26
0 BAHAN INFORMASI PENANGANAN BENCANA GEMPA BUMI & TSUNAMI DI PROVINSI SULAWESI TENGAH Jakarta, 4 Oktober 2018

BAHAN INFORMASI PENANGANAN BENCANA GEMPA BUMI …fmb9.id/document/1538729081_PUPR.pdf · 1 4 fokus strategi tanggap darurat evakuasi korban bencana 1 pembersihan kota dari puing-puing

Embed Size (px)

Citation preview

0

B A H A N I N F O R M A S I

PENANGANAN BENCANA GEMPA BUMI & TSUNAMI DI PROVINSI SULAWESI TENGAH

J a k a r t a , 4 O k t o b e r 2 0 1 8

1

4 FOKUS S TRATEGI TANGGAP DARURAT

EVAKUASI KORBAN BENCANA

1 PEMBERSIHAN KOTA DARI PUING-PUING BANGUNAN RUNTUH

3

PENYEDIAAN PRASARANA & SARANA

AIR BERSIH & SANITASI

2PENYELESAIAN

MASALAH KONEKTIVITAS

4

2

1. Evakuasi Korban Bencana:

• Mobilisasi 13 unit excavator (5 unit di Balaroa, 7 unit di Petobo, dan 1 unit di Sigi), 1 unit wheel loader dan 1

unit bulldozer di Balaroa, 1 unit back hoe loader di Petobo, 2 unit dump truck (1 unit di Balaroa dan 1 unit di

Petobo), serta 1 unit rock breaker di Hotel Roa-Roa ;

• Tambahan 2 unit excavator dan 1 unit mobil crane dari Makassar sudah tiba di Palu (per 3/10);

• Upaya evakuasi bekerjasama dengan BASARNAS, PMI, TNI/POLRI, Pemerintah setempat dan masyarakat;

• Supply BBM dijamin oleh Depo Pertamina setempat.

2. Penyediaan Prasarana & Sarana Air Bersih dan Sanitasi:

a. Sumber Air Baku: Artesis & Sumur Bor di 8 lokasi (6 lokasi dengan genset dan 2 lokasi dengan solar cell);

b. Sumber Air Permukaan (Intake Jembatan Palu 2 dan Intake Jembatan Kasubi);

c. Sarpras yang dikirimkan dari Makasar (sudah tiba per 30/9) serta dari Surabaya dan Bekasi (dijadwalkan akan

tiba Kamis 4/10:

• 15 unit Mobil Tangki Air (3 unit sudah beroperasi);

• 26 unit HU kap. 2.000 lt (21 unit sudah terpasang);

• 49 unit WC Knock Down (15 unit mulai dipasang per 2/10);

• 34 Tenda Darurat (10 unit mulai didistribusikan per 2/10);

• 5 unit dump truck (3 unit sudah beroperasi);

• 3 unit Mobil IPA (2 unit sudah tiba dari Surabaya per 3/10), 4 unit Mobil Tinja;

• 3 unit Genset.

d. Sedang dilakukan pengecekan jaringan distribusi perpipaan air minum Kota Palu dan Kota Donggala.

Status: 3/10/18

4 FOKUS STRATEGI TANGGAP DARURAT

3

3. Pembersihan Kota dari Puing-Puing Bangunan Runtuh:

• Mobilisasi 5 unit excavator, 3 unit wheel loader, dan 5 unit dump truck (Jalan Juanda & Jalan Diponegoro)

pembersihan jalan dan penghamparan timbunan sirtu;

• Ditargetkan selesai paling lambat pertengahan Oktober 2018 (2 minggu).

4. Pemulihan Konektivitas:

a. Akses ke Kota Palu melalui Lintas Barat, Timur, dan Tengah telah terbuka semua:

• Lintas Barat Ruas Palu – Pel. Pantoloan – Tolitoli – Buol (± 546 km) dan Ruas Palu – Donggala – Pasangkayu

– Mamuju (± 420 km);

• Lintas Tengah Ruas Palu – Napu – Poso (± 427 km) dan Palu – Kebon Kopi – Parigi – Poso (± 220 km);

• Lintas Timur Ruas Palu – Kebon Kopi – Marisa – Gorontalo (± 607 km);

b. Perbaikan 2 jembatan rusak pada ruas jalan nasional di Towalen & Toboyo dan 1 Jembatan Kuning di Kota Palu;

Mengingat fungsi Jembatan Kuning sebagai ikon Kota Palu, jembatan ini akan ditangani Kementerian PUPR

diawali dengan pengecekan struktur jembatan dan desain ulang;

c. Perbaikan jalan-jalan kota yang retak/mencuat dengan pengupasan/scrapping dan patching. Mobilisasi alat

berat 8 unit excavator, 1 unit wheel loader, 5 unit dump truck dan 5 unit bulldozer.

Status: 3/10/18

4 FOKUS STRATEGI TANGGAP DARURAT

4

EVAKUAS I KORBAN BENCANA [ 1- 3]

• Mobilisasi 13 unit excavator (5 unit di Balaroa, 7 unit di Petobo, dan 1 unit di Sigi), 1 unit wheelloader dan 1 unit bulldozer di Balaroa, 1 unit back hoe loader di Petobo, 2 unit dump truck (1unit di Balaroa dan 1 unit di Petobo), serta 1 unit rock breaker di Hotel Roa-Roa ;

• Tambahan 2 unit excavator dan 1 unit mobil crane dari Makassar sudah tiba di Palu (per 3/10).

