0.8

d. Watershed Conservation in Ohter Basins 16 13 0.8

Grand Total 94 75

Source: JICA Study Team

Table 11.6.2 Economic Cost of Proposed Projects in Master Plan

Tabel 11.6.2 Biaya Ekonomi Pada Usulan Proyek untuk Rencana Induk

Page 22: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-21

Total Financial Econimic Economic EconomicProject Work Unit Cost Factor* Unit Cost Cost

(1,000) ($) ($) (1,000$)(I) Direct Cost1. Land preparation

1) Terracing unit:(1) Cutting and filling m3 22,224 0.92 0.75 0.69 15,335

2) Waterway and drop(1) stone material m3 164 8.48 0.90 7.632 1,252(2) Excavation work m3 191 0.78 0.75 0.585 112(3) Masonry work m3 149 14.23 0.75 10.6725 1,590

3) Lip and rizer, planting(1) Seedling, grass for lip nr. 304,731 0.01 0.90 0.009 2,743(2) Seedling, shrub for lip nr. 18,284 0.07 0.90 0.063 1,152(3) Seedling, grass, for rizer nr. 432,330 0.0015 0.90 0.00135 584(4) Planting work, for lip m 91,420 0.02 0.75 0.012 1,097(5) Planting work, for rizer m2 86,466 0.04 0.75 0.03 2,594

2. Side diches (for housing yard)1) Side ditch

(1) Stone material m3 37 8.48 0.90 7.632 282(2) Excavation work m3 53 0.78 0.75 0.585 31(3) Masonry work m3 33 14.23 0.75 10.6725 352

2) Headgerow(1) Shrub, for hedger row nr. 8,346 0.07 0.90 0.063 526(2) planting work, hedge row m2 1,043 0.04 0.75 0.03 31

3. Agro-forestry and annual crops1) Agro-forestry and annual crops Ls 10,093 0.90 9,084

4. Support program1) Support program Ls 4894 0.90 4,405Total direct cost 41,168

(II) Government Admnistration and Engineering cost(10% of total direct cost) 0.90 3,705

(II) Pysical Contingency(10% of total cost of I andII) 0.90 4,039Total economic cost 48,912

*: Conversion factor of unskilled labor: 0.75, Standard conversion factor for materials:0.9Source: JICA study team

Table 11.6.3 Economic Project Cost in the Wonogiri Watershed Conservation Project

Items

Tabel 11.6.3 Biaya Proyek secara Ekonomi dalam Proyek Konservasi DAS Wonogiri

Page 23: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-22

Tabel 11.6.8 RangkumanHarga Crop Input dan Output (Harga Rp. 2005)

Item Unit FinancialPrice 2005 CF Economic

Price1. OutputsRice (Mentik) Rp./kg 3,100 2,780 Green bean Rp./kg 4,500 Soybean Rp./kg 2,250 2,740 Ground bean Rp./kg 7,000 Cassava Rp./kg 500 (Tolo) Rp./kg 2,500 Kacang panjang 2,000

2. InputsFertilizer

Urea Rp./kg 1,500 2,698 Triple Superphosphate (TSP) Rp./kg 1,800 1,798

Potassium Chloride (KCL) Rp./kg 3,000 1,465 Other Inputs

Wet grain of rice Rp./kg 1,400 0.9 1,260 Contract Mechanical Operations

Land Preparation Rp./ha 300,000 0.75 225,000 Agricultural Labor

Person md 25,000 0.75 18,750

World Bank Commodity Price Projections, May 2000BPS Kabupaten Sukoharjo; village administration (desa Pringanom/ kecamatan Masaran/ kabupaten Sragen); February 2006

Page 24: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-23

Commodity Rice SoybeanExport/ Import Substitute Imported ImportedMarket Product Location Thailand FOB US Gulf Port, RotterdamQuality of Marker Product 5% broken

