Bagian I Studi Rencana Induk
Tabel-Tabel
T-1
Tabel 1.5.2 Daftar Anggota Komisi Penasehat
Posisi Nama Lembaga
Chairman Josuke KASHIWAI
Ketua Kelompok Insinyur Peneliti Hidrolika Bendungan, Kelompok Insinyur Peneliti Hidrolika, Incorporated Administrative Agency, Institut Penelitian Pekerjaan Umum di bawah Departemen Pertanahan, Infrastruktur dan Transportasi
Anggotar Takashi HOSODA Profesor Insinyur Sistem Sungai, Departemen Menejemen Perkotaan, Fakultas Teknik, Universitas Kyoto
Anggota Hitoshi NOGUCHI
Kepala Divisi Mekanika Fluida, Departemen Sistem Pembangunan dan Pengawasan, Institut Penelitian Pelabuhan dan Bandara di bawah Departemen Pertanahan, Infrastruktur dan Transportasi
Anggota Junji YOKOKURA Penasehat Teknik Senior untuk Kegiatan Antarnegara, Departemen Kegiatan Antarnegara, Lembaga Sumber Daya Hijau Jepang
Sumber: Tim Studi JICA
Tabel 1.5.3 Komposisi Tim Studi
No. Posisi Nama
1 Ketua Tim/Sedimentasi Waduk/Perencana Pengoperasian Waduk Minoru OUCHI 2 Wakil Ketua Tim/Pengelolaan DAS/Ahli Erosi Tanah Kenjiro ONAKA 3 Ahli Hidrologi Naoki YAMASHITA 4 Insinyur Sipil/Sistem Pembuangan Sedimen Hidetoshi KANAMURA 5 Ahli Hidrolika Sedimen Tadahiro FUKUDA 6 Ahli Analisis Perhitungan Hidrolika Haisheng JIN 7 Ahli Survei Topografi Yutaka NAKADA 8 Ahli GIS Masahiko TANIGUCHI 9 Ahli Geologi Yasushi MOMOSE 10 Ahli Penyelidikan Sosial/Pemberdayaan Masyarakat Tetsunari GEJO 11 Ahli Lingkungan Hitoshi SAKAI 12 Insinyur Sipil/Waduk dan Fasilitas Lainnya Tamotsu SHINGU 13 Ahli Pertanian/Tanah Takashi SHIRAKI 14 Perencana Biaya/Perencana Pembangunan Masaru TOKUNO / Kozo YAMADA 15 Ahli Kelembagaan/Hukum dan Peraturan John A.L. CHETTOE 16 Ahli Sosial Ekonomi Magdalena LUKOWSKA 17 Koordinator/Ahli kualitas Air Hikaru SUGIMOTO
Sumber: Tim Studi JICA
T-2
Tabel 1.5.4 Daftar Personel Pendamping
No. Nama Posisi Lembaga Ke-1Ke-21 Ir. Tri Rohadi, Dipl HE Ketua Pendamping 1/Sedimentasi Waduk IPKPWSBS O O2 Ir. Hetomo, Dipl HE Ketua Pendamping 2/Sedimentasi Waduk IPKPWSBS – O3 Ir. Erwin Budoyo, M.Eng Perencana Pengoperasian Waduk PJT I B.Solo O O4 Ir. Widihardjo, Sp Pengelolaan DAS/Ahli Erosi Tanah IPKPWSBS O O5 Drs. Setyo Susilo Ahli Pengelolaan DAS Dinas LHKP Kab Wonogiri O O6 Rejodadi Ahli Erosi Tanah Dinas LHKP Kab Wonogiri – O7 Suparno Ahli Hidrologi IPKPWSBS O O8 Ir. Mulyana, Sp.1 Insiynur Sipil/Sistem Pembuangan Sedimen PJT I B.Solo – O9 Ir. Lilik Retno C, MA Ahli Hidrolika Sedimen IPKPWSBS O O
10 Ir. Sriyanto Hidrolika Sedimen PJT I B.Solo O –11 Ir. Daryanto Survei Sedimen IPKPWSBS O –12 Ir. Wisman Hari Ismoyo Survei Topografi IPKPWSBS O –13 Pardjo, BE Survei Topografi IPKPWSBS O –14 Ir. Raden Dody Prakoso Ahli GIS BP2TPDAS IBB O O15 A. Supriyanto, SP Ahli GIS BPDAS Solo O O16 Sudarmadji, SST Ahli Geologi IPKPWSBS O O17 Hernowo Edy Yuliasto Ahli Geologi IPKPWSBS O –
18 Ir. Edi Djoko Dwiono Penyelidikan Sosial/ Ahli Pemberdayaan Masyarakat
Bappeda Kab. Wonogiri O O
19 T. Sarwono, BE Penyelidikan Sosial/ Ahli Pemberdayaan Masyarakat
IPKPWSBS O –
20 Ruwiyo Sudjatmiko, S Sos Ahli Teknik Lingkungan IPKPWSBS O O21 Ir. S.B. Ekoyanto Insinyur Sipil/Sistem Pembuangan Sedimen IPKPWSBS O –22 Ir. Wuryanto A Sidik, Sp.1 Insinyur Sipil/Waduk dan Fasilitas Lainnya IPKPWSBS – O23 Ir. Muljana, SP Insinyur Sipil/Waduk dan Fasilitas Lainnya PJT I B.Solo O –24 Ir. Sri Widowati Ahli Pertanian dan Tanah Dipertanbun Kab. Wonogiri O O25 Ir. Saksono Ahli Pertanian dan Tanah IPKPWSBS O –26 Gemala Suzanti, SP. MMA Ahli Pertanian dan Tanah IPKPWSBS – O27 Joko Inti, ST. MT Perencana Biaya/Perencana Pembangunan SKS PPSABS – O28 Ir. Suyatmo Perencana Biaya IPKPWSBS O –29 Bsimo Sustyo, SST Perencana Pembangunan PJT I B.Solo O –30 Supriyanto, ST Ahli Kelembagaan/Hukum dan Peraturan SKS PPSABS – O31 Wiyanto, SH Ahli Kelembagaan/Hukum dan Peraturan Bag.Hukum Setkab Wonogiri – O32 Ir. Tugiyo Ahli Sosial Ekonomi Bappeda Kab. Wonogiri O O33 Dwi Sularjanto, BE Ahli Kualitas Air IPKPWSBS O O34 Drs. Djoko Widodo, MT Ahli Kualitas Air O –Catatan: PekerjaanTahap I : Agustus 2004 – Februari 2005 Pekerjaan Tahap II : Mei 2005 – Maret 2006 Sumber: Tim Studi JICA
T-3
Ta
ble
2.1.
1 So
cio-
Econ
omic
Indi
cato
rs o
f the
Stu
dy A
rea
1999
2002
1999
2002
1999
2002
1999
2002
1999
2002
1999
2002
1999
2002
Life
Exp
ecta
ncy
66.2
66.2
68.3
68.8
71.1
71.6
70.1
71.8
69.1
69.3
69.1
69.8
70.8
71.5
Adu
lt Li
tera
cy R
ate
88.4
89.5
84.8
85.7
76.4
77.4
78.3
78.9
84.0
82.2
81.1
82.8
71.6
75.3
Mea
n Y
ear o
f Sch
oolin
g6.
77.
16.
06.
55.
65.
96.
17.
07.
47.
96.
77.
35.
36.
0A
djus
ted
Real
per
cap
ita E
xpen
ditu
re [R
p. 0
00]
578.
859
1.2
583.
859
4.2
584.
260
7.6
587.
661
7.1
591.
860
7.0
589.
060
7.3
581.
359
2.7
HD
I64
.365
.864
.666
.364
.066
.564
.568
.566
.567
.765
.167
.862
.364
.9
Popu
latio
n w
ith N
o A
cces
s to
Fres
h W
ater
[%]
51.9
44.8
47.8
39.8
41.3
38.0
58.3
31.4
64.8
40.0
54.7
49.5
40.9
39.6
Popu
latio
n w
ith N
o A
cces
s to
Hea
lth F
acili
ties [
%]
21.6
23.1
17.1
20.9
25.9
16.8
17.1
23.9
17.1
14.0
17.1
13.9
51.3
36.0
HH
with
No
Acc
ess t
o Sa
nita
tion
[%]
25.0
30.9
31.1
7.1
10.3
35.0
29.0
25.4
17.1
36.2
37.2
24.7
23.1
Ope
n U
nem
ploy
men
t [%
]10
.68.
15.
45.
36.
97.
09.
6Em
ploy
men
t in
Info
rmal
Sec
tor [
%]
64.1
66.6
78.2
63.9
57.4
63.2
69.0
GRD
P Re
al p
er c
apita
200
0 [R
p. 0
00]
with
oil
& g
as1,
340
788
1,54
21,
480
1,06
980
7 w
ithou
t oil
& g
as1,
201
788
1,54
21,
480
1,06
980
7A
nnua
l Gro
wth
in R
eal G
RDP
per c
apita
199
9/20
00 A
nnua
l Gro
wth
/ with
oil
& g
as1.
12.
91.
43.
01.
73.
30.
02.
20.
03.
51.
42.
2 1
999/
2000
Ann
ual G
row
th/ w
ithou
t oil
& g
as0.
92.
51.
43.
01.
73.
30.
02.
20.
03.
51.
42.
2
Ave
rage
Non
-Agr
icul
ture
Wag
e [R
p. 0
00]
Ave
rage
Non
-Agr
icul
ture
Wag
e Fe
mal
e [R
p. 0
00]
461.
818
6.7
313.
121
7.9
336.
015
0.7
342.
121
4.0
349.
519
1.1
289.
916
9.1
279.
3A
vera
ge N
on-A
gric
ultu
re W
age
Mal
e [R
p. 0
00]
680.
729
4.7
500.
029
7.1
484.
327
0.1
590.
129
4.7
529.
627
3.4
432.
327
4.0
476.
8
Per C
apita
Exp
endi
ture
[Rp.
000]
206.
315
6.0
149.
018
1.0
183.
016
1.0
142.
0Fo
od [%
of t
otal
exp
endi
ture
]58
.561
.062
.757
.256
.560
.763
.8
Pove
rty L
ine
[Rp.
/cap
ita/m
onth
]10
9,00
010
6,43
810
2,93
210
7,58
310
5,07
110
4,34
795
,302
Num
ber o
f Poo
r Peo
ple
[thou
sand
]38
,394
7,30
824
613
413
528
724
5Po
verty
Rat
e [%
]18
.223
.125
.217
.016
.924
.528
.6H
PI25
.222
.723
.221
.023
.020
.926
.019
.424
.319
.724
.120
.931
.124
.8So
urce
: Sus
enas
200
2; B
PS; I
ndon
esia
: Hum
an D
evel
opm
ent R
epor
t 200
4 fo
r HD
I; W
onog
iri in
Fig
ures
200
4, C
entra
l Jav
a in
Fig
ures
200
4
Indo
nesi
aC
entra
l Jav
a Pr
ov.
Won
ogiri
wat
ersh
ed a
rea
Won
ogiri
irrig
ated
are
a
kab.
Won
ogiri
kab.
Kar
anga
nyar
kab.
Suk
ohar
joka
b. K
late
nka
b. S
rage
n
Tabe
l 2
.1.1
K
ondi
si S
osia
l-Eko
nom
i DA
S W
onog
iri,
DI W
onog
iri,
Prop
insi
Jaw
a Te
ngah
, dan
Inod
ones
ia T
ahun
199
9 da
n 20
02
T-4
Sub-
DA
Sha
%ha
%ha
%%
Ha
%
Ked
uang
17,7
8942
9,48
723
14,8
6135
42,1
3710
0
Tirto
moy
o6,
951
339,
052
435,
085
2421
,088
100
Tem
on3,
639
582,
631
426,
270
100
Upp
er S
olo
14,1
6172
2,67
514
2,87
815
19,7
1410
0
Ala
ng6,
150
365,
666
335,
152
3016
,968
100
Wur
yant
ro98
014
1,93
827
4,26
259
7,18
010
0
Ngu
ngga
han
2,66
332
2,25
227
3,34
941
8,26
410
0
Res
idua
l Bas
in12
84
2,73
496
2,86
210
0
Land
Are
a To
tal
52,4
6142
31,0
7025
26,0
9121
14,8
6112
124,
483
100
Wat
er S
urfa
ce8,
767
Tota
l52
,461
-31
,070
-26
,091
-14
,861
-13
3,25
0-
Mar
ent M
ater
ials
Phy
siogr
aphy
Vol
cani
c slo
pe V
olca
nic
slope
Fla
t or f
old
Vol
cani
c slo
pe V
olca
nic
pied
mon
t F
old
& u
plift
Vol
cani
c slo
peSo
urce
: Soi
l map
s pre
pare
d by
Sub
Bal
ai R
ehab
ilita
si L
ahan
dan
Kon
serv
asi T
anah
, Sol
o, 1
985;
bas
ed o
n a
map
pre
pare
d by
Soi
l Res
earc
h In
stitu
te, B
ogor
, 197
3
Vol
cani
c tu
ff V
olca
nic
tuff
Tabl
e 2.
4.1
Soi
l Dist
ribut
ion
in W
onog
iri C
atch
men
t Are
a
Soil
Type
Tota
lM
edite
ran
(Alfi
sols)
Lito
sol (
Ince
ptiso
ls)G
rum
sol (
Ver
tisol
s)La
toso
l (A
lfiso
ls)
Vol
cani
c tu
ff L
imes
tone
Cla
y de
posit
Vol
cani
c tu
ff
Tabe
l 2.4
.1
Dis
trib
usi J
enis
Tan
ah d
i DA
S W
onog
iri
T-5
Feat
ure
Faci
lity
Plan
Cos
tEv
alua
tion
1) Mod
ifica
tion
of in
take
◆In
take
tow
er w
ith se
lect
ive
inta
ke g
ate
is to
be
cons
truct
ed o
n th
e ex
istin
g in
take
to ra
ise
foun
datio
n he
ight
of I
nlet
.◆
This
met
hod
aim
s at a
void
ing
the
inta
ke fr
ombe
ing
burie
d by
sedi
men
tatio
n an
d to
pre
vent
garb
age
from
ent
erin
g th
e in
let.
i) In
take
Tow
er
Hei
ght
H=2
6.0
m
Gat
es
H5.
