    Borneo & Sakhalin

    LNG

    Prepared by :

    Melly Chandra Frayekti

    Teknik Pengolahan Gas

    6512010015

  • 8/12/2019 Brunei & Sakhalin LNG

    2/18

    SHE-Q Moment

  • 8/12/2019 Brunei & Sakhalin LNG

    3/18

    Agenda

    Borneo LNG

    Sakhalin LNG

    Comparison

  • 8/12/2019 Brunei & Sakhalin LNG

    4/18

    Brunei LNG

    (Borneo LNG)

  • 8/12/2019 Brunei & Sakhalin LNG

    5/18

    Profile

  • 8/12/2019 Brunei & Sakhalin LNG

    6/18

    Overview Plant

  • 8/12/2019 Brunei & Sakhalin LNG

    7/18

    The BLNG Features

  • 8/12/2019 Brunei & Sakhalin LNG

    8/18

    The pre-cooling is carried out in core-

    in-kettle HE by propane, the

    liquefaction and sub-cooling are

    carried out in spiral-wound HE(proprietary of APCI) by the mixture

    of nitrogen-methane-ethane-propane

  • 8/12/2019 Brunei & Sakhalin LNG

    9/18

    Supporting Unit

    Eleven boilers generate the steam for the turbines, which

    drive the refrigerant compressors. Treated river water is used as cooling medium via an open

    recirculating cooling cycle.

    An open cooling water system in which 135,000 m/hr ofwater is being circulated, is used for heat extraction fromthe refrigeration and steam cycles.

    The energy consumption of the plant is the equivalent of a300 MW power station. It comes from steam boilers whichdrive the turbine compressor and generator turbines.

    The boilers are fired by fuel gas, accounting for about ninepercent of the plant's total intake. LNG that vaporisesduring storage and loading is recycled and compressed toform part of the fuel gas supply.

  • 8/12/2019 Brunei & Sakhalin LNG

    10/18

    SAKHALIN LNG

  • 8/12/2019 Brunei & Sakhalin LNG

    11/18

    Profile

  • 8/12/2019 Brunei & Sakhalin LNG

    12/18

    Overview Plant

  • 8/12/2019 Brunei & Sakhalin LNG

    13/18

    Process and Technology LNG

  • 8/12/2019 Brunei & Sakhalin LNG

    14/18

    The pre-cooling is carried out in

    spiral-wound HE by themixture of ethane-propane,

    the liquefaction and sub-

    cooling are carried out in

    spiral-wound HE by the

    mixture of nitrogen-methane-

    ethane-propane Pre-cooling section utilizing

    two-stage single casing

    centrifugal compressor which

    directly connected to frame 7

    gas turbine driver. Liquefaction

    using two centrifugalcompressors in series which

    directly connected to frame 7

    gas turbine driver

  • 8/12/2019 Brunei & Sakhalin LNG

    15/18

    Supporting Unit

    utility systems, including instrument air and

    nitrogen plants and diesel fuel systems;

    A wastewater treatment plant to treat both sewage

    water and coil-containing water.

    Five gas turbine-driven generators with a totalpower capacity of around 129 MW.

    The jetty is fitted with four armstwo loading

    arms, one dual purpose arm and one vapor return

    arm.

  • 8/12/2019 Brunei & Sakhalin LNG

    16/18

  • 8/12/2019 Brunei & Sakhalin LNG

    17/18

  • 8/12/2019 Brunei & Sakhalin LNG

    18/18

    Reference

    http://www.hydrocarbons-

    technology.com/projects/sakhalin2/

    http://www.bruneilng.com/about_theplant.htm

    http://www.hydrocarbons-technology.com/projects/sakhalin2/http://www.hydrocarbons-technology.com/projects/sakhalin2/http://www.bruneilng.com/about_theplant.htmhttp://www.bruneilng.com/about_theplant.htmhttp://www.bruneilng.com/about_theplant.htmhttp://www.hydrocarbons-technology.com/projects/sakhalin2/http://www.hydrocarbons-technology.com/projects/sakhalin2/http://www.hydrocarbons-technology.com/projects/sakhalin2/http://www.hydrocarbons-technology.com/projects/sakhalin2/