2005 2005USD/tonIndicator Price = 308.2 227.6Quality Differential x 0.90 1.00Equivalent Value of Indoneisan Product = 277.4 227.6Freight and Insurance Cost to Semarang + 25.0 40.0Value at Indonesian Port = 302.4 267.6Rp./kg(exchange rate) 10,035 10,035Value at Indonesian Port = 3,034 2,685Port Handling Charges, Storage and Loss + 118 104Internal Handlihg/ Transport Cost - Near Port + 15 15Value at Wholesale Market = 3,167 2,804Transport Costs, Local to Wholesale Market - 36 38Dealer Handling and Processing Costs - 28 13Value at Local Market/ Processor/ Mill = 3,103 2,753Milling Cost - 310Transport Cost-Fargate to Local Market/ Mill - 13 13Value at Farmgate = 2,780 2,740

Commodity UreaExport/ Import Substitute ExportedMarket Product Location Northern EuropeQuality of Marker Product

2005USD/tonIndicator Price = 109.2Quality Differential x 1.10Equivalent Value of Indoneisan Product = 120.1Freight and Insurance Cost + 30.0Value at Indonesian Port = 150.1Rp./kg(exchange rate) 10,035Value at Indonesian Port of Exit Palembang = 1,506Internal Handling Charges/ Transport to Central Java + 30

Value at Wholesale Market = 1,536Transport Costs, Wholesale to Farmgate + 40Value at Farmgate (fertilizer) = 1,576Value at Farmgate (nutrient) = 2,698

Commodity TSP KCLTriple Superphosphate Potassium Chloride

Export/ Import Substitute Imported ImportedMarket Product Location Northern Europe/ Florida Northern Europe, CanadaQuality of Marker Product

2005 2005USD/tonIndicator Price = 145.7 113.8Quality Differential x 1.00 1.00Equivalent Value of Indoneisan Product = 145.7 113.8Freight and Insurance Cost + 20.0 20.0Value at Indonesian Port = 165.7 133.8Rp./kg(exchange rate) 10,035 10,035Value at Indonesian Port of Entry = 1,663 1,343Port Charges + 65 52Internal Handling/ Transport Costs - Near Port + 30 30Value at Wholesale Market = 1,758 1,425Transport Costs, Wholesale to Farmgate + 40 40Value at Farmgate (fertilizer) = 1,798 1,465Source: World Bank Commodity Price Projections, May 2000

Table 11.6.9 Border Parity Prices of Crops; Constant 2005 Economic Prices, USD per ton, Rp. per kg

Tabel 11.6.9 Batas Paritas Harga Crops; Constant 2005 Economic Prices, US$ per ton, Rp. per kg

Page 25: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-24

Crop Budget per Ha, Present Condition/ Financial Price

Quantity Unit rate [Rp.] ['000Rp.] [USD] Quantity Unit rate [Rp.] ['000Rp.] [USD]1. Crop Yield t/ha 5.5 1.52. Unit Price Rp./kg 3,100 2,2503. Gross Return 000Rp. 17,050 1,699 3,375 3364. Production Cost 000Rp. 3,679 367 2,317 231 Farm Inputs Seed kg/ha 30 1,400 42 60 3,200 192 Fertilizer/ Agro-chemical Urea kg/ha 225 1,500 338 100 1,500 150 TSP kg/ha 150 1,800 270 50 1,798 90 KCL kg/ha 100 3,000 300 ZA kg/ha 100 1,500 150 Insecticide kg 2.9 100,000 290 3.5 100,000 350 Hired Labor md 72 25,000 1,800 45 25,000 1,125 Family Labor md 73 45 Land Preparation cost Rp./ha 1 300,000 300 1 300,000 300 Miscellaneous 5% 189 5% 1105. Net Return 000Rp. 13,371 1,332 1,058 105Source: Technical Report for Wonogiri Irrigation Project, 2000 updated with 2005 commodity prices (originally based on F/S 1976)Exchange rate (Dec.2005): 1 USD = 10,035 Rp.