0m x
B12
.6m
x 2
nos.
E
leva
tion
of b
otto
m o
f inl
et
EL.
127.
0 m
i) C
onst
ruct
ion
Cos
t
$
3,16
0,00
0ii)
O&
M C
ost
$53
,000
/yea
r
◆ W
ater
supp
ly sh
ould
be
susp
ende
d du
ring
cons
truct
ion.
◆St
rong
load
bear
ing
capa
city
offo
unda
tion
shal
lbe
need
ed to
supp
ort t
he su
pers
truct
ure.
◆Se
dim
enta
tion
wou
ldbe
acce
lera
ted
due
tohe
ight
enin
gof
inle
t fou
ndat
ion
from
EL.
116.
0 m
to 1
27.0
m.
2) R
eloc
atio
nof
inta
ke◆
Relo
catio
n of
the
exis
ting
inta
ke to
300
mup
stre
am o
n th
e le
ft ba
nk w
here
less
sedi
men
tatio
nis
exp
ecte
d◆
Inta
ke to
wer
with
sele
ctiv
e in
take
with
gat
es is
tobe
con
stru
cted
.◆
Wat
erw
ay tu
nnel
is c
onst
ruct
ed to
con
nect
the
exis
ting
cond
uit t
o th
e po
wer
stat
ion.
i) In
take
Tow
er
Hei
ght
H=2
6.0
m
Gat
es
H5.
0m x
B12
.6m
x 2
nos.
E
leva
tion
of b
otto
m o
f inl
et
EL.
127.
0 m
ii) T
rans
mis
sion
Tun
nel
D
iam
eter
D=5
.5 m
L
engt
h
L
=570
m
i) C
onst
ruct
ion
Cos
t
$
8,80
0,00
0ii)
O&
M C
ost
$14
0,00
0/ye
ar
◆C
onst
ruct
ion
cost
is th
e hi
ghes
t◆
Sedi
men
tatio
nha
sal
read
ybe
enoc
curr
edar
ound
the
prop
osed
site
.So
effe
ctiv
enes
san
dre
liabi
lity
agai
nst
sedi
men
tatio
n is
ver
y lo
w.
◆W
ater
supp
lysh
ould
besu
spen
ded
durin
gco
nnec
tion
wor
k w
ith th
e ex
istin
g co
ndui
t.
3) Gar
bage
trapp
ing
stru
ctur
e at
inta
ke
◆O
verf
low
wei
r is t
o be
con
stru
cted
aro
und
the
exis
ting
inta
ke.
◆Tr
ash
rack
s are
to b
e in
stal
led
on th
e ov
erflo
ww
eir t
o bl
ock
garb
age
ente
ring
into
the
inta
ke.
◆A
ppro
achi
ng d
eck
is to
be
inst
alle
d ov
er th
etra
sh ra
cks t
o co
nnec
t th
e da
m c
rest
and
this
stru
ctur
e. T
hese
dec
k an
d tra
sh ra
ck a
re d
esig
ned
to b
e su
bmer
gibl
e to
min
imiz
e co
nstru
ctio
n co
st.
◆G
arba
ge o
n tra
sh ra
ck sh
all b
e re
mov
ed b
y ba
ckho
e to
min
imiz
e m
aint
enan
ce w
orks
.
i) D
oubl
e Sc
reen
H
26.0
m x
L11
1.2m
A
rea
A
=890
m2
ii) A
ppro
ach
Dec
k
Len
gth
L=1
06 m
W
idth
B
=7.0
m
Are
a
A=7
40 m
2
iii) S
teel
Pile
Φ
1,00
0 m
m x
H9.
0 m
x 3
4 no
s.
i) C
onst
ruct
ion
Cos
t
$
3,67
0,00
0ii)
O&
M C
ost
$65
,000
/yea
r
◆G
arba
ge re
mov
al w
ork
beco
me
easy
by
this
met
hod.
◆W
ater
supp
ly sh
ould
be
susp
ende
d du
ring
cons
truct
ion.
◆ C
erta
inty
and
effe
ctiv
enes
s are
ver
y hi
gh a
mon
gco
unte
rmea
sure
s.
4) Dre
dgin
g by
Hyd
ro-
suct
ion
met
hod
◆H
ydro
-suc
tion
syst
em is
to b
e in
stal
led
to re
mov
eth
e se
dim
ent a
nd g
arba
ge a
t int
ake.
i) H
ydro
-suc
tion
syst
emi)
Con
stru
ctio
n C
ost
$2,
875,
000
ii) O
&M
Cos
t
$
99,0
00/y
ear
◆Th
is m
etho
d is
con
side
red
to re
duce
ope
ratio
nal c
ost
with
nor
mal
hyd
raul
ic d
redg
ing.
◆C
erta
inty
of t
his m
etho
d is
a li
ttle
infe
rior t
o hy
drau
licdr
edgi
ng, h
owev
er e
ffect
iven
ess o
f thi
s met
hod
for b
oth
sedi
men
t and
gar
bage
wer
e co
nfirm
ed.
◆Th
ere
are
oper
atio
nal c
onst
rain
ts d
epen
ding
on
the
rese
rvoi
r wat
er le
vels
.
5) Hyd
raul
icdr
edgi
ng
◆Re
mov
e th
e se
dim
ent a
nd g
arba
ge a
t int
ake
bypu
mp
dred
ger.
i) D
redg
er
Suc
tion
dred
ger,
600P
S x
1uni
ti)
Con
stru
ctio
n C
ost
$4,
456,
700
ii) O
&M
Cos
t
$
320,
200/
year
◆Th
is m
etho
d is
com
mon
cou
nter
mea
sure
aga
inst
rese
rvoi
r sed
imen
tatio
n.◆
Relia
bilit
y of
sedi
men
t rem
ovin
g pe
rfor
man
ce is
hig
hest
amon
g th
e al
tern
ativ
e co
unte
rmea
sure
s.◆
Runn
ing
cost
is h
ighe
st. A
nd sp
oil b
ank
is re
quire
d.
6) Gar
bage
trapp
ing
stru
ctur
e in
the
Ked
uang
Riv
er
◆O
verf
low
wei
r with
stee
l pip
es is
to b
eco
nstru
cted
on
the
Ked
uang
Riv
er b
efor
e en
terin
gth
e re
serv
oir.
◆Sa
bo d
am w
ith st
eel-p
ipe
type
trap
ping
stru
ctur
eis
com
mon
in Ja
pan
to tr
ap a
nd re
mov
e ga
rbag
e.◆
Gar
bage
rem
oval
wor
ks w
ill b
e ca
rrie
d ou
tpe
riodi
cally
.
i) C
oncr
ete
Wei
r
Dam
wid
th
W=5
6.3
m
Dam
hei
ght
H
= 9.
3 m
D
esig
n di
scha
rge
Q=
1,3
70 m
3 /s
Cre
st w
idth
Bc
= 70
m
Ove
rflo
w d
epth
H
w=4
.9m
ii) S
teel
mat
eria
l
Wid
th
B=2
5.0
m
Hei
ght
H=4
.0 m
i) C
onst
ruct
ion
Cos
t
$
1,37
0,00
0ii)
O&
M C
ost
$21
,000
/yea
r
◆Th
is m
etho
d is
to re
duce
gar
bage
ent
erin
g in
to th
ere
serv
oir.
◆Pe
riodi
cal g
arba
ge re
mov
al w
orks
are
nee
ded.
Alte
rnat
ives
Tab
le 8
.6.1
Eva
luat
ion
of A
ltern
ativ
es fo
r C
ount
erm
easu
res f
or S
edim
ent D
epos
its a
nd G
arba
ge a
t Int
ake
Cocr
ete
for p
lug
EL.1
22.5
m
EL.1
16 m
EL.1
28 m
EL.1
40 m
Scre
en
Exis
ting
stru
ctur
es
Inta
ke to
wer
1,0m
10.0
m5.
0 m
15,7
m
EL.1
38 m
EL.1
29 m
Sect
ion
of c
onst
ruct
ion
ofne
w in
take
stru
ctur
e/w
ater
way
5.5
m
EL.1
40 m
Con
nect
ing
Poin
t
Surg
e ta
nk
EL.1
42.5
m
EL.1
07.6
m
Gat
e sh
aft
Spill
way
Sect
ion
of e
xist
ing
wat
erw
ay
ΔH
ΔH
EL.1
16.0
m
EL.1
28.0
m
EL.1
36.0
m EL.1
36.0
m
EL.1
16.0
m
EL.1
28.0
m
EL.1
36.0
m EL.1
36.0
m
Tabe
l 8.6
.1
Eva
luas
i Alte
rnat
if Pe
nang
anan
End
apan
Sed
imen
dan
Sam
pah
di In
take
T-6
Feat
ure
and
Sedi
men
t Bal
ance
Faci
lity
Plan
Cos
t E
valu
atio
n1)
Ked
uang
Riv
erSe
dim
ent
bypa
ss
◆Th
is m
etho
d is
redu
ce th
e se
dim
ent i
nflo
w fr
omth
e K
edua
ng R
iver
into
the
rese
rvoi
r by
dive
rting
the
sedi
men
t inf
low
with
hig
h co
ncen
tratio
n in
toth
e by
pass
tunn
el to
the
dow
nstre
am ri
ver.
◆Ta
rget
sedi
men
t is t
he w
ash
load
s bec
ause
tract
ive
forc
e is
smal
l due
to g
entle
byp
ass t
unne
l(c
hann
el) g
radi
ent o
f 1/1
,000
.◆
This
met
hod
is u
sual
ly e
ffect
ive
in c
ase
that
itw
ould
be
diffi
cult
to lo
wer
the
wat
er le
vel f
orse
dim
ent f
lush
ing
and
the
rese
rvoi
r is r
elat
ivel
ysm
all.
◆Ef
ficie
ncy
of S
edim
ent R
emov
al
Vol
ume
7
57,0
00 m
3 (wet
yea
r)
C
once
ntra
tion
2,
789
ppm
(wet
yea
r)
* w
et y
ear 1
998-
1999
i) B
ypas
s tun
nel
L
= 6
,435
m, I
= 1
/1,0
00
Hor
sesh
oe se
ctio
n 2r
= 5
.0 m
D
esig
n di
scha
rge
Q =
50
m3/
sii)
Riv
er im
prov
emen
t
L=2
,395
m, I
=1/2
00
Cro
ss se
ctio
n
B1
0.0
m x
H3.
0 m
(s
ide
slop
e 1:
0.5)
D
esig
n di
scha
rge
Q =
65
m3 /s
iii) D
iver
ting
Wei
r
W=1
37.9
m, H
= 9.
3 m
,
Des
ign
disc
harg
e Q
= 1
,370
m3 /s
C
rest
wid
th
Bc =
70
m
Ove
rflo
w d
epth
H
w =
4.9
m
Gat
es
H6.
7m x
B5.
0m x
2no
s.
i) C
onst
ruct
ion
Cos
t
$
82,9
40,0
00ii)
O&
M C
ost
$1,
597,
000/
year
iii) U
nit c
ost
$10
.7/m
3
◆C
onst
ruct
ion
cost
and
O&
M c
ost w
ill b
e hi
ghes
tam
ong
the
alte
rnat
ive
coun
term
easu
res.
◆V
olum
e of
sedi
men
t rel
ease
d is
alm
ost t
he sa
me
with
oth
er a
ltern
ativ
es, h
owev
er re
liabi
lity
and
effe
ctiv
enes
s of s
edim
ent r
elea
sing
is h
igh.
◆Le
ngth
of b
ypas
s cha
nnel
is v
ery
long
. And
com
pens
atio
n fo
r lan
d ac
quis
ition
will
be
nece
ssar
y.
2) S
edim
ent
sluic
ing
byne
w g
ates
◆Th
is m
etho
d is
to p
ath
thro
ugh
inco
min
g flo
odin
flow
from
the
Ked
uang
Riv
er w
ith h
igh
turb
idity
to th
e do
wns
tream
reac
hes t
hrou
gh n
ew g
ate
befo
rede
posi
tion
in th
e re
serv
oir.
◆N
ew sl
uici
ng g
ate
is to
be
inst
alle
d on
the
right
abut
men
t of t
he d
am to
mak
e th
e K
edua
ng fl
ood
inflo
w sm
ooth
ly fl
owin
g in
to sl
uice
gat
e.
◆Ef
ficie
ncy
of S
edim
ent R
emov
al
Vol
ume
843
,000
m3
(wet
yea
r)
C
once
ntra
tion
2,
712
ppm
(wet
yea
r)
* w
et y
ear 1
998-
1999
i) S
edim
ent g
ate
H
12.6
m x
B5.
0 m
x 4
nos.
ii) S
pillw
ay c
hann
el
L =
723
m, B
= 2
0 m
iii) F
ore
bay
exca
vatio
n
Lev
el o
f exc
avat
ion
EL.1
27.0
m
Vol
ume
183,
000
m3
i) C
onst
ruct
ion
Cos
t
$
35,6
30,0
00ii)
O&
M C
ost
$67
2,00
0/ye
ariii
) Uni
t cos
t
$
4.7/
m3
◆Fa
cilit
ies r
equi
red
are
only
slui
cing
gat
e an
dch
ute
way
whi
ch c
an b
e co
nstru
cted
with
in th
e da
mar
ea, s
o no
nee
d fo
r lan
d ac
quis
ition
.◆
Con
stru
ctio
n co
st is
che
apes
t am
ong
the
alte
rnat
ives
, it i
s aro
und
1/2
of th
e se
dim
ent
bypa
ssin
g.◆
Effe
ctiv
enes
s of s
edim
ent r
elea
se is
alm
ost t
hesa
me
as th
e se
dim
ent b
ypas
sing
.◆
Sedi
men
t slu
icin
g is
onl
y ef
fect
ive
whe
n th
ere
serv
oir w
ater
leve
l is l
ow m
ainl
y in
the
begi
nnin
gof
the
wet
seas
on. W
hen
the
rese
rvoi
r wat
er le
vel i
shi
gh, e
ffici
ency
on
sedi
men
t rel
easi
ng b
ecom
essm
all.