5

EVA K UA S I K ORBA N BENCA NA [ 2- 3 ]

E X C A V A T O R B E K E R J A U N T U K E V A K U A S I K O R B A N D I B A L A R O A

6

EVA K UA S I K ORBA N BENCA NA [ 3- 3 ]

R O C K B R E A K E R B E K E R J A U N T U K E V A K U A S I K O R B A N D I H O T E L R O A - R O A

7

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 1 - 8]

SUDAH BEROPERASI:

• 2 unit Mobil Tangki Air;• 17 unit HU kap. 2.000 lt;• 3 unit dump truck.

MULAI DIPASANG per 2/10:

15 unit WC knock down

MULAI DIDISTRIBUSIKAN per 2/10:

10 unit Tenda Darurat

8

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 2 - 8]

2 unit mobil IPA telah tiba dariSurabaya (per 3/10)

9

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 3 - 8]

D I S T R I B U S I A I R B E R S I H M E L A L U I 2 M O B I L T A N G K I A I R

10

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 4 - 8]

1. Lapangan Watulemo;2. Halaman Balai Kota;3. Bundaran Biromaru; 4. Bundaran STQ;5. Makorem;6. Mesjid Raya;7. Mako Sabara Paboya;8. Lapangan Anoa;9. Lapangan Perdos;10. Lapangan Dayodara;

11. GOR Siranindi;12. Kampung Siswa (Kel. Baiya);13. Kel. Pantoloan Boya;14. BTN Lasonni;15. Mako Sat Brimob Mamboro;16. Lapangan Bonjo Vera, Desa Loli

Saluran (Kab. Donggala) (2 unit);17. Lapangan Kawatuna (2 unit)18. Gedung RRI Palu (2 unit)

21 HU 2.000 ltSUDAH TERPASANG:

11

unit

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 5 - 8]

B A N T U A N A I R B E R S I H D I L A P A N G A N L O L I

12

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 6 - 8]

H I D R A N U M U M 2 . 0 0 0 L I T E R D I L A P A N G A N W A T U L E M O

13

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 7 - 8]

P E N G I S I A N H U 2 0 0 0 L D I D A E R A H D U Y U

14

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 8 - 8]

P E N G I S I A N A I R D I K E C A M A T A N B A L A R O A , K O T A P A L U B A R A T

15

P EMBERS I H AN KOTA DARI P UING BANGUNAN [ 1 - 3]

• Mobilisasi 5 unit excavator, 3 unit wheel loader, dan 5 unit dump truck (Jalan Juanda &Jalan Diponegoro) pembersihan jalan dan penghamparan timbunan sirtu;

• Ditargetkan selesai paling lambat pertengahan Oktober 2018 (2 minggu).

16

P E M B E R S I H A N J A L A N & P E N G H A M P A R A N T I M B U N A N S I R T U

P EMBERS I H AN KOTA DARI P UING BANGUNAN [ 2 - 3]

17

2 U N I T E X C A V A T O R & 1 U N I T C R A N ET E L A H T I B A D A R I M A K A S S A R D I P O S K O P A L U ( 3 / 1 0 )

P EMBERS I H AN KOTA DARI P UING BANGUNAN [ 3 - 3]

18

P ETA KONEKTIVIT AS

POSO

KOTA PALU

PARIGIDONGGALA

PASANGKAYU

TOLI TOLIBUOL

MARISA

KEBON KOPI

GORONTALO

MAMUJU

19

P EMUL IH AN KONEKTIVIT AS [ 1- 5]

P E M B E R S I H A N L O N G S O R A N T E B I N G P A S C A L O N G S O R A K I B A T G E M P A T E L A H T U N T A S

20

P EMUL IH AN KONEKTIVIT AS [ 2- 5]

K O N E K T I V I T A S D I K E B O N K O P I S U D A H P U L I H K E M B A L IP A S C A L O N G S O R A K I B A T G E M P A

21

P EMUL IH AN KONEKTIVIT AS [ 3- 5]

J A L U R L O G I S T I K D A R I A R A H G O R O N T A L O & P A R I G I S U D A H T E R B U K A V I A K E B O N K O P I

22

P EMUL IH AN KONEKTIVIT AS [ 4- 5]

P E M B E R S I H A N J A L A N P O R O S P A L U - D O N G G A L A

23

P EMUL IH AN KONEKTIVIT AS [ 5- 5]

P E R B A I K A N J E M B A T A N K U N I N G D I K O T A P A L U D I A W A L I D E N G A N P E N G E C E K A N S T R U K T U R & D E S A I N U L A N G

24

L AP ORAN KEJ ADIAN GEMP A & TS UNAMI

• Gempa pertama mengguncang Kab. Donggala pukul 14.00 WIB pada 28 September 2018 dengan kekuatanmagnitudo 6 SR pada kedalaman 10 km.

• Gempa kembali terjadi pukul 17:02 WIB dengan kekuatan yang lebih besar, yaitu 7,4 SR dengan kedalaman yang sama.

• Pukul 17:02 BMKG menyatakan status Siaga dan Waspada. Arti status Siaga, tinggi tsunami adalah 0,5-3 meter di pantai barat Donggala.

• Tsunami terjadi di Kota Palu dan Kab. Donggala pada Jumat, 28 September 2018. Sejumlah gempa susulan terusterjadi di kawasan tersebut hinggamalam hari.

• Korban meninggal akibat gempa dan tsunami 1.581 orang, 2.549 orang luka-luka, 113 orang dinyatakan hilang, dan sekitar 70.821 jiwa mengungsi di 141 titik

• 66.238 unit rumah warga RusakBerat/Roboh, Rusak Sedang (65.733 di Sulteng, 505 unit di Sulbar)

K R O N O L O G I S

25

TERIMA KASIH