Crop Budget per Ha, Present Condition/ Economic Price

Quantity Unit rate [Rp.] ['000Rp.] [USD] Quantity Unit rate [Rp.] ['000Rp.] [USD]1. Crop Yield t/ha 5.5 1.52. Unit Price Rp./kg 2,780 2,7403. Gross Return 000Rp. 15,290 1,524 4,111 4104. Production Cost 000Rp. 3,211 320 2,012 201 Farm Inputs Seed kg/ha 30 1,260 38 60 2,880 173 Fertilizer/ Agro-chemical Urea kg/ha 225 2,698 607 100 2,698 270 TSP kg/ha 150 1,798 270 50 1,798 90 KCL kg/ha 100 1,465 146 ZA kg/ha 100 1,500 150 Insecticide kg 2.9 90,000 261 3.5 90,000 315 Hired Labor md 72 18,750 1,350 45 18,750 844 Family Labor md 73 45 Land Preparation cost Rp./ha 1 225,000 225 1 225,000 225 Miscellaneous 5% 164 5% 965. Net Return 000Rp. 12,080 1,204 2,098 209Source: Technical Report for Wonogiri Irrigation Project, 2000 updated with 2005 commodity prices (originally based on F/S 1976)Exchange rate (Dec.2005): 1 USD = 10,035 Rp.

p g p

SoybeansPaddy (Dry Season I & II)

Paddy (Dry Season I & II) Soybeans

Unit

Unit

Tabel 11.6.10 Rencana Anggaran Tanaman Pertanian per Ha

Page 26: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-25

1. Target agricultural activities Crop sub-sector in upland field2. Farm size of typical farm Upland field: net cultivable area 0.5 ha/farm3. Duration of analysis 15 years4. Current cropping pattern

MT I: maize (hybrid; intensity 100%) + cassava (intensity 20%)MT II: groundnut (intensity 40%) + cassava (intensity 20%)MT III: cassava (intensity 20%)

MT I: maize (composite; intensity 100%) + cassava (intensity 20%)MT II: groundnut (intensity 40%) + cassava (intensity 20%)MT III: cassava (intensity 20%)

5. With-project cropping pattern(1) Slope Class: 0 - 8% 1st to 4th year

Typical Farm A-1 MT I: maize (hybrid; 100%) + cassava (20%) + tree crops (5%)MT II: groundnut (intensity 40%) + cassava (20%) + tree crops (5%)MT III: cassava (20%) + tree crops (5%)5th year & afterMT I: maize (hybrid; 95%) + cassava (20%) + tree crops (5%)MT II: groundnut (40%) + cassava (20%) + tree crops (5%)MT III: cassava (20%) + tree crops (5%)

(2) Slope Class: > 8 - 15% 1st to 4th yearTypical Farm A-2 MT I: maize (hybrid; 100%) + cassava (15%) + tree crops (13%)

MT II: groundnut (40%) + cassava (15%) + tree crops (13%)MT III: cassava (15%) + tree crops (13%)5th year & afterMT I: maize (hybrid; 87%) + cassava (10%) + tree crops (13%)MT II: groundnut (40%) + cassava (10%) + tree crops (13%)MT III: cassava (10%) + tree crops (13%)

(3) Slope Class: > 15 - 25% 1st to 4th yearTypical Farm A-3 MT I: maize (hybrid; 90%) + cassava (10%) + tree crops (25%)

MT II: groundnut (40%) + cassava (10%) + tree crops (25%)MT III: cassava (10%) + tree crops (25%)5th year & afterMT I: maize (hybrid; 75%) + medical crop (10%) + tree crops (25%)MT II: groundnut (30%) + medical crop (10%) + tree crops (25%)MT III: tree crops (25%)

(4) Slope Class: > 25 - 40%Typical Farm B-1 MT I: maize (hybrid; 75%) + cassava (5%) + tree crops (38%)