3) S
edim
ent
stor
age
rese
rvoi
rw
ith n
ewga
tes i
nre
serv
oir
◆Th
is m
etho
d is
to c
reat
e a
smal
l sed
imen
tst
orag
e re
serv
oir f
or th
e se
dim
ent i
nflo
w fr
om th
eK
edua
ng R
iver
insi
de th
e re
serv
oir.
◆Th
e sm
all s
edim
ent s
tora
ge re
serv
oir i
s cre
ated
by in
stal
latio
n of
clo
sure
dik
e.◆
New
gat
e is
to b
e in
stal
led
for s
edim
ent r
elea
sing
on th
e sa
me
loca
tion
of th
e se
dim
ent s
luic
ing
alte
rnat
ive.
◆Be
caus
e of
smal
l cap
acity
of s
edim
ent s
tora
gere
serv
oir,
the
rese
rvoi
r wat
er le
vel r
ises
rapi
dly
due
to in
flow
from
the
Ked
uang
Riv
er. T
he st
ored
wat
er in
the
stor
age
rese
rvoi
r is d
iver
ted
into
the
mai
n re
serv
oir t
hrou
gh th
e ne
w o
verf
low
wei
r.
◆Ef
ficie
ncy
of S
edim
ent R
emov
al
Vol
ume
1,38
0,00
0 m
3 (wet
yea
r)
i) C
losu
re d
ike
: dou
ble
shee
t pile
L
= 6
50 m
, H =
15
m, B
= 1
0 m
ii) S
edim
ent g
ate
H
12.6
m x
B7.
5 m
x 4
nos.
iii)
Spill
way
cha
nnel
L
= 7
23 m
, B =
20
miv
) For
e ba
y ex
cava
tion
L
evel
of e
xcav
atio
n EL
.127
.0 m
V
olum
e 18
3,00
0m3
v) O
verf
low
wei
r
L =
150
m, B
= 1
0 m
i) C
onst
ruct
ion
Cos
t
$
47,0
90,0
00ii)
O&
M C
ost
$90
8,00
0/ye
ariii
) Uni
t cos
t
$
3.8/
m3
◆Se
dim
ent s
tora
ge re
serv
oir c
an b
e op
erat
edse
para
tely
from
the
mai
n W
onog
iri re
serv
oir.
◆ S
edim
ent f
lush
ing
can
be o
pera
ted
with
out
low
erin
g m
ain
rese
rvoi
r wat
er le
vel.
◆A
ll fa
cilit
ies c
an b
e co
nstru
cted
with
in d
am si
tear
ea w
ithou
t lan
d ac
quis
ition
.◆
Gar
bage
issu
es a
t int
ake
will
be
solv
ed b
ecau
seal
mos
t all
of th
e ga
rbag
e fr
om th
e K
edua
ng R
iver
is re
tain
ed in
the
stor
age
rese
rvoi
r.◆
Sedi
men
t flu
shin
g ca
n be
mad
e af
ter s
torin
gw
ater
up
to N
HW
L in
the
mai
n re
serv
oir.
◆A
s wel
l as s
edim
ent f
lush
ing,
sedi
men
t slu
icin
gca
n be
mad
e in
the
begi
nnin
g of
the
wet
seas
on.
◆Su
stai
nabi
lity,
relia
bilit
y an
d ef
fect
iven
ess o
fse
dim
ent r
elea
sing
are
hig
hest
am
ong
the
alte
rnat
ive
coun
term
easu
res.
Alte
rnat
ivesTab
le 8
.6.2
E
valu
atio
n of
Alte
rnat
ives
for
Cou
nter
mea
sure
s for
Sed
imen
t Inf
low
from
Ked
uang
Riv
er
Bypa
ss T
unne
lL=
6,44
0m2R
=5.0
m
Div
ertin
g W
eir
Ked
uang
Riv
er
Won
ogir
iDam
Riv
er im
prov
emen
tL=
2,40
0mB
=10m
,h=3
.0m
Bypa
ss T
unne
lL=
6,44
0m2R
=5.0
m
Div
ertin
g W
eir
Ked
uang
Riv
er
Won
ogir
iDam
Riv
er im
prov
emen
tL=
2,40
0mB
=10m
,h=3
.0m
Ked
uang
Riv
er
Won
ogir
iD
amSe
dim
ent S
luic
ing
Gat
e
Pres
umed
se
dim
ent f
low
Exi
stin
g Sp
illw
ay
Solo
Riv
er
Ked
uang
Riv
er
Won
ogir
iD
amSe
dim
ent S
luic
ing
Gat
e
Pres
umed
se
dim
ent f
low
Exi
stin
g Sp
illw
ay
Solo
Riv
er
Won
ogir
iD
am
Bypa
ss w
ayL=
720
m
◆
Ove
rflo
w W
eir
L=15
0 m
Sedi
men
t Sto
rage
R
eser
voir
Won
ogir
iD
am
Bypa
ss w
ayL=
720
m
◆
Ove
rflo
w W
eir
L=15
0 m
Sedi
men
t Sto
rage
R
eser
voir
Tabe
l 8.6
.2
Eva
luas
i Alte
rnat
if Pe
nang
anan
Alir
an S
edim
en d
ari S
unga
i Ked
uang
T-7
Feat
ure
Faci
lity
Plan
Cos
tEv
alua
tion
1) S
edim
ent
stor
age
dam
for s
edim
ent
rem
oval
(Che
ck d
am,
Sabo
dam
)
◆ S
edim
ent s
tora
ge d
ams a
re c
onst
ruct
ed o
n th
e riv
er c
hann
el o
fm
ajor
trib
utar
ies t
o tra
p an
d st
ore
sedi
men
ts, a
nd to
rem
ove
byex
cava
tion.
◆Re
mov
al w
orks
of s
edim
ent d
epos
its is
car
ried
out i
n th
e dr
yse
ason
◆Tr
appe
d se
dim
ents
shal
l be
perio
dica
lly re
mov
ed b
y ex
cava
tion
by b
ack
hoe
and
conv
eyed
to sp
oil b
anks
by
truck
s.◆
Rela
tivel
y co
arse
sedi
men
ts a
re d
epos
ited
in th
e st
orag
e da
m a
ndfin
er se
dim
ents
flow
into
the
rese
rvoi
r
i) Se
dim
ent S
tora
ge D
am x
83un
its
Dam
wid
th
W =
116
m
Dam
hei
ght
H
= 9
.3 m
S
tora
ge C
apac
ity
V
= 2
4,00
0 m
3
C
rest
wid
th
Bc
= 70
m
Ove
rflo
w d
epth
H
w =
5.0
m
i) C
onst
ruct
ion
Cos
t
$
225,
460,
000
ii) O
&M
Cos
t
$3,1
89,0
00/y
ear
iii) U
nit c
ost
$12
.8/m
3
◆T
his m
etho
d is
com
mon
to
trap
sedi
men
ts in
rive
r .M
any
chec
k da
ms h
ave
been
alre
ady
cons
truct
ed.
How
ever
thes
e da
ms h
ave
been
alre
ady
fille
d w
ithse
dim
ents
with
out e
xcav
atio
n.◆
As t
he ta
rget
sedi
men
t is w
ash
load
s, se
dim
ent
trapp
ing
ratio
will
be
very
smal
l.◆
Furth
er, t
rapp
ing
capa
city
of s
tora
ge d
am is
ver
y sm
all
com
parin
g th
e se
dim
ent i
nflo
w, s
o m
any
stor
age
dam
ssh
all b
e co
nstru
cted
to c
ope
with
sedi
men
t inf
low
.◆
Due
to li
mita
tion
of lo
catio
ns o
f sto
rage
dam
, tra
pped
sedi
men
ts in
the
stor
age
dam
shal
l be
rem
oved
by
exca
vatio
n. T
hus h
uge
spoi
l ban
k ar
eas s
hall
be re
quire
d.
2) H
ydra
ulic
dred
ging
inre
serv
oir
◆Th
is m
etho
d is
to re
mov
e th
e de
posi
ted
sedi
men
t in
the
rese
rvoi
rby
hyd
raul
ic d
redg
ing.
◆D
redg
ed se
dim
ents
shal
l be
conv
eyed
to sp
oil b
anks
.
i) D
redg
erSu
ctio
ndr
edge
r,60
0PS
x10
units
i) C
onst
ruct
ion
Cos
t
$
44,5
67,0
00ii)
O&
M C
ost
$
3,20
2,00
0/ye
ariii
) Uni
t cos
t
$
4.3/
m3
◆ H
uge
spoi
l ban
k ar
eas s
hall
be re
quire
d.◆
Run
ning
cos
t is v
ery
expe
nsiv
e.◆
Rel
iabi
lity
of se
dim
ent r
emov
al is
hig
h.
3) D
ryex
cava
tion
inre
serv
oir
◆D
ry e
xcav
atio
n in
the
rese
rvoi
r sha
ll be
car
ried
out b
y ba
ck h
oeor
cra
wle
r-m
ount
ed b
ulld
ozer
for s
wam
p in
the
dry
seas
on w
hen
depo
site
d se
dim
ents
app
ear o
n th
e gr
ound
nea
r the
rive
r mou
ths o
fm
ajor
trib
utar
ies i
n th
e re
serv
oir.
◆Ex
cava
ted
sedi
men
ts sh
all b
e co
nvey
ed to
spoi
l ban
ks b
y tru
cks.
i)Bu
lldoz
er4t
,sw
amp
x2,
960
units
ii)C
raw
ler
load
er,
2.3
m3
x40
unit
iii)
Dum
ptru
ck,
20to
nx
165
units
i) C
onst
ruct
ion
Cos
t
$
287,
990,
000
ii) O
&M
Cos
t
$7,7
54,0
00/y
ear
iii) U
nit c
ost
$19
.0/m
3
◆Re
liabi
lity
of th
is m
etho
d is
hig
h.◆
This
met
hod
is a
pply
for s
edim
ent r
emov
al in
sedi
men
t sto
rage
dam
, how
ever
, to
cope
with
all
sedi
men
ts d
epos
ited
in th
e re
serv
oir (
arou
nd 2
0,00
0m
3/da
y) b
y so
le d
ry e
xcav
atio
n, m
any
syst
ems a
rere
quire
d, c
onse
quen
tly c
ost m
ust b
e ve
ry h
igh.
◆ H
uge
spoi
l ban
k ar
eas s
hall
be re
quire
d.
4) M
anag
ing
ofse
dim
ents
with
in re
serv
oir
by w
ater
rele
asin
g fro
mth
e in
take
◆Th
is m
etho
d ai
ms a
t mov
ing
the
prev
ious
ly d
epos
ited
sedi
men
tsto
war
d th
e de
ad z
one
of th
e re
serv
oir,
ther
eby
mai
ntai
ning
or
incr
easi
ng th
e ef
fect
ive
capa
city
of t
he re
serv
oir.
◆A
t the
beg
inni
ng o
f wet
seas
on, t
he m
axim
um in
take
dis
char
ge(7
0 m
3/s)
shal
l be
rele
ased
con
tinuo
usly
for l
ong
dura
tion,
say
2m
onth
s.◆
This
met
hod
is c
ateg
oriz
ed a
s sed
imen
t slu
icin
g by
use
of t
heex
istin
g in
take
.
No
new
faci
litie
s mig
ht b
ene
cess
ary.
Mai
nten
ance
of t
he e
xist
ing
inta
ke sh
all b
e ne
cess
ary.
i) C
onst
ruct
ion
Cos
t
$
0ii)
O&
M C
ost
$0/
year
iii) U
nit c
ost
$ 0
/m3
◆ R
elia
bilit
y of
this
met
hod
is v
ery
low
with
out
coun
term
easu
re fo
r blo
ckin
g of
inta
ke d
ue to
gar
bage
.G
arba
ge re
mov
al sy
stem
is st
the
inta
ke w
ill b
ein
disp
ensa
ble.
◆ T
his m
etho
d ha
s bee
n fu
nctio
ned
at n
orm
al o
pera
tion,
how
ever
it c
an n
ot b
e a
solu
tion
to c
ope
with
mas
sive
sedi
men
t inf
low
into
dam
rese
rvoi
r.◆
Sign
ifica
nt a
mou
nt o
f wat
er sh
all b
e re
leas
ed a
nd th
usth
ere
is a
risk
that
the
rese
rvoi
r wat
er le
vel c
an n
ot re
ach
NH
WL.
Alte
rnat
ivesT
able
8.6
.3 E
valu
atio
n of
Alte
rnat
ives
for
Cou
nter
mea
sure
s for
Sed
imen
t Inf
low
from
Oth
er T
ribu
tari
es
Hollo
w jet
Powe
r
HWL.1
36.
Guar
dco
nduit
EL.11
6.0m,
1310
Solo
Sluici
ng12
70
Exist
ing Sp
illwayTa
bel 8
.6.3
E
valu
asi A
ltern
atif
Pena
ngan
an A
liran
Sed
imen
dar
i Sun
gai L
ainn
ya
T-8
Tabel 9.1.1 Pelajaran dari Pengalaman Sebelumnya Pada Proyek-proyek Konservasi DAS Wonogiri
- Well integrated & coordinated physical and vegetative or civil and agricultural measures are-
-
-
- Not blue print approaches, but area specific & flexible prescriptions by watershed conditions are-
-
- Crop Selection & Cropping Pattern- Need of crops tolerant to dry climate & with adequate economic value- Introduction of area specific superior crops/commodity andalan for dry land- Further adaptation of multiple cropping system with legumes should be aimed for improvement of- Development of commodities suitable for conservation purposes is to be envisaged.- Selection of agricultural commodities should be based on market potential followed by technical &- One alternative is to combine perennial crops with seasonal crops in home compound & dry farm
- Project failed because of top-down management & use of inflexible prescriptions poorly adapted to loc-
-
-
-
- Monitoring of performances of the programs implemented seldom practiced in the past. -
-
- Legal or official procedures will be necessary for controlling cropping pattern in dry farm land.
-
--- Multi-stakeholders dialog at district & watershed levels are to be maintained.-
-
-
1/: Lessons learned was extracted based on the review on the following reports & interview with the agencies concerne-
-
As farmers are becoming more interested in income earned in non-agricultural activities, they areincreasingly reluctant to invest in their own farm especially when it concerns maintenance of their
Introduction of measures which are accepted & practiced by farmers/farmers groups andsustainable; not sophisticated, low cost, use of available materials.
