Upload
dounia-el-khoudri
View
3
Download
0
Embed Size (px)
DESCRIPTION
gvvccx
Citation preview
RIG: TP184 DATE: 23/11/2011WELL: OKS #53
BILAN DE VOLUME, 7" CSG JOB CEMENTATION
1-Pomper 10m3 spacer .
Avant pompage du spacer Apres pompage du gasoil+ spacer
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 21.45 C1/C2 29.4R1 5.8 R1 5.8
TOTAL 27.25 TOTAL 35.2LOSS/GAIN 7.95
2- Avant pomper 14.48 m3 slurry d=2.06 sgApres pompage du slurry d=2.06 sg
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 29.4 C1/C2 43.5R1 5.8 R1 5.8
TOTAL 35.2 TOTAL 49.3LOSS/GAIN 14.1
3- Diplacement de cement avec 62.85 m3 de boue 2.02 sg
First Switsh
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 43.5 C1/C2 11.5R1 5.8 R1 35.8TOTAL 49.3 total 47.3
Displacement Volume 32
Second Switsh
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 10.5 C1/C2 32.8R1 35.8 R1 13.5TOTAL 46.3 total 46.3
Displacement Volume 22.3Third Switsh
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 32.8 C1/C2 25R1 13.5 R1 21.3TOTAL 46.3 total 46.3
Displacement Volume 7.8
Total Displacement Volume 62.1 m3
RIG: TP184 DATE: 14/11/2011WELL: OKS #53
BILAN DE VOLUME, 9"5/8 CSG JOB CEMENTATION
1-Pomper 10m3 spacer .
Avant pompage du spacer Apres pompage du gasoil+ spacer
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 18.5 26.45 C1/C2 26.45
TOTAL 18.5 TOTAL 26.45LOSS/GAIN 7.95
2-pomper m3 lead slurry d=1.29sgApres pompage du lead slurry d=1.30sg
vide (cm) vol(m3)vide (cm) vol(m3) D1/D2
D1/D2 C1/C2 33.9C1/C2 26.45 TOTAL 33.9
TOTAL 26.45 LOSS/GAIN 7.5
full return3-pomper 36.2 m3 tail slurry d=1.90sg Apres pompage du tail slurry d=1.90sg
vide (cm) vol(m3)D1/D2 27
vide (cm) vol(m3) C1/C2 56.4D1/D2 15.9 RC 11.9C1/C2 33.9 basp 36.9R 6.2 total 132.2basp 36.9 LOSS/GAIN 39.3total 92.9 full return
4- diplacement de cement avec 57m3 de boue 1.3sg Apres diplacementAvant diplacement
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 27 D1/D2 8.9C1/C2 56.4 C1/C2 14.8
RC RCbasp basp
R1 83.4 total 23.7displasment v 59.7
5- -pomper de cement avec 4m3 slurry d=1.90sg Apres diplacementAvant diplacement
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 8.9 D1/D2 9.3C1/C2 14.8 C1/C2 18.4
RC RCbasp basp
R1 23.7 total 27.7displasment v 4
6- diplacement de cement avec 28 m3 de boue 1.3sg Apres diplacementAvant diplacement
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 D1/D2C1/C2 C1/C2
RC 61.3 RC 36.8basp basp
R1 61.3 total 36.8displasment v 24.5
7- volume finale Apres diplacement
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 3 D1/D2 13.2C1/C2 10.3 C1/C2 35.3
RC 6.1 RC 36.9basp 36.9 basp 43.8
R1 56.3 total 129.2displasment v 72.9
8911792.5
13117.518500
58.7
-48.4
RIG: TP184 DATE: 18/02/2012WELL: OKS #54
BILAN DE VOLUME, 7"CSG JOB CEMENTATION
1-Pomper 02 m3 of diesel+ 07m3 spacer d=2.04sg .
Avant pompage du gasoil+ spacer Apres pompage du gasoil+ spacer
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 121/121 16 D1/D2 105/105 18.1C1/C2 134/134 27.5 C1/C2 110/110 33.9R1C1.2
TOTAL 43.5 TOTAL 52LOSS/GAIN 8.5
2-pomper 14.57 m3 slurry d=2.06sgApres pompage du slurry d=2.06sg
vide (cm) vol(m3)vide (cm) vol(m3) D1/D2 74/74 22.2
D1/D2 105/105 18.1 C1/C2 71/71 44.2C1/C2 110/110 33.9 TOTAL 66.4
TOTAL 52.00 LOSS/GAIN 14.4
4- diplacement de cement avec 58 m3 de boue 2.02 sg+1.6m3 d'eau Avant diplacement Apres diplacement
vide (cm) vol(m3) vide (cm) vol(m3)D1/D2 74/74 22.2 D1/D2 180/182 8.1C1/C2 71/71 44.2 C1/C2 186/69 30.8R1c1,2 205/205 10.5 R1c1,2 75/145 39.6Total 76.9 Total 78.5
displasment v 1.6 water
Sheet1Sheet1 (2)CMT 4.5 liner OKS-53