MT II: groundnut (30%) + cassava (5%) + tree crops (38%)MT III: cassava (5%) + tree crops (38%)5th year & afterMT I: maize (hybrid; 62%) + medical crop (10%) + tree crops (38%)MT II: groundnut (30%) + medical crop (10%) + tree crops (38%)MT III: tree crops (38%)

(5) Slope Class: > 40% 1st to 4th yearTypical Farm B-2 MT I: maize (hybrid; 60%) + tree crops (50%)

MT II: groundnut (30%) + tree crops (50%)MT III: tree crops (50%)5th year & afterMT I: Maize (hybrid;50%), tree crops (50%) + medicinal crop (20%)MT II: Groundnut (30%), tree crops (50%) + medicinal crop (20%)MT III: tree crops (50%)

Source: JICA Study Team

Assumptions Applied for Analysis

1st to 4th year

Item

Pattern for uplands with slope classes of 0 ~ 25%

Pattern for uplands with slope classes of above 25%

Tabel 11.6.13 Asumsi Penerapan Pola Tanam

Page 27: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-26

Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (1/3)

0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.01 2.70 2.01 1.05 0.20Net retun (Rpmillion) 8,900 18,913 13,531 5,491 1,104 47,939Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,275 486 (4,590) (5,365) (10,927) (19,120)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 4,184 4,415 31,138Net return/ha (Rp million) 3.06 2.84 2.27 1.42 0.73Net retun (Rpmillion) 9,047 19,894 15,282 5,941 3,223 53,387Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 68,023Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,423 1,467 (2,840) (4,915) (8,808) (13,672)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.05 2.81 2.22 1.34 0.62Net retun (Rpmillion) 9,018 19,683 14,945 7,008 3,422 54,076Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 68,712Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,394 1,257 (3,176) (3,848) (8,609) (12,983)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.15 3.08 2.73 2.12 1.65Net retun (Rpmillion) 9,313 21,575 18,378 11,087 9,107 69,460Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 84,097Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,689 3,148 257 231 (2,924) 2,401Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.09 2.88 2.75 2.52 2.60Net retun (Rpmillion) 9,136 20,174 18,513 13,179 14,350 75,352Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 89,988Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,512 1,747 392 2,323 2,319 8,293

Slope Class1s

t yea

r

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ct c

ondi

tion

Com

posi

teTe

rrac

e

deve

lopm

ent

year

2nd

year

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ct c

ondi

tion

Com

posi

teTe

rrac

e

3rd

yea

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

4th

year

a

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

5th

year

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

Page 28: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-27

Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (2/3)

0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.18 3.10 3.18 3.17 3.46Net retun (Rpmillion) 9,402 21,715 21,408 16,579 19,097 88,200Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 102,836Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,778 3,288 3,286 5,722 7,066 21,141Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.24 3.27 3.51 3.67 4.11Net retun (Rpmillion) 9,580 22,906 23,629 19,193 22,684 97,992Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 112,628Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,955 4,479 5,508 8,337 10,653 30,933Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.30 3.42 3.50 3.81 4.09Net retun (Rpmillion) 9,757 23,956 23,562 19,926 22,574 99,775Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 114,411Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,133 5,529 5,441 9,070 10,543 32,715Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.36 3.58 4.10 4.57 5.30Net retun (Rpmillion) 9,934 25,077 27,601 23,900 29,252 115,765Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 130,401Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,310 6,650 9,480 13,044 17,221 48,706Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.42 3.72 4.37 4.98 5.84Net retun (Rpmillion) 10,112 26,058 29,419 26,045 32,232 123,865Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 138,501Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,488 7,631 11,297 15,188 20,202 56,806

deve

lopm

ent

year

Slope Class6t

h ye

ar

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

7th

year

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

8th

year

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

9th

year

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

10th

yea

r

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

Page 29: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-28

Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (3/3)