High priority to be given to sub-watersheds which are main contributors to the acute sedimentationproblems in the Wonogiri Reservoir.
Government support is still required & essential for supporting farming activities. The level ofincentives should be sufficiently high to induce farmers participation in soil conservation programs.
Precondition for success: strong & motivated extension services involving PPL & PKL will form thekey in implementing & sustaining conservation efforts.
1. Technical Issues
Grant aid in terrace rehabilitation has resulted in a detrimental change in social behavior in selfreliant activities for soil conservation and terrace rehabilitation.
Report on the Evaluation of Wonogiri Watershed Management, Watershed Management Technology Center(BP2TP DAS), Surakarta, 1995
Depending solely on conservation measures would mean implementing remedial measures withouttackling, preventing and solving the real causes.
2. Project Management Issues
Land is often left by the family head working on a seasonal basis in the cities. Recommendedagricultural measures are to be in line with this reality.
To achieve a balance between the farmers aspiration & the project objectives, an integrated planningwhich involves the bottom-up and bottom-down approaches is needed.Peoples behavior depends on their local culture. So, whatever programs must be formulatedaccordingly and not given as a uniform package for all locations, but must be arranged together withtheir leaders and then given to the people by various methods of extension and communications.Traditional values must be taken into account to ensure participation of communities.
3. Social & Institutional Issues
Technical collaboration team & technical working team at kabupaten level and integratedinstitutions at kecamatan & village levels are to be established.
Institutionalization of integrated & synergetic efforts & activities toward watershed management inthe Wonogiri catchment area is to be envisaged.
Consulting Services for the Upper Solo (Wonogiri) Watershed Protection Project, Monitoring & EvaluationFinal Report, July 1991, BCEOM
Planning is to be based on prospects for sustainable income flow, farmers traditional customs ofcultivation, off-farm income, availability of credits & markets, existing social priorities.
Reasons not following integrated approaches; project expenditures are to be spread as much aspossible among villages and communities in the project area.
Combined package of conservation measures and improved agricultural practices must provideadequate and immediate & long term financial gains to farmers for ensuring positive participation of
Agro-forestry approaches: Past projects were too much forestry oriented; to employ integratedforestry & agronomic approaches.
T-9
Veg
etat
ion
1/1.
Terr
ace
Benc
h (c
ultiv
ated
are
a)(1
)A
gro-
fore
stry
& L
and
Use
Mod
ifica
tion
Prov
ision
of:
1)Sl
ope
Cla
ss: 0
- 8
%A
nnua
l Cro
ps +
Tre
e C
rops
/Tre
e-
Agr
o-fo
rest
ry D
evel
opm
ent
Ann
ual c
rops
90%
+ T
ree
crop
s/tr
ees 1
0%・
Tree
cro
p/tre
e se
edlin
g2)
Slop
e C
lass
: 0 -
15 %
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
・Fe
rtiliz
er/c
ompo
stA
nnua
l cro
ps 2
5% +
Tre
e cr
ops/
tree
s 25%
・La
bor c
ost (
ince
ntiv
es)
3)Sl
ope
Cla
ss: >
15 -
25 %
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
Ann
ual c
rops
50%
+ T
ree
crop
s/tr
ees 5
0%(+
med
ical
cro
ps)
Exte
nsio
n Se
rvic
es:
4)Sl
ope
Cla
ss: >
25 -
40 %
Tree
Cro
ps/T
rees
+ A
nnua
l Cro
ps・
Lan
d us
e co
nver
sion
to o
rcha
rd(+
med
ical
cro
ps)
Tre
e cr
ops/
tree
s 75%
+ A
nnua
l cro
ps 2
5%
・Tr
aini
ng p
rogr
am5)
Slop
e C
lass
: >40
%Tr
ee C
rops
/Tre
es・
Fiel
d pr
ogra
ms
Lan
d us
e co
nver
sion
to o
rcha
rd/fo
rest
(+ m
edic
al c
rops
+ C
over
Cro
p/G
rass
es)
・Li
vest
ock
supp
ort p
rogr
amT
ree
crop
s/tr
ees 1
00%
1-1.
Terr
ace
Lip
Impr
ovem
ent
1.Te
rrac
e Li
pPr
ovisi
on o
f:(1
)Te
rrac
e Li
p Im
prov
emen
t(1
)Te
rrac
e Li
p St
abili
zatio
nG
rass
es-
Agr
o-fo
rest
ry D
evel
opm
ent
-1)
-Ele
phan
t gra
ss・
Tree
cro
p/tre
e se
edlin
g-R
. Kol
onjo
no・
Ferti
lizer
/com
post
-Bra
chya
ria
briz
anth
a・
Labo
r cos
t (in
cent
ives
)2)
Prev
entin
g pl
antin
g of
cas
sava
on
lipSh
rubs
1-2.
Terr
ace
Ris
er Im
prov
emen
t-L
euca
ena
leuc
ocep
hala
(lam
toro
)-
Farm
ing
supp
ort
(1)
Terr
ace
Rise
r Im
prov
emen
t2.
Terr
ace
Rise
r-G
lyri
cide
ae・
Soil
amel
iora
nt-
(1)
Terr
ace
Rise
r Sta
biliz
atio
n・
Farm
inpu
ts1)
Veg
etat
ing
riser
with
gra
sses
of c
reep
ing
natu
reG
rass
es (C
reep
ing/
runn
er ty
pe g
rass
es p
refe
rabl
e)-
-Bra
chya
ria
briz
anth
a (B
B)Ex
tens
ion
Serv
ices
:2)
Prev
entin
g pl
antin
g of
cas
sava
on
riser
-Bra
chia
ria
decu
mbe
ns (B
D)
・
-Loc
al g
rass
(eba
lan
rum
put)
3.Te
rrac
e Be
nch
(cul
tivat
ed a
rea)
・Tr
aini
ng p
rogr
am1-
3.Te
rrac
e Be
nch
Impr
ovem
ent
(1)
Agr
o-fo
rest
ry &
Lan
d U
se M
odifi
catio
n・
Fiel
d pr
ogra
ms
(1)
Terr
ace
Benc
h R
efor
mat
ion
1)Sl
ope
Cla
ss: 0
- 8
%・
Live
stoc
k su
ppor
t pro
gram
1)A
nnua
l cro
ps 9
0% +
Tre
e cr
ops/
tree
s 10%
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
2)Sl
ope
Cla
ss: 0
- 15
%-
Ann
ual c
rops
25%
+ T
ree
crop
s/tr
ees 2
5%A
nnua
l Cro
ps +
Tre
e C
rops
/Tre
e3)
Slop
e C
lass
: >15
- 25
%A
nnua
l cro
ps 5
0% +
Tre
e cr
ops/
tree
s 50%
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
4)Sl
ope
Cla
ss: >
25 -
40 %
(+ m
edic
al c
rops
)L
and
use
conv
ersi
on to
orc
hard
Tree
Cro
ps/T
rees
+ A
nnua
l Cro
ps1-
4.W
ater
way
& D
rop
Stru
ctur
e Im
prov
emen
tT
ree
crop
s/tr
ees 7
5% +
Ann
ual c
rops
25%
(+
med
ical
cro
ps)
1)5)
Slop
e C
lass
: >40
%L
and
use
conv
ersi
on to
orc
hard
/fore
stTr
ee C
rops
/Tre
esT
ree
crop
s/tr
ees 1
00%
(+ m
edic
al c
rops
+ C
over
Cro
p/G
rass
es)
U S 1 ~ 4 T 1 U S 1 ~ 5 T 2 ~ 3
Back
war
dslo
ppin
gof
terr
ace
benc
h;co
nstri
ctio
nof
terr
ace
drai
nan
dex
cava
tion
ofdu
gout
forw
ater
& se
dim
ent d
epos
ition
Form
ing
orre
shap
ing
&st
reng
then
ing
ofte
rrac
elip
like
ridge
of p
addy
fiel
d
Form
ing
or re
shap
ing
of te
rrac
eris
er
Impr
ovem
ent o
f wat
erw
ay &
dro
pst
ruct
ure
All Classes
Upland Field with Bench Terrace
Veg
etat
ive
Mea
sure
s/A
gro-
fore
stry
Targ
et P
lace
/Veg
etat
ive
Mea
sure
s/A
gro-
fore
stry
No
cons
erva
tion
wor
ks p
lann
edPh
ysic
al M
easu
res
Supp
ort P
rogr
ams
Req
uire
d
Tab
le 9
.3.8
Bas
ic C
ount
erm
easu
rs fo
r W
ater
shed
Con
serv
atio
n in
the
Won
ogir
i Cat
chm
ent A
rea
(1/2
)
Medium & Fair to Poor Quality Bench Terrace
Subject Area
Slope Class
Good Quality Bench TerraceTerrace Type& Condition
Land Unit
Soil
& W
ater
Con
serv
atio
n M
easu
res
Form
atio
n/em
pow
erm
ent o
ffa
rmer
gro
ups
Form
atio
n/em
pow
erm
ent o
ffa
rmer
gro
ups
1. B
ench
Ter
race
Impr
ovem
ent W
orks
Veg
etat
ing
lipw
ithgr
asse
sor
shru
bsw
ithec
onom
ic u
se (f
odde
r, fu
el)
Benc
h im
prov
emen
t & c
onst
ruct
ion
of te
rrac
e dr
ain
Prev
entin
gre
shap
ing
orcl
earin
gpr
actic
esof
riser
&pr
eser
ving
vege
tatio
n
Tabe
l 9.3
.8
Pena
ngan
an D
asar
Kon
serv
asi D
AS
di D
TA W
aduk
Won
ogir
i (1/
2)
T-10
Veg
etat
ion
1/
2-1.
Con
stru
ctio
n of
ben
ch te
rrac
e1.
Terr
ace
Lip
Prov
ision
of:
1)(1
)Te
rrac
e Li
p St
abili
zatio
nG
rass
es-
Agr
o-fo
rest
ry D
evel
opm
ent
1)-E
leph
ant g
rass
・Tr
ee c
rop/
tree
seed
ling
-R. K
olon
jono
・Fe
rtiliz
er/c
ompo
st-B
rach
yari
a br
izan
tha
・La
bor c
ost (
ince
ntiv
es)
2)Pr
even
ting
plan
ting
of c
assa
va o
n lip
Shru
bs2-
2.W
ater
way
& D
rop
Stru
ctur
e C
onst
ruct
ion
-Leu
caen
a le
ucoc
epha
la (l
amto
ro)
-Fa
rmin
g su
ppor
t1)
-Gly
rici
deae
・So
il am
elio
rant
2.Te
rrac
e R
iser
・Fa
rm in
puts
(1)
Terr
ace
Rise
r Sta
biliz
atio
nG
rass
es (C
reep
ing/
runn
er ty
pe g
rass
es p
refe
rabl
e)1)
Veg
etat
ing
riser
with
gra
sses
of c
reep
ing
natu
re-B
rach
yari
a br
izan
tha
(BB)
Exte
nsio
n Se
rvic
es:
-Bra
chia
ria
decu
mbe
ns (B
D)
・
2)Pr
even
ting
plan
ting
of c
assa
va o
n ris
er-L
ocal
gra
ss (e
bala
n ru
mpu
t)・
Trai
ning
pro
gram
3.Te
rrac
e Be
nch
(cul
tivat
ed a
rea)
・Fi
eld
prog
ram
s(1
)A
gro-
fore
stry
& L
and
Use
Mod
ifica
tion
・Li
vest
ock
supp
ort p
rogr
am1)
Slop
e C
lass
: 0 -
8 %
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
Ann
ual c
rops
90%
+ T
ree
crop
s/tr
ees 1
0%2)
Slop
e C
lass
: 0 -
15 %
Ann
ual C
rops
+ T
ree
Cro
ps/T
ree
Ann
ual c
rops
25%
+ T
ree
crop
s/tr
ees 2
5%3)
Slop
e C
lass
: >15
- 25
%A
nnua
l Cro
ps +
Tre
e C
rops
/Tre
eA
nnua
l cro
ps 5
0% +
Tre
e cr
ops/
tree
s 50%
(+ m
edic
al c
rops
)4)
Slop
e C
lass
: >25
- 40
%Tr
ee C
rops
/Tre
es +
Ann
ual C
rops
Lan
d us
e co
nver
sion
to o
rcha
rd(+
med
ical
cro
ps)
Tre
e cr
ops/
tree
s 75%
+ A
nnua
l cro
ps 2
5%
5)Sl
ope
Cla
ss: >
40 %
Tree
Cro
ps/T
rees
Lan
d us
e co
nver
sion
to o
rcha
rd/fo
rest
(+ m
edic
al c
rops
+ C
over
Cro
p/G
rass
es)
Tre
e cr
ops/
tree
s 100
%1.
Frin
ge o
f Hou
sing
Yar
d1)
Eros
ion
Miti
gatio
n in
Hou
sing
Yar
dSh
rubs
Prov
ision
of:
-Ser
enga
n ja
ntan
・Tr
ee se
edlin
g(F
lem
ingi
a co
nges
ta R
oxb)
・La
bor c
ost (
ince
ntiv
es)
1/: K
inds
of t
ree
crop
s/tre
es: t
o be
sele
cted
by
bene
ficia
ries o
n ne
ed b
asis
2/
: Hou
sing
yar
d
Land Unit
Soil
& W
ater
Con
serv
atio
n M
easu
res
Veg
etat
ive
Mea
sure
s/A
gro-
fore
stry
Supp
ort P
rogr
ams
Phys
ical
Mea
sure
sTa
rget
Pla
ce/V
eget
ativ
e M
easu
res/
Agr
o-fo
rest
ryR
equi
red
Esta
blish
emen
t of h
edge
row
s aro
und
hous
ing
yard
Housing 2/
> 8%
H S 2 ~ S 5
No
phys
ical
mea
sure
s pla
nned
P S 1 ~ S 5 T 42.