0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.47 3.87 4.36 5.11 5.81Net retun (Rpmillion) 10,260 27,108 29,351 26,724 32,067 125,511Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 140,147Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,636 8,682 11,230 15,868 20,036 58,451Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.48 3.89 4.69 5.47 6.48Net retun (Rpmillion) 10,289 27,249 31,573 28,607 35,765 133,482Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 148,119Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,665 8,822 13,452 17,751 23,734 66,423Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.50 3.93 4.78 5.60 6.65Net retun (Rpmillion) 10,348 27,529 32,179 29,287 36,703 136,046Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 150,682Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,724 9,102 14,058 18,431 24,672 68,987Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.51 3.97 4.85 5.71 6.80Net retun (Rpmillion) 10,378 27,809 32,650 29,862 37,531 138,230Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 152,866Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,754 9,382 14,529 19,006 25,500 71,171Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.51 3.97 4.85 5.71 6.80Net retun (Rpmillion) 10,378 27,809 32,650 29,862 37,531 138,230Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 152,866Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,754 9,382 14,529 19,006 25,500 71,171

Source: JICA Study Team

Slope Classde

velo

pmen

tye

ar11

th y

ear

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

eTe

rrac

e

With

out p

roje

ctco

nditi

on

12th

yea

r

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

15th

yea

r

with

pro

ject

cond

ition

Terr

ace

With

out p

roje

ctco

nditi

on Com

posi

teTe

rrac

e

13th

yea

r14

th y

ear

with

pro

ject

cond

ition

Com

posi

teTe

rrac

e

Page 30: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-29

NPV 50.0 USD Million (12%)EIRR 16.4%

Unit:USD million

SedimentStorage

Reservoir

W/C inKeduang Dredger W/C in

Others

SedimentStorage

Reservoir

W/C inKeduang Dredger W/C in

Others

1 2010 -18.897 0.000 0.000 -0.385 -0.385 8.537 6.389 3.586 0.000 0.000 0.000 0.000 0.000 18.5122 2011 -15.128 0.002 0.017 -0.175 -0.156 8.537 6.389 0.000 0.000 0.000 0.000 0.047 0.000 14.9733 2012 -8.767 0.005 0.035 -0.219 -0.179 8.537 0.000 0.000 0.000 0.000 0.004 0.047 0.000 8.5884 2013 -8.527 0.010 0.076 -1.323 -1.237 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.000 7.2895 2014 -8.023 0.018 0.129 -0.867 -0.721 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3026 2015 -7.489 0.026 0.195 -0.408 -0.187 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3027 2016 -6.018 0.037 0.273 0.974 1.284 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3028 2017 -5.393 0.050 0.363 1.496 1.909 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3029 2018 3.292 0.062 0.454 2.851 3.367 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07510 2019 4.326 0.074 0.545 3.782 4.401 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07511 2020 4.603 0.087 0.636 3.955 4.678 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07512 2021 6.083 0.099 0.726 5.332 6.158 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07513 2022 6.843 0.111 0.817 5.990 6.918 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07514 2023 51.202 5.409 39.710 6.158 51.277 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07515 2024 51.723 5.401 39.650 6.747 51.798 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07516 2025 51.842 5.393 39.590 6.934 51.917 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07517 2026 51.932 5.385 39.531 7.092 52.008 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07518 2027 51.865 5.377 39.471 7.092 51.940 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07519 2028 51.797 5.369 39.411 7.092 51.872 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07520 2029 51.729 5.360 39.351 7.092 51.804 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07521 2030 51.661 5.352 39.292 7.092 51.736 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07522 2031 51.593 5.344 39.232 7.092 51.668 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07523 2032 51.525 5.336 39.172 7.092 51.600 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07524 2033 51.457 5.328 39.112 7.092 51.532 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07525 2034 51.389 5.320 39.052 7.092 51.464 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07526 2035 51.321 5.312 38.993 7.092 51.397 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07527 2036 51.253 5.303 38.933 7.092 51.329 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07528 2037 51.186 5.295 38.873 7.092 51.261 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07529 2038 51.118 5.287 38.813 7.092 51.193 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07530 2039 51.050 5.279 38.754 7.092 51.125 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07531 2040 50.982 5.271 38.694 7.092 51.057 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07532 2041 50.914 5.263 38.634 7.092 50.989 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07533 2042 50.846 5.255 38.574 7.092 50.921 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07534 2043 50.778 5.246 38.515 7.092 50.853 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07535 2044 50.710 5.238 38.455 7.092 50.785 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07536 2045 50.642 5.230 38.395 7.092 50.717 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07537 2046 50.574 5.222 38.335 7.092 50.650 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07538 2047 50.506 5.214 38.275 7.092 50.582 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07539 2048 50.439 5.206 38.216 7.092 50.514 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07540 2049 50.371 5.198 38.156 7.092 50.446 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07541 2050 50.303 5.189 38.096 7.092 50.378 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07542 2051 50.235 5.181 38.036 7.092 50.310 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07543 2052 50.167 5.173 37.977 7.092 50.242 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07544 2053 50.099 5.165 37.917 7.092 50.174 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07545 2054 50.031 5.157 37.857 7.092 50.106 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07546 2055 49.963 5.149 37.797 7.092 50.038 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07547 2056 49.895 5.141 37.738 7.092 49.970 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07548 2057 49.827 5.132 37.678 7.092 49.903 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07549 2058 49.759 5.124 37.618 7.092 49.835 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07550 2059 49.692 5.116 37.558 7.092 49.767 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.075