Ter
race
For
mat
ion/
Upg
radi
ng W
orks
Con
stru
ctio
n of
wat
erw
ay &
dro
pst
ruct
ure
All Classes
Composite
Subject Area
Slope Class
Terrace Type& Condition
Form
atio
n/em
pow
erm
ent o
ffa
rmer
gro
ups
Upland Field without Bench Terrace, Traditional Terrace & Settlement Area under uplandField Condition
Upg
radi
ng c
urre
nt te
rrac
es in
toim
prov
ed b
ench
terr
ace
orfo
rmat
ion
of im
prov
ed b
ench
terr
ace
Veg
etat
ing
lipw
ithgr
asse
sor
shru
bsw
ithec
onom
ic u
se (f
odde
r, fu
el)
Tabe
l 9.3
.8
Pena
ngan
an D
asar
Kon
serv
asi D
AS
di D
TA W
aduk
Won
ogir
i (2/
2)
T-11
1. L
and
Man
agem
ent f
or S
oil &
Wat
er C
onse
rvat
ion
1-1.
Farm
Lan
d Im
prov
emen
t-
Diss
emin
atio
n of
ben
efits
of s
oil &
wat
er c
onse
rvat
ion
-
-Te
rrac
e m
anag
emen
t-
Terr
ace
impr
ovem
ent w
ith a
dequ
ate
vege
tativ
e m
easu
res;
soil
& w
ater
con
serv
atio
n m
easu
res
-So
il m
anag
emen
t/im
prov
emen
t-
Impr
ovem
ent o
f soi
l che
mic
al &
phy
sical
pro
perti
es &
soil
prod
uctiv
ity th
roug
h;・
App
licat
ion
of o
rgan
ic fe
rtiliz
er o
r mat
ter;
diss
emin
atio
n of
qua
lity
com
post
mak
ing
・In
trodu
ctio
n of
cov
er/fo
dder
cro
ps in
MT
II to
app
ly o
rgan
ic m
atte
r & p
rovi
de v
eget
ativ
e co
ver
・Pl
antin
g of
seas
onal
gra
sses
or l
egum
es fo
r soi
l im
prov
emen
t & li
vest
ock
deve
lopm
ent
-So
il su
rfac
e co
ver m
anag
emen
t/im
prov
emen
t-
Impr
ovem
ent s
oil s
urfa
ce c
over
thro
ugh;
・M
ulch
ing
usin
g cr
op re
sidue
s, es
peci
ally
in M
T II
・In
trodu
ctio
n of
cov
er/fo
dder
cro
ps in
MT
II to
pro
vide
veg
etat
ive
cove
r & a
pply
org
anic
mat
ter
・ ・
1-2.
Land
Use
Mod
ifica
tion/
Con
vers
ion
- -Es
tabl
ishin
g so
il co
nser
vatio
n or
ient
ed la
nd u
se b
y pr
omot
ing
agro
-fore
stry
mea
sure
s-
2. A
gro-
fore
stry
Pro
mot
ion
2-1.
Prom
otio
n of
Agr
o-fo
rest
ry- -
3. Im
prov
emen
t of P
ekar
anga
n U
se3-
1.Im
prov
emen
t of V
eget
ativ
e C
over
& P
rodu
ctiv
ity-
Esta
blish
men
t of w
ell m
anag
ed p
ekar
anga
n w
ith su
ffici
ent t
ree
crop
s & im
prov
ed la
nd fo
rms
-M
odifi
catio
n of
land
use
in p
ekar
anga
n to
war
d so
il &
wat
er c
onse
rvat
ion
orie
nted
use
Tab
le 9
.3.9
L
and
Man
agem
ent &
Agr
icul
tura
l Pro
mot
ion
Mea
sure
s in
Dry
Far
m L
and
(1/2
)
Des
crip
tion/
Obj
ectiv
esSu
bjec
t/Mea
sure
s
Intro
duct
ion
ofril
eycr
oppi
ngby
mul
tiple
crop
ping
ofpa
law
ijaof
diffe
rent
grow
thdu
ratio
n;ex
.mai
ze11
0da
ys+
soyb
eans
90da
ys
Diss
emin
atio
nof
bene
fits
ofso
il&
wat
erco
nser
vatio
nth
roug
hm
ass
guid
ance
&ot
her
exte
nsio
nac
tiviti
esin
tegr
ated
with
impl
emen
tatio
n of
soi
l & w
ater
con
serv
atio
n m
easu
res
Col
labo
rativ
e &
inte
grat
ed m
easu
res o
f agr
icul
tura
l (es
tate
& fr
uit c
rops
) & fo
rest
ry m
easu
res i
n pr
omot
ion
of a
gro-
fore
stry
Cul
tivat
ion
ofle
gum
inou
scr
ops
offa
vora
ble
surf
ace
cove
rin
the
edge
ofte
rrac
e;ex
.mai
zein
cent
erof
benc
hw
ithgr
ound
nuti
nth
e ed
ge
Land
use
conv
ersio
nof
farm
land
toor
char
d/fo
rest
incr
itica
llan
dsof
slope
clas
s>
40%
; aim
ing
atla
ndpr
oduc
tivity
impr
ovem
ent
& so
il co
nser
vatio
n
Prom
otio
nof
plan
ting
pere
nnia
lcro
psto
redu
cela
bor
requ
irem
ents
infa
rmin
g;ne
xtge
nera
tion
appe
ars
toha
vele
ssin
tere
sted
infa
rmin
g &
labo
r sho
rtage
pro
blem
s sla
ted
Prom
otio
nof
agro
-fore
stry
asa
mea
sure
for
agric
ultu
ralp
rom
otio
nas
wel
las
soil
&w
ater
cons
erva
tion
base
don
land
suita
bilit
y,m
arke
tabi
lity
&pa
ying
due
cons
ider
atio
nto
annu
al&
long
term
prod
uctiv
ity&
econ
omic
valu
e;se
lect
ion
ofpl
ants
shou
ldbe
base
don
ben
efic
iarie
s pre
fere
nce
Tabe
l 9.3
.9
Peng
elol
aan
Lah
an d
an P
enan
gana
n Pr
omos
i Per
tani
an d
i Lah
an P
erta
nian
Ker
ing
(1/2
)
T-12
4. C
rop
Sub-
sect
or M
easu
res
4-1.
Impr
ovem
ent o
f Cro
ppin
g Sy
stem
1)Im
prov
emen
t of C
ropp
ing
Patte
rnIm
prov
emen
t of C
ropp
ing
Patte
rn &
Sys
tem
-Si
ngle
Cro
ppin
g in
MT
1・
Mai
ze/C
assa
va -
Fallo
w-
Impr
ovem
ent o
f pro
duct
ivity
& in
clus
ion
of b
eans
in M
T 1
(ex.
row
s of b
eans
in th
e lo
wer
edg
e of
terr
ace
benc
h)-
Incl
usio
n of
bea
ns/d
roug
ht to
lera
nt c
rops
in M
T II;
inc
lusio
n of
legu
min
ous c
over
cro
ps in
MT
II-
Prev
entin
g ca
ssav
a pl
antin
g on
terr
ace
lip &
rise
r
・M
ultip
le C
rops
with
Bea
ns/C
assa
va -
Fallo
w-
Incl
usio
n of
bea
ns/d
roug
ht to
lera
nt c
rops
in M
T II;
inc
lusio
n of
legu
min
ous c
over
cro
ps/s
orgh
um in
MT
II
・M
ultip
le C
rops
with
out B
eans
/Cas
sava
- Fa
llow
-In
clus
ion
of b
eans
/dro
ught
tole
rant
cro
ps in
MT
II; i
nclu
sion
of le
gum
inou
s cov
er c
rops
/sor
ghum
in M
T II
-Im
prov
emen
t of p
rodu
ctiv
ity &
incl
usio
n of
bea
ns in
MT
1 (e
x. ro
ws o
f bea
ns in
the
low
er e
dge
of te
rrac
e be
nch)
-Pr
even
ting
cass
ava
plan
ting
on te
rrac
e lip
& ri
ser
-D
oubl
e C
ropp
ing
in M
T 1
& M
T 2
・M
aize
/Cas
sava
- M
aize
-Im
prov
emen
t of p
rodu
ctiv
ity &
incl
usio
n of
bea
ns in
MT
1 (e
x. ro
ws o
f bea
ns in
the
low
er e
dge
of te
rrac
e be
nch)
-In
clus
ion
of b
eans
or l
egum
inou
s cov
er c
rops
in M
T II
-Pr
even
ting
cass
ava
plan
ting
on te
rrac
e lip
& ri
ser
・M
ultip
le C
rops
with
bea
ns/C
assa
va -
Bean
s-
Impr
ovem
ent o
f pro
duct
ivity
of b
eans
in M
T I
-Pr
even
ting
cass
ava
plan
ting
on te
rrac
e lip
& ri
ser
・M
ultip
le C
rops
with
out b
eans
/Cas
sava
- Be
ans
-Im
prov
emen
t of p
rodu
ctiv
ity &
incl
usio
n of
bea
ns in
MT
1 (e
x. ro
ws o
f bea
ns in
the
low
er e
dge
of te
rrac
e be
nch)
-Pr
even
ting
cass
ava
plan
ting
on te
rrac
e lip
& ri
ser
2)Im
prov
emen
t of F
arm
ing
Prac
tices
-A
ppro
pria
te fe
rtiliz
atio
n in
clud
ing
orga
nic
ferti
lizer
; te
chni
cal t
rain
ing
on q
ualit
y co
mpo
st p
repa
ratio
n-
Use
of q
ualit
y se
eds,
espe
cial
ly in
MT
I-
Intro
duct
ion
of m
ulch
ing
& st
able
mul
ch;
min
imum
tilla
ge in
MT
II
4-2.
Tech
nolo
gy D
evel
opm
ent
-A
dapt
abili
ty te
st o
f pro
misi
ng b
ean
varie
ties
-R
iley
crop
ping
to e
nsur
e ve
geta
tive
cove
r in
criti
cal p
erio
d fo
r ero
sion
from
Janu
ary
to M
arch
-A
dapt
abili
ty te
st o
f sha
de to
lera
nt c
rops
, dro
ught
tole
rant
cro
ps &
oth
er p
rom
ising
cro
ps-
Tech
nolo
gy d
evel
opm
ent o
n tre
e cr
ops p
rodu
ctio
n on
long
term
bas
is
4-3.
Pala
wija
See
d Pr
oduc
tion
-A
ctiv
atio
n of
See
d Fa
rm th
roug
h re
nova
tion
& c
apac
ity b
uild
ing
-D
evel
opm
ent o
f soy
bean
s & g
roun
dnut
seed
pro
duct
ion
tech
nolo
gy b
y th
e Se
ed F
arm
-Fo
rmat
ion
of p
alaw
ija se
ed g
row
ers f
arm
er g
roup
s & p
rodu
ctio
n/su
pply
of s
eeds
in a
dist
rict
5. L
ives
tock
Sub
-sec
tor
Mea
sure
s5-
1.Li
vest
ock
Prom
otio
n-
Impl
emen
tatio
nof
lives
tock
prom
otio
npr
ogra
ms
(suc
has
intro
duct
ion
ofqu
ality
bree
ds&
impr
oved
offe
edin
gpr
actic
es a
nd st
reng
then
ing
of v
eter
inar
y &
ext
ensio
n se
rvic
es) i
nteg
rate
d w
ith so
il co
nser
vatio
n ve
geta
tive
mea
sure
s
Subj
ect/M
easu
res
Des
crip
tion/
Obj
ectiv
es
Tabe
l 9.3
.9
Peng
elol
aan
Lah
an d
an P
enan
gana
n Pr
omos
i Per
tani
an d
i Lah
an P
erta
nian
Ker
ing
(2/2
)
T-13
Topography and Geology
Soil erosion
Waste (Dredged/excavated material)
Groundwater (well water use)
Water quality (Bengawan Solo river)
Water quality (Wonogiri reservoir)
Air quality (emission gas, dust.)
Noise and vibration
Terrestrial flora and fauna
Aquatic flora and fauna
Protected species and areas
Land acquisition and Resettlement
People's unrest and conflict/opposition
Change of income / livelihood
Impacts on agriculture, fishery, forestry
Impacts on downstream area
Traffic and transportation
Mod
ifica
tion
of th
e in
take
--
--
+-
-R
eloc
atio
n of
the
inta
ke-
-1-
-1-2
--
+1-
-1G
arba
ge tr
appi
ng s
truct
ure
at in
take
--
--
-+
--
Gar
bage
trap
ping
stru
ctur
e at
Ked
uang
rive
r-1
+-
--
-+
--
Hyd
ro-s
uctio
n se
dim
ent r
emov
al sy
stem
-1+
--
-1+
-H
ydra
ulic
dre
dgin
g-1
+-
-+
Ked
uang
rive
r sed
imen
t byp
ass
-1-2
-2-2
+1-1
-2-2
-1-2
+2-1
--1
Sedi
men
t slu
cing
by
new
gat
es-2
-2+1
-1-1
-2-1
-+1
-1-
-1C
ompa
rtmen
ted
rese
rvoi
r with
new
flus
hing
gat
es-2
-2+1
-1-1
-2-1
-+1
-1-
-1Se
dim
ent s
tora
ge d
am fr
o se
dim
ent r
emov
al-1
+-
--
-+
--
Hyd
raul
ic d
redg
ing
in re
serv
oir
-1+
--
-+
-D
ry e
xcav
atio
n in
rese
rvoi
r-1
-2-
+-2
-2-
-1-1
+2-1
-1M
anag
ing
of s
edim
ents
with
in re
serv
oir b
y w
ater
rele
asin
g fr
om th
e in
take
+-1
Re-
allo
catio
n of
rese
rvoi
r sto
rage
cap
acity
-1-1
-1-3
-3+1
-1-1
d. W
ater
shed
Con
serv
atio
nC
omm
unity
-bas
ed so
il co
nser
vatio
n+2
++1
+1-
+1+1
-
e. N
o A
ctio
nD
o no
thin
g fo
r sed
imen
tatio
n pr
oble
m-3
-1-
--2
--2
-1-2
-2-
Not
e)
"
-": N
eglig
ible
neg
ativ
e im
pact
, "
-1":
Min
or n
egat
ive
impa
ct,
"-2
": M
ediu
m n
egat
ive
impa
ct,
"-3
": S
igni
fican
t neg
ativ
e im
pact
.
"+":
Neg
ligib
le p
ositi
ve im
pact
, "
+1":
Min
or p
ositi
ve im
pact
, "
+2":
Med
ium
pos
itive
impa
ct,
"+3
": S
igni
fican
t pos
itive
impa
ct.
b. C
ount
erm
easu
res
for S
edim
ent I
nflo
wfr
om K
edua
ng ri
ver
c. C
ount
erm
easu
res
for S
edim
ent I
nflo
wfr
om O
ther
Trib
utar
ies
a. C
ount
erm
easu
res
for S
edim
ent
Dep
osits
and
Gar
bage
at I
ntak
e
E
nvir
onm
enta
l Ele
men
ts
Can
dida
te P
roje
ct C
ompo
nent
s
Phys
ical
Env
iron
men
tN
atur
alE
nvir
onm
ent
Soci
o-ec
onom
ic E
nvir
onm
ent
Tabe
l 10.
6.1
Mat
rik
Dam
pak
Kom
pone
n C
alon
Pro
yek
dala
m M
aste
r Pla
n
T-14
(1) Countermeasures for Sediment Deposits and Garbage at IntakePositive Impact
Pre-construction
Construction Operation All Stages
Modification of the intake -1 +1 ○
Relocation of the intake - -2 +1 △
Garbage trapping structure at intake -1 - + ○
Garbage trapping structure at Keduang river - -1 - +1 ○
Hydro-suction sediment removal system -1 -1 +1 ○
Hydraulic dredging - -1 +1 ○
(2) Countermeasures for Sediment Inflow from Keduang RiverPositive Impact
Pre-construction
Construction Operation All Stages
Keduang river sediment bypass -2 -2 -2 +2 ×
Sediment sluicing by new gates -1 -1 -2 +2 △
Compartmented reservoir with new flushinggates -1 -2 -2 +2 △
(3) Countermeasures for Sediment Inflow from Other TributariesPositive Impact
Pre-construction
Construction Operation All Stages
Sediment storage dam for sediment removal - -1 -1 + ○
Hydraulic dredging in reservoir - -2 + ○
Dry excavation in reservoir -2 -2 +1 △
Managing of sediments within reservoir bywater releasing from the intake -1 +1 ○
Re-allocation of reservoir storage capacity -3 -2 -1 +1 ×
(4) Countermeasues for Watershed ConservationPositive Impact
Pre-construction
Construction Operation All stages
Community-based soil conservation - - +2 ○
-: Negligible negative impact, -1: Minor negative impact, -2: Medium negative impact, -3: Significant negative impact +: Negligible positive impact, +1: Minor positive impact, +2: Medium positive impact, +3: Significant positive impact○:Good, △:Fair, ×:Not Recommended
Table 10.6.2 Evaluation of Candidate Project Components
Evaluation
Evaluation
Evaluation
Candidate Project Components
Candidate Project Components
Candidate Project Components
Negative Impact
Negative Impact
Negative Impact
Candidate Project ComponentsNegative Impact
Evaluation
Tabel 10.6.2 Evaluasi Komponen Calon Proyek
T-15
Unit Cost Cost(US$) (US$, thousand)
I Diect costA Spillway
/1 Excavation m3 502,580 3 1,510/2 Backfill m3 46,470 4 190/3 Concrete m3 35,110 113 3,970/4 Reinforcing bar t 1,756 813 1,430/5 Gate, radial t 170 18,600 3,160/6 Excavation, fore bay m3 183,000 5 920
Sub Total A 11,180B Closure dike
/1 Filling, for dike m3 47,320 6 280/2 Steel sheet pile t 4,452 1,200 5,340/3 Concrete, capping m3 3,300 13 40/4 Reinforcing bar t 165 813 130
Sub Total B 5,790C Overflow dike
/1 Excavation m3 20,000 3 60/2 Concrete m3 5,000 113 570
Sub Total C 630D Sub total, A to C 17,600E Other works (35% of D) 6,160F Sub total, D to E 23,760G Temporary works (10% of F) 2,380H Direct construction cost 26,140
( Total F and G)
II Government administration and Engineering service cost 3,920(15% of H)
III Pysical contingency 6,010(20% of I and II)
Grand Total 36,070Source: JICA Study Team
Unit Cost Cost(US$) (US$, thousand)
I Diect costA Equipment
/1 Cutter-suction dredger, 600PS nr. 1 2,969,200 2,970B Other equipments (15% of A) 446C Direct construction cost 3,416
( Total A and B)II Pysical contingency 170
(5% of I )
Grand Total 3,586Source: JICA Study Team
Table 11.4.3 Project Cost of Sediment Storage Reservoir with New Gates
Unit QuantityDescriptionNo.
Table 11.4.4 Procurement Cost of Dredger
No. Description Unit Quantity
Tabel 11.4.3 Biaya Konstruksi Waduk Penampung Sedimen Dengan Pintu-pintu Baru
Tabel 11.4.4 Biaya Pengadaan Mesin Pengeruk
T-16
Tab
le 1
1.4.
5 P
roje
ct C
ost b
y W
ater
shed
Con
serv
atio
n
Uni
tE
ntir
e ba
sinK
udua
ngT
irto
moy
oT
emon
Upp
er S
olo
Ala
ngN
gung
gaha
nW
urya
ntor
oR
emna
ntC
ost
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
Q'ty
Am
ount
($)
($, t
hous
.)($
, tho
us.)
($, t
hous
.)($
, tho
us.)
($, t
hous
.)($
, tho
us.)
($, t
hous
.)($
, tho
us.)
($, t
hous
.)I.
Con
stru
ctio
n co
st1.
Land
pre
para
tion
1)Te
rrac
ing
(1)
Cut
ting
and
fillin
gm
30.
6922
,224
,000
15,3
355,
269,
000
3,63
64,
675,
000
3,22
61,
073,
000
740
5,58
8,00
03,
856
2,52
1,00
01,
739
1,51
2,00
01,
043
936,
000
646
650,
000
449
2)W
ater
way
and
dro
p(1
)St
one
mat
eria
lm
38.
4816
4,00
01,
391
45,0
0038
239
,000
331
8,00
068
38,0
0032
215
,000
127
9,00
076
6,00
051
4,00
034
(2)
Exca
vatio
nm
30.
5819
1,00
011
162
,000
3636
,000
2110
,000
637
,000
2119
,000
119,
000
511
,000
67,
000
4(3
)M
ason
ry w
ork
m3
10.6
414
9,00
01,
585
41,0
0043
636
,000
383
7,00
074
34,0
0036
213
,000
138
8,00
085
6,00
064
4,00
043
3)Li
p an
d riz
er, p
lant
ing
(1)
Seed
ling,
gra
ss, f
or li
pnr
.0.
0130
4,73
1,00
03,
047
86,1
07,0
0086
170
,106
,000
701
15,3
97,0
0015
468
,341
,000
683
28,0
70,0
0028
116
,178
,000
162
12,2
13,0
0012
28,
319,
000
83(2
)Se
edlin
g, sh
rub,
for l
ipnr
.0.
0718
,284
,000
1,28
05,
166,
000
362
4,20
6,00
029
492
4,00
065
4,10
1,00
028
71,
684,
000
118
971,
000
6873
3,00
051
499,
000
35(3
)Se
edlin
g, g
rass
, for
rise
rnr
.0.
0015
432,
330,
000
648
119,
414,
000
179
103,
112,
000
155
21,3
34,0
0032
98,9
13,0
0014
838
,625
,000
5822
,905
,000
3416
,181
,000
2411
,846
,000
18(4
)Pl
antin
g w
ork,
for l
ipm
0.01
91,4
20,0
0091
425
,833
,000
258
21,0
32,0
0021
04,
619,
000
4620
,502
,000
205
8,42
1,00
084
4,85
3,00
049
3,66
4,00
037
2,49
6,00
025
(5)
Plan
ting
wor
k, fo
r ris
erm
20.
0286
,466
,000
1,72
923
,883
,000
478
20,6
22,0
0041
24,
267,
000
8519
,783
,000
396
7,72
5,00
015
54,
581,
000
923,
236,
000
652,
369,
000
472.
Side
ditc
hes (
hous
ing
yard
)1)
Side
ditc
h(1
)St
one
mat
eria
lm
38.
4837
,000
314
20,0
0017
07,
000
591,
000
85,
000
421,
000
81,
000
81,
000
81,
000
8(2
)Ex
cava
tion
m3
0.58
53,0
0031
28,0
0016
11,0
006
2,00
01
7,00
04
2,00
01
1,00
01
1,00
01
1,00
01
(3)
Mas
onry
wor
km
310
.64
33,0
0035
118
,000
192
7,00
074
1,00
011
4,00
043
1,00
011
1,00
011
1,00
011
--
2)H
edge
row
(1)
Shru
b, fo
r hed
ge ro
wnr
.0.
078,
346,
000
584
4,44
2,00
031
11,
690,
000
118
282,
000
201,
130,
000
7930
4,00
021
221,
000
1518
9,00
013
90,0
006
(2)
Plan
ting
wor
k, h
edge
row
m2
0.02
1,04
3,00
021
555,
000
1121
1,00
04
35,0
001
141,
000
338
,000
128
,000
124
,000
-11
,000
-3.
Agr
o-fo
rest
ry a
nd a
nnua
l cro
p1)
Agr
o-fo
rest
ry a
nd a
nnua
l cro
pL.
S10
,093
3,12
52,
033
538
2,08
599
252
152
727
24.
Supp
ort p
rogr
am1)
Supp
ort p
rogr
amL.
S2,
974
981
595
149
595
268
149
149
90
Sub-
tota
l for
I.40
,408
11,4
348,
622
1,99
89,
131
4,01
32,
320
1,77
51,
115
II.
Gov
ernm
ent a
dmin
istra
tion
and
engi
neer
ing
serv
ice
cost
10%
4,04
11,
143
862
200
913
401
232
178
112
(10%
of I
.)
III.
Phys
ical
con
tinge
ncy
10%
4,44
51,
258
948
220
1,00
444
125
519
512
3(1
0% o
f tot
al o
f I. a
nd II
.)
Proj
ect C
ost (
tota
l of I
., II
. and
III
.)48
,894
13,8
3510
,433
2,41
811
,049
4,85
62,
807
2,14
81,
349
Sour
ce:
JIC
A S
tudy
Tea
m
Uni
tIt
em
Tabe
l 11.
4.5
Bia
ya K
onst
ruks
i Pro
yek
Kon
serv
asi D
AS
T-17
Project Name: Construction of Sediment Storage Reservoir with New Gates in the Wonogiri ReservoTarget Area: In/around the Wonogiri Reservoir Project Period: 4 years
Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions
Overall Goal
Project Purpose
Outputs
Activities Inputs
Pre-conditions
Source: JICA Study Team
Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.
1)Decreasing ration of theeffective storage volume in thereservoir
2) Water supply to the Wonogiriirrigation area
Reservoirsedimentationsurvey andmonitoring ofwater supply
There will be no drastic change inreservoir management policy ofGovernment of Indonesia
1) The existing intake structurewill be completely reloevedfrom the sediment and garbageinflow from the Keduang River.
2) Majority of sediment andgarbage from the KeduangRiver will released from thenew gates to the vdownstreamreach from the dam.
1) Sediment deposition level atthe intake (every 2 month)
2) Frequency of interruption ofpower generation and watersupply
3) Volume of released sedimentfrom the new gates
1) Echo soundingsurvey at theintake
2) Operationrecord of powergeneration andwater supply
1) PJT I Bengawan Solo will operate thesediment storage reservoir according tothe new operation rule.
2) PJT I Bengawan Solo will conductsedimentation survey at the intakeperiodically.
Janapnese side:Funding assistance for construction of the sedimentstorage reservoir with new gates
Indonesian side:Government administrationAllocation of proper O&M cost by PJT I BengawanSolo
Sediment storage reservoir withnew gates will be constructed inthe Wonogiri reservoir.
Construction of:1) Sediment stodrage reservoirwith new gates in the Wonogirireservoir,2) Closure and overflow dikes
Socialization of downstreamresidents (stakeholders) for theconstruction
1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.3) Water quality of the downstreamreach is not drastically deteriorated.
Construction cost does not increasedrastically.
Visible confirmation Surver recordProgress report,completion reportand evaluationreport of theconstruction stage
1) The sediment storage reservoir willbe operated according to the reservoiroperation rule and maintained properly.
2) Maintenance dredging at the intakewill be conducted periodically.
Tabel 11.5.4 PDM Penanganan Mendesak (1/2)
T-18
Project Name: Watershed Conservation in Keduang River CatchmentTarget Area: Keduang River Watershed Project Period: 3 years
Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions
Overall Goal
Project Purpose
Outputs
Activities Inputs
Pre-conditions
Source: JICA Study Team
Janapnese side:Funding assistance for implementation of watershedconservation
Indonesian side:Government administrationTechnical and financial support program for landmanagement and agricultural promotion
In the watershed of Keduangriver,1) K2TAs will be established inthe selected area.2) Farmers understandings onthe importance of land andwater conservation will bedeepened in the selected areas.3) Demonstration plots will beprepared and managed by thekey farmers.4) 11,260 ha of upland fieldwill be rehabilitated throughparticipation of farmers.5) Agro-forestry will bedeveloped and applied in theselected area.
1) Formulation of K2TA2) Farmer training on: -Land & water conservation -Terrace formation,improvement and rehabilitation -Agro-forestry development3) Making demonstration plot4) Farm input supply5) Labor cost subsidy6) Field staff training on soil &water conservation
1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.
1) Cost of the farm input and thematerials for terrace rehabilitation donot change dramatically.2) Needs of upland farmer is notchanged.
1) Estbalishment of committeeanf farmer groups2) Progress of project works andsupporting program3) Record of demonstration plots4) Number of participants forthe works and supportingprogram5) Change of land use, croppingpattern, terrace improvement,framing practices, etc.6) Change of income ofvillage/groups7) No. of request and discussionwith the executing agency8) Change of the project plan
1) Surver report
2) Record ofweekly andmonthly meeting(monitoring onmembers
3) Monitoringsurver
1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.
2) Cooperation of line agenciesconcerned does not chgane drastically.
1) Annual sediment inflow fromthe Keduang River will bereduced from 1.22 million m3to 0.80 million m3.
2) Agricultural productivity willbe increased with provision ofnext generation of farmers withresources of anotheragricultural income.