Source: JICA Study Team

IrrigationWaterSupply

TotalConstruction

YearNo B-CO/M

TotalWatershed

Conservation

Benefit Cost

HydropowerSupply

Tabel 11.6.16 Net Present Value (US$ 2005) dan Economic Internal Rate of Return

Page 31: Bagian I Studi Rencana Induk Tabel-TabelBagian I Studi Rencana Induk Tabel-Tabel T-1 Tabel 1.5.2 Daftar Anggota Komisi Penasehat Posisi Nama Lembaga Chairman Josuke KASHIWAI Ketua

T-30

Rp. millionPlan

2003 2004 2005 2006I. REVENUES 3,282 5,397 6,101 6,250 A. Water Service 2,844 3,084 4,215 5,225 a. Hydropower generation (PLN) 1,361 1,062 1,507 1,968 b. Drinking water (PDAM) 43 151 162 239 c. Industries 1,440 1,871 2,546 3,018

B. Non-water Service 438 2,313 1,886 1,025 1 Tourism2 Equipment 409 2,278 1,787 950 3 Construction 4 Consultation5 Others 29 35 99 75

II. COSTS 2,985 4,755 4,995 5,545 a. O&M 882 1,314 1,490 1,525 b. Employment (officials) 1,230 1,513 2,036 2,250 c. Production services (bonus for employees) 99 149 170 d. General affairs 212 247 275 345 e. Transportation (field trips) 226 242 326 410 f. Services 87 924 g. Marketing 82 85 128 140 h. Depreciation 85 95 152 180 i. Supervisor board 124 82 j. Extension (dissemination of info) 26 24 k. Management 25 l. HR development 21 40

m. R&D 50 50 60 n. Watershed protection 10 15 65 150 o Non-water services 324 315

% O&M in total costs III. PROFIT/ LOSS 297 642 1,106 705 IV. INCOME (NON-OPERATIONAL) 347 379

1 Bank services 5 6 2 PGPS 342 373 3 Others

V. COSTS (NON-OPERATIONAL) 125 VI. PROFIT/ LOSS (NON-OPERATIONAL) 347 254

VII. PROFIT/ LOSS BEFORE TAX 644 896 1,106 705 12

VIII. INCOME TAX 189 267 1 Current tax 192 273 2 Outstanding tax -3 -6

IX.X.

XI. TAXXII. PROFIT/ LOSS AFTER TAX 455 629 1,106 705

Source: JICA Study Team

RealizationNo Income/ Loss

Tabel 11.8.2 Neraca Untung Rugi PJT I Bengawan Solo