1) Sediment deposition in thereservoir (every 3 year)
2) Increase of agriculturalproductivity
3) Balance of cash flow offarmers
1) Echo soundingsurvey in thereservoir
2) Operationrecord of powergeneration andwater supply
1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.
2) Cooperation efforts of line agenciesconcerned does not chgane drastically.
3) Aspiration of local farmers tomaintain the rehabilitated terrace doesnot change drastically.
Table 11.5.4 PDM of Urgent Countermeasures (2/2)
Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.
1)Decreasing ration of theeffective storage volume in thereservoir2) Water supply to the Wonogiriirrigation area
Reservoirsedimentationsurvey andmonitoring ofwater supply
There will be no drastic change inreservoir management policy ofGovernment of Indonesia
Tabel 11.5.4 PDM Penanganan Mendesak (2/2)
T-19
Project Name: Watershed Conservation in Other River catchmentsTarget Area: Watershed of Other Rivers Project Period: 6 years
Narrative Summary Verifiable Indicators Means ofVerification Important Assumptions
Overall Goal
Project Purpose
Outputs
Activities Inputs
Pre-conditions
Source: JICA Study Team
Janapnese side:Funding assistance for implementation of watershedconservation
Indonesian side:Government administrationTechnical and financial support program for landmanagement and agricultural promotion
In the watershed of othertributaries,1) K2TAs will be established inthe selected area.2) Farmers understandings onthe importance of land andwater conservation will bedeepened in the selected areas.3) Demonstration plots will beprepared and managed by thekey farmers.4) 23,120 ha of upland fieldwill be rehabilitated throughparticipation of farmers.5) Agro-forestry will bedeveloped and applied in theselected area.
1) Formulation of K2TA2) Farmer training on: -Land & water conservation -Terrace formation,improvement and rehabilitation -Agro-forestry development3) Making demonstration plot4) Farm input supply5) Labor cost subsidy6) Field staff training on soil &water conservation
1) The watershed condition does notchange drastically from the condition in2006.2) The demand of water supply from thereservoir does not change drastically.
1) Cost of the farm input and thematerials for terrace rehabilitation donot change dramatically.2) Needs of upland farmer is notchanged.
1) Estbalishment of committeeanf farmer groups2) Progress of project works andsupporting program3) Record of demonstration plots4) Number of participants forthe works and supportingprogram5) Change of land use, croppingpattern, terrace improvement,framing practices, etc.6) Change of income ofvillage/groups7) No. of request and discussionwith the executing agency8) Change of the project plan
1) Surver report
2) Record ofweekly andmonthly meeting(monitoring onmembers
3) Monitoringsurver
1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.
2) Cooperation of line agenciesconcerned does not chgane drastically.
1) Annual sediment inflow fromother tributaries will be reducedfrom 1.96 million m3 to 1.04million m3.
2) Agricultural productivity willbe increased with provision ofnext generation of farmers withresources of anotheragricultural income.
1) Sediment deposition in thereservoir (every 3 year)
2) Increase of agriculturalproductivity
3) Balance of cash flow offarmers
1) Echo soundingsurvey in thereservoir
2) Operationrecord of powergeneration andwater supply
1) Aspiration of local farmers toparticiaprte in the watershedconservation does not changedrastically.
2) Cooperation efforts of line agenciesconcerned does not chgane drastically.
3) Aspiration of local farmers tomaintain the rehabilitated terrace doesnot change drastically.
Table 11.5.5 PDM of Mid Term Countermeasures
Long-term ability of theWonogiri reservoir functionwill be secured for 100 years.
1)Decreasing ration of theeffective storage volume in thereservoir2) Water supply to the Wonogiriirrigation area
Reservoirsedimentationsurvey andmonitoring ofwater supply
There will be no drastic change inreservoir management policy ofGovernment of Indonesia
Tabel 11.5.5 PDM Penanganan Jangka Menengah
T-20
(Unit:US$ thousand)
Countermeasures Total Cost /Financial
Total Cost /Economic Conversion Factor
1. Urgent Countermeasures for Garbage and SedimentInflow from Keduang River
a. Sediment Storage Reservoir with New Gates 36,070 25,610 0.71
b. Watershed Conservation in Keduang Catchment 13,835 12,778 (Total works both by government andbeneficiary) x CF
c. Procurement of One Dredger 3,586 3,586 1.00
Sub-total 53,491 41,974
2.Mid Term Countermeasures for Sediment Inflowfrom Other Tributaries
d. Watershed Conservation in Ohter Basins 35,060 36,134 (Total works both by government andbeneficiary) x CF
Grand Total 88,551 78,108
(Unit:US$ thousand)
O&M Total OM Cost/Financial
Total OM Cost /Economic Conversion Factor
a. Sediment Storage Reservoir with New Gates 14 11 0.8
b. Watershed Conservation in Keduang Catchment 5 4 0.8
c. Procurement of One Dredger 59 47 0.8
d. Watershed Conservation in Ohter Basins 16 13 0.8
Grand Total 94 75
Source: JICA Study Team
Table 11.6.2 Economic Cost of Proposed Projects in Master Plan
Tabel 11.6.2 Biaya Ekonomi Pada Usulan Proyek untuk Rencana Induk
T-21
Total Financial Econimic Economic EconomicProject Work Unit Cost Factor* Unit Cost Cost
(1,000) ($) ($) (1,000$)(I) Direct Cost1. Land preparation
1) Terracing unit:(1) Cutting and filling m3 22,224 0.92 0.75 0.69 15,335
2) Waterway and drop(1) stone material m3 164 8.48 0.90 7.632 1,252(2) Excavation work m3 191 0.78 0.75 0.585 112(3) Masonry work m3 149 14.23 0.75 10.6725 1,590
3) Lip and rizer, planting(1) Seedling, grass for lip nr. 304,731 0.01 0.90 0.009 2,743(2) Seedling, shrub for lip nr. 18,284 0.07 0.90 0.063 1,152(3) Seedling, grass, for rizer nr. 432,330 0.0015 0.90 0.00135 584(4) Planting work, for lip m 91,420 0.02 0.75 0.012 1,097(5) Planting work, for rizer m2 86,466 0.04 0.75 0.03 2,594
2. Side diches (for housing yard)1) Side ditch
(1) Stone material m3 37 8.48 0.90 7.632 282(2) Excavation work m3 53 0.78 0.75 0.585 31(3) Masonry work m3 33 14.23 0.75 10.6725 352
2) Headgerow(1) Shrub, for hedger row nr. 8,346 0.07 0.90 0.063 526(2) planting work, hedge row m2 1,043 0.04 0.75 0.03 31
3. Agro-forestry and annual crops1) Agro-forestry and annual crops Ls 10,093 0.90 9,084
4. Support program1) Support program Ls 4894 0.90 4,405Total direct cost 41,168
(II) Government Admnistration and Engineering cost(10% of total direct cost) 0.90 3,705
(II) Pysical Contingency(10% of total cost of I andII) 0.90 4,039Total economic cost 48,912
*: Conversion factor of unskilled labor: 0.75, Standard conversion factor for materials:0.9Source: JICA study team
Table 11.6.3 Economic Project Cost in the Wonogiri Watershed Conservation Project
Items
Tabel 11.6.3 Biaya Proyek secara Ekonomi dalam Proyek Konservasi DAS Wonogiri
T-22
Tabel 11.6.8 RangkumanHarga Crop Input dan Output (Harga Rp. 2005)
Item Unit FinancialPrice 2005 CF Economic
Price1. OutputsRice (Mentik) Rp./kg 3,100 2,780 Green bean Rp./kg 4,500 Soybean Rp./kg 2,250 2,740 Ground bean Rp./kg 7,000 Cassava Rp./kg 500 (Tolo) Rp./kg 2,500 Kacang panjang 2,000
2. InputsFertilizer
Urea Rp./kg 1,500 2,698 Triple Superphosphate (TSP) Rp./kg 1,800 1,798
Potassium Chloride (KCL) Rp./kg 3,000 1,465 Other Inputs
Wet grain of rice Rp./kg 1,400 0.9 1,260 Contract Mechanical Operations
Land Preparation Rp./ha 300,000 0.75 225,000 Agricultural Labor
Person md 25,000 0.75 18,750
World Bank Commodity Price Projections, May 2000BPS Kabupaten Sukoharjo; village administration (desa Pringanom/ kecamatan Masaran/ kabupaten Sragen); February 2006
T-23
Commodity Rice SoybeanExport/ Import Substitute Imported ImportedMarket Product Location Thailand FOB US Gulf Port, RotterdamQuality of Marker Product 5% broken
2005 2005USD/tonIndicator Price = 308.2 227.6Quality Differential x 0.90 1.00Equivalent Value of Indoneisan Product = 277.4 227.6Freight and Insurance Cost to Semarang + 25.0 40.0Value at Indonesian Port = 302.4 267.6Rp./kg(exchange rate) 10,035 10,035Value at Indonesian Port = 3,034 2,685Port Handling Charges, Storage and Loss + 118 104Internal Handlihg/ Transport Cost - Near Port + 15 15Value at Wholesale Market = 3,167 2,804Transport Costs, Local to Wholesale Market - 36 38Dealer Handling and Processing Costs - 28 13Value at Local Market/ Processor/ Mill = 3,103 2,753Milling Cost - 310Transport Cost-Fargate to Local Market/ Mill - 13 13Value at Farmgate = 2,780 2,740
Commodity UreaExport/ Import Substitute ExportedMarket Product Location Northern EuropeQuality of Marker Product
2005USD/tonIndicator Price = 109.2Quality Differential x 1.10Equivalent Value of Indoneisan Product = 120.1Freight and Insurance Cost + 30.0Value at Indonesian Port = 150.1Rp./kg(exchange rate) 10,035Value at Indonesian Port of Exit Palembang = 1,506Internal Handling Charges/ Transport to Central Java + 30
Value at Wholesale Market = 1,536Transport Costs, Wholesale to Farmgate + 40Value at Farmgate (fertilizer) = 1,576Value at Farmgate (nutrient) = 2,698
Commodity TSP KCLTriple Superphosphate Potassium Chloride
Export/ Import Substitute Imported ImportedMarket Product Location Northern Europe/ Florida Northern Europe, CanadaQuality of Marker Product
2005 2005USD/tonIndicator Price = 145.7 113.8Quality Differential x 1.00 1.00Equivalent Value of Indoneisan Product = 145.7 113.8Freight and Insurance Cost + 20.0 20.0Value at Indonesian Port = 165.7 133.8Rp./kg(exchange rate) 10,035 10,035Value at Indonesian Port of Entry = 1,663 1,343Port Charges + 65 52Internal Handling/ Transport Costs - Near Port + 30 30Value at Wholesale Market = 1,758 1,425Transport Costs, Wholesale to Farmgate + 40 40Value at Farmgate (fertilizer) = 1,798 1,465Source: World Bank Commodity Price Projections, May 2000
Table 11.6.9 Border Parity Prices of Crops; Constant 2005 Economic Prices, USD per ton, Rp. per kg
Tabel 11.6.9 Batas Paritas Harga Crops; Constant 2005 Economic Prices, US$ per ton, Rp. per kg
T-24
Crop Budget per Ha, Present Condition/ Financial Price
Quantity Unit rate [Rp.] ['000Rp.] [USD] Quantity Unit rate [Rp.] ['000Rp.] [USD]1. Crop Yield t/ha 5.5 1.52. Unit Price Rp./kg 3,100 2,2503. Gross Return 000Rp. 17,050 1,699 3,375 3364. Production Cost 000Rp. 3,679 367 2,317 231 Farm Inputs Seed kg/ha 30 1,400 42 60 3,200 192 Fertilizer/ Agro-chemical Urea kg/ha 225 1,500 338 100 1,500 150 TSP kg/ha 150 1,800 270 50 1,798 90 KCL kg/ha 100 3,000 300 ZA kg/ha 100 1,500 150 Insecticide kg 2.9 100,000 290 3.5 100,000 350 Hired Labor md 72 25,000 1,800 45 25,000 1,125 Family Labor md 73 45 Land Preparation cost Rp./ha 1 300,000 300 1 300,000 300 Miscellaneous 5% 189 5% 1105. Net Return 000Rp. 13,371 1,332 1,058 105Source: Technical Report for Wonogiri Irrigation Project, 2000 updated with 2005 commodity prices (originally based on F/S 1976)Exchange rate (Dec.2005): 1 USD = 10,035 Rp.
Crop Budget per Ha, Present Condition/ Economic Price
Quantity Unit rate [Rp.] ['000Rp.] [USD] Quantity Unit rate [Rp.] ['000Rp.] [USD]1. Crop Yield t/ha 5.5 1.52. Unit Price Rp./kg 2,780 2,7403. Gross Return 000Rp. 15,290 1,524 4,111 4104. Production Cost 000Rp. 3,211 320 2,012 201 Farm Inputs Seed kg/ha 30 1,260 38 60 2,880 173 Fertilizer/ Agro-chemical Urea kg/ha 225 2,698 607 100 2,698 270 TSP kg/ha 150 1,798 270 50 1,798 90 KCL kg/ha 100 1,465 146 ZA kg/ha 100 1,500 150 Insecticide kg 2.9 90,000 261 3.5 90,000 315 Hired Labor md 72 18,750 1,350 45 18,750 844 Family Labor md 73 45 Land Preparation cost Rp./ha 1 225,000 225 1 225,000 225 Miscellaneous 5% 164 5% 965. Net Return 000Rp. 12,080 1,204 2,098 209Source: Technical Report for Wonogiri Irrigation Project, 2000 updated with 2005 commodity prices (originally based on F/S 1976)Exchange rate (Dec.2005): 1 USD = 10,035 Rp.
p g p
SoybeansPaddy (Dry Season I & II)
Paddy (Dry Season I & II) Soybeans
Unit
Unit
Tabel 11.6.10 Rencana Anggaran Tanaman Pertanian per Ha
T-25
1. Target agricultural activities Crop sub-sector in upland field2. Farm size of typical farm Upland field: net cultivable area 0.5 ha/farm3. Duration of analysis 15 years4. Current cropping pattern
MT I: maize (hybrid; intensity 100%) + cassava (intensity 20%)MT II: groundnut (intensity 40%) + cassava (intensity 20%)MT III: cassava (intensity 20%)
MT I: maize (composite; intensity 100%) + cassava (intensity 20%)MT II: groundnut (intensity 40%) + cassava (intensity 20%)MT III: cassava (intensity 20%)
5. With-project cropping pattern(1) Slope Class: 0 - 8% 1st to 4th year
Typical Farm A-1 MT I: maize (hybrid; 100%) + cassava (20%) + tree crops (5%)MT II: groundnut (intensity 40%) + cassava (20%) + tree crops (5%)MT III: cassava (20%) + tree crops (5%)5th year & afterMT I: maize (hybrid; 95%) + cassava (20%) + tree crops (5%)MT II: groundnut (40%) + cassava (20%) + tree crops (5%)MT III: cassava (20%) + tree crops (5%)
(2) Slope Class: > 8 - 15% 1st to 4th yearTypical Farm A-2 MT I: maize (hybrid; 100%) + cassava (15%) + tree crops (13%)
MT II: groundnut (40%) + cassava (15%) + tree crops (13%)MT III: cassava (15%) + tree crops (13%)5th year & afterMT I: maize (hybrid; 87%) + cassava (10%) + tree crops (13%)MT II: groundnut (40%) + cassava (10%) + tree crops (13%)MT III: cassava (10%) + tree crops (13%)
(3) Slope Class: > 15 - 25% 1st to 4th yearTypical Farm A-3 MT I: maize (hybrid; 90%) + cassava (10%) + tree crops (25%)
MT II: groundnut (40%) + cassava (10%) + tree crops (25%)MT III: cassava (10%) + tree crops (25%)5th year & afterMT I: maize (hybrid; 75%) + medical crop (10%) + tree crops (25%)MT II: groundnut (30%) + medical crop (10%) + tree crops (25%)MT III: tree crops (25%)
(4) Slope Class: > 25 - 40%Typical Farm B-1 MT I: maize (hybrid; 75%) + cassava (5%) + tree crops (38%)
MT II: groundnut (30%) + cassava (5%) + tree crops (38%)MT III: cassava (5%) + tree crops (38%)5th year & afterMT I: maize (hybrid; 62%) + medical crop (10%) + tree crops (38%)MT II: groundnut (30%) + medical crop (10%) + tree crops (38%)MT III: tree crops (38%)
(5) Slope Class: > 40% 1st to 4th yearTypical Farm B-2 MT I: maize (hybrid; 60%) + tree crops (50%)
MT II: groundnut (30%) + tree crops (50%)MT III: tree crops (50%)5th year & afterMT I: Maize (hybrid;50%), tree crops (50%) + medicinal crop (20%)MT II: Groundnut (30%), tree crops (50%) + medicinal crop (20%)MT III: tree crops (50%)
Source: JICA Study Team
Assumptions Applied for Analysis
1st to 4th year
Item
Pattern for uplands with slope classes of 0 ~ 25%
Pattern for uplands with slope classes of above 25%
Tabel 11.6.13 Asumsi Penerapan Pola Tanam
T-26
Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (1/3)
0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.01 2.70 2.01 1.05 0.20Net retun (Rpmillion) 8,900 18,913 13,531 5,491 1,104 47,939Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,275 486 (4,590) (5,365) (10,927) (19,120)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 4,184 4,415 31,138Net return/ha (Rp million) 3.06 2.84 2.27 1.42 0.73Net retun (Rpmillion) 9,047 19,894 15,282 5,941 3,223 53,387Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 68,023Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,423 1,467 (2,840) (4,915) (8,808) (13,672)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.05 2.81 2.22 1.34 0.62Net retun (Rpmillion) 9,018 19,683 14,945 7,008 3,422 54,076Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 68,712Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,394 1,257 (3,176) (3,848) (8,609) (12,983)Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.15 3.08 2.73 2.12 1.65Net retun (Rpmillion) 9,313 21,575 18,378 11,087 9,107 69,460Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 84,097Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,689 3,148 257 231 (2,924) 2,401Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.09 2.88 2.75 2.52 2.60Net retun (Rpmillion) 9,136 20,174 18,513 13,179 14,350 75,352Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 89,988Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,512 1,747 392 2,323 2,319 8,293
Slope Class1s
t yea
r
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ct c
ondi
tion
Com
posi
teTe
rrac
e
deve
lopm
ent
year
2nd
year
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ct c
ondi
tion
Com
posi
teTe
rrac
e
3rd
yea
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
4th
year
a
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
5th
year
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
T-27
Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (2/3)
0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.18 3.10 3.18 3.17 3.46Net retun (Rpmillion) 9,402 21,715 21,408 16,579 19,097 88,200Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 102,836Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,778 3,288 3,286 5,722 7,066 21,141Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.24 3.27 3.51 3.67 4.11Net retun (Rpmillion) 9,580 22,906 23,629 19,193 22,684 97,992Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 112,628Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 1,955 4,479 5,508 8,337 10,653 30,933Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.30 3.42 3.50 3.81 4.09Net retun (Rpmillion) 9,757 23,956 23,562 19,926 22,574 99,775Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 114,411Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,133 5,529 5,441 9,070 10,543 32,715Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.36 3.58 4.10 4.57 5.30Net retun (Rpmillion) 9,934 25,077 27,601 23,900 29,252 115,765Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 130,401Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,310 6,650 9,480 13,044 17,221 48,706Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.42 3.72 4.37 4.98 5.84Net retun (Rpmillion) 10,112 26,058 29,419 26,045 32,232 123,865Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 138,501Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,488 7,631 11,297 15,188 20,202 56,806
deve
lopm
ent
year
Slope Class6t
h ye
ar
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
7th
year
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
8th
year
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
9th
year
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
10th
yea
r
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
T-28
Tabel 11.6.14 Keuntungan Total secara Ekonomi dari DAS Wonogiri (3/3)
0-8 % 8-15 % 15-25 % 25-40 % ove 40 TotalGross area (ha) 3,017 7,532 7,564 6,301 7,359 31,773Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.47 3.87 4.36 5.11 5.81Net retun (Rpmillion) 10,260 27,108 29,351 26,724 32,067 125,511Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 140,147Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,636 8,682 11,230 15,868 20,036 58,451Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.48 3.89 4.69 5.47 6.48Net retun (Rpmillion) 10,289 27,249 31,573 28,607 35,765 133,482Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 148,119Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,665 8,822 13,452 17,751 23,734 66,423Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.50 3.93 4.78 5.60 6.65Net retun (Rpmillion) 10,348 27,529 32,179 29,287 36,703 136,046Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 150,682Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,724 9,102 14,058 18,431 24,672 68,987Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.51 3.97 4.85 5.71 6.80Net retun (Rpmillion) 10,378 27,809 32,650 29,862 37,531 138,230Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 152,866Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,754 9,382 14,529 19,006 25,500 71,171Gross area (ha) 3,017 7532 7564 6301 7359 31,773Net area (ha) 2,957 7,005 6,732 5,230 5,519 31,138Net return/ha (Rp million) 3.51 3.97 4.85 5.71 6.80Net retun (Rpmillion) 10,378 27,809 32,650 29,862 37,531 138,230Gross area (ha) 1,659 3,163 3,404 3,024 3,385 14,636Net area (ha) 1,659 3,163 3,404 3,024 3,385 152,866Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 4,231 8,067 8,680 5,716 6,398 33,092Gross area (ha) 1,358 4,369 4,160 3,277 3,974 17,137Net area (ha) 1,330 4,063 3,703 2,720 2,980 50,229Net return/ha (Rp million) 2.55 2.55 2.55 1.89 1.89Net retun (Rpmillion) 3,393 10,360 9,442 5,140 5,633 33,967Benefit (Rp million) 2,754 9,382 14,529 19,006 25,500 71,171
Source: JICA Study Team
Slope Classde
velo
pmen
tye
ar11
th y
ear
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
eTe
rrac
e
With
out p
roje
ctco
nditi
on
12th
yea
r
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
15th
yea
r
with
pro
ject
cond
ition
Terr
ace
With
out p
roje
ctco
nditi
on Com
posi
teTe
rrac
e
13th
yea
r14
th y
ear
with
pro
ject
cond
ition
Com
posi
teTe
rrac
e
T-29
NPV 50.0 USD Million (12%)EIRR 16.4%
Unit:USD million
SedimentStorage
Reservoir
W/C inKeduang Dredger W/C in
Others
SedimentStorage
Reservoir
W/C inKeduang Dredger W/C in
Others
1 2010 -18.897 0.000 0.000 -0.385 -0.385 8.537 6.389 3.586 0.000 0.000 0.000 0.000 0.000 18.5122 2011 -15.128 0.002 0.017 -0.175 -0.156 8.537 6.389 0.000 0.000 0.000 0.000 0.047 0.000 14.9733 2012 -8.767 0.005 0.035 -0.219 -0.179 8.537 0.000 0.000 0.000 0.000 0.004 0.047 0.000 8.5884 2013 -8.527 0.010 0.076 -1.323 -1.237 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.000 7.2895 2014 -8.023 0.018 0.129 -0.867 -0.721 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3026 2015 -7.489 0.026 0.195 -0.408 -0.187 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3027 2016 -6.018 0.037 0.273 0.974 1.284 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3028 2017 -5.393 0.050 0.363 1.496 1.909 0.000 0.000 0.000 7.227 0.011 0.004 0.047 0.013 7.3029 2018 3.292 0.062 0.454 2.851 3.367 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07510 2019 4.326 0.074 0.545 3.782 4.401 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07511 2020 4.603 0.087 0.636 3.955 4.678 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07512 2021 6.083 0.099 0.726 5.332 6.158 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07513 2022 6.843 0.111 0.817 5.990 6.918 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07514 2023 51.202 5.409 39.710 6.158 51.277 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07515 2024 51.723 5.401 39.650 6.747 51.798 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07516 2025 51.842 5.393 39.590 6.934 51.917 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07517 2026 51.932 5.385 39.531 7.092 52.008 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07518 2027 51.865 5.377 39.471 7.092 51.940 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07519 2028 51.797 5.369 39.411 7.092 51.872 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07520 2029 51.729 5.360 39.351 7.092 51.804 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07521 2030 51.661 5.352 39.292 7.092 51.736 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07522 2031 51.593 5.344 39.232 7.092 51.668 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07523 2032 51.525 5.336 39.172 7.092 51.600 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07524 2033 51.457 5.328 39.112 7.092 51.532 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07525 2034 51.389 5.320 39.052 7.092 51.464 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07526 2035 51.321 5.312 38.993 7.092 51.397 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07527 2036 51.253 5.303 38.933 7.092 51.329 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07528 2037 51.186 5.295 38.873 7.092 51.261 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07529 2038 51.118 5.287 38.813 7.092 51.193 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07530 2039 51.050 5.279 38.754 7.092 51.125 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07531 2040 50.982 5.271 38.694 7.092 51.057 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07532 2041 50.914 5.263 38.634 7.092 50.989 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07533 2042 50.846 5.255 38.574 7.092 50.921 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07534 2043 50.778 5.246 38.515 7.092 50.853 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07535 2044 50.710 5.238 38.455 7.092 50.785 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07536 2045 50.642 5.230 38.395 7.092 50.717 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07537 2046 50.574 5.222 38.335 7.092 50.650 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07538 2047 50.506 5.214 38.275 7.092 50.582 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07539 2048 50.439 5.206 38.216 7.092 50.514 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07540 2049 50.371 5.198 38.156 7.092 50.446 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07541 2050 50.303 5.189 38.096 7.092 50.378 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07542 2051 50.235 5.181 38.036 7.092 50.310 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07543 2052 50.167 5.173 37.977 7.092 50.242 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07544 2053 50.099 5.165 37.917 7.092 50.174 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07545 2054 50.031 5.157 37.857 7.092 50.106 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07546 2055 49.963 5.149 37.797 7.092 50.038 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07547 2056 49.895 5.141 37.738 7.092 49.970 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07548 2057 49.827 5.132 37.678 7.092 49.903 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07549 2058 49.759 5.124 37.618 7.092 49.835 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.07550 2059 49.692 5.116 37.558 7.092 49.767 0.000 0.000 0.000 0.000 0.011 0.004 0.047 0.013 0.075
Source: JICA Study Team
IrrigationWaterSupply
TotalConstruction
YearNo B-CO/M
TotalWatershed
Conservation
Benefit Cost
HydropowerSupply
Tabel 11.6.16 Net Present Value (US$ 2005) dan Economic Internal Rate of Return
T-30
Rp. millionPlan
2003 2004 2005 2006I. REVENUES 3,282 5,397 6,101 6,250 A. Water Service 2,844 3,084 4,215 5,225 a. Hydropower generation (PLN) 1,361 1,062 1,507 1,968 b. Drinking water (PDAM) 43 151 162 239 c. Industries 1,440 1,871 2,546 3,018
B. Non-water Service 438 2,313 1,886 1,025 1 Tourism2 Equipment 409 2,278 1,787 950 3 Construction 4 Consultation5 Others 29 35 99 75
II. COSTS 2,985 4,755 4,995 5,545 a. O&M 882 1,314 1,490 1,525 b. Employment (officials) 1,230 1,513 2,036 2,250 c. Production services (bonus for employees) 99 149 170 d. General affairs 212 247 275 345 e. Transportation (field trips) 226 242 326 410 f. Services 87 924 g. Marketing 82 85 128 140 h. Depreciation 85 95 152 180 i. Supervisor board 124 82 j. Extension (dissemination of info) 26 24 k. Management 25 l. HR development 21 40
m. R&D 50 50 60 n. Watershed protection 10 15 65 150 o Non-water services 324 315
% O&M in total costs III. PROFIT/ LOSS 297 642 1,106 705 IV. INCOME (NON-OPERATIONAL) 347 379
1 Bank services 5 6 2 PGPS 342 373 3 Others
V. COSTS (NON-OPERATIONAL) 125 VI. PROFIT/ LOSS (NON-OPERATIONAL) 347 254
VII. PROFIT/ LOSS BEFORE TAX 644 896 1,106 705 12
VIII. INCOME TAX 189 267 1 Current tax 192 273 2 Outstanding tax -3 -6
IX.X.
XI. TAXXII. PROFIT/ LOSS AFTER TAX 455 629 1,106 705
Source: JICA Study Team
RealizationNo Income/ Loss